CN206784154U - A kind of pile-column bridge structure - Google Patents

A kind of pile-column bridge structure Download PDF

Info

Publication number
CN206784154U
CN206784154U CN201720541612.0U CN201720541612U CN206784154U CN 206784154 U CN206784154 U CN 206784154U CN 201720541612 U CN201720541612 U CN 201720541612U CN 206784154 U CN206784154 U CN 206784154U
Authority
CN
China
Prior art keywords
pile
downcomer
main body
bridge floor
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720541612.0U
Other languages
Chinese (zh)
Inventor
高军
林晓
李兰勤
史鹏飞
赵涛
盛永东
杨西
霍文龙
娄显军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720541612.0U priority Critical patent/CN206784154U/en
Application granted granted Critical
Publication of CN206784154U publication Critical patent/CN206784154U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of pile-column bridge structure, belongs to bridge construction field, including bridge floor main body and pile structure, and pile structure is connected to below bridge floor main body and supports bridge floor main body;Characterized in that, offering multigroup discharge structure in bridge floor main body, each group of discharge structure includes the osculum for being symmetrically set in bridge floor main body both sides;There is the downcomer in communicated drainage hole below bridge floor main body, downcomer extends to pile structure, it is disposed with drainpipe, drainpipe and downcomer along its short transverse in pile structure and is sealed by Rose Box and be connected, and Rose Box is detachably connected with drainpipe and downcomer;Rose Box is the body structure of both ends open, and the bottom of Rose Box has the screen pack through its cross section.This pile-column bridge structure has the characteristic of quick discharge ponding, ensure that the smooth of the vehicles passes through on bridge.

Description

A kind of pile-column bridge structure
Technical field
Bridge construction field is the utility model is related to, in particular to a kind of pile-column bridge structure.
Background technology
Pile-column bridge structure is one of infrastructure project important at present.Bridge structure often rides upon river, agriculture Field, the isostructural top of city main stem.The draining of bridge structure is a link important in bridge construction and design process, row Water-bound design is unreasonable to cause bridge floor to be submerged, and bridge is lost the function that is open to traffic.The row of bridge structure in the prior art Drainage facility design not enough in place, there is the danger for producing ponding.
Utility model content
The utility model provides a kind of pile-column bridge structure, it is intended to solves the above problems.
What the utility model was realized in:
A kind of pile-column bridge structure, including bridge floor main body and pile structure, the pile structure are connected to the bridge floor Below main body and the bridge floor main body is supported, the bridge floor main body both sides have the guardrail for being higher by the bridge floor body upper surface; Multigroup discharge structure is offered in the bridge floor main body, discharge structure described in each group includes being symmetrically set in the bridge floor main body two The osculum of side;There is the downcomer for connecting the osculum, the downcomer extends to the stake below the bridge floor main body Rod structure, drainpipe is disposed with along its short transverse in the pile structure, the drainpipe and the downcomer pass through filtering Case sealing is connected, and the Rose Box is detachably connected with the drainpipe and the downcomer;The Rose Box is both ends The body structure of opening, the bottom of the Rose Box have the screen pack through its cross section, the screen pack and the filtering Collection slag portion is formed between case top.
Preferably, the downcomer is L-type, and a part for downcomer fits in the bottom of the bridge floor main body, downcomer Another part fit in the surface of pile structure.
Preferably, the Rose Box and the downcomer are connected by clamping ring;The bottom inside of the downcomer has Downwardly projecting first boss, the inside top of the Rose Box have a second boss protruding upward, the first boss and Second boss is engaged to form seal groove;The inner side of the clamping ring has the sealing strip that width is less than the clamping ring, described Sealing strip is connected in the seal groove, and the both ends of the clamping ring are fixed by screw connected.
Preferably, the downcomer, the Rose Box are adopted made of plastic, and the clamping ring adopts made of plastic, institute Sealing strip is stated to be made of rubber.
The beneficial effects of the utility model are:The pile-column bridge structure that the utility model is obtained by above-mentioned design has The characteristic of quick discharge ponding, it ensure that the smooth of the vehicles passes through on bridge.
Brief description of the drawings
Fig. 1 is the structural representation of pile-column bridge structure provided by the utility model;
Fig. 2 is the structural representation of Rose Box in pile-column bridge structure provided by the utility model;
Fig. 3 is the structural representation that Rose Box and downcomer are connected in pile-column bridge structure provided by the utility model.
Reference collects:Bridge floor main body 10;Pile structure 11;Guardrail 12;Osculum 13;Downcomer 14;Drainpipe 15; Rose Box 16;Screen pack 17;Collect slag portion 18;Clamping ring 19;First boss 20;Second boss 21;Seal groove 22;Sealing strip 23.
Embodiment
In order that those skilled in the art more fully understands technical scheme, below in conjunction with the accompanying drawings and embodiment party The present invention is described in further detail for formula.
Embodiment, refer to Fig. 1-Fig. 3.
A kind of pile-column bridge structure is present embodiments provided, this pile-column bridge structure has draining convenient, is not easy Produce the characteristic of ponding.
Pile-column bridge structure includes bridge floor main body 10 and pile structure 11, and pile structure 11 is connected under bridge floor main body 10 Side simultaneously supports bridge floor main body 10, and the both sides of bridge floor main body 10 have the guardrail 12 for being higher by the upper surface of bridge floor main body 10;Bridge floor main body 10 That is the agent structure of bridge, vehicle travel in bridge floor main body 10, and pile structure 11 is used for supporting bridge floor main body 10, pile structure 11 fix on the ground.The guardrail 12 of the both sides of bridge floor main body 10 has protective action, prevents vehicle from falling down bridge.
Multigroup discharge structure is offered in bridge floor main body 10, each group of discharge structure includes being symmetrically set in 10 liang of bridge floor main body The osculum 13 of side;The lower section of bridge floor main body 10 has the downcomer 14 in communicated drainage hole 13, and downcomer 14 extends to pile structure 11, drainpipe 15 is disposed with along its short transverse in pile structure 11, and drainpipe 15 and downcomer 14 are sealed by Rose Box 16 It is connected, and Rose Box 16 is detachably connected with drainpipe 15 and downcomer 14;Rose Box 16 is the body structure of both ends open, The bottom of Rose Box 16 has the screen pack 17 through its cross section, and collection slag portion is formed between screen pack 17 and the top of Rose Box 16 18。
The discharge of ponding in bridge floor main body 10 is realized by discharge structure.Length of multigroup discharge structure along bridge floor main body 10 Direction expression in the eyes, the osculum 13 that the both sides of bridge floor main body 10 are set enable the ponding of the both sides of bridge floor main body 10 rapidly to discharge. Two osculums 13 of one group of discharge structure carry out draining by same drainpipe 15.Ponding is drained into down by drainpipe 15 Side.
The Rose Box 16 being connected is sealed with drainpipe 15 and downcomer 14 and plays a part of impurity screening, prevents impurity from entering Sewers, cause the blocking of sewers.Also, filter mechanism is arranged on the position so that draining in bridge floor main body 10 Hole 13 can not have to set filter mechanism, could be arranged to larger opening, enable ponding promptly from bridge floor main body 10 Discharge, will not produce ponding in bridge floor main body 10.
In the prior art, filter mechanism being set on road surface or bridge floor so that lower water herein is slower, meanwhile, once Impurity is accumulated, and results in blockage, then further slows down the velocity of discharge of ponding, it is easy to result in blockage.And in the present embodiment, will Filter mechanism is arranged on the position, greatly reduces the possibility of ponding in bridge floor main body 10.
The Rose Box 16 being detachably connected with drainpipe 15 and downcomer 14 so that Rose Box 16 can be removed carrying out Clean work.Collection slag portion 18 is internally formed in Rose Box 16, dregs are stored in the position, can facilitate after Rose Box 16 is pulled down Ground carries out work of slagging tap.
Thus, it could be seen that the pile-column bridge structure of this structure has the characteristic of quick discharge ponding, ensure that on bridge The vehicles smoothly pass through.
As shown in figure 1, downcomer 14 is L-type, a part for downcomer 14 fits in the bottom of bridge floor main body 10, downcomer 14 another part fits in the surface of pile structure 11.The downcomer 14 of this set makes its easy for installation, is not easy to rock.
As shown in Figures 2 and 3, Rose Box 16 and downcomer 14 are connected by clamping ring 19;The bottom inside of downcomer 14 With downwardly projecting first boss 20, the inside top of Rose Box 16 has second boss 21 protruding upward, first boss 20 and second boss 21 be engaged to form seal groove 22;The inner side of clamping ring 19 has the sealing strip that width is less than clamping ring 19 23, sealing strip 23 is connected in seal groove 22, and the both ends of clamping ring 19 are fixed by screw connected.
Clamping ring 19 is the structure of strip, and both ends are screwed to be connected is formed the structure of round afterwards.
The downcomer 14 and Rose Box 16 being connected by the clamping ring 19 with sealing strip 23, have and be completely embedded, will not The characteristic of leak.The outside of first boss 20 and second boss 21 forms the seal groove 22 to cave inward, and sealing strip 23 is connected to There is good sealing effectiveness herein, along with the confinement that clamping ring 19 is tightened up a screw acts on, sealing strip 23 is closely crimped on In seal groove 22.
Downcomer 14, Rose Box 16 are adopted made of plastic, and clamping ring 19 is adopted made of plastic, and sealing strip 23 uses rubber It is made.Plastic material is convenient to be processed, and makes downcomer 14, Rose Box 16 and the cost of clamping ring 19 relatively low, the sealing strip of quality of rubber materials 23 easily produce deformation so that connection is closer, and sealing effectiveness is more preferable.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or using the present invention. A variety of modifications to these embodiments will be apparent for those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention.Therefore, it is of the invention The embodiments shown herein is not intended to be limited to, and is to fit to and principles disclosed herein and features of novelty phase one The most wide scope caused.

Claims (4)

1. a kind of pile-column bridge structure, including bridge floor main body and pile structure, the pile structure are connected to the bridge floor master Below body and the bridge floor main body is supported, the bridge floor main body both sides have the guardrail for being higher by the bridge floor body upper surface;Its It is characterised by, multigroup discharge structure is offered in the bridge floor main body, discharge structure described in each group is described including being symmetrically set in The osculum of bridge floor main body both sides;There is the downcomer for connecting the osculum, the downcomer prolongs below the bridge floor main body Extend the pile structure, drainpipe, the drainpipe and the lower water are disposed with along its short transverse in the pile structure Pipe is sealed by Rose Box to be connected, and the Rose Box is detachably connected with the drainpipe and the downcomer;The mistake Filter box is the body structure of both ends open, and the bottom of the Rose Box has the screen pack through its cross section, the screen pack Collection slag portion is formed between the Rose Box top.
2. pile-column bridge structure according to claim 1, it is characterised in that the downcomer is L-type, the one of downcomer Part fits in the bottom of the bridge floor main body, and another part of downcomer fits in the surface of pile structure.
3. pile-column bridge structure according to claim 1, it is characterised in that the Rose Box and the downcomer pass through Clamping ring is connected;The bottom inside of the downcomer has downwardly projecting first boss, the inside top tool of the Rose Box There is second boss protruding upward, the first boss and second boss are engaged to form seal groove;The inner side of the clamping ring It is less than the sealing strip of the clamping ring with width, the sealing strip is connected in the seal groove, and the both ends of the clamping ring lead to Fastened by screw is crossed to be connected.
4. pile-column bridge structure according to claim 3, it is characterised in that the downcomer, the Rose Box are adopted Made of plastic, the clamping ring is adopted made of plastic, and the sealing strip is made of rubber.
CN201720541612.0U 2017-05-16 2017-05-16 A kind of pile-column bridge structure Expired - Fee Related CN206784154U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720541612.0U CN206784154U (en) 2017-05-16 2017-05-16 A kind of pile-column bridge structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720541612.0U CN206784154U (en) 2017-05-16 2017-05-16 A kind of pile-column bridge structure

Publications (1)

Publication Number Publication Date
CN206784154U true CN206784154U (en) 2017-12-22

Family

ID=60711542

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720541612.0U Expired - Fee Related CN206784154U (en) 2017-05-16 2017-05-16 A kind of pile-column bridge structure

Country Status (1)

Country Link
CN (1) CN206784154U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952456A (en) * 2019-12-06 2020-04-03 中铁十八局集团建筑安装工程有限公司 Pile type bridge construction process
CN112160234A (en) * 2020-09-29 2021-01-01 山西交科桥梁隧道加固维护工程有限公司 Pile type bridge structure

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110952456A (en) * 2019-12-06 2020-04-03 中铁十八局集团建筑安装工程有限公司 Pile type bridge construction process
CN112160234A (en) * 2020-09-29 2021-01-01 山西交科桥梁隧道加固维护工程有限公司 Pile type bridge structure
CN112160234B (en) * 2020-09-29 2022-07-26 山西交科桥梁隧道加固维护工程有限公司 Pile type bridge structure

Similar Documents

Publication Publication Date Title
CN207582630U (en) A kind of municipal works Anti-odor device of sewer
CN206784154U (en) A kind of pile-column bridge structure
CN205917593U (en) Bridge expansion joint drainage device
CN105672445B (en) Rainwater set, abandoned stream, overflow, the power-free integrated device of purification
CN205502184U (en) Rainwater set, abandon class, overflow, unpowered integrated device of purification
CN207260284U (en) One kind shunting anti-blockage type road drainage pipeline
CN206267231U (en) A kind of dewatering in siphon type filter for urban road
CN204510425U (en) Drainer
CN207469082U (en) A kind of anti-clogging road and bridge drainage arrangement
CN206512847U (en) A kind of rain early-stage split-flow filter
CN206438393U (en) A kind of municipal bridge anti-blockage type sewer
CN206267274U (en) A kind of improved subsurface stormwater pipe
CN206570866U (en) It is a kind of to be used for the rainwater-collecting irrigation rig of greenbelt under overpass
CN216238882U (en) Road drainage device for sponge city anti-blocking
CN206693375U (en) A kind of water conservancy town road emergency drainage device
CN212129416U (en) Highway bridge road surface drainage structures
CN204491805U (en) The anhydrous automatic-sealed drainer of urban road
CN211897674U (en) Highway curb drainage device
CN207435889U (en) A kind of building expansion joint integrate draining structure
CN209277270U (en) A kind of town road water feeding and draining device
CN206337623U (en) A kind of ground water permeable device for sponge city
CN207846628U (en) A kind of novel garden drainage arrangement
CN206859534U (en) A kind of roof drainage system
CN206319380U (en) A kind of rotation grass planting ditch structure for sponge city
CN207227978U (en) A kind of landfill yard guide french drain pipeline configuration

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171222

Termination date: 20210516