CN206782403U - A kind of battery production electrolyte storage bin - Google Patents

A kind of battery production electrolyte storage bin Download PDF

Info

Publication number
CN206782403U
CN206782403U CN201720312474.9U CN201720312474U CN206782403U CN 206782403 U CN206782403 U CN 206782403U CN 201720312474 U CN201720312474 U CN 201720312474U CN 206782403 U CN206782403 U CN 206782403U
Authority
CN
China
Prior art keywords
sliding block
slide rail
casing
spring
storage bin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720312474.9U
Other languages
Chinese (zh)
Inventor
王金录
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Xinli Energy Technology Co., Ltd.
Original Assignee
Ou Yanghuahong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ou Yanghuahong filed Critical Ou Yanghuahong
Priority to CN201720312474.9U priority Critical patent/CN206782403U/en
Application granted granted Critical
Publication of CN206782403U publication Critical patent/CN206782403U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Battery Mounting, Suspending (AREA)

Abstract

It the utility model is related to a kind of storage bin, more particularly to a kind of battery production electrolyte storage bin.The technical problems to be solved in the utility model be to provide it is a kind of can storage when can be again stirring for electrolyte, storage when can prevent the battery production that other impurities are entered in container electrolyte storage bin.In order to solve the above-mentioned technical problem, the utility model provides such a battery production electrolyte storage bin, includes bottom plate, the first slide rail, the first sliding block, the second slide rail, installing mechanism, the second sliding block, steel wire rope, the first casing, handle, rabbling mechanism, Electric Motor Wheel etc.;Bottom plate inner top is connected with the first slide rail, and slidingtype is connected with the first sliding block on the first slide rail, and the first sliding block and the first slide rail coordinate.The utility model devises a kind of battery production electrolyte storage bin, and when being located at by the fixture block of setting in the first groove, the first casing cannot move left and right, so as to be closed the first casing and the second casing.

Description

A kind of battery production electrolyte storage bin
Technical field
It the utility model is related to a kind of storage bin, more particularly to a kind of battery production electrolyte storage bin.
Background technology
Battery, which refers to, fills electrolyte solution and metal electrode to produce the cup of electric current, groove or other containers or clad vessel Segment space, chemical energy can be changed into the device of electric energy.Point with positive pole, negative pole.With the development of science and technology battery refers to The midget plant of electric energy can be produced.Such as solar cell.The performance parameter of battery mainly has electromotive force, capacity, than energy and electricity Resistance.Energy source is utilized the battery as, can be obtained with burning voltage, stabling current, long-time stable power supply, by extraneous shadow The electric current of very little is rung, and battery structure is simple, and easy to carry, discharge and recharge is easy to operation, not by outside climatic and temperature Influence, stable and reliable for performance, various aspects in modern society's life, which play, great role.
Electrolyte:There is the electrolyte in organism, also there is the electrolyte applied to battery industry, and electrolytic capacitor, The electrolyte of the industries such as ultracapacitor.
Existing most of electrolyte are stored in a simple container, but also no lid carries out isolation and prevented Shield, electrolyte is caused to enter other impurities, and electrolyte is placed long afterwards, and sediment can be deposited in electrolyte bottom, so that Electrolyte is obtained to stir again again.
Therefore needing research and development one kind badly be able to can be again stirring for preventing other impurities from entering when electrolyte, storage in storage Enter the battery production electrolyte storage bin in container, can not be again stirring for being electrolysed in storage in the prior art to overcome The shortcomings that can not preventing other impurities from entering in container when liquid, storage.
Utility model content
(1)Technical problems to be solved
The utility model can not prevent when can not be again stirring for electrolyte, storage during storage in the prior art to overcome The shortcomings that other impurities are entered in container, the technical problems to be solved in the utility model be to provide one kind can storage when can It is again stirring for that when electrolyte, storage the battery production that other impurities are entered in container electrolyte storage bin can be prevented.
(2)Technical scheme
In order to solve the above-mentioned technical problem, the utility model provides such a battery production electrolyte storage bin, Include bottom plate, the first slide rail, the first sliding block, the second slide rail, installing mechanism, the second sliding block, steel wire rope, the first casing, handle, Rabbling mechanism, Electric Motor Wheel, the second casing, fixture block and the first spring, bottom plate inner top are connected with the first slide rail, slided on the first slide rail Dynamic formula is connected with the first sliding block, and the first sliding block and the first slide rail coordinate, and the first slider top is connected with installing mechanism, installing mechanism Top is connected with the first casing, and the first casing left wall is connected with handle, and rabbling mechanism is connected with the first casing, and the first casing is left The first groove is provided with the top of right two walls, the rightmost side is connected with the second slide rail at the top of bottom plate, and slidingtype is connected with the second slide rail Second sliding block, the second sliding block and the second slide rail coordinate, and the first bullet is connected between the second slider top and the second slide rail inner top Spring, the second slide rail antetheca downside are connected with Electric Motor Wheel, steel wire rope are wound with Electric Motor Wheel, and steel wire rope is connected with the second slider bottom, Second sliding block left wall is connected with the second casing, is respectively connected with fixture block at left and right sides of the second bottom half, fixture block is located at the first groove Surface, and fixture block and the first groove coordinate.
Preferably, installing mechanism includes pole, fixed plate and the first bolt, and the first slider top is connected with fixed plate, The left and right sides is provided with the second groove at the top of fixed plate, is respectively connected with pole at left and right sides of the first bottom half, and pole is positioned at the In two grooves, the wall of pole and fixed plate or so two is symmetrically provided with the first screwed hole, the first spiral shell of the wall of pole and fixed plate or so two Pit is in same horizontal line, and the first bolt is equipped with the first screwed hole, and the first bolt passes through the first screwed hole and second Groove.
Preferably, rabbling mechanism includes the wall of bearing block, bull stick, blade, second spring and steel ball, the first casing or so two Top is symmetrically connected with bearing block, and bull stick is connected with bearing block, and blade is uniformly connected with bull stick, and blade is located at the first casing Interior, blade end is connected with second spring, and second spring end is connected with steel ball.
Preferably, oscillating rod, the 3rd spring, the second bolt, pedal, the 3rd slide rail, connecting rod, the 4th bullet are also included Spring, the 3rd sliding block and L-shaped connecting rod, bottom plate right-hand member are connected with L-shaped connecting rod, and the second screwed hole, the second screwed hole are provided with L-shaped connecting rod Inside it is provided with the second bolt, the second bolt passes through the second screwed hole, and lower right side rotary type is connected with oscillating rod in L-shaped connecting rod, puts The 3rd spring is connected with lever bottom and L-shaped connecting rod between right side, is contacted at the top of oscillating rod with the second stud base, second slides The 3rd slide rail is connected with the downside of rail right wall, slidingtype is connected with the 3rd sliding block on the 3rd slide rail, and the 3rd sliding block is matched somebody with somebody with the 3rd slide rail Close, being connected with the 4th spring, the 3rd slider top right side and second between the 3rd slide rail inner top on the left of the 3rd slider top Connecting rod is connected between sliding block right wall, pedal is connected with the right side of the 3rd slider bottom, pedal coordinates with oscillating rod.
Preferably, the material of the first casing and the second casing is stainless steel.
Preferably, the material of the second slide rail is Q235 steel.
Preferably, the material of blade is high-quality steel.
Operation principle:During using this equipment, the first casing is fixed on first by user of service by installing mechanism first On sliding block, then after the first casing is moved to the left into correct position by the first sliding block by pull handle, handle is stopped drag To left movement, after electrolyte is poured into the first casing, promote handle that the first casing is moved right by the first sliding block Moving after returning to original position, enable Electric Motor Wheel and rotate clockwise, pack up steel wire rope, steel wire rope pulls the second sliding block to move down, and first Spring is stretched, and the second sliding block drives the second casing to move down, and the second casing drives fixture block to move down, and fixture block is located at first When in groove, the first casing cannot move left and right, and so as to be closed the first casing and the second casing, protect in casing Electrolyte does not enter other impurities, is closed after the first casing and the second casing, you can closes Electric Motor Wheel.Then, use is worked as When personnel need to take electrolyte, rabbling mechanism is enabled, it is possible to electrolyte is stirred and is mixed with, then enables Electric Motor Wheel pine Steel wire rope is put, the first spring, which then restores to the original state, drives the second sliding block to move up, and the second sliding block drives the second casing to move up, After the second casing returns to original position, Electric Motor Wheel is closed.In this way, it is possible to during being stored to electrolyte, protective action is played, And when taking, worker is facilitated to be stirred mixing to electrolyte again.
Because installing mechanism includes pole, fixed plate and the first bolt, the first slider top is connected with fixed plate, fixed The left and right sides is provided with the second groove at the top of plate, and pole is respectively connected with left and right sides of the first bottom half, and pole is recessed positioned at second In groove, the wall of pole and fixed plate or so two is symmetrically provided with the first screwed hole, the first screwed hole of the wall of pole and fixed plate or so two In same horizontal line, the first bolt is equipped with the first screwed hole, the first bolt passes through the first screwed hole and the second groove, When needing the first casing of replacing to be stored, user of service outwards winding the first bolt, the first bolt is departed from into the first screwed hole, just The first casing can be changed, has changed and then by first the first screwed hole of bolt precession, the first casing is fixed, In this way, very easily electrolyte can be changed with being fixed.
Because rabbling mechanism includes on the wall of bearing block, bull stick, blade, second spring and steel ball, the first casing or so two Portion is symmetrically connected with bearing block, and bull stick is connected with bearing block, and blade is uniformly connected with bull stick, and blade is located at the first casing Interior, blade end is connected with second spring, and second spring end is connected with steel ball, and user of service rotates bull stick, bull stick band movable vane Piece rotates, and blade drives second spring to rotate, and second spring drives steel ball to rotate, and the rotation of blade and steel ball causes the electricity of precipitation Solution liquid is rocked, and sediment is mixed in electrolyte again.
Because also include oscillating rod, the 3rd spring, the second bolt, pedal, the 3rd slide rail, connecting rod, the 4th spring, 3rd sliding block and L-shaped connecting rod, bottom plate right-hand member are connected with L-shaped connecting rod, are provided with the second screwed hole on L-shaped connecting rod, in the second screwed hole Provided with the second bolt, the second bolt passes through the second screwed hole, and lower right side rotary type is connected with oscillating rod in L-shaped connecting rod, swings The 3rd spring is connected with bar bottom and L-shaped connecting rod between right side, is contacted at the top of oscillating rod with the second stud base, the second slide rail The 3rd slide rail is connected with the downside of right wall, slidingtype is connected with the 3rd sliding block on the 3rd slide rail, and the 3rd sliding block and the 3rd slide rail coordinate, Being connected with the 4th spring, the 3rd slider top right side and the second sliding block between the 3rd slide rail inner top on the left of 3rd slider top Connecting rod is connected between right wall, pedal is connected with the right side of the 3rd slider bottom, pedal coordinates with oscillating rod, user of service When needing to move down the second casing, user of service steps on pedal and moved down, and pedal drives the 3rd sliding block to moving down Dynamic, the 3rd sliding block drives connecting rod to move down, and connecting rod drives the second sliding block to move down, and the 4th spring is stretched, and second Sliding block drives the second casing to move down, and when fixture block is located in the first groove, oscillating rod is located above pedal, and pedal is then It is stuck, will not be moved up so as to stabilize the second casing, it is necessary to open the first casing, when allowing the second casing to return to original position, The second bolt is screwed out, oscillating rod will be upturned in the presence of the 3rd spring force, allow pedal and the 3rd sliding block The effect of four spring forces moves back into original position upwards, so, is stepped on by using personnel and be can be achieved with pedal to the second case The purpose that body is stablized, then no longer need to realize by Electric Motor Wheel, reduce the manufacturing cost of device.
Because the material of the first casing and the second casing is stainless steel, stainless steel corrosion resistance and acid resistance are strong, make device Service life it is longer.
Because the material of the second slide rail is Q235 steel, Q235 steel hardness is high and does not allow yielding, makes the service life of device It is longer.
Because the material of blade is high-quality steel, surface plating zinc layers so that the present apparatus is not perishable, and raising uses the longevity Life.
(3)Beneficial effect
The utility model devises a kind of battery production electrolyte storage bin, is located at the first groove by the fixture block of setting When interior, the first casing cannot move left and right, and so as to be closed the first casing and the second casing, effectively protect in casing Electrolyte does not enter other impurities, the installing mechanism also set up, it is possible to and very easily electrolyte is changed and used, leaf The rotation of piece and steel ball make it that the electrolyte of precipitation is rocked, and sediment is mixed in electrolyte again, manually steps on and uses pin Pedal instead of Electric Motor Wheel, not only environmentally friendly but also convenient.
Brief description of the drawings
Fig. 1 is the first main structure diagram of the present utility model.
Fig. 2 is the main structure diagram of the utility model installing mechanism.
Fig. 3 is the main structure diagram of the utility model rabbling mechanism.
Fig. 4 is second of main structure diagram of the present utility model.
Mark in accompanying drawing for:1- bottom plates, the slide rails of 2- first, the sliding blocks of 3- first, the slide rails of 4- second, 5- installing mechanisms, 6- Second sliding block, 7- steel wire ropes, the casings of 8- first, the grooves of 9- first, 10- handles, 11- rabbling mechanisms, 12- Electric Motor Wheels, 13- second Casing, 14- fixture blocks, the springs of 15- first, 501- poles, the screwed holes of 502- first, 503- fixed plates, the grooves of 504- second, 505- First bolt, 111- bearing blocks, 112- bull sticks, 113- blades, 114- second springs, 115- steel balls, the screwed holes of 16- second, 17- Oscillating rod, the springs of 18- the 3rd, the bolts of 19- second, 20- pedals, the slide rails of 21- the 3rd, 22- connecting rods, the springs of 23- the 4th, The sliding blocks of 24- the 3rd, 25-L shape connecting rods.
Embodiment
The utility model is further described with reference to the accompanying drawings and examples.
Embodiment 1
A kind of battery production electrolyte storage bin, as Figure 1-4, include bottom plate 1, the first slide rail 2, the first sliding block 3rd, the second slide rail 4, installing mechanism 5, the second sliding block 6, steel wire rope 7, the first casing 8, handle 10, rabbling mechanism 11, Electric Motor Wheel 12, Second casing 13, the spring 15 of fixture block 14 and first, the inner top of bottom plate 1 are connected with the first slide rail 2, and slidingtype connects on the first slide rail 2 The first sliding block 3 is connected to, the first sliding block 3 coordinates with the first slide rail 2, and the top of the first sliding block 3 is connected with installing mechanism 5, installing mechanism 5 Top is connected with the first casing 8, and the left wall of the first casing 8 is connected with handle 10, and rabbling mechanism 11 is connected with the first casing 8, the It is provided with the first groove 9 at the top of the wall of one casing 8 or so two, the top rightmost side of bottom plate 1 is connected with the second slide rail 4, on the second slide rail 4 Slidingtype is connected with the second sliding block 6, and the second sliding block 6 coordinates with the second slide rail 4, the top of the second sliding block 6 and the inner top of the second slide rail 4 Between be connected with the first spring 15, be connected with Electric Motor Wheel 12 on the downside of the antetheca of the second slide rail 4, steel wire rope 7, steel be wound with Electric Motor Wheel 12 Cord 7 is connected with the bottom of the second sliding block 6, and the left wall of the second sliding block 6 is connected with the second casing 13, the bottom of the second casing 13 left and right sides Fixture block 14 is respectively connected with, fixture block 14 is located at directly over the first groove 9, and fixture block 14 coordinates with the first groove 9.
Embodiment 2
A kind of battery production electrolyte storage bin, as Figure 1-4, include bottom plate 1, the first slide rail 2, the first sliding block 3rd, the second slide rail 4, installing mechanism 5, the second sliding block 6, steel wire rope 7, the first casing 8, handle 10, rabbling mechanism 11, Electric Motor Wheel 12, Second casing 13, the spring 15 of fixture block 14 and first, the inner top of bottom plate 1 are connected with the first slide rail 2, and slidingtype connects on the first slide rail 2 The first sliding block 3 is connected to, the first sliding block 3 coordinates with the first slide rail 2, and the top of the first sliding block 3 is connected with installing mechanism 5, installing mechanism 5 Top is connected with the first casing 8, and the left wall of the first casing 8 is connected with handle 10, and rabbling mechanism 11 is connected with the first casing 8, the It is provided with the first groove 9 at the top of the wall of one casing 8 or so two, the top rightmost side of bottom plate 1 is connected with the second slide rail 4, on the second slide rail 4 Slidingtype is connected with the second sliding block 6, and the second sliding block 6 coordinates with the second slide rail 4, the top of the second sliding block 6 and the inner top of the second slide rail 4 Between be connected with the first spring 15, be connected with Electric Motor Wheel 12 on the downside of the antetheca of the second slide rail 4, steel wire rope 7, steel be wound with Electric Motor Wheel 12 Cord 7 is connected with the bottom of the second sliding block 6, and the left wall of the second sliding block 6 is connected with the second casing 13, the bottom of the second casing 13 left and right sides Fixture block 14 is respectively connected with, fixture block 14 is located at directly over the first groove 9, and fixture block 14 coordinates with the first groove 9.
Installing mechanism 5 includes pole 501, the bolt 505 of fixed plate 503 and first, and the top of the first sliding block 3 is connected with fixation Plate 503, the top of fixed plate 503 left and right sides are provided with the second groove 504, branch are respectively connected with left and right sides of the bottom of the first casing 8 Bar 501, pole 501 are located in the second groove 504, and pole 501 is symmetrically provided with the first screwed hole with the wall of fixed plate 503 or so two 502, pole 501 and the first screwed hole 502 of the wall of fixed plate 503 or so two are in same horizontal line, in the first screwed hole 502 The first bolt 505 is equipped with, the first bolt 505 passes through the first screwed hole 502 and the second groove 504.
Embodiment 3
A kind of battery production electrolyte storage bin, as Figure 1-4, include bottom plate 1, the first slide rail 2, the first sliding block 3rd, the second slide rail 4, installing mechanism 5, the second sliding block 6, steel wire rope 7, the first casing 8, handle 10, rabbling mechanism 11, Electric Motor Wheel 12, Second casing 13, the spring 15 of fixture block 14 and first, the inner top of bottom plate 1 are connected with the first slide rail 2, and slidingtype connects on the first slide rail 2 The first sliding block 3 is connected to, the first sliding block 3 coordinates with the first slide rail 2, and the top of the first sliding block 3 is connected with installing mechanism 5, installing mechanism 5 Top is connected with the first casing 8, and the left wall of the first casing 8 is connected with handle 10, and rabbling mechanism 11 is connected with the first casing 8, the It is provided with the first groove 9 at the top of the wall of one casing 8 or so two, the top rightmost side of bottom plate 1 is connected with the second slide rail 4, on the second slide rail 4 Slidingtype is connected with the second sliding block 6, and the second sliding block 6 coordinates with the second slide rail 4, the top of the second sliding block 6 and the inner top of the second slide rail 4 Between be connected with the first spring 15, be connected with Electric Motor Wheel 12 on the downside of the antetheca of the second slide rail 4, steel wire rope 7, steel be wound with Electric Motor Wheel 12 Cord 7 is connected with the bottom of the second sliding block 6, and the left wall of the second sliding block 6 is connected with the second casing 13, the bottom of the second casing 13 left and right sides Fixture block 14 is respectively connected with, fixture block 14 is located at directly over the first groove 9, and fixture block 14 coordinates with the first groove 9.
Installing mechanism 5 includes pole 501, the bolt 505 of fixed plate 503 and first, and the top of the first sliding block 3 is connected with fixation Plate 503, the top of fixed plate 503 left and right sides are provided with the second groove 504, branch are respectively connected with left and right sides of the bottom of the first casing 8 Bar 501, pole 501 are located in the second groove 504, and pole 501 is symmetrically provided with the first screwed hole with the wall of fixed plate 503 or so two 502, pole 501 and the first screwed hole 502 of the wall of fixed plate 503 or so two are in same horizontal line, in the first screwed hole 502 The first bolt 505 is equipped with, the first bolt 505 passes through the first screwed hole 502 and the second groove 504.
Rabbling mechanism 11 includes bearing block 111, bull stick 112, blade 113, second spring 114 and steel ball 115, the first case The wall top of body 8 or so two is symmetrically connected with bearing block 111, and bull stick 112 is connected with bearing block 111, is uniformly connected on bull stick 112 There is blade 113, blade 113 is located in the first casing 8, and the end of blade 113 is connected with second spring 114, the end of second spring 114 It is connected with steel ball 115.
Embodiment 4
A kind of battery production electrolyte storage bin, as Figure 1-4, include bottom plate 1, the first slide rail 2, the first sliding block 3rd, the second slide rail 4, installing mechanism 5, the second sliding block 6, steel wire rope 7, the first casing 8, handle 10, rabbling mechanism 11, Electric Motor Wheel 12, Second casing 13, the spring 15 of fixture block 14 and first, the inner top of bottom plate 1 are connected with the first slide rail 2, and slidingtype connects on the first slide rail 2 The first sliding block 3 is connected to, the first sliding block 3 coordinates with the first slide rail 2, and the top of the first sliding block 3 is connected with installing mechanism 5, installing mechanism 5 Top is connected with the first casing 8, and the left wall of the first casing 8 is connected with handle 10, and rabbling mechanism 11 is connected with the first casing 8, the It is provided with the first groove 9 at the top of the wall of one casing 8 or so two, the top rightmost side of bottom plate 1 is connected with the second slide rail 4, on the second slide rail 4 Slidingtype is connected with the second sliding block 6, and the second sliding block 6 coordinates with the second slide rail 4, the top of the second sliding block 6 and the inner top of the second slide rail 4 Between be connected with the first spring 15, be connected with Electric Motor Wheel 12 on the downside of the antetheca of the second slide rail 4, steel wire rope 7, steel be wound with Electric Motor Wheel 12 Cord 7 is connected with the bottom of the second sliding block 6, and the left wall of the second sliding block 6 is connected with the second casing 13, the bottom of the second casing 13 left and right sides Fixture block 14 is respectively connected with, fixture block 14 is located at directly over the first groove 9, and fixture block 14 coordinates with the first groove 9.
Installing mechanism 5 includes pole 501, the bolt 505 of fixed plate 503 and first, and the top of the first sliding block 3 is connected with fixation Plate 503, the top of fixed plate 503 left and right sides are provided with the second groove 504, branch are respectively connected with left and right sides of the bottom of the first casing 8 Bar 501, pole 501 are located in the second groove 504, and pole 501 is symmetrically provided with the first screwed hole with the wall of fixed plate 503 or so two 502, pole 501 and the first screwed hole 502 of the wall of fixed plate 503 or so two are in same horizontal line, in the first screwed hole 502 The first bolt 505 is equipped with, the first bolt 505 passes through the first screwed hole 502 and the second groove 504.
Rabbling mechanism 11 includes bearing block 111, bull stick 112, blade 113, second spring 114 and steel ball 115, the first case The wall top of body 8 or so two is symmetrically connected with bearing block 111, and bull stick 112 is connected with bearing block 111, is uniformly connected on bull stick 112 There is blade 113, blade 113 is located in the first casing 8, and the end of blade 113 is connected with second spring 114, the end of second spring 114 It is connected with steel ball 115.
Also include oscillating rod 17, the 3rd spring 18, the second bolt 19, pedal 20, the 3rd slide rail 21, connecting rod 22, 4th spring 23, the 3rd sliding block 24 and L-shaped connecting rod 25, the right-hand member of bottom plate 1 are connected with L-shaped connecting rod 25, second are provided with L-shaped connecting rod 25 Screwed hole 16, is provided with the second bolt 19 in the second screwed hole 16, and the second bolt 19 passes through the second screwed hole 16, in L-shaped connecting rod 25 Lower right side rotary type is connected with oscillating rod 17, and the 3rd spring is connected between the bottom of oscillating rod 17 and the interior right side of L-shaped connecting rod 25 18, the top of oscillating rod 17 is contacted with the bottom of the second bolt 19, and the 3rd slide rail 21 is connected with the downside of the right wall of the second slide rail 4, and the 3rd slides Slidingtype is connected with the 3rd sliding block 24 on rail 21, and the 3rd sliding block 24 coordinates with the 3rd slide rail 21, the top left side of the 3rd sliding block 24 with The 4th spring 23 is connected between the inner top of 3rd slide rail 21, is connected between the top right side of the 3rd sliding block 24 and the right wall of the second sliding block 6 Connecting rod 22 is connected to, the bottom right of the 3rd sliding block 24 is connected with pedal 20, and pedal 20 coordinates with oscillating rod 17.
The material of first casing 8 and the second casing 13 is stainless steel.
The material of second slide rail 4 is Q235 steel.
The material of blade 113 is high-quality steel.
Operation principle:During using this equipment, the first casing 8 is fixed on by user of service by installing mechanism 5 first On one sliding block 3, then after first casing 8 is moved to the left into correct position by the first sliding block 3 by pull handle 10, stop drawing Dynamic handle 10 is to left movement, after electrolyte is poured into the first casing 8, promotes handle 10 by the first casing 8 by the One sliding block 3 moves right return to original position after, enable Electric Motor Wheel 12 and rotate clockwise, pack up steel wire rope 7, steel wire rope 7 pulls second Sliding block 6 moves down, and the first spring 15 is stretched, and the second sliding block 6 drives the second casing 13 to move down, and the second casing 13 drives Fixture block 14 moves down, and when fixture block 14 is located in the first groove 9, the first casing 8 cannot move left and right, so as to be closed One casing 8 and the second casing 13, protect the electrolyte in casing not enter other impurities, are closed the first casing 8 and second After casing 13, you can close Electric Motor Wheel 12.Then, when user of service needs to take electrolyte, rabbling mechanism 11 is enabled, just Electrolyte can be stirred and be mixed with, then enabled Electric Motor Wheel 12 and unclasp steel wire rope 7, the first spring 15 then restores to the original state drive Second sliding block 6 moves up, and the second sliding block 6 drives the second casing 13 to move up, and after the second casing 13 returns to original position, closes Electric Motor Wheel 12.In this way, it is possible to during being stored to electrolyte, when playing protective action, and taking, facilitate worker again Mixing is stirred to electrolyte.
Because installing mechanism 5 includes pole 501, the bolt 505 of fixed plate 503 and first, the top of the first sliding block 3 is connected with Fixed plate 503, the top of fixed plate 503 left and right sides are provided with the second groove 504, are all connected with left and right sides of the bottom of the first casing 8 There is pole 501, pole 501 is located in the second groove 504, and pole 501 is symmetrically provided with the first screw thread with the wall of fixed plate 503 or so two Hole 502, pole 501 and the first screwed hole 502 of the wall of fixed plate 503 or so two are in same horizontal line, the first screwed hole 502 The first bolt 505 is inside equipped with, the first bolt 505 passes through the first screwed hole 502 and the second groove 504, when needing replacing first When casing 8 is stored, user of service outwards winding the first bolt 505, and the first bolt 505 is departed from into the first screwed hole 502, it is possible to The first casing 8 is changed, has changed and then by the first screwed hole of precession 502 of the first bolt 505, the first casing 8 is consolidated It is fixed, in this way, very easily can be changed electrolyte with being fixed.
Because rabbling mechanism 11 includes bearing block 111, bull stick 112, blade 113, second spring 114 and steel ball 115, the The wall top of one casing 8 or so two is symmetrically connected with bearing block 111, is connected with bull stick 112 on bearing block 111, on bull stick 112 uniformly Blade 113 is connected with, blade 113 is located in the first casing 8, and the end of blade 113 is connected with second spring 114, second spring 114 End is connected with steel ball 115, and user of service rotates bull stick 112, and bull stick 112 rotates with movable vane piece 113, and blade 113 drives second Spring 114 rotates, and second spring 114 drives steel ball 115 to rotate, and the rotation of blade 113 and steel ball 115 causes the electrolyte of precipitation Rocked, sediment is mixed in electrolyte again.
Because also include oscillating rod 17, the 3rd spring 18, the second bolt 19, pedal 20, the 3rd slide rail 21, connecting rod 22nd, the 4th spring 23, the 3rd sliding block 24 and L-shaped connecting rod 25, the right-hand member of bottom plate 1 are connected with L-shaped connecting rod 25, are provided with L-shaped connecting rod 25 Second screwed hole 16, the second bolt 19 is provided with the second screwed hole 16, the second bolt 19 passes through the second screwed hole 16, L-shaped connecting rod Lower right side rotary type is connected with oscillating rod 17 in 25, and the 3rd is connected between the bottom of oscillating rod 17 and the interior right side of L-shaped connecting rod 25 Spring 18, the top of oscillating rod 17 are contacted with the bottom of the second bolt 19, and the 3rd slide rail 21 is connected with the downside of the right wall of the second slide rail 4, the Slidingtype is connected with the 3rd sliding block 24 on three slide rails 21, and the 3rd sliding block 24 coordinates with the 3rd slide rail 21, the top left of the 3rd sliding block 24 Be connected with the 4th spring 23 between side and the inner top of the 3rd slide rail 21, the top right side of the 3rd sliding block 24 and the right wall of the second sliding block 6 it Between be connected with connecting rod 22, the bottom right of the 3rd sliding block 24 is connected with pedal 20, and pedal 20 coordinates with oscillating rod 17, use When personnel need to move down the second casing 13, user of service steps on pedal 20 and moved down, and pedal 20 drives the 3rd Sliding block 24 moves down, and the 3rd sliding block 24 drives connecting rod 22 to move down, and connecting rod 22 drives the second sliding block 6 to move down, 4th spring 23 is stretched, and the second sliding block 6 drives the second casing 13 to move down, when fixture block 14 is located in the first groove 9, pendulum Lever 17 is located at the top of pedal 20, and pedal 20 is then stuck, so as to stabilize the second casing 13 will not move up, it is necessary to The first casing 8 is opened, when allowing the second casing 13 to return to original position, screws out the second bolt 19, oscillating rod 17 will be in the 3rd spring 18 It is upturned in the presence of elastic force, allows pedal 20 to be moved back into upwards in the effect of the elastic force of the 4th spring 23 with the 3rd sliding block 24 Original position, so, the purpose that can be achieved to stablize the second casing 13 with pedal 20 is stepped on by using personnel, then is no longer needed To be realized by Electric Motor Wheel 12, reduce the manufacturing cost of device.
Because the material of the first casing 8 and the second casing 13 is stainless steel, stainless steel corrosion resistance and acid resistance are strong, make dress The service life put is longer.
Because the material of the second slide rail 4 is Q235 steel, Q235 steel hardness is high and does not allow yielding, makes the service life of device It is longer.
Because the material of blade 113 is high-quality steel, surface plating zinc layers so that the present apparatus is not perishable, improves and uses Life-span.
Embodiment described above only expresses preferred embodiment of the present utility model, and its description is more specific and detailed, But therefore it can not be interpreted as the limitation to the utility model patent scope.It should be pointed out that for the common of this area For technical staff, without departing from the inventive concept of the premise, some deformations can also be made, improves and substitutes, these are all Belong to the scope of protection of the utility model.Therefore, the protection domain of the utility model patent should be determined by the appended claims.

Claims (7)

1. a kind of battery production electrolyte storage bin, it is characterised in that include bottom plate(1), the first slide rail(2), first slide Block(3), the second slide rail(4), installing mechanism(5), the second sliding block(6), steel wire rope(7), the first casing(8), handle(10), stirring Mechanism(11), Electric Motor Wheel(12), the second casing(13), fixture block(14)With the first spring(15), bottom plate(1)Inner top is connected with One slide rail(2), the first slide rail(2)Upper slidingtype is connected with the first sliding block(3), the first sliding block(3)With the first slide rail(2)Coordinate, First sliding block(3)Top is connected with installing mechanism(5), installing mechanism(5)Top is connected with the first casing(8), the first casing(8) Left wall is connected with handle(10), the first casing(8)Inside it is connected with rabbling mechanism(11), the first casing(8)At the top of the wall of left and right two It is provided with the first groove(9), bottom plate(1)The top rightmost side is connected with the second slide rail(4), the second slide rail(4)Upper slidingtype is connected with Second sliding block(6), the second sliding block(6)With the second slide rail(4)Coordinate, the second sliding block(6)Top and the second slide rail(4)Inner top it Between be connected with the first spring(15), the second slide rail(4)Electric Motor Wheel is connected with the downside of antetheca(12), Electric Motor Wheel(12)On be wound with steel wire Rope(7), steel wire rope(7)With the second sliding block(6)Bottom connects, the second sliding block(6)Left wall is connected with the second casing(13), the second case Body(13)Fixture block is respectively connected with left and right sides of bottom(14), fixture block(14)Positioned at the first groove(9)Surface, and fixture block(14) With the first groove(9)Coordinate.
A kind of 2. battery production electrolyte storage bin according to claim 1, it is characterised in that installing mechanism(5)Bag Pole is included(501), fixed plate(503)With the first bolt(505), the first sliding block(3)Top is connected with fixed plate(503)Gu Fixed board(503)The second groove is provided with left and right sides of top(504), the first casing(8)Pole is respectively connected with left and right sides of bottom (501), pole(501)Positioned at the second groove(504)It is interior, pole(501)With fixed plate(503)The wall of left and right two is symmetrically provided with first Screwed hole(502), pole(501)With fixed plate(503)First screwed hole of the wall of left and right two(502)In same horizontal line, First screwed hole(502)Inside it is equipped with the first bolt(505), the first bolt(505)Through the first screwed hole(502)It is recessed with second Groove(504).
A kind of 3. battery production electrolyte storage bin according to claim 2, it is characterised in that rabbling mechanism(11)Bag Bearing block is included(111), bull stick(112), blade(113), second spring(114)And steel ball(115), the first casing(8)Left and right Two wall tops are symmetrically connected with bearing block(111), bearing block(111)On be connected with bull stick(112), bull stick(112)On uniformly connect It is connected to blade(113), blade(113)Positioned at the first casing(8)It is interior, blade(113)End is connected with second spring(114), the Two springs(114)End is connected with steel ball(115).
4. a kind of battery production electrolyte storage bin according to claim 3, it is characterised in that also include oscillating rod (17), the 3rd spring(18), the second bolt(19), pedal(20), the 3rd slide rail(21), connecting rod(22), the 4th spring (23), the 3rd sliding block(24)With L-shaped connecting rod(25), bottom plate(1)Right-hand member is connected with L-shaped connecting rod(25), L-shaped connecting rod(25)On be provided with Second screwed hole(16), the second screwed hole(16)Inside it is provided with the second bolt(19), the second bolt(19)Through the second screwed hole (16), L-shaped connecting rod(25)Interior lower right side rotary type is connected with oscillating rod(17), oscillating rod(17)Bottom and L-shaped connecting rod(25) The 3rd spring is connected between interior right side(18), oscillating rod(17)Top and the second bolt(19)Bottom contacts, the second slide rail(4) The 3rd slide rail is connected with the downside of right wall(21), the 3rd slide rail(21)Upper slidingtype is connected with the 3rd sliding block(24), the 3rd sliding block (24)With the 3rd slide rail(21)Coordinate, the 3rd sliding block(24)Top left side and the 3rd slide rail(21)The 4th is connected between inner top Spring(23), the 3rd sliding block(24)Top right side and the second sliding block(6)Connecting rod is connected between right wall(22), the 3rd sliding block (24)Bottom right is connected with pedal(20), pedal(20)With oscillating rod(17)Coordinate.
A kind of 5. battery production electrolyte storage bin according to claim 4, it is characterised in that the first casing(8)With Second casing(13)Material be stainless steel.
A kind of 6. battery production electrolyte storage bin according to claim 5, it is characterised in that the second slide rail(4)'s Material is Q235 steel.
A kind of 7. battery production electrolyte storage bin according to claim 6, it is characterised in that blade(113)Material Matter is high-quality steel.
CN201720312474.9U 2017-03-28 2017-03-28 A kind of battery production electrolyte storage bin Expired - Fee Related CN206782403U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720312474.9U CN206782403U (en) 2017-03-28 2017-03-28 A kind of battery production electrolyte storage bin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720312474.9U CN206782403U (en) 2017-03-28 2017-03-28 A kind of battery production electrolyte storage bin

Publications (1)

Publication Number Publication Date
CN206782403U true CN206782403U (en) 2017-12-22

Family

ID=60705424

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720312474.9U Expired - Fee Related CN206782403U (en) 2017-03-28 2017-03-28 A kind of battery production electrolyte storage bin

Country Status (1)

Country Link
CN (1) CN206782403U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111060655A (en) * 2019-12-28 2020-04-24 安徽正熹标王新能源有限公司 Battery is electrolyte selective examination device for production line

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111060655A (en) * 2019-12-28 2020-04-24 安徽正熹标王新能源有限公司 Battery is electrolyte selective examination device for production line

Similar Documents

Publication Publication Date Title
CN206782403U (en) A kind of battery production electrolyte storage bin
CN207140815U (en) A kind of sun electric car can charge bicycle shed
CN106492919A (en) A kind of battery graphite powder primary preparation facilitiess
CN207001110U (en) A kind of genetic test reagent storage device
CN205555260U (en) Battery production discharge device
CN209803049U (en) Water quality detection device
CN207191640U (en) A kind of battery labeling machine simple to operate
CN204962361U (en) Portable chargeable desk lamp
CN209603753U (en) It is a kind of based on photovoltaic power generation can automatic close window
CN107824104A (en) A kind of waste battery is mixed into house refuse equipment
CN206824259U (en) A kind of new energy battery production silicon single crystal rod multistage pickler
CN203075560U (en) Outdoor arm strength training device
CN212700445U (en) Sports goods strorage device
CN108087218A (en) A kind of gravitional force energy storage device
CN208479242U (en) A kind of removable mobile phone charging pile with moisture-proof functions/drying
CN220626064U (en) Heavy object impact testing machine
CN203431688U (en) Table lamp
CN206647281U (en) Slotting dual purpose fan is filled in a kind of mini hand-held lithium electricity stepless speed regulation
CN207307052U (en) A kind of multipurpose of energy electrification energy storage automatically retracts rope skipping
CN209063873U (en) A kind of new-energy automobile cell fixing device
CN219544542U (en) Battery cabinet that trades that safety in utilization is high
CN209912293U (en) Power battery management simulation system
CN221633437U (en) Battery charge and discharge management module convenient to detach
CN219533129U (en) Cement component detector
CN213162435U (en) Automatic soil sampling device for soil remediation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20190808

Address after: 628300 Jianmen Industrial Park, Xiasi Town, Jiange County, Guangyuan City, Sichuan Province (No. 3-4, Electronic Industrial Park)

Patentee after: Sichuan Xinli Energy Technology Co., Ltd.

Address before: Room 1003, 559 Chenggong Street, Nan'an City, Quanzhou City, Fujian Province, 362000

Patentee before: OuYang Huahong

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171222

Termination date: 20210328

CF01 Termination of patent right due to non-payment of annual fee