CN206780323U - A kind of multi-functional geological prospecting hammer - Google Patents
A kind of multi-functional geological prospecting hammer Download PDFInfo
- Publication number
- CN206780323U CN206780323U CN201720388287.9U CN201720388287U CN206780323U CN 206780323 U CN206780323 U CN 206780323U CN 201720388287 U CN201720388287 U CN 201720388287U CN 206780323 U CN206780323 U CN 206780323U
- Authority
- CN
- China
- Prior art keywords
- hammer handle
- tup
- hammer
- intermediate bar
- bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of multi-functional geological prospecting to be hammered into shape, including tup and hammer handle, and described tup one end is bolted with iron, and the tup other end is connected by bolt with shielding plate;The shielding plate is made up of connector, pole, block cloth;The bolt is threadedly coupled self-locking with bolt slot;The tup side is connected with intermediate bar one end, and the intermediate bar other end is provided with external screw thread;Storage chamber is provided with inside the intermediate bar;The intermediate bar is threadedly coupled with hammer handle, and hammer handle one end is provided with groove, and groove inner surface is provided with internal thread;The hammer handle covers with hammer handle to be connected by spring;Neck is provided with the hammer handle, and climbing rope is provided with neck;The neck opening is provided with draw-in groove lid.The utility model is simple in construction, novel in design, multiple functional, facilitates geology investigation and prospecting person to use.
Description
Technical field
A kind of exploration hammer is the utility model is related to, specially a kind of multi-functional geological prospecting hammer, belongs to geological prospecting equipment
Technical field.
Background technology
Geological prospecting hammer is one of basic tool of geological work, and geological prospecting hammer is the indispensable of geologist
Equipment.
Many problems in the production and application of geological prospecting hammer be present, and existing geological prospecting hammer structure is relatively simple,
Inconvenience uses in wild environment complicated and changeable, and except the weight of exploration hammer, staff often also needs to load a variety of
The weight of instrument, the heavy load of the personnel of work, it is unfavorable in the dangerously steep place walking of physical features, while rock is pounded in exploration hammer
During, rock can be splashed to staff and damage with it;Therefore, a kind of multi-functional geology is proposed regarding to the issue above
Exploration hammer.
Utility model content
The purpose of this utility model is that to solve the above problems and provides a kind of multi-functional geological prospecting hammer.
The utility model is achieved through the following technical solutions above-mentioned purpose, a kind of multi-functional geological prospecting hammer, including hammer
Head and hammer handle, described tup one end is bolted with iron, and the tup other end is connected by bolt with shielding plate;Institute
Shielding plate is stated to be made up of connector, pole, block cloth;The bolt is threadedly coupled self-locking with bolt slot;The tup side is with
Between bar one end connect, and the intermediate bar other end is provided with external screw thread;Storage chamber is provided with inside the intermediate bar;The intermediate bar and hammer
Handle is threadedly coupled, and hammer handle one end is provided with groove, and groove inner surface is provided with internal thread;The hammer handle passes through spring with hammer handle set
Connection;Neck is provided with the hammer handle, and climbing rope is provided with neck;The neck opening is provided with draw-in groove lid
Preferably, described tup one end is in rectangular parallelepiped structure, the wedge shaped structure of the corresponding other end.
Preferably, the intermediate bar is threadedly coupled self-locking by the external screw thread with the hammer handle with the internal thread.
Preferably, the shielding plate has four, and in sector structure, and shielding plate surround tup one week.
Preferably, the length of the storage chamber is more than the length of the iron, and the length of the storage chamber is more than described
The length of connector.
The beneficial effects of the utility model are:The utility model is simple in construction, novel in design, multiple functional, is tapping rock
During stone, the splashing of rock is effectively prevented, avoids rock debris from damaging staff, in addition the design of hammer handle
The vibrations to arm for tapping rock can be effectively reduced, it is more comfortable using process;Exploration can be hammered into shape by simply dismantling
The hook for being easy to climb is deformed into, contributes to the climbing of staff, facilitates geology investigation and prospecting person to use, there is extensive city
Field prospect, is adapted to promote the use of.
Brief description of the drawings
Fig. 1 is the utility model overall structure diagram;
Fig. 2 is the utility model shielding plate mounting structure schematic diagram;
Fig. 3 is the utility model entirety tup cross section structure schematic diagram;
Fig. 4 is the utility model entirety intermediate bar mounting structure schematic diagram;
Fig. 5 is that the utility model entirety hammer handle covers internal structure schematic diagram.
In figure:1st, tup, 2, hammer handle, 3, iron, 4, bolt, 5, bolt slot, 6, neck, 7, climbing rope, 8, shielding plate,
801st, shading cloth, 802, pole, 803, connector, 9, intermediate bar, 901, external screw thread, 10, storage chamber, 11, draw-in groove lid, 12, recessed
Groove, 1201, internal thread, 13, spring, 14, hammer handle set.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Refer to shown in Fig. 1-5, a kind of multi-functional geological prospecting hammer, including tup 1 and hammer handle 2, described one end of tup 1
It is connected with iron 3 by bolt 4, and the other end of tup 1 is connected by bolt 4 with shielding plate 8;The shielding plate 8 is by connector
803rd, pole 802, block cloth 801 form;The bolt 4 is threadedly coupled self-locking with bolt slot 5;The side of tup 1 and intermediate bar 9
One end connects, and the other end of intermediate bar 9 is provided with external screw thread 901;The inside of intermediate bar 9 is provided with storage chamber 10;The intermediate bar 9
It is threadedly coupled with hammer handle 2, and the one end of hammer handle 2 is provided with groove 12, and the inner surface of groove 12 is provided with internal thread 1201;The hammer handle 2
It is connected with hammer handle set 14 by spring 13;Neck 6 is provided with the hammer handle 2, and climbing rope 7 is provided with neck 6;The neck 6
Opening is provided with draw-in groove lid 11.
As a kind of prioritization scheme of the present utility model, described one end of tup 1 is in rectangular parallelepiped structure, and corresponding is another
Wedge shaped structure is held, is easy to use.
As a kind of prioritization scheme of the present utility model, the intermediate bar 9 passes through the external screw thread 901 with the hammer handle 2
Self-locking, convenient disassembly, stable connection are threadedly coupled with the internal thread 1201.
As a kind of prioritization scheme of the present utility model, the shielding plate 8 has four, in sector structure, and the ring of shielding plate 8
Around tup 1 one weeks, the splashing of rock is effectively prevented.
As a kind of prioritization scheme of the present utility model, the length of the storage chamber 10 is more than the length of the iron 3, and
The length of the storage chamber 10 is more than the length of the connector 803, compact-sized.
The utility model when in use, before tup 1 taps rock, passes through the fixedly connected part of bolt 4 on bolt slot 5
803, then on connector 803 be threadedly coupled pole 802, then the shading cloth 801 between 802 is deployed, pound rock when
Wait, shading cloth 801 can stop the splashing of rock;After tapping rock, the dismounting of the grade of shielding plate 8 parts is placed on storage chamber
In 10, intermediate bar 9 and the screw thread self-locking of groove 12 of the one end of hammer handle 2 are fixed;When needing climbing, pass through spiral shell in the side wall of tup 1
Bolt fixes iron 3 and forms a hook, takes out the use that the climbing rope 7 in neck 6 coordinates hook;When tapping rock, hammer handle
Set 14 under the cooperation of spring 13 with playing good cushioning effect, convenient use.
It is obvious to a person skilled in the art that the utility model is not limited to the details of above-mentioned one exemplary embodiment, and
And in the case of without departing substantially from spirit or essential attributes of the present utility model, it can realize that this practicality is new in other specific forms
Type.Therefore, no matter from the point of view of which point, embodiment all should be regarded as exemplary, and is nonrestrictive, this practicality is new
The scope of type limits by appended claims rather than described above, it is intended that the equivalency fallen in claim is contained
All changes in justice and scope are included in the utility model.Any reference in claim should not be considered as limitation
Involved claim.
Moreover, it will be appreciated that although the present specification is described in terms of embodiments, not each embodiment is only wrapped
Containing an independent technical scheme, this narrating mode of specification is only that those skilled in the art should for clarity
Using specification as an entirety, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art
It is appreciated that other embodiment.
Claims (5)
1. a kind of multi-functional geological prospecting hammer, including tup (1) and hammer handle (2), it is characterised in that:Described tup (1) one end
It is connected with iron (3) by bolt (4), and tup (1) other end is connected by bolt (4) with shielding plate (8);The shielding plate
(8) it is made up of connector (803), pole (802), block cloth (801);The bolt (4) is threadedly coupled self-locking with bolt slot (5);
Tup (1) side is connected with intermediate bar (9) one end, and intermediate bar (9) other end is provided with external screw thread (901);The centre
Storage chamber (10) is provided with inside bar (9);The intermediate bar (9) is threadedly coupled with hammer handle (2), and hammer handle (2) one end is provided with groove
(12), and groove (12) inner surface is provided with internal thread (1201);The hammer handle (2) is connected with hammer handle set (14) by spring (13)
Connect;Neck (6) is provided with the hammer handle (2), and climbing rope (7) is provided with neck (6);Neck (6) opening is provided with card
Groove lid (11).
A kind of 2. multi-functional geological prospecting hammer according to claim 1, it is characterised in that:Described tup (1) one end is in length
Cube structure, the wedge shaped structure of the corresponding other end.
A kind of 3. multi-functional geological prospecting hammer according to claim 2, it is characterised in that:The intermediate bar (9) with it is described
Hammer handle (2) is threadedly coupled self-locking by the external screw thread (901) with the internal thread (1201).
A kind of 4. multi-functional geological prospecting hammer according to claim 1, it is characterised in that:The shielding plate (8) has four,
In sector structure, and shielding plate (8) surround tup (1) one week.
A kind of 5. multi-functional geological prospecting hammer according to claim 1, it is characterised in that:The length of the storage chamber (10)
More than the length of the iron (3), and the length of the storage chamber (10) is more than the length of the connector (803).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720388287.9U CN206780323U (en) | 2017-04-11 | 2017-04-11 | A kind of multi-functional geological prospecting hammer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720388287.9U CN206780323U (en) | 2017-04-11 | 2017-04-11 | A kind of multi-functional geological prospecting hammer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206780323U true CN206780323U (en) | 2017-12-22 |
Family
ID=60708038
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720388287.9U Expired - Fee Related CN206780323U (en) | 2017-04-11 | 2017-04-11 | A kind of multi-functional geological prospecting hammer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206780323U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108356767A (en) * | 2018-03-16 | 2018-08-03 | 河北工程大学 | A kind of safe Multifunction geological hammer |
-
2017
- 2017-04-11 CN CN201720388287.9U patent/CN206780323U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108356767A (en) * | 2018-03-16 | 2018-08-03 | 河北工程大学 | A kind of safe Multifunction geological hammer |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206657830U (en) | A kind of New-energy electric vehicle battery protection case | |
CN206143948U (en) | Anti -seismic support | |
CN206780323U (en) | A kind of multi-functional geological prospecting hammer | |
CN203223170U (en) | Percussion drill hammerhead applied to drilling for pile foundation under inclined rock geological condition | |
CN205062861U (en) | Inspection shaft safety intelligent monitoring system's installation device | |
CN204676523U (en) | A kind of Novel construction steel pile | |
CN205219036U (en) | Multi -functional claw hammer | |
CN201700993U (en) | Hook | |
CN204531050U (en) | Single-pipe tower earthquake resistant structure | |
CN206363236U (en) | A kind of machine box for server for being easy to carry | |
CN207030749U (en) | A kind of ground jack suspension hook locking device | |
CN201953886U (en) | Damper used for bicycle | |
CN201970280U (en) | Hammer | |
CN205852695U (en) | A kind of civil engineering Multifunctional hammer | |
CN205950643U (en) | Block up erecting tool | |
CN212318075U (en) | Safety device for coal mining | |
CN205226807U (en) | Stable form geological survey support | |
CN204053977U (en) | Multifunctional hammer | |
CN204549085U (en) | One is dumping dustbin not | |
CN214356436U (en) | High-voltage bag of motorcycle | |
CN205290858U (en) | Geological hammer device with scalable function of dismantling | |
CN206655666U (en) | A kind of MWD inclinometers erection device | |
CN201887162U (en) | Convenient earthing pole | |
CN210338766U (en) | Square barrel case with stable structure | |
CN205896638U (en) | TV set components of a whole that can function independently mounting |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171222 Termination date: 20190411 |
|
CF01 | Termination of patent right due to non-payment of annual fee |