CN206771823U - A kind of water charging system of air conditioning water pipeline - Google Patents

A kind of water charging system of air conditioning water pipeline Download PDF

Info

Publication number
CN206771823U
CN206771823U CN201720552832.3U CN201720552832U CN206771823U CN 206771823 U CN206771823 U CN 206771823U CN 201720552832 U CN201720552832 U CN 201720552832U CN 206771823 U CN206771823 U CN 206771823U
Authority
CN
China
Prior art keywords
air conditioning
water
charging system
water pipeline
pressure gauge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720552832.3U
Other languages
Chinese (zh)
Inventor
徐健梅
高季源
王东林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anqing Pharmaceutcal Corp Ltd Of Shanghai Baolong
Original Assignee
Anqing Pharmaceutcal Corp Ltd Of Shanghai Baolong
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anqing Pharmaceutcal Corp Ltd Of Shanghai Baolong filed Critical Anqing Pharmaceutcal Corp Ltd Of Shanghai Baolong
Priority to CN201720552832.3U priority Critical patent/CN206771823U/en
Application granted granted Critical
Publication of CN206771823U publication Critical patent/CN206771823U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Pipeline Systems (AREA)

Abstract

The utility model discloses a kind of water charging system of air conditioning water pipeline, and it is directly using water supply pipe with water to air conditioning water pipeline moisturizing.The water charging system includes pressure gauge, the oral siphon for connecting water supply pipe, one end connection air conditioning water pipeline and the other end connection outlet pipe of oral siphon, the valve one for separating or connecting oral siphon and outlet pipe, one end connects with outlet pipe and the other end installs the pressure gauge erecting device of pressure gauge.Pressure gauge erecting device must be positioned at valve one close to the side of air conditioning water pipeline, and pressure gauge has a markd scale area, and the scale area is the desired pressure section of air conditioning water pipeline.Air conditioning water pipeline is in normal condition, the pointer of pressure gauge is pointed in the scale area, when the pointer of pressure gauge declines and drops to the disengaging scale area, water supply pipe is made to air conditioning water pipeline moisturizing by Open valve one, the pointer of pressure gauge is pointed to again in the scale area, turn off valve one.

Description

A kind of water charging system of air conditioning water pipeline
Technical field
It the utility model is related to a kind of water charging system, more particularly to a kind of water charging system of air conditioning water pipeline.
Background technology
In pharmacy procedure, whole plant area's humidity is very big for our company, therefore the water of Floor 3, Factory Room air conditioning water moisturizing Case easily rots, and water tank to Air Conditioning Facilities pipeline also holds corrosion-vulnerable.Using traditional water charging system, it is necessary to remake water Case, maintenance pipeline engineering amount are big, constructional difficulties, costly.And for the environment of humidity superelevation, this is nor long-term plan.
Utility model content
The purpose of this utility model is to provide a kind of water charging system of air conditioning water pipeline, and it abolishes former moisturizing system System, and can accomplish that directly opening realizes that moisturizing enters air-conditioning on water supply pipe using the technical solution of the utility model Chilled water pipeline, improvement and installation is realized, and it is good using operational effect.
Solution of the present utility model is:A kind of water charging system of air conditioning water pipeline, it directly uses running water Pipeline with water to air conditioning water pipeline moisturizing;The water charging system includes:
Oral siphon, its one end connection water supply pipe;
Outlet pipe, its one end connection air conditioning water pipeline, its other end connection oral siphon;
Valve one, it is arranged on oral siphon or outlet pipe, for separating or connecting oral siphon and outlet pipe;
Pressure gauge;
Pressure gauge erecting device, its one end connect with outlet pipe, other end installation pressure gauge;
Wherein, pressure gauge erecting device must be positioned at valve one close to the side of air conditioning water pipeline, and to pressure gauge One of scale area be marked, the scale area be air conditioning water pipeline desired pressure section.
As the further improvement of such scheme, the water charging system also includes suggestion device, and pressure gauge is to be filled with the prompting The electronic pressure gage of electric connection is put, the suggestion device, which declines and dropped in the pointer of pressure gauge, departs from the scale area alarm Prompting.
Further, the suggestion device is buzzer.
Further, the suggestion device is voice announcer.
Further, the suggestion device is indicator lamp.
Further, the suggestion device is display or charactron.
As the further improvement of such scheme, the water charging system also includes the water to be pressurizeed to liquid in oral siphon Pump.
As the further improvement of such scheme, the water charging system also includes valve two, and installation valve two is arranged on water outlet Between pipe and pressure gauge, and kept it turned in air conditioning water pipeline normal operation.
As the further improvement of such scheme, the liquid that the water charging system also includes connecting oral siphon with outlet pipe connects Logical flange.
Further, valve one is arranged on fluid connection flange.
The utility model abolishes former water charging system, using the oral siphon of connection water supply pipe, one end connection air-conditioning freezing Waterpipe and the other end connection outlet pipe of oral siphon, the valve one for separating or connecting oral siphon and outlet pipe, one end with Outlet pipe connects and the pressure gauge erecting device of other end installation pressure gauge, while more importantly, pressure gauge erecting device Valve one be must be positioned at close to the side of air conditioning water pipeline, one of scale area of pressure gauge is marked, the quarter Spend the desired pressure section that area is air conditioning water pipeline;In normal condition, the pointer of pressure gauge refers to air conditioning water pipeline Into the scale area, when the pointer of pressure gauge declines and drops to the disengaging scale area, connected originally by Open valve one Waterpipe makes the pointer of pressure gauge point to again in the scale area into air conditioning water pipeline, and simultaneously by closing valve One cut-off water supply pipe and air conditioning water pipeline.Therefore the utility model can be accomplished directly to be open on water supply pipe Realize that moisturizing enters air conditioning water pipeline, realize improvement and installation, and it is good using operational effect.
Brief description of the drawings
Fig. 1 is the structural representation of the water charging system for the air conditioning water pipeline that the utility model preferred embodiment provides.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining The utility model, it is not used to limit the utility model.
Referring to Fig. 1, the water charging system of air conditioning water pipeline of the present utility model directly uses the use of water supply pipe 2 Water is to the moisturizing of air conditioning water pipeline 1.The water charging system includes oral siphon 9, outlet pipe 8, valve 1, pressure gauge 3, pressure gauge Erecting device 4.
One end connection water supply pipe 2 of oral siphon 9, the other end connect one end of outlet pipe 8, the other end of outlet pipe 8 Connect air conditioning water pipeline 1.Valve 1 is arranged on oral siphon 9 or outlet pipe 8, for separating or connecting oral siphon 9 and go out Water pipe 8, as long as can accomplish to separate or connect oral siphon 9 and outlet pipe 8, valve 1 can choose at random installed in oral siphon 9 or On outlet pipe 8.But after valve 1 installs, the remaining part of water charging system cannot be transferred arbitrarily.
One end of pressure gauge erecting device 4 connects with outlet pipe 8, other end installation pressure gauge 3.Pressure gauge erecting device 4 Valve 1 be must be positioned at close to the side of air conditioning water pipeline 1, and one of scale area of pressure gauge 3 is marked, The scale area is the desired pressure section of air conditioning water pipeline 1.
When in use, air conditioning water pipeline 1 is in normal condition, pressure gauge 3 for the water charging system of air conditioning water pipeline Pointer point in the scale area, valve 1 is constantly in closed mode.Decline in the pointer of pressure gauge 3 and drop to disengaging During the scale area, water supply pipe 2 is connected into air conditioning water pipeline 1 by Open valve 1, makes the pointer of pressure gauge 3 Again point in the scale area, and separate water supply pipe 2 and air conditioning water pipeline 1 by closing valve 1 simultaneously.
Therefore, the scale area is departed from when the pointer for finding pressure gauge 3 declines and dropped to, it is possible to pass through Open valve one 6, moisturizing is carried out to air conditioning water pipeline 1 using water supply pipe 2, the pointer of moisturizing to pressure gauge 3 points to the scale again In area, it is possible to close valve 1., so can be with it is of course also possible to increase to the water pump that liquid is pressurizeed in oral siphon 9 Quickly realize the moisturizing to air conditioning water pipeline 1.
The water charging system of air conditioning water pipeline of the present utility model tries in on-site, works well, if empty Computer room is adjusted positioned at needing on the high-storey of secondary pressurized, then to air conditioning water pipeline moisturizing using respective storey originally Waterpipe, it is complete using design of the present utility model because the water supply pipe of respective storey belongs to secondary water-supply The moisturizing directly to air conditioning water pipeline can be met.It can certainly use and once supply water, increase again when connecing and once supplying water Make-up water pump is pressurizeed.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model All any modification, equivalent and improvement made within the spirit and principle of utility model etc., should be included in the utility model Protection domain within.

Claims (10)

  1. A kind of 1. water charging system of air conditioning water pipeline, it is characterised in that:It is directly using water supply pipe (2) water pair Air conditioning water pipeline (1) moisturizing;The water charging system includes:
    Oral siphon (9), its one end connection water supply pipe (2);
    Outlet pipe (8), its one end connection air conditioning water pipeline (1), its other end connection oral siphon (9);
    Valve one (6), it is arranged on oral siphon (9) or outlet pipe (8), for separating or connecting oral siphon (9) and outlet pipe (8);
    Pressure gauge (3);
    Pressure gauge erecting device (4), its one end connect with outlet pipe (8), other end installation pressure gauge (3);
    Wherein, pressure gauge erecting device (4) must be positioned at valve one (6) close to the side of air conditioning water pipeline (1), and to pressure One of scale area of power table (3) is marked, and the scale area is the desired pressure section of air conditioning water pipeline (1).
  2. 2. the water charging system of air conditioning water pipeline as claimed in claim 1, it is characterised in that:The water charging system also includes carrying Showing device, pressure gauge (3) be with the suggestion device be electrically connected with electronic pressure gage, finger of the suggestion device in pressure gauge (3) Pin, which declines and dropped to, departs from scale area alarm prompting.
  3. 3. the water charging system of air conditioning water pipeline as claimed in claim 2, it is characterised in that:The suggestion device is buzzing Device.
  4. 4. the water charging system of air conditioning water pipeline as claimed in claim 2, it is characterised in that:The suggestion device is broadcast for voice Report device.
  5. 5. the water charging system of air conditioning water pipeline as claimed in claim 2, it is characterised in that:The suggestion device is instruction Lamp.
  6. 6. the water charging system of air conditioning water pipeline as claimed in claim 2, it is characterised in that:The suggestion device is display Or charactron.
  7. 7. the water charging system of air conditioning water pipeline as claimed in claim 1, it is characterised in that:The water charging system also include pair The water pump that oral siphon (9) interior liquid is pressurizeed.
  8. 8. the water charging system of air conditioning water pipeline as claimed in claim 1, it is characterised in that:The water charging system also includes valve Two (5) of door, installation valve two (5) is arranged between outlet pipe (8) and pressure gauge (3), and is normally transported in air conditioning water pipeline Kept it turned on during row.
  9. 9. the water charging system of air conditioning water pipeline as claimed in claim 1, it is characterised in that:The water charging system also includes will The fluid connection flange (7) that oral siphon (9) connects with outlet pipe (8).
  10. 10. the water charging system of air conditioning water pipeline as claimed in claim 9, it is characterised in that:Valve one (6) is arranged on liquid On body connection flange (7).
CN201720552832.3U 2017-05-18 2017-05-18 A kind of water charging system of air conditioning water pipeline Expired - Fee Related CN206771823U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720552832.3U CN206771823U (en) 2017-05-18 2017-05-18 A kind of water charging system of air conditioning water pipeline

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720552832.3U CN206771823U (en) 2017-05-18 2017-05-18 A kind of water charging system of air conditioning water pipeline

Publications (1)

Publication Number Publication Date
CN206771823U true CN206771823U (en) 2017-12-19

Family

ID=60641411

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720552832.3U Expired - Fee Related CN206771823U (en) 2017-05-18 2017-05-18 A kind of water charging system of air conditioning water pipeline

Country Status (1)

Country Link
CN (1) CN206771823U (en)

Similar Documents

Publication Publication Date Title
CN107551837A (en) One kind improvement is safety-type to match somebody with somebody ammonia device and matches somebody with somebody ammonia method automatically automatically
CN101192353A (en) Pipeline oil transportation simulator
CN102650369A (en) Liquefied natural gas filling pry
CN206771823U (en) A kind of water charging system of air conditioning water pipeline
CN205151801U (en) Automatic medicament feeding system
CN204664477U (en) Non-transformer Combined water level control valve
CN207037895U (en) Gas alarm calibrating installation interlocking protective device
CN105688359A (en) Automatic end water-test equipment of automatic water fire extinguishing system
CN204667210U (en) Single-chip Microprocessor Auto filling system
US2918928A (en) Process and apparatus for liquid transfer
CN102012352B (en) Device for measuring density and pH value of slurry
CN208764655U (en) A kind of drain valve drain automatic conveying device
CN104991576A (en) Microcomputer-based full-automatic perfusion system
CN202170544U (en) Water level monitoring device applied in water tank
CN201892031U (en) Gas pipeline drainer
CN206191269U (en) Immersed pump supercharging device of LNG gas station
CN208949973U (en) Open type cold-storage tank moisturizing self-con-tained unit
CN206837276U (en) A kind of integrating device for subway water mists fire-fighting system
CN203642730U (en) Steel spraying water storage tank
CN202179758U (en) Operating room gas terminal box
CN207487022U (en) The waste cold recycle device that a kind of liquid gasification is combined with central air-conditioning
CN106643993B (en) Device for low-temperature test of water supply vertical pipe and water meter
CN204460803U (en) Solar water heater and solar water heater thawing apparatus in winter
CN205048172U (en) City natural gas high -voltage tube intellectual detection system and control system
RU139361U1 (en) CONTROL UNIT SPRINKLER WATER FILLED WITH LIQUID FLOW SIGNALIZER

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219

Termination date: 20200518