CN206769403U - 沟道混凝土浇筑漏斗 - Google Patents
沟道混凝土浇筑漏斗 Download PDFInfo
- Publication number
- CN206769403U CN206769403U CN201720660769.5U CN201720660769U CN206769403U CN 206769403 U CN206769403 U CN 206769403U CN 201720660769 U CN201720660769 U CN 201720660769U CN 206769403 U CN206769403 U CN 206769403U
- Authority
- CN
- China
- Prior art keywords
- sides
- concrete
- limit card
- card board
- material distribution
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
本实用新型公开了一种沟道混凝土浇筑漏斗,包括中间向上拱起、两侧具有坡度的分料台,所述分料台的长度与沟壁模板内壁两侧之间的距离相适配;所述分料台的前后两端分别固定设置有混凝土挡板,所述分料台的左右两侧分别设置有限位卡板,所述限位卡板与所述混凝土挡板固定连接,两侧所述限位卡板之间的距离与沟壁模板外壁两侧之间的距离相适配;所述限位卡板与所述混凝土挡板共同围合形成混凝土容纳槽,两侧所述限位卡板与所述分料台之间分别形成有混凝土漏料口。本实用新型整体结构设计简单,制造方便,能够有效保证现场施工进度,利于减少人力、混凝土浪费,并使混凝土浇筑速度和质量得到有效控制。
Description
技术领域
本实用新型涉及沟道混凝土施工技术领域,具体涉及一种沟道混凝土浇筑漏斗。
背景技术
在电力建设施工中,都会涉及到大量的沟道(电缆沟、排水沟等)施工。早期电力建设领域,沟道浇筑主要有以下施工方案:沟道混凝土施工主要是靠泵送工人直接用泵管浇筑,或在狭窄的空间内人工用铁锹直接浇筑,这些施工方法存在以下缺点:
(1)由于很多沟道沟壁比较薄,泵管浇筑由于速度比较快,容易使很多混凝土抛洒到沟壁外,造成浪费并影响周围安全文明施工,增加了后期的人工清理工作。
(2)在狭窄的空间内,沟道浇筑泵车无法进行施工作业,需要人工用铁锹直接浇筑,这样施工效率极低,需要耗费大量的劳动力。
因此,为了提高施工效率、保障施工质量,需要有新的施工方法和相应的工具以满足工程施工的需要。
实用新型内容
本实用新型所要解决的技术问题是提供一种结构简单合理、利于提高沟道混凝土施工效率、减少混凝土抛洒浪费的沟道混凝土浇筑漏斗。
为解决上述技术问题,本实用新型的技术方案是:沟道混凝土浇筑漏斗,包括中间向上拱起、两侧具有坡度的分料台,所述分料台的长度与沟壁模板内壁两侧之间的距离相适配;所述分料台的前后两端分别固定设置有混凝土挡板,所述分料台的左右两侧分别设置有限位卡板,所述限位卡板与所述混凝土挡板固定连接,两侧所述限位卡板之间的距离与沟壁模板外壁两侧之间的距离相适配;所述限位卡板与所述混凝土挡板共同围合形成混凝土容纳槽,两侧所述限位卡板与所述分料台之间分别形成有混凝土漏料口。
作为优选的技术方案,所述限位卡板的顶端与所述混凝土挡板的顶端相平齐。
作为优选的技术方案,所述混凝土漏料口的宽度与沟壁的厚度相适配。
由于采用了上述技术方案,本实用新型具有以下有益效果:整体结构设计简单,制造方便,能够有效保证现场施工进度,利于减少人力、混凝土浪费,并使混凝土浇筑速度和质量得到有效控制。
附图说明
以下附图仅旨在于对本实用新型做示意性说明和解释,并不限定本实用新型的范围。其中:
图1是本实用新型实施例的俯视结构示意图;
图2是图1中A-A向的剖面示意图;
图3是本实用新型实施例的施工状态参考图。
图中:1-分料台;2-沟壁模板;3-混凝土挡板;4-限位卡板;5-混凝土容纳槽;6-混凝土漏料口;7-泵管。
具体实施方式
下面结合附图和实施例,进一步阐述本实用新型。在下面的详细描述中,只通过说明的方式描述了本实用新型的某些示范性实施例。毋庸置疑,本领域的普通技术人员可以认识到,在不偏离本实用新型的精神和范围的情况下,可以用各种不同的方式对所描述的实施例进行修正。因此,附图和描述在本质上是说明性的,而不是用于限制权利要求的保护范围。
如图1至图3所示,沟道混凝土浇筑漏斗,包括中间向上拱起、两侧具有坡度的分料台1,分料台1便于施工时混凝土向两侧均匀分布骨料并提高浇筑速度;所述分料台1的长度与沟壁模板2内壁两侧之间的距离相适配;所述分料台1的前后两端分别固定设置有混凝土挡板3,所述分料台1的左右两侧分别设置有限位卡板4,两侧的限位卡板4有助于漏斗固定在沟壁模板2上防止其左右摆动,从而有效保证施工质量;所述限位卡板4与所述混凝土挡板3固定连接,两侧所述限位卡板4之间的距离与沟壁模板2外壁两侧之间的距离相适配;所述限位卡板4与所述混凝土挡板3共同围合形成混凝土容纳槽5,有效容量大,能够避免浇筑过程中混凝土溢出,从而避免混凝土材料的浪费;两侧所述限位卡板4与所述分料台1之间分别形成有混凝土漏料口6,混凝土漏料口6的宽度与沟壁的厚度D相适配。其中,所述限位卡板4的顶端最好与所述混凝土挡板3的顶端相平齐。
在制作前,工人可以根据现场施工的沟道宽度进行下料,通常采用15mm或18mm厚的废旧模板制作即可,其中,分料台1宽度优选在30~40cm,混凝土挡板3高度在30cm左右。
参考图3,在沟道混凝土浇筑时,通过两侧的限位卡板4将漏斗固定在沟壁模板2上,将泵管7置于分料台1上方,即可开始浇筑作业;使用此工具仅需要3个人就能完成,1人负责浇筑,1人负责漏斗移动,1人负责混凝土的振捣,能保证混凝土浇筑的更加连贯、快速。
该工具已成功运用于中电建核电工程公司方家庄电厂项目工程,大大提升了工作效率,减少了浇筑过程中10%的混凝土浪费,同时避免了后期清理外漏凝结的混凝土需要的人工,节约了建筑材料,有效保证施工工艺,可重复利用,推广应用前景广阔。
以上所述仅为本实用新型示意性的具体实施方式,并非用以限定本实用新型的范围。任何本领域的技术人员,在不脱离本实用新型的构思和原则的前提下所作出的等同变化与修改,均应属于本实用新型保护的范围。
Claims (3)
1.沟道混凝土浇筑漏斗,其特征在于:包括中间向上拱起、两侧具有坡度的分料台,所述分料台的长度与沟壁模板内壁两侧之间的距离相适配;所述分料台的前后两端分别固定设置有混凝土挡板,所述分料台的左右两侧分别设置有限位卡板,所述限位卡板与所述混凝土挡板固定连接,两侧所述限位卡板之间的距离与沟壁模板外壁两侧之间的距离相适配;所述限位卡板与所述混凝土挡板共同围合形成混凝土容纳槽,两侧所述限位卡板与所述分料台之间分别形成有混凝土漏料口。
2.如权利要求1所述的沟道混凝土浇筑漏斗,其特征在于:所述限位卡板的顶端与所述混凝土挡板的顶端相平齐。
3.如权利要求1或2所述的沟道混凝土浇筑漏斗,其特征在于:所述混凝土漏料口的宽度与沟壁的厚度相适配。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720660769.5U CN206769403U (zh) | 2017-06-08 | 2017-06-08 | 沟道混凝土浇筑漏斗 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720660769.5U CN206769403U (zh) | 2017-06-08 | 2017-06-08 | 沟道混凝土浇筑漏斗 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206769403U true CN206769403U (zh) | 2017-12-19 |
Family
ID=60636614
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720660769.5U Active CN206769403U (zh) | 2017-06-08 | 2017-06-08 | 沟道混凝土浇筑漏斗 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206769403U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403219A (zh) * | 2018-12-25 | 2019-03-01 | 中交公局第工程有限公司 | 一种均匀分散浇筑混凝土的装置 |
CN110777795A (zh) * | 2019-12-09 | 2020-02-11 | 中交一公局第一工程有限公司 | 混凝土管道快速包封浇筑装置及其施工方法 |
-
2017
- 2017-06-08 CN CN201720660769.5U patent/CN206769403U/zh active Active
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109403219A (zh) * | 2018-12-25 | 2019-03-01 | 中交公局第工程有限公司 | 一种均匀分散浇筑混凝土的装置 |
CN110777795A (zh) * | 2019-12-09 | 2020-02-11 | 中交一公局第一工程有限公司 | 混凝土管道快速包封浇筑装置及其施工方法 |
CN110777795B (zh) * | 2019-12-09 | 2024-03-01 | 中交一公局集团有限公司 | 混凝土管道快速包封浇筑装置及其施工方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207616844U (zh) | 基础承台预制混凝土侧模及成型装置 | |
CN207568180U (zh) | 止水坎支模加固结构 | |
CN201738479U (zh) | 屋面伸缩缝一体化盖板防水构造 | |
CN109208575B (zh) | 一种药剂-水平真空联合加固高含水率吹填软土的方法 | |
CN206769403U (zh) | 沟道混凝土浇筑漏斗 | |
CN102587663A (zh) | 一种超高层建筑钢管柱混凝土施工工艺 | |
CN206233596U (zh) | 砌体外墙构造柱混凝土浇筑装置 | |
CN108166750A (zh) | 一种免人工振捣混凝土墙体施工用模板及实施工艺 | |
CN102535746A (zh) | 钢管混凝土柱及其浇筑方法 | |
CN202401668U (zh) | 钢管混凝土柱结构 | |
CN206267179U (zh) | 一种柔性面层土钉墙护坡结构 | |
CN205024827U (zh) | 预制板与梁连接结构 | |
CN209556422U (zh) | 防辐射混凝土楼板结构施工缝的加固结构 | |
CN207419778U (zh) | 一种免拆除墙体浇筑模板装置 | |
CN207176432U (zh) | 一种预制拼装急流槽 | |
CN208379874U (zh) | 一种混凝土叠合板 | |
CN205400050U (zh) | 一种薄壁方箱空心楼盖芯模 | |
CN206319404U (zh) | 一种建筑用预制外模板 | |
CN204455988U (zh) | 一种水利护坡墙 | |
CN207813015U (zh) | 楼板预留洞工具式模板支撑结构 | |
CN207376762U (zh) | 一种防洪电排站 | |
CN203867065U (zh) | 建筑整浇圈梁 | |
CN217924985U (zh) | 一种混凝土养护装置 | |
CN112376569B (zh) | 一种利用废弃降水井作为串筒进行底板浇筑的结构 | |
CN211257067U (zh) | 大断面多舱室现浇综合管廊支模体系 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 250102 Hanyu Jingu A3-3 Building, Jinan High-tech Zone, Shandong Province Patentee after: POWERCHINA NUCLEAR ENGINEERING Co.,Ltd. Address before: 250102 Hanyu Jingu A3-3 Building, Jinan High-tech Zone, Shandong Province Patentee before: POWERCHINA NUCLEAR ENGINEERING Co. |
|
CP01 | Change in the name or title of a patent holder |