CN206769392U - A kind of falsework - Google Patents

A kind of falsework Download PDF

Info

Publication number
CN206769392U
CN206769392U CN201720507708.5U CN201720507708U CN206769392U CN 206769392 U CN206769392 U CN 206769392U CN 201720507708 U CN201720507708 U CN 201720507708U CN 206769392 U CN206769392 U CN 206769392U
Authority
CN
China
Prior art keywords
bar
montant
horizon bar
horizon
perforation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720507708.5U
Other languages
Chinese (zh)
Inventor
伍任雄
张瑜
刘启胤
王斌
黄煌
李军权
段文川
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Original Assignee
Chongqing University
Chongqing Construction Engineering Group Co Ltd
Chongqing Construction Residential Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing University, Chongqing Construction Engineering Group Co Ltd, Chongqing Construction Residential Engineering Co Ltd filed Critical Chongqing University
Priority to CN201720507708.5U priority Critical patent/CN206769392U/en
Application granted granted Critical
Publication of CN206769392U publication Critical patent/CN206769392U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model provides a kind of falsework, including bottom plate, montant, first level bar, the second horizon bar and connecting rod, the connecting rod is connected on the montant, four montants of vertical welding on the bottom plate, the first level bar and the second horizon bar respectively with the montant vertical welding, simultaneously when formwork, second horizon bar is less than thickness of slab apart from the distance of template die plate.The utility model needs the plank sheathing that sets up is one of to be placed on the first level bar and then the emerge to the right one end of the montant of being emerged in the second horizon bar horizontal direction is withstood, other one piece of the plank sheathing for needing to set up is placed on second horizon bar but is not adjacent to the montant, can between the montant and this block plank sheathing cushioning block, it is necessary to which two pieces of the plank sheathing set up can use split bolt etc. fixed after being well placed.

Description

A kind of falsework
Technical field
It the utility model is related to a kind of falsework, and in particular to a kind of falsework.
Background technology
Need constantly to set up beam forms in building construction process, some sealing templates in template die plate and toilet Deng so usually cumbersome, process trouble.
Utility model content
Problem to be solved in the utility model is to provide a kind of template for the above-mentioned deficiency in the presence of prior art Support can set up template directly to the seepproof screen of toilet, convenient to install plank sheathing.
To achieve the above object, the utility model employs following technical scheme:A kind of falsework, including bottom plate, Montant, first level bar, the second horizon bar and connecting rod, the connecting rod are connected on the montant, vertical on the bottom plate Weld four montants, the first level bar and the second horizon bar respectively with the montant vertical welding, first water The distance of the montant of the closest left end of left end of flat bar and second horizon bar be respectively 3cm~6cm and 10cm~ The distance of the montant of the closest right-hand member of right-hand member of 20cm, the first level bar and second horizon bar is respectively 10cm~20cm and 3cm~6cm;Simultaneously when formwork, second horizon bar is less than thickness of slab apart from the distance of template die plate.
Further, a kind of falsework also includes clamp system, and the clamp system includes the first L with inner chamber Shape bar and the 2nd L row bars, the first L-shaped bar correspond to second horizon bar, and the 2nd L row bars correspond to the first level Bar, the first L-shaped bar are provided with the first perforation, and the 2nd L rows bar is provided with the second perforation, and described the is penetrated by bolt The 2nd L row bars that one perforation and the second perforation make to stretch into the first L-shaped bar inner chamber are tightened on the first L shape bars.
Further, the 2nd L row bars stretch into one end of the first L-shaped bar inner chamber and are pushed against described first by spring In L shape bars, second perforation is the perforation that radius is gradually reduced from top to bottom.
Further, hinge is gone back on the first L-shaped bar fastener, and the fastener energy fastener is on second horizon bar.
Compared to prior art, the utility model has the advantages that:The bottom plate of the present utility model welds respectively Entire combination template is placed in the beam form planted after connecing the montant, the first level bar, the second horizon bar and connecting rod, Toilet plank sheathing or seepproof screen plank sheathing are set up on the first level bar and the second horizon bar;Need the plank sheathing set up It is one of to be placed on the first level bar described erect of emerging to the right of then being emerged in the second horizon bar horizontal direction One end of bar is withstood, it is necessary to other one piece of the plank sheathing set up is placed on second horizon bar but is not adjacent to the montant, can With the cushioning block between the montant and this block plank sheathing, it is necessary to which two pieces of the plank sheathing set up can be with to drawing spiral shell after being well placed Bolt etc. is fixed, after mould bases is well placed successively, casting concrete, concrete first out of beam form from bottom to up, while form beam, Plate and toilet seepproof screen etc., the first level bar and the second horizon bar left and right ends are respectively provided with the montant of emerging External part, wherein one section of short external part length is 3cm~6cm, it is ensured that the plank sheathing for needing to set up has with the montant A certain distance, wherein the plank sheathing that one section of long external part length needs to set up for the convenient installations of 10cm~20cm, described the Two horizon bars are more than thickness of slab apart from the distance of template die plate and make concrete outsmart second horizon bar to pour second horizon bar Build with plate.
Further advantage, target and feature of the present utility model embody part by following explanation, and part will also pass through Research of the present utility model and practice are understood by the person skilled in the art.
Brief description of the drawings
Fig. 1 is a kind of falsework front view of the utility model.
A kind of falsework right view of Fig. 2 the utility model.
Fig. 3 is the part A enlarged drawing in the utility model Fig. 1.
Fig. 4 utility models the second horizontal bar structure schematic diagram.
Embodiment
In order that technological means, creation characteristic, reached purpose that the utility model is realized more understand and are easy to acting on Understand, the utility model is further elaborated with reference to the accompanying drawings and detailed description:
It should be noted that " left side " " right side " that the utility model is mentioned is the left and right of accompanying drawing 1.
The utility model proposes a kind of falsework, including bottom plate 1, montant 2, first level bar 3, the second horizon bar 4 With connecting rod 5, the connecting rod 5 is connected on the montant 2, and the montant 2 of vertical welding four, described on the bottom plate 1 The horizon bar 4 of first level bar 3 and second respectively with the vertical welding of montant 2, the first level bar 3 and described second horizontal The distance of the montant 2 of the closest left end of left end of bar 4 is respectively 3cm~6cm and 10cm~20cm, the first level The distance of the montant 2 of the closest right-hand member of right-hand member of bar 3 and second horizon bar 4 is respectively 10cm~20cm and 3cm ~6cm;Simultaneously when formwork, second horizon bar 4 is less than thickness of slab apart from the distance of template die plate.
The montant, the first level bar, the second horizon bar and connection is respectively welded in the bottom plate of the present utility model Entire combination template is placed in the beam form planted after bar, is two, every on the first level bar and the second horizon bar The first level bar and the second horizon bar direction is the same and horizontal direction on be welded on side by side on two montants, described Toilet plank sheathing or seepproof screen plank sheathing are set up on one horizon bar and the second horizon bar;Need the plank sheathing wherein one set up Block, which is placed on the first level bar and then emerged in the second horizon bar horizontal direction, emerges to the right the one of the montant End is withstood, it is necessary to other one piece of the plank sheathing set up is placed on second horizon bar but is not adjacent to the montant, can be in institute Cushioning block between montant and this block plank sheathing is stated, it is necessary to which two pieces of the plank sheathing set up can be solid with split bolt etc. after being well placed It is fixed, after mould bases is well placed successively, casting concrete, concrete first out of beam form from bottom to up, while form beam, plate and Toilet seepproof screen etc., the first level bar and the second horizon bar left and right ends are respectively provided with the stretching for the montant of emerging End, wherein one section of short external part length is 3cm~6cm, it is ensured that the plank sheathing for needing to set up has necessarily with the montant Distance, wherein one section of long external part length is the institute of the closest right-hand member of right-hand member of the first level bar for 10cm~20cm The distance for stating montant is 10cm~20cm and the distance of the montant of the closest left end of left end of second horizon bar is 10cm~20cm, convenient installation need the plank sheathing set up;Simultaneously when formwork, i.e., start casting concrete toward beam form and template die When, the bottom plate is placed in beam form, and now second horizon bar is less than thickness of slab apart from the distance of template die plate expired concrete Second horizon bar second horizon bar pour with plate.
As specific embodiment, a pair of wooden model board clampings that needs are set up for convenience, a kind of falsework is also Including clamp system, the clamp system includes the first L-shaped bar 6 and the 2nd L rows bar 7 with inner chamber, the 2nd L rows bar 7 It can stretch into the first L-shaped bar 6 and slidably reciprocate inside, after a pair of wooden model Board positions for needing to set up are well placed, i.e. institute State the first L-shaped bar 6 and be adjacent to the plank sheathing being placed on second horizon bar 4, the 2nd L rows bar 7 be adjacent to be placed on it is described Plank sheathing on first level bar 3, in order to fix the first L-shaped bar 6 and the 2nd L rows bar 7, the first L-shaped bar 6 The first perforation 10 is provided with, the 2nd L rows bar 7 is provided with the second perforation 9, and first perforation, 10 Hes are penetrated by bolt 8 The 2nd L rows bar 7 that second perforation 9 makes to stretch into the inner chamber of the first L-shaped bar 6 is tightened on the first L-shaped bar 6.
It is described in order to adjust the distance that the 2nd L rows bar 7 is stretched into the first L-shaped bar 6 as specific embodiment One end that 2nd L rows bar 7 stretches into the inner chamber of the first L-shaped bar 6 is pushed against in the first L-shaped bar 6 by spring 18, and described The perforation that two perforation 9 are gradually reduced for radius from top to bottom, second perforation 9 have thread protrusion 11, and the bolt 8 has Thread groove, the thread protrusion 11 also thread groove be engaged enable the bolt 8 described second perforation 9 on constantly Reverse, when the bolt 8 is slowly turned round downwards, the 2nd L rows bar 7 moves right so as to change in the first L-shaped bar 6 The distance for a pair of plank sheathings for needing to set up simultaneously is stepped up.
As specific embodiment, hinge is gone back on the first L-shaped bar 6 fastener 12, and the energy of fastener 12 fastener is described The plate upper level more formed on second horizon bar 4 at its hinge higher than concrete, can after concrete formation plate has been poured Directly to disassemble fastener 12, the fastener 12 it is reserved with concrete slab, the fastener 12 is provided with the 3rd perforation 13, described First L-shaped bar 6 is provided with the 4th perforation 14, by toward the described 3rd perforation 13 and the insertion rod member of the 4th perforation 14 and then described in First L-shaped bar 6 is locked on second horizon bar 4.
As specific embodiment, beam forms 15 is connected with template die plate, and template die plate is more than plate apart from second horizon bar 4 Thickness is, it is necessary to which a pair of the plank sheathings set up are left templates 17 and right mould plate 16.
Finally illustrate, above example is only unrestricted to illustrate the technical solution of the utility model, although ginseng The utility model is described in detail according to preferred embodiment, it will be understood by those within the art that, can be to this The technical scheme of utility model is modified or equivalent substitution, without departing from the objective and model of technical solutions of the utility model Enclose, it all should cover among right of the present utility model.

Claims (4)

  1. A kind of 1. falsework, it is characterised in that:Including bottom plate (1), montant (2), first level bar (3), the second horizon bar (4) With connecting rod (5), the connecting rod (5) is connected on the montant (2), and vertical welding four is described perpendicular on the bottom plate (1) Bar (2), the first level bar (3) and the second horizon bar (4) respectively with the montant (2) vertical welding, the first level The distance of the montant (2) of the closest left end of left end of bar (3) and second horizon bar (4) be respectively 3cm~6cm and The montant of the closest right-hand member of right-hand member of 10cm~20cm, the first level bar (3) and second horizon bar (4) (2) distance is respectively 10cm~20cm and 3cm~6cm;Simultaneously when formwork, second horizon bar (4) is apart from template die plate Distance be less than thickness of slab.
  2. A kind of 2. falsework according to claim 1, it is characterised in that:A kind of falsework also includes clamping machine Structure, the clamp system include the first L-shaped bar (6) and the 2nd L rows bar (7) with inner chamber, and the first L-shaped bar (6) is corresponding Second horizon bar (4), the 2nd L rows bar (7) correspond to the first level bar (3), set on the first L-shaped bar (6) There is the first perforation (10), the 2nd L rows bar (7) is provided with the second perforation (9), and first perforation is penetrated by bolt (8) (10) tightened with second perforation (9) described 2nd L rows bar (7) for making to stretch into the first L-shaped bar (6) inner chamber in the first L On shape bar (6).
  3. A kind of 3. falsework according to claim 2, it is characterised in that:The 2nd L rows bar (7) stretches into the first L One end of shape bar (6) inner chamber is pushed against in the first L-shaped bar (6) by spring (18), and second perforation (9) is from top to bottom The perforation being gradually reduced for radius.
  4. A kind of 4. falsework according to claim 2, it is characterised in that:Going back hinge on the first L-shaped bar (6) has fastener (12), fastener (12) the energy fastener is on second horizon bar (4).
CN201720507708.5U 2017-05-08 2017-05-08 A kind of falsework Expired - Fee Related CN206769392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720507708.5U CN206769392U (en) 2017-05-08 2017-05-08 A kind of falsework

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720507708.5U CN206769392U (en) 2017-05-08 2017-05-08 A kind of falsework

Publications (1)

Publication Number Publication Date
CN206769392U true CN206769392U (en) 2017-12-19

Family

ID=60649534

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720507708.5U Expired - Fee Related CN206769392U (en) 2017-05-08 2017-05-08 A kind of falsework

Country Status (1)

Country Link
CN (1) CN206769392U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221689A (en) * 2018-01-02 2018-06-29 中国建筑第四工程局有限公司 A kind of bridge beam body sealing off and covering anchorage template support method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108221689A (en) * 2018-01-02 2018-06-29 中国建筑第四工程局有限公司 A kind of bridge beam body sealing off and covering anchorage template support method

Similar Documents

Publication Publication Date Title
CN204960311U (en) Door and window entrance to a cave removable mold board bearing structure
CN110778105B (en) Clear water formwork and construction process thereof
CN206769392U (en) A kind of falsework
CN207983649U (en) Precast concrete partition wall adjustable mould
CN210917458U (en) City utility tunnel unilateral side mould frock subassembly
CN205046844U (en) Clear water concrete window steel form structure device that wafts
CN210450585U (en) Forming die who possesses heating function
CN108035544A (en) Expansion joint position shear wall side formwork reinforcing device and construction method
CN103802202B (en) Self-heat-preservatiblock block machine and production method thereof
CN204081475U (en) A kind of adjustable floor one-piece keel structure
CN206707274U (en) A kind of cross beam mould shape steel form
CN205200365U (en) Heat exchanger electric tube expander
CN211615902U (en) Special platform suitable for cutting haunched plate template
CN205519263U (en) Rack stake mould
CN208884842U (en) A kind of crossbeam of integrated fashioned iron class house easy for construction
CN202990423U (en) Shearing force wall opening forming die
CN207086707U (en) Lighting proof strip overlaps the curved processing mold of " second " word
CN211868138U (en) Device for preventing prefabricated box girder centre form come-up
CN221741999U (en) Wall post pouring template fixed establishment
CN219599875U (en) Special forming equipment for producing light composite wallboard
CN211080301U (en) Side wall template structure of subway station shield well
CN214034794U (en) Telescopic template reinforcing apparatus
CN217840865U (en) Cast-in-place area of assembled superimposed sheet hangs mould device
CN210439688U (en) Door opening template device
CN209832018U (en) Assembled wallboard making devices

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219

Termination date: 20210508

CF01 Termination of patent right due to non-payment of annual fee