CN206769384U - One kind is lower to hang steel pipe outsourcing post forming panel - Google Patents
One kind is lower to hang steel pipe outsourcing post forming panel Download PDFInfo
- Publication number
- CN206769384U CN206769384U CN201720324737.8U CN201720324737U CN206769384U CN 206769384 U CN206769384 U CN 206769384U CN 201720324737 U CN201720324737 U CN 201720324737U CN 206769384 U CN206769384 U CN 206769384U
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- bottom plate
- perforating
- closure plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The utility model discloses extension steel pipe outsourcing post forming panel under one kind, including:For being molded the bottom plate of outsourcing post downside, the perforating steel pipe that inscribe Circular Aperture is more than target perforating steel pipe external diameter is provided with the middle part of the bottom plate;Closure plate, for blocking the gap between the perforating steel pipe hole wall and the target steel pipe of the bottom plate, the edge downside of the closure plate offsets with the bottom plate upper side and being capable of relatively described bottom plate transverse shifting.In the mould, the reinforced steel bar perforation diameter of bottom plate is tuned up, so that bottom plate can be with relative target steel pipe movement, can be adjusted to target location.Closure plate is used simultaneously, the gap blocked between bottom plate perforating steel pipe hole wall and target steel pipe, slurry can be avoided to be fallen from gap, ensure that the bottom surface of the outsourcing post is molded, while is capable of the position of fixed steel bars by the bottom plate.Based on this, the lower extension steel pipe outsourcing post forming panel can efficiently solve the problem of lower extension steel pipe outsourcing post shaping cost is big.
Description
Technical field
Architectural Equipment technical field is the utility model is related to, is molded more specifically to steel pipe outsourcing post is hung under one kind
Template.
Background technology
As high-rise building is more and more, urban centre reconstruction and extension project considers to build multi-storey basement and surrounding is close
It is stable to collect groups of building, contrary sequence method is more and more used, and the current vertical supporting component of reverse construction uses concrete filled steel tubular column more
Or concrete filled square steel tubular columns, contrary sequence method consider that " semi-inverse method " is designed to use more, i.e. underground chamber base from economic and environment-friendly angle at present
Structure is inverse to be made, and ground body structure portion is suitable to be done." semi-inverse method " basement concrete filled steel tubular column need to be before main structure construction, in steel
Reinforced concrete enveloped forms reinforced concrete square columns around pipe concrete post, reaches basic vertical member support before main structure construction
The peak load that can reach, so as to contentedly upper main structure construction requirement.
During right adverse construction method basement part, on the downside of floor, immediately floor face do one be wrapped on the outside of light pipe and under
Hanging column under vertical mixed mud, multiple reinforcing bars being enclosed on the outside of steel pipe is interspersed with lower hanging column, the upper end of reinforcing bar is inserted into lower extension
In post, lower end is exposed.Because steel pipe there may be deviation when default, then cause the lower extension being molded in the center of circle of steel pipe and needs
Post central cross deviates, so when hanging column is molded collet under making, exists between reinforced hole and the steel pipe hole reserved at middle part
Certain deviation, and then cause, it is necessary to which site setup template, for the versatility of template than relatively low, cost is huge.
In summary, the problem of lower extension steel pipe outsourcing post shaping cost is big how is efficiently solved, is current this area skill
Art personnel's urgent problem.
Utility model content
In view of this, the purpose of this utility model is to provide extension steel pipe outsourcing post forming panel, the lower extension steel under one kind
Pipe outsourcing post forming panel can efficiently solve the problem of lower extension steel pipe outsourcing post shaping cost is big.
In order to achieve the above object, the utility model provides following technical scheme:
The lower extension steel pipe outsourcing post forming panel of one kind, including:
Inscribe Circular Aperture is provided with for being molded the bottom plate of outsourcing post downside, in the middle part of the bottom plate to wear more than target steel pipe
The perforating steel pipe of hole external diameter, and the aperture reinforced steel bar perforation equal with target bar diameter is provided with precalculated position;
Closure plate, for blocking the gap between the perforating steel pipe hole wall and the target steel pipe of the bottom plate, the closure plate
Edge downside and the bottom plate upper side offset and can relatively described bottom plate transverse shifting, the middle part of the closure plate is set
There is the aperture perforating steel pipe equal with the aperture of the target steel pipe, the reinforced steel bar perforation of the bottom plate is located at the closure plate edge
Outside.
Preferably, the perforating steel pipe of the bottom plate is rounded, and the closure plate is in annular.
Preferably, the external diameter of the closure plate is more than the perforating steel pipe aperture of the bottom plate, and is worn with the steel pipe of the bottom plate
Hole aperture difference is equal to the difference in the perforating steel pipe aperture of the bottom plate and the perforating steel pipe aperture of closure plate.
Preferably, including side profiled sheeting, the surrounding of the bottom plate are provided with for limiting side profiled sheeting lateral attitude
Neck.
Preferably, bottom plate is half-and-half separated into two detachable scoreboards, the closure plate be half-and-half separated into two it is detachable
Scoreboard.
Preferably, the baseplate underside is provided with the connector for two pieces of scoreboards of the bottom plate to be fixedly connected.
Preferably, two pieces of scoreboards of the closure plate pass through the latch grafting that laterally sets.
Preferably, the bottom plate, the closure plate and the side profiled sheeting are steel plate.
A kind of lower extension steel pipe outsourcing post forming panel provided by the utility model, the specific lower extension steel pipe outsourcing post shaping
Template includes bottom plate and closure plate, and its bottom plate is used to be molded outsourcing post downside, and portion is provided with perforating steel pipe in the soleplate,
And the inscribe Circular Aperture of the perforating steel pipe of bottom plate is more than target outer diameter of steel pipes, during so that target steel pipe passing through the perforating steel pipe, energy
Enough there is certain activity space, and the aperture reinforced steel bar perforation equal with target bar diameter is provided with precalculated position.Wherein
Closure plate is used to block the gap between the perforating steel pipe hole wall and target steel pipe of bottom plate, to avoid mortar gap that reverse mould is molded
In slip out.And the aperture perforating steel pipe equal with the aperture of target steel pipe is provided with the middle part of closure plate, while the reinforcing bar of bottom plate
Perforation, to ensure when closure plate moves, avoids reinforcing bar from preventing the movement of closure plate opposed bottom positioned at the outside at closure plate edge.
According to above-mentioned technical scheme, it is recognised that wearing steel pipe during the lower extension steel pipe outsourcing post forming panel in application
Hole sequentially passes through closure plate and bottom plate, it is contemplated that the position of baseplate molding, so closure plate can now relatively moved with bottom plate, with
Bottom plate is set to be located at predetermined shaping position, and closure plate is remained with target steel pipe and is relatively fixed.In forming process, because closure plate
It can be covered in the gap between the hole wall of bottom plate perforating steel pipe and target steel pipe, it is possible to avoid the occurrence of spillage, carry out
Ensure the shaping of the outsourcing post bottom surface.In the lower extension steel pipe outsourcing post mould, the reinforced steel bar perforation diameter of bottom plate has been tuned up,
So that bottom plate can be with relative target steel pipe movement, can be adjusted to target location.Closure plate is used simultaneously, bottom plate steel pipe is blocked and wears
Gap between hole hole wall and target steel pipe, slurry can be avoided to be fallen from gap, with ensure that the bottom surface of the outsourcing post into
Type, while it is capable of by the bottom plate position of fixed steel bars.Based on this, the lower extension steel pipe outsourcing post forming panel can be effectively
Solve the problems, such as down that extension steel pipe outsourcing post shaping cost is big.
Brief description of the drawings
, below will be to embodiment in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
Or the required accompanying drawing used is briefly described in description of the prior art, it should be apparent that, drawings in the following description are only
It is some embodiments of the utility model, for those of ordinary skill in the art, is not paying the premise of creative work
Under, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the partial structural diagram for the lower extension steel pipe outsourcing post forming panel that the utility model embodiment provides.
Marked in accompanying drawing as follows:
Bottom plate 1, closure plate 2, target steel pipe 3, reinforced steel bar perforation 4.
Embodiment
The utility model embodiment discloses extension steel pipe outsourcing post forming panel under one kind, to efficiently solve lower extension steel pipe
The problem of outsourcing post shaping cost is big.
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, Fig. 1 is the partial structurtes for the lower extension steel pipe outsourcing post forming panel that the utility model embodiment provides
Schematic diagram.
In a kind of specific embodiment, extension steel pipe outsourcing post forming panel under one kind is present embodiments provided, specifically should
Lower extension steel pipe outsourcing post forming panel includes bottom plate 1 and closure plate 2, will also include other necessary parts certainly, is such as used to be molded this
The lower side profiled sheeting for hanging steel pipe outsourcing post side.Its bottom plate 1, closure plate 2 and side profiled sheeting, plank can be used, but
Allowing for the lower extension steel pipe outsourcing post profiled sheeting needs long term frequent to use, based on this, preferred bottom plate 1, closure plate 2 and side herein
Face profiled sheeting is steel plate.
Its bottom plate 1 is used to be molded outsourcing post downside, i.e., in forming process, the upper surface of bottom plate 1 is used for and steel pipe
The downside of outsourcing post offsets, with the downside of shaping steel tube outsourcing post.
And the middle part of bottom plate 1 is provided with perforating steel pipe, and the inscribe Circular Aperture of the perforating steel pipe of bottom plate 1 is more than target steel
The external diameter of pipe 3, during so that target steel pipe 3 passing through the perforating steel pipe, there can be certain activity space, to adapt to target steel pipe 3
Opposed bottom 1 moves.It should be noted that the cross section of the perforating steel pipe of the bottom plate 1 can be oval, square or polygon
Shape, it is contemplated that, the position that the diameter of axle opposed bottom 1 of steel pipe deviates should in a border circular areas, so, based on this,
The cross section of preferred perforating steel pipe is circle herein.
And the aperture reinforced steel bar perforation 4 equal with target bar diameter, wherein precalculated position are provided with precalculated position, should
Determined according to the reinforcement location required for the lower extension steel pipe outsourcing post, usually multiple reinforcing bars are uniformly arranged around steel pipe, specifically
Can use ten six roots of sensation reinforcing bars around steel pipe arrangement.Wherein reinforced steel bar perforation 4 is consistent with the diameter of target reinforcing bar, can be with stabilized steel
The position of muscle perforation 4.
Wherein closure plate 2 is used to block the gap between the perforating steel pipe hole wall and target steel pipe 3 of bottom plate 1, to avoid reverse mould
The mortar of shaping slips out from the gap.Further, the edge downside of closure plate 2 and the upper side of bottom plate 1 are offseted, i.e. closure plate
2 are placed on the upside of bottom plate 1, and be able to should ensure closure plate 2 can opposed bottom 1 transversely relatively move.And in closure plate 2
Portion is provided with the aperture perforating steel pipe equal with the aperture of target steel pipe 3, by the perforating steel pipe of itself of closure plate 2, can ensure
The perforating steel pipe hole wall of closure plate 2 can closely offset with the surface of steel pipe, to avoid producing gap between the two.Bottom plate 1 simultaneously
Reinforced steel bar perforation 4 be located at the outside at the edge of closure plate 2, to ensure when closure plate 2 moves, avoid reinforcing bar from preventing closure plate 2 relative
Bottom plate 1 moves.
In the present embodiment, perforating steel pipe is made to sequentially pass through closure plate 2 during the lower extension steel pipe outsourcing post forming panel in application
With bottom plate 1, it is contemplated that the position that bottom plate 1 is molded, so now closure plate 2 can be made to be relatively moved with bottom plate 1, so that bottom plate 1
In predetermined shaping position, and closure plate 2 is remained with target steel pipe 3 and is relatively fixed.In forming process, because closure plate 2 can
It is covered in the gap between the hole wall and target steel pipe 3 of the perforating steel pipe of bottom plate 1, it is possible to avoid the occurrence of spillage, protected
Demonstrate,prove the shaping of the outsourcing post bottom surface.In the lower extension steel pipe outsourcing post mould, the diameter of reinforced steel bar perforation 4 of bottom plate 1 has been tuned up,
So that bottom plate 1 can be moved with relative target steel pipe 3, can be adjusted to target location.Closure plate 2 is used simultaneously, blocks the steel of bottom plate 1
The gap that pipe is perforated between hole wall and target steel pipe 3, can avoid slurry from being fallen from gap, ensure that the bottom of the outsourcing post
Face is molded, while is capable of the position of fixed steel bars by the bottom plate 1.Based on this, the lower extension steel pipe outsourcing post forming panel can
Efficiently solve the problem of lower extension steel pipe outsourcing post shaping cost is big.
The region that diameter of axle opposed bottom 1 such as above-mentioned target steel pipe 3 deviates is a border circular areas, excellent herein based on this
Select the perforating steel pipe of bottom plate 1 rounded.Accordingly, in order to avoid the area of closure plate 2 is excessive, and reinforced hole on bottom plate 1 is influenceed
Arrangement, preferred closure plate 2 is in annular herein.Further, herein preferably, not only the external diameter of closure plate 2 is worn more than the steel pipe of bottom plate 1
Hole aperture, and the perforating steel pipe aperture difference of the external diameter of the closure plate 2 and bottom plate 1 is equal to the perforating steel pipe aperture of bottom plate 1 with blocking up
The difference in the perforating steel pipe aperture of plate 2, to ensure, when target steel pipe 3 is in peak excursion position, outside the part of the closure plate 2
Along the boundary position for being in the perforating steel pipe aperture of bottom plate 1.
Further, after bottom plate 1 and closure plate 2 is assembled, that is, seating side profiled sheeting is needed, in order to facilitate installation side
Face profiled sheeting, ensure the precise degrees of side shaping, herein preferably, be provided with the surrounding of bottom plate 1 for limiting side shaping
The neck of plate lateral attitude, it is contemplated that outsourcing post is in integrally cube, so general neck is in rectangular layout, in each of neck
Opening is provided with individual straightway, to facilitate side profiled sheeting to insert in laterally inserted neck.
In view of the length of target steel pipe 3 that in actual underground job, is frequently run onto all at more than ten meters, based on this preferred bottom
Plate 1 preferably half-and-half separates to being partly separated into two detachable scoreboards along the center line of bottom plate 1, certainly on the basis of scoreboard
On can also further be separated, this is no longer going to repeat them.It is made up of multiple scoreboards, so as to be separated by scoreboard, makes
Steel pipe can be entered laterally in perforating steel pipe.Likewise, for closure plate 2, preferred pair is semi-detached to be shaped as detachable scoreboard,
And preferably half-and-half separated along center line, so that after being separated by two scoreboards of the closure plate 2, target steel pipe 3 can be made laterally to enter
Enter into perforating steel pipe, then by two scoreboard assembling synthesis.
Further, for bottom plate 1, because the active force of mortar is top-down, two points of bottom plate 1
Do not apply any constraint component between plate, can ensure that the position of two scoreboards is relatively stable yet, but in actual installation, bottom
Need to install other parts on plate 1, in installation process, the installing force applied easily causes two pieces of scoreboards separation of bottom plate 1.
Based on this, herein preferably, the connector for two pieces of piecemeals of bottom plate 1 to be fixedly connected is provided with the downside of bottom plate 1.
And for closure plate 2, in order to avoid deviation, herein it is also preferred that two pieces of scoreboards of closure plate 2 are connected, it is contemplated that
Arrive, the upper side of closure plate 2 is forming surface, and downside offsets with bottom plate 1, so being inconvenient to set.Simultaneously in view of on closure plate 2
Other parts need not be installed, based on this, herein preferably, two pieces of scoreboards of closure plate 2 are by the latch grafting that laterally sets, to protect
It is relatively stable to hold both.
Each embodiment is described by the way of progressive in this specification, what each embodiment stressed be and other
The difference of embodiment, between each embodiment identical similar portion mutually referring to.
The foregoing description of the disclosed embodiments, professional and technical personnel in the field are enable to realize or new using this practicality
Type.A variety of modifications to these embodiments will be apparent for those skilled in the art, determine herein
The General Principle of justice can be realized in other embodiments in the case where not departing from spirit or scope of the present utility model.Cause
This, the utility model is not intended to be limited to the embodiments shown herein, and is to fit to and principles disclosed herein
The most wide scope consistent with features of novelty.
Claims (8)
1. one kind is lower to hang steel pipe outsourcing post forming panel, it is characterised in that including:
For being molded the bottom plate of outsourcing post downside, inscribe Circular Aperture is provided with the middle part of the bottom plate more than outside target perforating steel pipe
The perforating steel pipe in footpath, and the aperture reinforced steel bar perforation equal with target bar diameter is provided with precalculated position;
Closure plate, for blocking the gap between the perforating steel pipe hole wall and the target steel pipe of the bottom plate, the side of the closure plate
Offseted along downside and the bottom plate upper side and can relatively described bottom plate transverse shifting, be provided with hole in the middle part of the closure plate
The footpath perforating steel pipe equal with the aperture of the target steel pipe, the reinforced steel bar perforation of the bottom plate are located at the outer of the closure plate edge
Side.
2. lower extension steel pipe outsourcing post forming panel according to claim 1, it is characterised in that the perforating steel pipe of the bottom plate
Rounded, the closure plate is in annular.
3. lower extension steel pipe outsourcing post forming panel according to claim 2, it is characterised in that the external diameter of the closure plate is more than
The perforating steel pipe aperture of the bottom plate, and it is equal to the perforating steel pipe aperture difference of the bottom plate perforating steel pipe hole of the bottom plate
Footpath and the difference in the perforating steel pipe aperture of closure plate.
4. the lower extension steel pipe outsourcing post forming panel according to claim any one of 1-3, it is characterised in that including side into
Template, the surrounding of the bottom plate are provided with the neck for limiting side profiled sheeting lateral attitude.
5. lower extension steel pipe outsourcing post forming panel according to claim 4, it is characterised in that bottom plate is half-and-half separated into two
Detachable scoreboard, the closure plate are half-and-half separated into two detachable scoreboards.
6. lower extension steel pipe outsourcing post forming panel according to claim 5, it is characterised in that the baseplate underside is provided with
For the connector for being fixedly connected with two pieces of scoreboards of the bottom plate.
7. lower extension steel pipe outsourcing post forming panel according to claim 6, it is characterised in that two pieces of scoreboards of the closure plate
Pass through the latch grafting laterally set.
8. lower extension steel pipe outsourcing post forming panel according to claim 7, it is characterised in that the bottom plate, the closure plate
It is steel plate with the side profiled sheeting.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720324737.8U CN206769384U (en) | 2017-03-29 | 2017-03-29 | One kind is lower to hang steel pipe outsourcing post forming panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720324737.8U CN206769384U (en) | 2017-03-29 | 2017-03-29 | One kind is lower to hang steel pipe outsourcing post forming panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206769384U true CN206769384U (en) | 2017-12-19 |
Family
ID=60631134
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720324737.8U Expired - Fee Related CN206769384U (en) | 2017-03-29 | 2017-03-29 | One kind is lower to hang steel pipe outsourcing post forming panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206769384U (en) |
-
2017
- 2017-03-29 CN CN201720324737.8U patent/CN206769384U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10465374B2 (en) | Frame structure and method of constructing frame structure | |
CN106758833B (en) | A kind of hydraulic climbing die block system for the construction of small-sized variable cross-section pier | |
CN108487256B (en) | Reinforced structure and method for deepening and super-digging foundation pit | |
CN104947603B (en) | A kind of rc beam bridge girder reinforcing construction and reinforcement means | |
CN107227814A (en) | A kind of large cantilever concrete structure section construction method | |
CN103628575A (en) | Large-altitude-difference variable-section concrete structure construction joint and construction method thereof | |
CN205653902U (en) | Floor entrance to a cave block structure | |
CN107724540A (en) | Steel plate shear force wall and the attachment structure and its construction method of steel bar girder floor plates | |
CN206769384U (en) | One kind is lower to hang steel pipe outsourcing post forming panel | |
CN105297890A (en) | Anchor connection node for buckling-restrained brace and concrete beam-column steel angles | |
CN110541429B (en) | Energy-consuming bolt type connecting method for connecting concrete prefabricated column and foundation | |
CN205954681U (en) | A structure for locating assembly piping lane reinforcing bar | |
KR100290257B1 (en) | Assembly block for construction of retaining wall | |
CN204825945U (en) | A fixture for fixing buried bolt in advance | |
CN204850244U (en) | Steel bar support rod split heads structure | |
KR101868974B1 (en) | Fabricated block for constructing ridge between rice paddies | |
CN107060093B (en) | The support system and assembling method of large-scale oblique braiding gusset plate latticed shell structure | |
CN207484200U (en) | Ashlar brick | |
KR101248173B1 (en) | Bottom-pillar-beam coupling structure of prefab water-storage tank | |
CN207498935U (en) | A kind of civil engineering built pile | |
CN205766787U (en) | Space segmentation template | |
CN105507475A (en) | Continuous alternative semiconical roof and construction method thereof | |
CN206233612U (en) | Core Walls Structure cast-in-place concrete wet curing system | |
CN205206351U (en) | Special split heads of big terrace | |
CN205077503U (en) | Prefabricated basis of building |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171219 |
|
CF01 | Termination of patent right due to non-payment of annual fee |