CN206769169U - A kind of adjustable steel structural transition layer suspension member - Google Patents

A kind of adjustable steel structural transition layer suspension member Download PDF

Info

Publication number
CN206769169U
CN206769169U CN201720524260.8U CN201720524260U CN206769169U CN 206769169 U CN206769169 U CN 206769169U CN 201720524260 U CN201720524260 U CN 201720524260U CN 206769169 U CN206769169 U CN 206769169U
Authority
CN
China
Prior art keywords
cross
suspension member
steel structural
transition layer
arm
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720524260.8U
Other languages
Chinese (zh)
Inventor
严军勇
杨智辉
江杰
陈晋强
张绮珊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHENZHEN BAUING CONSTRUCTION GROUP Co Ltd
Original Assignee
SHENZHEN BAUING CONSTRUCTION GROUP Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHENZHEN BAUING CONSTRUCTION GROUP Co Ltd filed Critical SHENZHEN BAUING CONSTRUCTION GROUP Co Ltd
Priority to CN201720524260.8U priority Critical patent/CN206769169U/en
Application granted granted Critical
Publication of CN206769169U publication Critical patent/CN206769169U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides a kind of adjustable steel structural transition layer suspension member, including two groups of hoop components, the cross-arm being connected to below hoop component, the upper end mounting ear of hoop component described in every group is mutually butted, its lower end mounting ear fits in the both sides of the cross-arm, is bolted;The cross-arm lower end has hung cross flange by hemisphere bolt;The hemispherical projections of the hemisphere bolt lower end adaptedly holding in the hemispherical neck of the cross flange;Each elongated end of the cross flange has been bolted connector, and the bare terminal end on the outside of the connector has been bolted conversion layer side and led to.The utility model have installation it is simple, can flexible modulation, economical and practical, easy disassembly the characteristics of.

Description

A kind of adjustable steel structural transition layer suspension member
Technical field
Building decoration area is the utility model is related to, more particularly, to a kind of adjustable steel structural transition layer suspension member.
Background technology
In modern architecture, large-size net rack structure has been widely used as the roof system of large space, and indoor ceiling fills Decorations will typically be constructed by conversion layer structure, and conversion layer is connected to the lower boom lower end of grid structure.At present, generally Way be that the square steel tube of conversion layer is directly welded on the lower boom of grid structure, have the shortcomings that this way:(1) it is excessive Welding procedure can slacken the stress of each steel structural rod piece, so as to reduce integrally-built stability;(2) traditional steel construction conversion Layer can not be adjusted according to indoor ceiling design form, significant limitation be present, and later maintenance is inconvenient.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of adjustable steel structural transition layer suspension member, has installation letter It is single, can flexible modulation, economical and practical, easy disassembly the characteristics of.
In order to solve the above-mentioned technical problem, the utility model provides a kind of adjustable steel structural transition layer suspension member, including two Group hoop component, the cross-arm that is connected to below hoop component, the upper end mounting ear of hoop component described in every group is mutually butted, under it End mounting ear fits in the both sides of the cross-arm, is bolted;The cross-arm lower end has hung cross by hemisphere bolt Flange;The hemispherical projections of the hemisphere bolt lower end adaptedly holding in the hemispherical neck of the cross flange;It is described Each elongated end of cross flange has been bolted connector, and the bare terminal end on the outside of the connector has been bolted Conversion layer side leads to.
It is preferred that the circular hole one of horizontally-parallel spacing arrangement, vertical is opened up on the elongated end of the cross flange Slotted hole, the inner side connection end of the connector fit in the elongated end side, two circular holes two thereon respectively with it is described Circular hole one and vertical slotted hole align one by one after, insertion bolt connection.
It is preferred that the transverse width of the vertical slotted hole is identical with the diameter of the circular hole one and circular hole two; The vertical extension of the vertical slotted hole is more than its transverse width.
It is preferred that the bare terminal end of the connector is provided with the holding piece of two panels parallel interval arrangement, described in every The horizontal slotted hole of two vertical parallel spacing arrangements is offered on holding piece respectively;The logical end in the conversion layer side is plugged on Between described two holding pieces, two circular holes three of its end alignd one by one with two horizontal slotted holes after, penetrate bolt Connection.
It is preferred that the vertical extension of the horizontal slotted hole is identical with the diameter of the circular hole three;The transverse direction The transverse width of slotted hole is more than its vertical extension.
It is preferred that the cross-arm or conversion layer side are logical, to be that square steel is logical be made.
A kind of adjustable steel structural transition layer suspension member is the utility model is related to, compared with existing design, the advantage is that: (1) steel construction of conversion layer is installed on the lower boom of grid structure by anchor ear, cross-arm, cross flange, integral installation structure Welding procedure is not used, is bolted completely, steadiness is more preferable, and construction quality is protected.(2) hemisphere bolt makes With can adjust the height of conversion layer installation, and realize the regulation of lower end conversion layer level angle;Cross flange and connector It is connected with each other, the logical angle in every conversion layer side can be adjusted;The connection that connector leads to conversion layer side, it is possible to achieve every turns Change the horizontal displacement that layer side leads to;It is adjusted with realizing that conversion layer can be directed to the design of arc-shaped curved surface smallpox, forms continuous globality Cambered surface steel structure conversion layer.(3) the utility model steel construction conversion layer suspension member field-mounted process is simple, saves human cost. (4) the utility model steel construction conversion layer suspension member is all connected by screw bolts, in that context it may be convenient to the adjustment of smallpox flatness is carried out, Convenient disassembly, facilitate later maintenance or change parts.
Brief description of the drawings
Fig. 1 is the utility model adjustable steel structural transition layer suspension member schematic perspective view.
Fig. 2 is the utility model adjustable steel structural transition layer suspension member decomposing schematic representation.
Fig. 3 is the utility model hemisphere bolt schematic diagram.
Fig. 4 is the utility model cross flange schematic diagram.
Fig. 5 is the utility model connector schematic diagram.
Fig. 6 is the utility model adjustable steel structural transition layer suspension member use state diagram one.
Fig. 7 is the utility model adjustable steel structural transition layer suspension member use state diagram two.
Reference is as follows:
1- hoop components, 11- upper ends mounting ear, 12- lower ends mounting ear, 2- cross-arms, 3- hemisphere bolt,
31- hemispherical projections, 32- screw rods, 4- crosses flange, 41- elongated ends, 411- circular holes one, 412-
Vertical slotted hole, 42- hemisphericals neck, 5- connectors, 51- connection ends, 511- circular holes two, 52-
Bare terminal end, 521- transverse directions slotted hole, 6- conversion layer sides are logical, 61- circular holes three.
Embodiment
It the utility model is related to a kind of adjustable steel structural transition layer suspension member, including two groups of hoop components 1, be connected to anchor ear The cross-arm 2 of the lower end of component 1, the cross flange 4 for being connected to the lower end of cross-arm 2, the conversion layer side for being connected to 4 each end of cross flange Logical 6.Illustrated below in conjunction with Fig. 1-7 pairs of the utility model,
The utility model adjustable steel structural transition layer suspension member, as shown in figure 1, two groups of intervals of hoop component 1 are arranged on and built On the lower boom for building thing grid structure, every group of hoop component 1 is located at two panels upper end mounting ear 11 above lower boom each other Dock, be bolted fixation;The two panels lower end mounting ear 12 that every group of hoop component 1 is located at below lower boom fits in respectively The both sides of cross-arm 2, it is bolted, crosspiece is connected to the lower end of grid beam lower boom, crosspiece plays a part of balance.
Cross flange 4 has been hung on cross-arm 2, between two groups of hoop components 1, by hemisphere bolt 3;As in Figure 2-4, Cross flange 4 is provided centrally with downward opening hemispherical neck 42, the hemispherical projections 31 of the lower end of hemisphere bolt 3 from lower and On adaptedly holding is in the hemispherical neck 42, the screw rod 32 of the upper end of hemisphere bolt 3 is through the top of hemispherical neck 42 Through hole, the through hole being set on the cross-arm 2 of upper end, and fixed by nut;Hemispherical projections 31 can be in hemispherical neck Inside rotate freely, to realize the regulation of lower end conversion layer level angle.Pass through the vertical relative position of adjusting screw rod 32 and cross-arm 2 Relation, to adjust being horizontally mounted highly for lower end conversion layer.
As illustrated in figures 4-5, the circular hole 1 of horizontally-parallel spacing arrangement is opened up on the elongated end 41 of cross flange 4, is erected To slotted hole 412, the vertical extension of vertical slotted hole 412 is more than the diameter of circular hole 1;The inner side connection end 51 of connector 5 On open up two horizontally-parallel spacing arrangements, with the diameter identical circular hole 2 511 of circular hole 1;The inner side connection of connector 5 The sides that end 51 fits in elongated end 41, two circular holes 2 511 thereon respectively with circular hole 1 and vertical slotted hole 412 1 After one or so alignment, insert bolt connection.Wherein, as shown in fig. 6-7, the vertical extension of vertical slotted hole 412 is more than circular hole one 411 and the diameter of circular hole 2 511, realizing connector 5 can be with circular hole 1 for the center of circle, in the vertical length of vertical slotted hole 412 Rotated up and down in the range of degree, that is, realize and the logical setting angle in conversion layer side is adjusted according to in-site installation requirement, to adapt to arc Curved surface smallpox design requirement.
As shown in figure 5, the bare terminal end 52 in the outside of the utility model connector 5 is provided with the clamping of two panels parallel interval arrangement Piece, the horizontal slotted hole 521 of two vertical parallel spacings arrangements is offered on every holding piece respectively;The end of conversion layer side logical 6 Portion offers vertical spacing arrangement, diameter and horizontal slotted hole 521 vertical extension identical circular hole 3 61;Conversion layer side leads to 6 end is plugged between two holding pieces, two circular holes 3 61 with after two horizontal slotted holes 521 one by one consistency from top to bottom, wear Enter bolt connection.Wherein, the transverse width of horizontal slotted hole 521 is more than its vertical extension, and conversion layer side logical 6 can be laterally oval Moved in hole 521, to realize the logical distance between cross flange in adjustment conversion layer side.
The cross-arm 2 of the utility model adjustable steel structural transition layer suspension member or conversion layer side logical 6, which are that square steel is logical, to be made.

Claims (6)

  1. A kind of 1. adjustable steel structural transition layer suspension member, it is characterised in that:Including two groups of hoop components (1), it is connected to anchor ear group Cross-arm (2) below part (1), the upper end mounting ear (11) of hoop component (1) described in every group is mutually butted, its lower end mounting ear (12) both sides of the cross-arm (2) are fitted in, are bolted;Cross-arm (2) lower end has been hung by hemisphere bolt (3) Cross flange (4);The hemispherical projections (31) of hemisphere bolt (3) lower end adaptedly holding in the cross flange (4) In hemispherical neck (42);Each elongated end (41) of the cross flange (4) has been bolted connector (5), described Bare terminal end (52) on the outside of connector (5) has been bolted conversion layer side and has led to (6).
  2. A kind of 2. adjustable steel structural transition layer suspension member according to claim 1, it is characterised in that:The cross flange (4) circular hole one (411), the vertical slotted hole (412) of horizontally-parallel spacing arrangement, the connector are opened up on elongated end (41) (5) inner side connection end (51) fits in the elongated end side, two circular holes two (511) thereon respectively with the circular hole one (411) and vertical slotted hole (412) align one by one after, insertion bolt connection.
  3. A kind of 3. adjustable steel structural transition layer suspension member according to claim 2, it is characterised in that:The vertical slotted hole (412) transverse width is identical with the diameter of the circular hole one (411) and circular hole two (511);The vertical slotted hole (412) Vertical extension is more than its transverse width.
  4. A kind of 4. adjustable steel structural transition layer suspension member according to claim 1 or 2, it is characterised in that:The connector (5) bare terminal end (52) is provided with the holding piece of two panels parallel interval arrangement, offers two on the every holding piece respectively and erects The horizontal slotted hole (521) arranged to parallel spacing;The conversion layer side lead to (6) end be plugged on described two holding pieces it Between, two circular holes three (61) of its end alignd one by one with two horizontal slotted holes (521) after, penetrate bolt connection.
  5. A kind of 5. adjustable steel structural transition layer suspension member according to claim 4, it is characterised in that:The horizontal slotted hole (521) vertical extension is identical with the diameter of the circular hole three (61);The transverse width of the horizontal slotted hole (521) is more than it Vertical extension.
  6. A kind of 6. adjustable steel structural transition layer suspension member according to claim 1, it is characterised in that:The cross-arm (2) or Conversion layer side logical (6), which is that square steel is logical, to be made.
CN201720524260.8U 2017-05-12 2017-05-12 A kind of adjustable steel structural transition layer suspension member Expired - Fee Related CN206769169U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720524260.8U CN206769169U (en) 2017-05-12 2017-05-12 A kind of adjustable steel structural transition layer suspension member

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720524260.8U CN206769169U (en) 2017-05-12 2017-05-12 A kind of adjustable steel structural transition layer suspension member

Publications (1)

Publication Number Publication Date
CN206769169U true CN206769169U (en) 2017-12-19

Family

ID=60648939

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720524260.8U Expired - Fee Related CN206769169U (en) 2017-05-12 2017-05-12 A kind of adjustable steel structural transition layer suspension member

Country Status (1)

Country Link
CN (1) CN206769169U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441008A (en) * 2018-09-27 2019-03-08 上海市建筑装饰工程集团有限公司 Big area roof truss anchor ear system
CN110700472A (en) * 2019-10-30 2020-01-17 广州金霸建材股份有限公司 Honeycomb panel structure system for ceiling lighting skylight
CN111042428A (en) * 2019-12-04 2020-04-21 深圳市宝鹰建设集团股份有限公司 Construction method for adjustable unit type aluminum plate ceiling of double-layer steel structure conversion layer
CN112900728A (en) * 2021-03-15 2021-06-04 浙江亚厦装饰股份有限公司 Adjusting structure of steel structure conversion layer
CN112900726A (en) * 2021-03-15 2021-06-04 浙江亚厦装饰股份有限公司 Steel structure conversion layer

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109441008A (en) * 2018-09-27 2019-03-08 上海市建筑装饰工程集团有限公司 Big area roof truss anchor ear system
CN110700472A (en) * 2019-10-30 2020-01-17 广州金霸建材股份有限公司 Honeycomb panel structure system for ceiling lighting skylight
CN111042428A (en) * 2019-12-04 2020-04-21 深圳市宝鹰建设集团股份有限公司 Construction method for adjustable unit type aluminum plate ceiling of double-layer steel structure conversion layer
CN112900728A (en) * 2021-03-15 2021-06-04 浙江亚厦装饰股份有限公司 Adjusting structure of steel structure conversion layer
CN112900726A (en) * 2021-03-15 2021-06-04 浙江亚厦装饰股份有限公司 Steel structure conversion layer

Similar Documents

Publication Publication Date Title
CN206769169U (en) A kind of adjustable steel structural transition layer suspension member
CN102983387B (en) Antenna mounting piece
CN203026634U (en) Antenna mounting piece
CN208565819U (en) A kind of adjustable suspension and support
CN202440971U (en) Curtain wall hooking structure
CN206110434U (en) Triangle -shaped aluminum honeycomb board smallpox pendant
CN204104440U (en) Tree support frame
CN204006613U (en) A kind of collector lifting fixed support
CN204877802U (en) Angle can be adjusted support and small wind turbine machine
CN208078594U (en) A kind of system of jumping line
CN215442636U (en) Suspended ceiling connecting system of tall vault
CN205961032U (en) Four connecting rod strutting arrangement of photovoltaic board
CN108775099A (en) A kind of glass curtain wall mounting structure
CN207761122U (en) A kind of lighting roof curtain wall frame connecting structure
CN209163419U (en) Connecting beam apparatus for raise scaffold
CN206753108U (en) A kind of main couple supporting apparatus of sheet truss combining structure
CN207053113U (en) A kind of support meanss for crane span structure
CN207053118U (en) A kind of high load-bearing aluminum cable tray
CN209145105U (en) A kind of glass curtain wall mounting structure
CN104143679B (en) Movable medium-wave cage antenna
CN205946464U (en) Network cabinet that can 19 inches 21 inches installations of on --spot change
CN210563336U (en) Multifunctional adjusting rod of electric hanging basket
CN201574572U (en) Angle-adjustable operating platform hanging rack
CN206245843U (en) A kind of steel tower for being provided with bird-proof device
CN218664875U (en) Adjustable attaches alignment jig at wall frame horizontal installation inclination

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219

CF01 Termination of patent right due to non-payment of annual fee