- CN206767448U CN206767448U CN201720242546.7U CN201720242546U CN206767448U CN 206767448 U CN206767448 U CN 206767448U CN 201720242546 U CN201720242546 U CN 201720242546U CN 206767448 U CN206767448 U CN 206767448U
- Authority
- CN
- China
- Prior art keywords
- tuyere
- tuyere cover
- arm
- main
- hinged
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005452 bending Methods 0.000 abstract description 6
- 238000000034 method Methods 0.000 description 5
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 229910000831 Steel Inorganic materials 0.000 description 4
- 239000010959 steel Substances 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Landscapes
- Blast Furnaces (AREA)
Abstract
本实用新型公开了一种风口套吊装工具,涉及风口套运输工具领域。一种风口套吊装工具,其特征在于,包括:用于连接起吊装置的连接装置;与连接装置铰接的两副臂;中间弯折、背向设置的两主臂,主臂的上部铰接于副臂;与两主臂的弯折处铰接的平衡部;连接于主臂下部的钩接部。本实用新型的风口套吊装工具能够钩接风口套和风口套毛坯件的小端的挡边,可以方便、安全、稳定的将风口套和风口套的毛坯件的小端向上、竖直放置,减少操作人员的劳动强度。平衡部可以使得每个钩接部都能与挡边钩紧,也使得风口套和风口套毛坯件在吊起时不会倾斜。
The utility model discloses a tuyere cover hoisting tool, which relates to the field of tuyere cover transportation tools. A tuyere cover hoisting tool, characterized in that it comprises: a connecting device used to connect a lifting device; two auxiliary arms hinged to the connecting device; The arm; the balance part hinged with the bending part of the two main arms; the hook part connected to the lower part of the main arm. The hoisting tool of the tuyere cover of the utility model can be hooked to the edge of the small end of the tuyere cover and the blank of the tuyere cover, and can conveniently, safely and stably place the small end of the tuyere cover and the blank of the tuyere cover upward and vertically, reducing The labor intensity of the operator. The balance part can make each hooking part hook tightly with the rib, and also prevent the tuyere sleeve and the blank of the tuyere sleeve from tilting when hoisted.
Description
技术领域technical field
本实用新型涉及风口套运输工具领域,具体的涉及一种风口套吊装工具。The utility model relates to the field of tuyere cover transport tools, in particular to a tuyere cover hoisting tool.
背景技术Background technique
风口套和风口套的毛坯件成圆台形,中心为通孔,小端中间有挡边。在加工风口套和风口套毛坯件的小端时,需要将工件小端向上,正向竖直放置。通常的搬运方式是用吊绳穿过风口套或风口套的毛坯件的中心通孔,然后通过天车吊运;这种方式在将风口套或风口套的毛坯件放下时,通常会横向放置,以方便将吊绳抽出,然后在根据需要将工件小端向上竖起,此种方式过程繁琐、操作费力。还有一种方式是用钩状的吊具钩住风口套或风口套的毛坯件小端的挡边吊起,移动到需要的位置后慢慢放下,使小端向上;但是这种方式风口套或风口套的毛坯件钩接不牢、容易晃动,存在掉落的危险。因此,现在非常需要一种能够方便、安全的将风口套或风口套的毛坯件小端向上,竖直放置的工具。The tuyere cover and the blank of the tuyere cover are in the shape of a truncated cone, with a through hole in the center and a rib in the middle of the small end. When processing the small end of the tuyere sleeve and the blank of the tuyere sleeve, it is necessary to place the small end of the workpiece upwards and place it vertically. The usual handling method is to use a sling to pass through the central through hole of the tuyere sleeve or the blank of the tuyere sleeve, and then lift it through the crane; in this way, when the tuyere sleeve or the blank of the tuyere sleeve is put down, it is usually placed horizontally , so as to facilitate the pulling out of the sling, and then erect the small end of the workpiece upwards as required. This method is cumbersome and laborious to operate. Another way is to use a hook-shaped sling to hook the edge of the small end of the blank of the tuyere sleeve or the tuyere sleeve and lift it up, move it to the required position and slowly lower it to make the small end upward; The blank of the tuyere cover is not hooked firmly, is easy to shake, and there is a danger of falling. Therefore, there is a great need for a tool that can conveniently and safely place the small end of the blank of the tuyere cover or the tuyere cover upwards and vertically.
实用新型内容Utility model content
本实用新型的目的在于提供一种可方便的将风口套和风口套毛坯件小端向上,竖直吊起、竖直放置的风口套吊装工具。The purpose of the utility model is to provide a tuyere cover hoisting tool which can conveniently lift and place the tuyere cover and the small end of the tuyere cover blank upright.
为实现上述目的,本实用新型所采取的技术方案为:In order to achieve the above object, the technical scheme adopted by the utility model is:
一种风口套吊装工具,其包括:A tuyere cover lifting tool, which includes:
用于连接起吊装置的连接装置;Connecting devices for connecting lifting gear;
与连接装置铰接的两副臂;Two auxiliary arms hinged with the connecting device;
中间弯折、背向设置的两主臂,主臂的上部铰接于副臂;The two main arms are bent in the middle and set facing away from each other, and the upper part of the main arm is hinged to the auxiliary arm;
与两主臂的弯折处铰接的平衡部;以及a balance portion hinged to the bend of the two main arms; and
连接于主臂下部的钩接部。Connected to the hook on the lower part of the main arm.
进一步的,还包括连接筋,连接筋连接主臂的上部和下部。Further, a connecting rib is also included, and the connecting rib connects the upper part and the lower part of the main arm.
进一步的,平衡部为平衡板,平衡板的两端分别铰接两主臂的弯折处。Further, the balance part is a balance board, and the two ends of the balance board are respectively hinged to the bends of the two main arms.
进一步的,钩接部的顶抵端为尖形或弧形。Further, the abutting end of the hooking portion is pointed or arc-shaped.
进一步的,还包括防脱杆,防脱杆一端铰接于副臂、另一端与另一副臂钩接。Further, it also includes an anti-off rod, one end of the anti-off rod is hinged to the auxiliary arm, and the other end is hooked to another auxiliary arm.
进一步的,副臂设有卡置防脱杆一端的若干卡槽。Further, the auxiliary arm is provided with several slots for locking one end of the anti-loosening rod.
进一步的,连接装置为设有吊孔的连接板,连接板的两端角分别铰接两副臂。Further, the connecting device is a connecting plate provided with lifting holes, and the two ends of the connecting plate are hinged to the two sub-arms respectively.
进一步的,主臂形成以主臂与副臂的铰接点为施力点、主臂与平衡部的铰接点为支点、钩接部为阻力点的省力杠杆。Further, the main arm forms a labor-saving lever with the hinge point between the main arm and the auxiliary arm as the force application point, the hinge point between the main arm and the balance part as the fulcrum, and the hook joint as the resistance point.
本实用新型的有益效果是:本实用新型的风口套吊装工具能够钩接风口套和风口套毛坯件的小端的挡边,可以方便、安全、稳定的将风口套和风口套的毛坯件的小端向上、竖直放置,减少操作人员的劳动强度。平衡部可以使得每个钩接部都能与挡边钩紧,也使得风口套和风口套毛坯件在吊起时不会倾斜。The beneficial effects of the utility model are: the tuyere cover hoisting tool of the utility model can be hooked to the edge of the small end of the tuyere cover and the blank of the tuyere cover, and can conveniently, safely and stably lift the tuyere cover and the small end of the blank of the tuyere cover. The end is up and placed vertically to reduce the labor intensity of the operator. The balance part can make each hooking part hook tightly with the rib, and also prevent the tuyere sleeve and the blank of the tuyere sleeve from tilting when hoisted.
附图说明Description of drawings
图1为本实用新型风口套吊装工具的放松状态主视图;Fig. 1 is the front view of the relaxed state of the tuyere cover lifting tool of the utility model;
图2为本实用新型风口套吊装工具的吊起状态主视图;Fig. 2 is the front view of the hoisting state of the tuyere cover hoisting tool of the utility model;
图3为本实用新型风口套吊装工具的钩接部的一种实施方式的放松状态俯视图;Fig. 3 is a top view of a relaxed state of an embodiment of the hooking part of the tuyere cover hoisting tool of the present invention;
图4为本实用新型风口套吊装工具的钩接部的另一种实施方式的放松状态俯视图。Fig. 4 is a top view of another embodiment of the hooking part of the tuyere cover hoisting tool of the present invention in a relaxed state.
图中:1-连接装置、2-副臂、3-主臂、4-平衡部、5-钩接部、6-连接筋、7-防脱杆、8-卡槽。In the figure: 1-Connection device, 2-Auxiliary arm, 3-Main arm, 4-Balance part, 5-Hook joint, 6-Connecting rib, 7-Anti-loosening rod, 8-Catch slot.
具体实施方式detailed description
为了使本实用新型所要解决的技术问题、技术方案及有益效果更加清楚明白,以下结合附图及实施例,对本实用新型进行进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。In order to make the technical problems, technical solutions and beneficial effects to be solved by the utility model clearer, the utility model will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the utility model, and are not intended to limit the utility model.
如图1、2所示,一种风口套吊装工具,其包括:用于连接起吊装置的连接装置1;与连接装置1铰接的两副臂2;中间弯折、背向设置的两主臂3,主臂3上部铰接于副臂2;与两主臂3的弯折处铰接的平衡部4;以及连接于主臂3下部的钩接部5。本实用新型的风口套吊装工具能够钩接风口套和风口套毛坯件的小端的挡边,可以方便、安全、稳定的将风口套和风口套毛坯件的小端向上、竖直放置,减少操作人员的劳动强度。As shown in Figures 1 and 2, a tuyere cover lifting tool includes: a connecting device 1 for connecting the lifting device; two auxiliary arms 2 hinged with the connecting device 1; two main arms bent in the middle and set back 3. The upper part of the main arm 3 is hinged to the auxiliary arm 2; the balance part 4 is hinged to the bend of the two main arms 3; and the hooking part 5 is connected to the lower part of the main arm 3. The hoisting tool of the tuyere cover of the utility model can be hooked to the edge of the small end of the tuyere cover and the blank of the tuyere cover, and can conveniently, safely and stably place the small end of the tuyere cover and the blank of the tuyere cover upwards and vertically, reducing operation Labor intensity of personnel.
具体的,连接装置1用于连接起吊装置的吊钩。两根副臂2为钢板切割成长条状制成。平衡部4为钢板切割制成;两根主臂3为钢筋中间位置弯折制成,主臂3的上部和下部呈钝角弯折;钩接部5为两个长条铁块。两根副臂2的一端通过销轴铰接在连接装置1的下部;两根副臂2的另一端通过销轴分别铰接于两根主臂3的上端。平衡部4的两端设置铰接轴,分别铰接两个主臂3的弯折处,使得两个主臂3背向设置,即两个主臂3钝角的开口朝向相反的方向。主臂3的下端焊接钩接部5,用以钩接风口套或风口套毛坯件的挡边。Specifically, the connecting device 1 is used for connecting the hook of the lifting device. The two auxiliary arms 2 are made by cutting the steel plates into long strips. The balance part 4 is made by cutting steel plates; the two main arms 3 are made by bending the steel bars in the middle, and the upper and lower parts of the main arms 3 are bent at an obtuse angle; the hooking part 5 is two long iron blocks. One ends of the two auxiliary arms 2 are hinged to the lower part of the connecting device 1 through pin shafts; the other ends of the two auxiliary arms 2 are respectively hinged to the upper ends of the two main arms 3 through pin shafts. The two ends of the balance part 4 are provided with hinge shafts to respectively hinge the bending points of the two main arms 3 so that the two main arms 3 are arranged facing away, that is, the openings of the obtuse angles of the two main arms 3 face opposite directions. The lower end of the main arm 3 is welded with a hook joint 5 for hooking the edge of the tuyere sleeve or the blank of the tuyere sleeve.
使用时,将连接装置1连接到起吊装置的吊钩;将主臂3下端的钩接部5从小端放入风口套或风口套毛坯件的通孔中,将钩接部5钩接到小端的挡边上;缓慢升起吊钩,通过连接装置1和副臂2带动两根主臂3上部向中央合并,使得两根主臂3的下部向两侧分开,进而使得钩接部5钩接到小端的挡边上,钩接部5的前端顶在风口套或风口套毛坯件的内壁,最终将风口套或风口套毛坯件小端向上、竖直吊起。在起吊的过程中,平衡部4可以活动,调节两支臂铰接轴的相对位置,来调节两钩接部5的位置,使得两主臂3下端的钩接部5都能与挡边钩接牢固,而且可以使得风口套或风口套毛坯件不会倾斜。When in use, connect the connecting device 1 to the hook of the lifting device; put the hooking part 5 at the lower end of the main arm 3 from the small end into the through hole of the tuyere cover or the blank of the tuyere cover, and hook the hooking part 5 to the small end. Slowly raise the hook, and drive the upper parts of the two main arms 3 to merge toward the center through the connecting device 1 and the auxiliary arm 2, so that the lower parts of the two main arms 3 are separated to both sides, and then the hooking part 5 is hooked. On the sidewall of the small end, the front end of the hooking part 5 is pressed against the inner wall of the tuyere sleeve or the blank of the tuyere sleeve, and finally the small end of the tuyere sleeve or the blank of the tuyere sleeve is lifted up and vertically. During the hoisting process, the balance part 4 can be moved to adjust the relative positions of the hinge shafts of the two arms to adjust the positions of the two hooking parts 5, so that the hooking parts 5 at the lower ends of the two main arms 3 can be hooked with the ribs It is firm, and can prevent the tuyere sleeve or the blank of the tuyere sleeve from tilting.
进一步的,如图1、2所示,还包括连接筋6,连接筋6连接主臂3的上部和下部。风口套或风口套毛坯件重量较大,通过连接筋6连接主臂3的上部和下部,使得连接筋6与主臂3的上部和下部形成三角形,稳定性更好,延长使用寿命。具体的,连接筋6采用钢筋,连接筋6的一端焊接在主臂3的上端、另一端焊接在主臂3的下端并共同与钩接部5焊接。Further, as shown in FIGS. 1 and 2 , a connecting rib 6 is also included, and the connecting rib 6 connects the upper part and the lower part of the main arm 3 . The tuyere cover or the blank of the tuyere cover is heavy, and the upper and lower parts of the main arm 3 are connected through the connecting rib 6, so that the connecting rib 6 and the upper and lower parts of the main arm 3 form a triangle, which has better stability and prolongs the service life. Specifically, the connecting rib 6 is a steel bar, and one end of the connecting rib 6 is welded on the upper end of the main arm 3 , and the other end is welded on the lower end of the main arm 3 and is jointly welded with the hook joint 5 .
进一步的,平衡部4为平衡板,平衡板的两端分别铰接两主臂3的弯折处。Further, the balance part 4 is a balance board, and the two ends of the balance board are respectively hinged to the bending places of the two main arms 3 .
进一步的,如图3、4所示,钩接部5的顶抵端为尖形或弧形。钩接部5的前端为顶抵端,用于顶紧风口套或风口套毛坯件的内壁。顶抵端制作成尖形或弧形可以更好的与内壁贴合,钩接更稳定,使风口套或风口套毛坯件不容易晃动,防止掉落。Further, as shown in FIGS. 3 and 4 , the abutting end of the hooking portion 5 is pointed or arc-shaped. The front end of the hooking portion 5 is a butting end, which is used to tighten the inner wall of the tuyere sleeve or the blank of the tuyere sleeve. The top-to-end is made into a pointed or arc shape to better fit the inner wall, and the hook connection is more stable, so that the tuyere sleeve or the blank of the tuyere sleeve is not easy to shake and prevents it from falling.
进一步的,如图1、2所示,还包括防脱杆7,防脱杆7一端铰接于副臂2、另一端与另一副臂2钩接。防脱杆7防止在吊运过程中,操作人员拉动主臂3或副臂2使得风口套或风口套毛坯件掉落。具体的,防脱杆7为一长条铁片,防脱杆7的一端通过销轴铰接在一个副臂2,防脱杆7的另一端弯折成弯钩,用于钩住另一副臂2。Further, as shown in FIGS. 1 and 2 , an anti-loosening rod 7 is also included. One end of the anti-loosening rod 7 is hinged to the auxiliary arm 2 , and the other end is hooked to another auxiliary arm 2 . The anti-off rod 7 prevents the operator from pulling the main arm 3 or the auxiliary arm 2 to make the tuyere cover or the blank of the tuyere cover fall off during the lifting process. Specifically, the anti-off rod 7 is a long strip of iron, one end of the anti-off rod 7 is hinged on a secondary arm 2 through a pin, and the other end of the anti-off rod 7 is bent into a hook for hooking another pair of arms. arm2.
进一步的,如图1、2所示,副臂2设有卡置防脱杆7一端的若干卡槽8。使得防脱杆7与副臂2的钩接更牢固。具体的,可以沿副臂2钻一排与防脱杆7弯钩配合的孔作为卡槽8。Further, as shown in FIGS. 1 and 2 , the auxiliary arm 2 is provided with a plurality of slots 8 for locking one end of the anti-loosening rod 7 . This makes the hooking between the anti-loosening rod 7 and the auxiliary arm 2 more firm. Specifically, a row of holes cooperating with the hooks of the anti-off rod 7 can be drilled along the auxiliary arm 2 as the slot 8 .
进一步的,如图1、2所示,连接装置1为设有吊孔的连接板,连接板的两端角分别铰接两副臂2。通过设有吊孔的连接装置1可以方便与不同的起吊装置配合。同时连接板与副臂2的铰接使得副臂2的运动方向固定,防止副臂2晃动造成工件脱落。Further, as shown in Figures 1 and 2, the connecting device 1 is a connecting plate provided with lifting holes, and the two ends of the connecting plate are respectively hinged to two sub-arms 2 . The connecting device 1 provided with lifting holes can be conveniently matched with different lifting devices. Simultaneously, the hinge connection between the connecting plate and the auxiliary arm 2 makes the movement direction of the auxiliary arm 2 fixed, preventing the auxiliary arm 2 from shaking and causing the workpiece to fall off.
进一步的,主臂3形成以主臂3与副臂2的铰接点为施力点、主臂3与平衡部4的铰接点为支点、钩接部5为阻力点的省力杠杆。使的钩接部5钩紧风口套或风口套毛坯件的力更大,钩接更稳固。具体的,主臂3的弯折位置到主臂3下端的长度小于主臂3的弯折位置到主臂3上端的长度。Further, the main arm 3 forms a labor-saving lever with the hinge point of the main arm 3 and the auxiliary arm 2 as the force application point, the hinge point of the main arm 3 and the balance part 4 as the fulcrum, and the hooking part 5 as the resistance point. The force of hooking part 5 hooking the tuyere cover or the blank of the tuyere cover is greater, and the hooking is more stable. Specifically, the length from the bending position of the main arm 3 to the lower end of the main arm 3 is shorter than the length from the bending position of the main arm 3 to the upper end of the main arm 3 .
以上仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内所作的任何修改、等同替换和改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present utility model, and are not intended to limit the present utility model. Any modifications, equivalent replacements and improvements made within the spirit and principles of the present utility model should be included in the utility model. within the scope of protection.
Claims (8)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720242546.7U CN206767448U (en) | 2017-03-10 | 2017-03-10 | Tuyere case lifting device |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720242546.7U CN206767448U (en) | 2017-03-10 | 2017-03-10 | Tuyere case lifting device |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206767448U true CN206767448U (en) | 2017-12-19 |
Family
ID=60633477
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720242546.7U Active CN206767448U (en) | 2017-03-10 | 2017-03-10 | Tuyere case lifting device |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206767448U (en) |
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108190498A (en) * | 2018-01-24 | 2018-06-22 | 郑存伟 | A kind of pole formula air brushing terrine mobile device |
| AU2020201534B2 (en) * | 2019-03-01 | 2025-02-27 | Graeme Davis | Lifting Device |
-
2017
- 2017-03-10 CN CN201720242546.7U patent/CN206767448U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN108190498A (en) * | 2018-01-24 | 2018-06-22 | 郑存伟 | A kind of pole formula air brushing terrine mobile device |
| AU2020201534B2 (en) * | 2019-03-01 | 2025-02-27 | Graeme Davis | Lifting Device |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN103863972B (en) | Forklift truck lifting equipment holding tool and hanging method thereof | |
| CN115448180A (en) | A jacking crossbeam, climbing frame and tower machine for tower machine climbing frame | |
| CN212769429U (en) | Concrete pole quick loading and unloading fixture | |
| KR20100135379A (en) | Boundary Stone Clamp | |
| CN211198358U (en) | Lifting appliance | |
| CN206886521U (en) | The spreader that can adjust the posture of the rail during the hoisting process | |
| WO2024240048A1 (en) | Tower crane step-changing device and tower crane | |
| CN206142648U (en) | Supplementary support body of heavy panel hoist and mount | |
| KR102810912B1 (en) | Lifting device for water pipe | |
| CN206521205U (en) | Tuyere case lifting device | |
| CN210286463U (en) | A spreader for clamping brake hub | |
| CN214653014U (en) | Calcium carbide pot clamp lifting device | |
| CN109019311B (en) | Coiled steel bar lifting device and coiled steel bar lifting equipment | |
| CN220745102U (en) | Lifting device with adjustable lifting distance | |
| CN223547603U (en) | A general-purpose flip tool | |
| CN221986998U (en) | A mobile C-type sling storage rack | |
| CN221876281U (en) | Steel reinforcement cage hoisting frame | |
| CN213536994U (en) | Lifting appliance | |
| CN213141150U (en) | Raw material hoisting tool for rim production | |
| CN219950246U (en) | Slice type steel beam hoisting clamp | |
| CN210556462U (en) | Tool for integral hoisting of large-batch standard parts | |
| CN204251203U (en) | High-temperature ring part suspender | |
| CN202575693U (en) | Lifting appliance for molten iron desulfurizing stirring head | |
| CN216235635U (en) | Automatic tensioning lifting appliance | |
| CN222665173U (en) | Coil lifting tools |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant | ||
| CB03 | Change of inventor or designer information | ||
| CB03 | Change of inventor or designer information |
Inventor after: Niu Jianping Inventor after: Huo Shouming Inventor after: Yan Lifeng Inventor after: Wang Haiyang Inventor after: Liu Shangjing Inventor before: Niu Jianping Inventor before: Huo Shouming Inventor before: Yan Lifeng Inventor before: Wang Haiyang Inventor before: Liu Shangjin |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Air outlet cover lifting tool Effective date of registration: 20220824 Granted publication date: 20171219 Pledgee: China Construction Bank Corporation Zhangjiakou Xihuan Sub-branch Pledgor: HEBEI WANFENG METALLURGICAL SPARE PARTS Co.,Ltd. Registration number: Y2022980013496 |
|
| PC01 | Cancellation of the registration of the contract for pledge of patent right | ||
| PC01 | Cancellation of the registration of the contract for pledge of patent right |
Granted publication date: 20171219 Pledgee: China Construction Bank Corporation Zhangjiakou Xihuan Sub-branch Pledgor: HEBEI WANFENG METALLURGICAL SPARE PARTS Co.,Ltd. Registration number: Y2022980013496 |
|
| PE01 | Entry into force of the registration of the contract for pledge of patent right | ||
| PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of utility model: Wind outlet cover lifting tool Granted publication date: 20171219 Pledgee: China Construction Bank Corporation Zhangjiakou Xihuan Sub-branch Pledgor: HEBEI WANFENG METALLURGICAL SPARE PARTS Co.,Ltd. Registration number: Y2024980043855 |