CN206764717U - A kind of bridge tube servicepiston - Google Patents

A kind of bridge tube servicepiston Download PDF

Info

Publication number
CN206764717U
CN206764717U CN201720324009.7U CN201720324009U CN206764717U CN 206764717 U CN206764717 U CN 206764717U CN 201720324009 U CN201720324009 U CN 201720324009U CN 206764717 U CN206764717 U CN 206764717U
Authority
CN
China
Prior art keywords
support bar
positioning
supporting plate
hole
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720324009.7U
Other languages
Chinese (zh)
Inventor
张水虎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SHAOXING KEQIAO BINHAI WATER SUPPLY Co Ltd
Original Assignee
SHAOXING KEQIAO BINHAI WATER SUPPLY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SHAOXING KEQIAO BINHAI WATER SUPPLY Co Ltd filed Critical SHAOXING KEQIAO BINHAI WATER SUPPLY Co Ltd
Priority to CN201720324009.7U priority Critical patent/CN206764717U/en
Application granted granted Critical
Publication of CN206764717U publication Critical patent/CN206764717U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of bridge tube servicepiston, including base, first support bar is separately installed with the base, second support bar, the first support bar can adjust with the 3rd support bar to be connected, the second support bar can adjust with the 4th support bar to be connected, the first supporting plate is installed on 3rd support bar and the 4th support bar, chute is offered in first supporting plate, slide bar is installed on the chute, the slide bar is vertically connected with second supporting plate one end, the second supporting plate other end is vertically connected with hook plate, and slide bar installation parallel with hook plate;Reinforcement is installed, the reinforcement is connected with first positioning rope one end, and the other end of first positioning rope is connected with slide bar and/or hook plate in first supporting plate.A kind of bridge tube servicepiston described in the utility model, while fastness is ensured, increases the activity space of workmen, is easily installed the expansion with construction working.

Description

A kind of bridge tube servicepiston
Technical field
It the utility model is related to a kind of bridge tube servicepiston.
Background technology
General bridge tube I&M construction, the safety of workmen is ensured by the way of safety belt is tied up, safety belt Mode is although feasible, but has working space to be limited, the shortcomings that personnel activity's inconvenience.
Utility model content
The purpose of this utility model is to provide a kind of bridge tube servicepiston, and operation is empty when it overcomes the existing bridge tube to construct Between be limited, the problem of personnel activity's inconvenience, while fastness is ensured, increase the activity space of workmen, be easy to pacify The expansion of dress and construction working.
In order to achieve the above object, the technical solution of the utility model is:
A kind of bridge tube servicepiston, including base, first support bar, the second support are separately installed with the base Bar, the first support bar and the 3rd support bar are adjustable to be connected, and more than 1 is offered in the first support bar and first is determined Position through hole, second positioning through hole of more than 1 is offered on the 3rd support bar, and the first support bar passes through first and positioned It is connected after selling through the first positioning through hole, the second positioning through hole with the 3rd support bar, the second support bar and the 4th support bar It is adjustable to be connected, the 3rd positioning through hole of more than 1 is offered in the second support bar, is offered on the 4th support bar 4th positioning through hole of more than 1, the second support bar are logical through the 3rd positioning through hole, the 4th positioning by the second alignment pin The support bars of Kong Houyu the 4th are connected;First supporting plate is installed on the 3rd support bar and the 4th support bar, described first Chute is offered on fagging, slide bar is installed on the chute, the slide bar is vertically connected with second supporting plate one end, and described The two supporting plate other ends are vertically connected with hook plate, and slide bar installation parallel with hook plate;It is provided with first supporting plate Reinforcement, the reinforcement are connected with first positioning rope one end, the other end and slide bar and/or the hook plate phase of first positioning rope Even.
First antiskid plate is installed on the base, the second protective plate is installed in first supporting plate, described second 3rd antiskid plate is installed in supporting plate.
First clamping screw is installed on first alignment pin, the second locking screw is installed on second alignment pin Bolt.
The slide bar is installed in the same direction with hook plate.
Locating piece is installed in the chute of the slide bar both sides.
The beneficial effects of the utility model are:A kind of bridge tube servicepiston, operation is empty when it overcomes existing bridge tube construction Between be limited, the problem of personnel activity's inconvenience, while fastness is ensured, increase the activity space of workmen, be easy to pacify The expansion of dress and construction working.
Brief description of the drawings
Fig. 1 is the structural representation of embodiment one;
Fig. 2 is the structural representation of embodiment two.
Embodiment
Embodiment 1
A kind of bridge tube servicepiston as shown in Figure 1, including base 1, first support bar is separately installed with the base 1 11st, second support bar 21, the first support bar 11 can adjust with the 3rd support bar 12 to be connected, and is opened in the first support bar 11 Provided with first positioning through hole 13 of more than 1, second positioning through hole 14 of more than 1 is offered on the 3rd support bar 12, The first support bar 11 by the first alignment pin 15 through the first positioning through hole 13, after the second positioning through hole 14 with the 3rd support Bar 12 is connected, and the second support bar 21 can adjust with the 4th support bar 22 to be connected, and 1 is offered in the second support bar 21 More than the 3rd positioning through hole 23, offer the 4th positioning through hole 24 of more than 1 on the 4th support bar 22, described second Support bar 21 by the second alignment pin 25 through the 3rd positioning through hole 23, after the 4th positioning through hole 24 with the phase of the 4th support bar 22 Even;First supporting plate 2 is installed on the 3rd support bar 12 and the 4th support bar 22, offered in first supporting plate 2 Chute 3, slide bar 4 is installed on the chute 3, the slide bar 4 is vertically connected with the one end of the second supporting plate 5, second support The other end of plate 5 is vertically connected with hook plate 6, and the slide bar 4 and 6 parallel installation of hook plate;It is provided with and adds in first supporting plate 2 Strengthening tendons 7, the reinforcement 7 are connected with the one end of the first positioning rope 8, the other end and the slide bar 4 of first positioning rope 8.
It is connected because the first support bar 11 and the 3rd support bar 12 are adjustable, the second support bar 21 and the 4th Strut 22 is adjustable to be connected, therefore is capable of the height of the supporting plate 2 of flexible modulation base 1 and first.The cooperation of chute 3 and slide bar 4 Use the right position that the second supporting plate 5 can be adjusted flexibly.The mode that the setting of hook plate 6 can catch on Bridge guardrail consolidates work Make platform.The setting of first positioning rope 8 can improve the stability of workbench installation.
First antiskid plate 16 is installed on the base 1, the second protective plate 26, institute are installed in first supporting plate 2 State and the 3rd antiskid plate 9 is installed in the second supporting plate 5.The setting of first antiskid plate 16, the second protective plate 26, the 3rd antiskid plate 9 Being capable of anti-skidding personnel's standing construction easy to operation.
First clamping screw 17 is installed on first alignment pin 15, second lock is installed on second alignment pin 25 Tight bolt 18.
The slide bar 4 is installed in the same direction with hook plate 6.
Locating piece 27 is installed in the chute 3 of the both sides of slide bar 4.The setting of locating piece 27 can fixed slip bar 4, avoid Slide bar 4 slides.
A kind of bridge tube servicepiston of the present embodiment, working space is limited when it overcomes existing bridge tube construction, and personnel live The problem of dynamic inconvenient, while fastness is ensured, the activity space of workmen is increased, is easily installed and construction working Expansion.
Embodiment 2
A kind of bridge tube servicepiston as shown in Figure 2, including base 1, first support bar is separately installed with the base 1 11st, second support bar 21, the first support bar 11 can adjust with the 3rd support bar 12 to be connected, and is opened in the first support bar 11 Provided with first positioning through hole 13 of more than 1, second positioning through hole 14 of more than 1 is offered on the 3rd support bar 12, The first support bar 11 by the first alignment pin 15 through the first positioning through hole 13, after the second positioning through hole 14 with the 3rd support Bar 12 is connected, and the second support bar 21 can adjust with the 4th support bar 22 to be connected, and 1 is offered in the second support bar 21 More than the 3rd positioning through hole 23, offer the 4th positioning through hole 24 of more than 1 on the 4th support bar 22, described second Support bar 21 by the second alignment pin 25 through the 3rd positioning through hole 23, after the 4th positioning through hole 24 with the phase of the 4th support bar 22 Even;First supporting plate 2 is installed on the 3rd support bar 12 and the 4th support bar 22, offered in first supporting plate 2 Chute 3, slide bar 4 is installed on the chute 3, the slide bar 4 is vertically connected with the one end of the second supporting plate 5, second support The other end of plate 5 is vertically connected with hook plate 6, and the slide bar 4 and 6 parallel installation of hook plate;It is provided with and adds in first supporting plate 2 Strengthening tendons 7, the reinforcement 7 are connected with the one end of the first positioning rope 8, and the other end hook plate 6 of first positioning rope 8 is connected.
It is connected because the first support bar 11 and the 3rd support bar 12 are adjustable, the second support bar 21 and the 4th Strut 22 is adjustable to be connected, therefore is capable of the height of the supporting plate 2 of flexible modulation base 1 and first.The cooperation of chute 3 and slide bar 4 Use the right position that the second supporting plate 5 can be adjusted flexibly.The mode that the setting of hook plate 6 can catch on Bridge guardrail consolidates work Make platform.The setting of first positioning rope 8 can improve the stability of workbench installation.
First antiskid plate 16 is installed on the base 1, the second protective plate 26, institute are installed in first supporting plate 2 State and the 3rd antiskid plate 9 is installed in the second supporting plate 5.The setting of first antiskid plate 16, the second protective plate 26, the 3rd antiskid plate 9 Being capable of anti-skidding personnel's standing construction easy to operation.
First clamping screw 17 is installed on first alignment pin 15, second lock is installed on second alignment pin 25 Tight bolt 18.
The slide bar 4 is installed in the same direction with hook plate 6.
Locating piece 27 is installed in the chute 3 of the both sides of slide bar 4.The setting of locating piece 27 can fixed slip bar 4, avoid Slide bar 4 slides.
A kind of bridge tube servicepiston of the present embodiment, working space is limited when it overcomes existing bridge tube construction, and personnel live The problem of dynamic inconvenient, while fastness is ensured, the activity space of workmen is increased, is easily installed and construction working Expansion.

Claims (5)

  1. A kind of 1. bridge tube servicepiston, it is characterised in that:Including base(1), the base(1)On be separately installed with first Strut(11), second support bar(21), the first support bar(11)With the 3rd support bar(12)It is adjustable to be connected, described first Support bar(11)On offer first positioning through hole of more than 1(13), the 3rd support bar(12)On offer more than 1 The second positioning through hole(14), the first support bar(11)Pass through the first alignment pin(15)Through the first positioning through hole(13)、 Second positioning through hole(14)Afterwards with the 3rd support bar(12)It is connected, the second support bar(21)With the 4th support bar(22)It is adjustable Section is connected, the second support bar(21)On offer the 3rd positioning through hole of more than 1(23), the 4th support bar(22) On offer the 4th positioning through hole of more than 1(24), the second support bar(21)Pass through the second alignment pin(25)Through Three positioning through hole(23), the 4th positioning through hole(24)Afterwards with the 4th support bar(22)It is connected;3rd support bar(12)With Four support bars(22)On the first supporting plate is installed(2), first supporting plate(2)On offer chute(3), the chute (3)On slide bar is installed(4), the slide bar(4)With the second supporting plate(5)One end is vertically connected, second supporting plate(5)Separately One end and hook plate(6)It is vertically connected, and the slide bar(4)With hook plate(6)Parallel installation;First supporting plate(2)Upper installation There is reinforcement(7), the reinforcement(7)With the first positioning rope(8)One end is connected, first positioning rope(8)The other end with Slide bar(4)And/or hook plate(6)It is connected.
  2. A kind of 2. bridge tube servicepiston according to claim 1, it is characterised in that:The base(1)On be provided with One antiskid plate(16), first supporting plate(2)On the second protective plate is installed(26), second supporting plate(5)Upper installation There is the 3rd antiskid plate(9).
  3. A kind of 3. bridge tube servicepiston according to claim 1, it is characterised in that:First alignment pin(15)Upper peace Equipped with the first clamping screw(17), second alignment pin(25)On the second clamping screw is installed(18).
  4. A kind of 4. bridge tube servicepiston according to claim 1, it is characterised in that:The slide bar(4)With hook plate(6)Together To installation.
  5. A kind of 5. bridge tube servicepiston according to claim 1, it is characterised in that:The slide bar(4)The chute of both sides (3)Locating piece is inside installed(27).
CN201720324009.7U 2017-03-30 2017-03-30 A kind of bridge tube servicepiston Expired - Fee Related CN206764717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720324009.7U CN206764717U (en) 2017-03-30 2017-03-30 A kind of bridge tube servicepiston

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720324009.7U CN206764717U (en) 2017-03-30 2017-03-30 A kind of bridge tube servicepiston

Publications (1)

Publication Number Publication Date
CN206764717U true CN206764717U (en) 2017-12-19

Family

ID=60630984

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720324009.7U Expired - Fee Related CN206764717U (en) 2017-03-30 2017-03-30 A kind of bridge tube servicepiston

Country Status (1)

Country Link
CN (1) CN206764717U (en)

Similar Documents

Publication Publication Date Title
CN205206716U (en) Open -air anti -skidding operation ladder of electric power engineering
CN205855767U (en) A kind of for sheet material shipment, the suspender of transfer
CN206764717U (en) A kind of bridge tube servicepiston
CN206665955U (en) A kind of high-strength steel triangle suspender lifts framework constructing device
CN206590784U (en) A kind of material volume conveying device of pipe fitting production line
CN205802864U (en) Novel architecture lowering or hoisting gear
CN206051281U (en) A kind of special hanger of shield crane hanging component hopper
CN204752130U (en) Aerial working platform extends platform with full stroke locking means
CN208310154U (en) A kind of construction scaffold
CN204474138U (en) A kind of fast hoisting jig
CN203264089U (en) Portable transformer anti-drop rod
CN206580440U (en) A kind of girder steel string device for hoisting
CN204174915U (en) Scaffold
CN204847756U (en) Special lifting device of box transformer
CN204324685U (en) Interim hanger is used in a kind of novel short range lifting
CN204148776U (en) The assembled moulding bed of bent cap framework of steel reinforcement
CN206903183U (en) A kind of scaffold board framework
CN203487805U (en) Rapid purline/steel beam clamping support with safety rope
CN203545436U (en) Multipurpose lifting tool
CN207658017U (en) A kind of collapsible foot guard plate based on ship scaffold
CN207748738U (en) Cyclone system integrally group to tooling
CN207392720U (en) A kind of architectural engineering scaffold bracing means
CN207361630U (en) A kind of color steel hanging apparatus
CN105197775B (en) A kind of servicing unit for lifting by crane steel plate
CN207582917U (en) A kind of bamboo and wood products' false work

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219

Termination date: 20210330