CN206761721U - Tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider - Google Patents

Tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider Download PDF

Info

Publication number
CN206761721U
CN206761721U CN201720054500.2U CN201720054500U CN206761721U CN 206761721 U CN206761721 U CN 206761721U CN 201720054500 U CN201720054500 U CN 201720054500U CN 206761721 U CN206761721 U CN 206761721U
Authority
CN
China
Prior art keywords
metal
sleeve
upper arm
cruciate ligament
anterior cruciate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720054500.2U
Other languages
Chinese (zh)
Inventor
李彬
王广斌
周秉正
白伦浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shengjing Hospital of China Medical University
Original Assignee
Shengjing Hospital of China Medical University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shengjing Hospital of China Medical University filed Critical Shengjing Hospital of China Medical University
Priority to CN201720054500.2U priority Critical patent/CN206761721U/en
Application granted granted Critical
Publication of CN206761721U publication Critical patent/CN206761721U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Surgical Instruments (AREA)

Abstract

The utility model tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider, including upper arm, metal handle, hollow metal sleeve, described upper arm one end is fixedly connected with metal handle, the upper arm other end is provided with kink, for the kink to insert metal hook formation in articular cavity, the end for inserting metal hook formation in articular cavity is the short hook of metal;The tail end of the metal handle is provided with tail end and consolidates portion, and the tail end is consolidated and is provided with firm cylinder in portion, and the firm jacket casing is connected on hollow metal sleeve, and one end of the hollow metal sleeve is barrel forward end opening, the other end is sleeve rear end opening;The tip of the hollow metal sleeve, the center of firm cylinder and the short hook of metal point-blank, is welded with metal hour hand, into 55 degree of angles between the hollow metal sleeve and upper arm in the sleeve wall of barrel forward end opening.The utility model meets mechanics principle, and intensity is reliable, meets the requirement of early postoperation rehabilitation training, and postoperative patient recovers fast.

Description

Tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider
Technical field
The utility model belongs to Medical orthopedic operation technique apparatus technical field, particularly relates to a kind of anterior cruciate ligament Shin bone stop avulsion fracture suture fixation guider.
Background technology
Anterior cruciate ligament is the important rock-steady structure of knee joint, and its shin bone stop avulsion fracture is knee joint common injury, Because of the embedding folder of soft tissue between sclerite and bone bed, almost without the possibility of reset the probability of nonunion occurs for expectant treatment very Height, easily cause ligament insufficiency and instability of knee occurs, accelerate the generation of knee joint osseous arthritis.Therefore, for There is the tibial insertion of anterior cruciate ligament stop avulsion fracture of displacement, it should carry out operative treatment;Traditional surgical approaches are cut under direct-view Carry out reduction of the fracture screw to fix, wound is larger, and postoperative rehabilitation process is longer, and generation synarthrophysis chance is larger, and function is extensive It is multiple not fully up to expectations.
After tibial insertion of anterior cruciate ligament stop avulsion fracture, carry out suture along anterior cruciate ligament fiber direction out of shape and tie up fixation It is that the method for best suiting mechanics principle ties the suture of anterior cruciate ligament through shin, it is necessary to bore osseous tunnel in proximal tibia to guide It is fixed after bone surface, but how precise positioning tunnel internal orifice, to ensure that suture firmly blocks the fixed sclerite of pressure be operation problem.
The content of the invention
The utility model makes up the deficiencies in the prior art aiming above mentioned problem, there is provided a kind of tibial insertion of anterior cruciate ligament Stop avulsion fracture suture fixation guider;The utility model guider is aided under existing Arthroscopy, by suture Along the anterior cruciate ligament fiber fixed sclerite of direction draw bail pressure out of shape, meet mechanics principle, intensity is reliable, meets early postoperation The requirement of rehabilitation training, postoperative patient recover fast.
To achieve the above object, the utility model adopts the following technical scheme that.
A kind of tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider of the utility model, it is characterised in that: Including upper arm, metal handle, hollow metal sleeve, described upper arm one end is fixedly connected with metal handle, and the upper arm other end is provided with Kink, the kink are to insert metal hook formation in articular cavity, the end for inserting metal hook formation in articular cavity Portion is the short hook of metal;The tail end of the metal handle is provided with tail end and consolidates portion, and the tail end consolidates and is provided with firm cylinder in portion, The firm jacket casing is connected on hollow metal sleeve, and one end of the hollow metal sleeve is barrel forward end opening, the other end is Sleeve rear end opening;The hollow metal sleeve, firm cylinder center and the short hook of metal tip point-blank, in sleeve Metal hour hand is welded with the sleeve wall of front opening, into 55 degree of angles between the hollow metal sleeve and upper arm.
In addition, the utility model also includes with guider being matched with tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation The metal minute hand used is covered, described metal minute hand penetrates hollow metal sleeve, by barrel forward end opening by sleeve rear end opening Pass hollow metal sleeve.
As a kind of preferred scheme of the present utility model, the upper arm be by the one that arc strip wall and straight wall are formed into Type structure, kink is set in the straight wall, the arc strip wall is fixedly connected with metal handle.
As another preferred scheme of the present utility model, into 55 degree between the straight wall of the hollow metal sleeve and upper arm Angle.
As another preferred scheme of the present utility model, the length of the short hook of metal is 1mm.
As another preferred scheme of the present utility model, the length of the metal hour hand is 5mm, a diameter of 2mm.
As another preferred scheme of the present utility model, the internal diameter of the hollow metal sleeve is 2.5mm, hollow metal The thickness of the sleeve wall of sleeve is 2mm.
As another preferred scheme of the present utility model, the firm cylinder bottom that the tail end consolidates portion is trapezoidal block knot Structure, the height of the trapezoidal block structure is 1cm.
The utility model beneficial effect.
1st, the utility model passes through the short hook of the metal for inserting metal hook structure in articular cavity, it is ensured that in knee joint Intracavitary moves freely precise positioning tunnel internal orifice;The tail end consolidates the firm cylinder in portion and trapezoidal block structure, can prevent Because the fine motion of hollow metal sleeve causes metal minute hand to be passed from set osseous tunnel internal orifice position in operating process;Institute The metal hour hand welded in the barrel forward end opening of hollow metal sleeve is stated, for localized tunnel collar extension, ensures two tunnel collar extensions It is close, be advantageous to suture pass tunnel collar extension and knot after, carry out windlass type rotation suture, pressure bone folded block, ensure sclerite Healing.
2 at the same the utility model do not need secondary pain and the financial burden for taking tack operation, reducing patient, method is simple, Effectively, there is significant application value;The effect of clinical treatment anterior cruciate ligament avulsion fracture patient can be improved.
Brief description of the drawings
In order that technical problem, technical scheme and beneficial effect that the utility model solves are more clearly understood, below With reference to the drawings and the specific embodiments, the utility model is further elaborated.It should be appreciated that tool described herein Body embodiment only to explain the utility model, is not used to limit the utility model.
Fig. 1 is a kind of three-dimensional knot of tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider of the utility model Structure schematic diagram.
Fig. 2 is the a-quadrant mplifying structure schematic diagram in Fig. 1.
Fig. 3 is a kind of orientation stereoscopic-state figure that the utility model squeezes into metal minute hand along hollow metal sleeve.
Fig. 4 is another orientation stereoscopic-state figure that the utility model squeezes into metal minute hand along hollow metal sleeve.
Marked in figure:1 be the short hook of metal, 2 for insert metal hook formation in articular cavity, 4 be metal hour hand, 5 be sleeve Front opening, 6 be hollow metal sleeve, 7 be firm cylinder, 8 be tail end consolidate portion, 9 be upper arm, 10 be metal handle, 11 be gold Category minute hand, 12 be sleeve rear end opening, 91 be straight-arm, 92 be arc strip wall.
Embodiment
With reference to shown in accompanying drawing 1,2,3,4, a kind of tibial insertion of anterior cruciate ligament stop avulsion fracture suture of the utility model is fixed With guider, it is characterised in that:Including upper arm 9, metal handle 10, hollow metal sleeve 6, described one end of upper arm 9 is fixedly connected Metal handle 10, the other end of upper arm 9 are provided with kink, and the kink is described to insert metal hook formation 2 in articular cavity The end for inserting metal hook formation 2 in articular cavity is the short hook 1 of metal;The tail end of the metal handle 10 is provided with tail end and consolidated Portion 8, the tail end are consolidated and are provided with firm cylinder 7 in portion 8, and the firm cylinder 7 is socketed on hollow metal sleeve 6, described hollow One end of metal sleeve 6 is barrel forward end opening 5, the other end is sleeve rear end opening 12;The hollow metal sleeve 6, consolidate Point-blank, it is short in the sleeve wall of barrel forward end opening 5 to be welded with metal for the tip of center and the short hook 1 of metal of cylinder 7 Pin 4, into 55 degree of angles between the hollow metal sleeve 6 and upper arm 9.
In addition, the utility model also includes with guider being matched with tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation Cover the metal minute hand 11 that uses, described metal minute hand 11 penetrates hollow metal sleeve 6 by sleeve rear end opening 12, by sleeve before End opening 5 passes hollow metal sleeve 6.
The upper arm 9 is the integrated formed structure being made up of arc strip wall 92 and straight wall 91, is set in the straight wall 91 Kink, the arc strip wall 92 are fixedly connected with metal handle 10.
Into 55 degree of angles between the straight wall 91 of the hollow metal sleeve 6 and upper arm 9.
The length of the short hook 1 of metal is 1mm;Pass through the short hook 1 of metal that length is 1mm, it is ensured that in knee joint cavity Inside move freely precise positioning tunnel internal orifice.
The length of the metal hour hand 4 is 5mm, a diameter of 2mm;Pass through the metal hour hand 4 that length is 5mm, a diameter of 2mm For localized tunnel collar extension, ensure that two tunnel collar extensions are close, be advantageous to after suture passes tunnel collar extension and knot, carry out windlass type Suture is rotated, pressure bone folded block, ensures the healing of sclerite.
The internal diameter of the hollow metal sleeve 6 is 2.5mm, and the thickness of the sleeve wall of hollow metal sleeve 6 is 2mm.
The bottom of firm cylinder 7 that the tail end consolidates portion 8 is trapezoidal block structure, and the height of the trapezoidal block structure is 1cm;The swing of hollow metal sleeve 6 so more can be effectively avoided, enables the standard of metal minute hand 11 squeezed into along hollow metal sleeve 6 Really reach the tip of the short hook 1 of metal.
It is understood that above with respect to specific descriptions of the present utility model, it is merely to illustrate the utility model and is not The technical scheme described by the utility model embodiment is limited to, it will be understood by those within the art that, still can be with The utility model is modified or equivalent substitution, to reach identical technique effect;As long as satisfaction uses needs, all in this reality Within new protection domain.

Claims (7)

1. tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider, it is characterised in that:Including upper arm(9), metal Handle(10), hollow metal sleeve(6), the upper arm(9)One end is fixedly connected with metal handle(10), upper arm(9)The other end is set Kink is equipped with, the kink is to insert metal hook formation in articular cavity(2), it is described to insert the hook-shaped knot of metal in articular cavity Structure(2)End be the short hook of metal(1);The metal handle(10)Tail end be provided with tail end consolidate portion(8), the tail end is steady Gu portion(8)On be provided with firm cylinder(7), the firm cylinder(7)It is socketed in hollow metal sleeve(6)On, the hollow metal set Cylinder(6)One end be barrel forward end opening(5), the other end be sleeve rear end opening(12);The hollow metal sleeve(6), it is steady Gu cylinder(7)Center and the short hook of metal(1)Tip point-blank, in barrel forward end opening(5)Sleeve wall on weld There is metal hour hand(4), the hollow metal sleeve(6)With upper arm(9)Between into 55 degree of angles.
2. tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider according to claim 1, its feature exist In:The upper arm(9)For by arc strip wall(92)With straight wall(91)The integrated formed structure of composition, the straight wall(91)On set Put kink, the arc strip wall(92)With metal handle(10)It is fixedly connected.
3. tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider according to claim 1, its feature exist In:The hollow metal sleeve(6)With upper arm(9)Straight wall(91)Between into 55 degree of angles.
4. tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider according to claim 1, its feature exist In:The short hook of metal(1)Length be 1mm.
5. tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider according to claim 1, its feature exist In:The metal hour hand(4)Length be 5mm, a diameter of 2mm.
6. tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider according to claim 1, its feature exist In:The tail end consolidates portion(8)Firm cylinder(7)Bottom is trapezoidal block structure, and the height of the trapezoidal block structure is 1cm。
7. tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider according to claim 1, its feature exist In:The hollow metal sleeve(6)Internal diameter be 2.5mm, hollow metal sleeve(6)The thickness of sleeve wall be 2mm.
CN201720054500.2U 2017-01-18 2017-01-18 Tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider Expired - Fee Related CN206761721U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720054500.2U CN206761721U (en) 2017-01-18 2017-01-18 Tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720054500.2U CN206761721U (en) 2017-01-18 2017-01-18 Tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider

Publications (1)

Publication Number Publication Date
CN206761721U true CN206761721U (en) 2017-12-19

Family

ID=60647128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720054500.2U Expired - Fee Related CN206761721U (en) 2017-01-18 2017-01-18 Tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider

Country Status (1)

Country Link
CN (1) CN206761721U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113208722A (en) * 2021-05-26 2021-08-06 郑伟 Fixing and suspending device for posterior cruciate ligament avulsion fracture reduction operation and operation method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113208722A (en) * 2021-05-26 2021-08-06 郑伟 Fixing and suspending device for posterior cruciate ligament avulsion fracture reduction operation and operation method

Similar Documents

Publication Publication Date Title
CN208942414U (en) Anterior cruciate ligament Anatomical Reconstruction approach guides locator
JP2008539910A (en) Osteosynthesis device
CN206761721U (en) Tibial insertion of anterior cruciate ligament stop avulsion fracture suture fixation guider
CN205698003U (en) Anterior cruciate ligament of knee joint based on virtual operation rebuilds tibia guider
CN210843402U (en) Internal fixing device for patellar fracture
CN206044789U (en) A kind of distal radius fracture reduction fixator
CN108451626A (en) A kind of minimally invasive restorer of tibial plateau collapsed fracture block
CN107961057A (en) Processus coracoideus clavicle closure punching sighting device
CN204306893U (en) The Kirschner wire positioner that a kind of Wicresoft of fracturing is fixing
CN206729990U (en) Multi-functional knee joint intracavitary measuring scale
CN208958252U (en) A kind of astragalus drilling instrument
CN206315130U (en) Neck of femur minimal invasion navigation template
CN208677573U (en) Healing in Anterior Cruciate Ligament Reconstruction locating guider based on 3D printing
CN209153926U (en) Dynamic bone towing bracket
CN212281586U (en) Femoral medial condyle retrograde locking intramedullary needle
CN108685603A (en) A kind of astragalus drilling instrument
CN208002839U (en) Allogenous cortical bone squeezing nail
CN208808574U (en) A kind of preceding road hollow screw operation auxiliary Path Setup device of upper cervical spine
CN105640636A (en) Method for adopting loop steel plate for treating ulna coracoid process fractures
CN206792472U (en) A kind of flexible intramedullary nail with pressurization anti-rotation function
CN207270414U (en) Acetabular prosthesis positioning implantation device
CN205339100U (en) Director resets in marrow
CN205144798U (en) A cup joint fixing device for fixing fracture around hip joint prosthesis
CN2400064Y (en) Steel-wire, silk thread and tendon introducer
CN105919631B (en) A kind of medical instrument rebuild for plantar ligaments and application method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171219

Termination date: 20190118

CF01 Termination of patent right due to non-payment of annual fee