CN206756889U - A kind of intelligent electric energy meter - Google Patents

A kind of intelligent electric energy meter Download PDF

Info

Publication number
CN206756889U
CN206756889U CN201720429474.7U CN201720429474U CN206756889U CN 206756889 U CN206756889 U CN 206756889U CN 201720429474 U CN201720429474 U CN 201720429474U CN 206756889 U CN206756889 U CN 206756889U
Authority
CN
China
Prior art keywords
micro
chip processor
chip
energy meter
electric energy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720429474.7U
Other languages
Chinese (zh)
Inventor
肖涛
姚力
柳圆成
李亦龙
邹成伍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Marketing Service Center of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Zhejiang Electric Power Co Ltd
Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Zhejiang Electric Power Co Ltd, Electric Power Research Institute of State Grid Zhejiang Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201720429474.7U priority Critical patent/CN206756889U/en
Application granted granted Critical
Publication of CN206756889U publication Critical patent/CN206756889U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Arrangements For Transmission Of Measured Signals (AREA)

Abstract

The utility model discloses a kind of intelligent electric energy meter.Once there is hardware or software fault in existing electric energy meter, can only change whole electric energy meter everything goes well with your work ensureing electric-power metering and carry out;If in addition, wanting to extend the function of updating and management unit, it also can only more renew table.Intelligent electric energy meter of the present utility model includes legality measurement unit and administrative unit, described legality measurement unit includes the first micro-chip processor, described administrative unit includes the second micro-chip processor, and the first described micro-chip processor is connected with the second micro-chip processor by interface;After the first described micro-chip processor obtains electric quantity data, and interval preserves current electric quantity data according to set time;The second described micro-chip processor obtains the electric quantity data of setting time interval preservation from the first micro-chip processor by interface and settled accounts.The utility model can improve the accuracy and reliability of electric energy meter legality measurement unit, support the Function Extension of administrative unit.

Description

A kind of intelligent electric energy meter
Technical field
Electric energy meter field is the utility model is related to, especially a kind of intelligent electric energy meter.
Background technology
At present, China's electric energy meter is the integrated design, and design on hardware and software compares solidification, using single microprocessor core The legality measurement unit of piece, i.e. electric energy meter and the function of administrative unit are realized by same micro-chip processor.Legality measurement list First main responsible electric energy meter is active and reactive and the metering of the data such as hour hands;Part in addition to legal system metering units is referred to as pipe Manage unit.Due to being designed using single micro-chip processor, once there is hardware or software fault, can only change whole electricity in electric energy meter Can table everything goes well with your work ensureing electric-power metering carries out, can so cause the waste of resource.In addition, as existing electrity market is to electricity The functional requirement of energy table is more and more, the implementation of such as more rate electricity prices and pricing for segment charging measure, if thinking extension upgrading pipe The function of unit is managed, also can only more renew table.
Utility model content
Technical problem to be solved in the utility model is for existing electric energy meter legality measurement unit and administrative unit The situation that function is realized by same micro-chip processor and administrative unit can not upgrade provides a kind of legality measurement unit and pipe Unit is managed each using micro-chip processor and the intelligent electric energy meter of the expansible upgrading of administrative unit.
Therefore, the technical solution adopted in the utility model is:A kind of intelligent electric energy meter, including legality measurement unit and management Unit, described legality measurement unit include the first micro-chip processor, and described administrative unit includes the second micro-chip processor, institute The first micro-chip processor stated is connected with the second micro-chip processor by interface;
After the first described micro-chip processor obtains electric quantity data, and interval preserves current electric quantity number according to set time According to;The second described micro-chip processor obtains the electric quantity data of setting time interval preservation by interface from the first micro-chip processor And settled accounts.
Further, in order to improve the transmission rate between the first micro-chip processor and the second micro-chip processor, first is micro- Connected between process chip and the second micro-chip processor using SPI interface, the second micro-chip processor is as main SPI, first micro- place Chip is managed to be used as from SPI.
Further, described legality measurement unit also include computation chip, clock chip, memory, RS485 interfaces and Battery;The computation chip, clock chip, memory, RS485 interfaces and battery are connected with the first described micro-chip processor Connect, be responsible for controlling each several part of legal system metering units by the first micro-chip processor;Described computation chip is carried out to energy data Metering, switchs to electric quantity data.
Further, computation chip is connected with voltage sampling circuit and current sampling circuit respectively, and computation chip is to electricity The energy data that pressure sample circuit and current sampling circuit collect is measured, and switchs to electric quantity data.
Further, described computation chip is integrated on the first micro-chip processor.
Further, described administrative unit also includes LCD display, communication module, memory module and battery;Described LCD display, communication module, memory module and battery are connected with the second micro-chip processor, are born by the second micro-chip processor The each several part of duty control administrative unit.
Existing intelligent electric energy meter is designed using single MCU, and the function of legality measurement unit and administrative unit all passes through one Individual MCU is realized.The utility model is separated legality measurement unit and administrative unit, and legality measurement unit is by the first microprocessor Chip is responsible for, and administrative unit is responsible for by the second micro-chip processor.Legality measurement unit and administrative unit are carried out into separation has such as Lower advantage:
1st, administrative unit breaks down, and without changing whole electric energy meter, only need to change administrative unit, save maintenance Cost.
2nd, the respective independent operating of the first micro-chip processor and the second micro-chip processor, does not interfere with each other, ensure that legality measurement The accuracy of unit, safety and reliability.
Brief description of the drawings
Fig. 1 is theory diagram of the present utility model.
Embodiment
The utility model is described in further detail below in conjunction with specification drawings and specific embodiments.
Fig. 1 shows a kind of embodiment of the present utility model, and it is made up of legality measurement unit and administrative unit, legal system Metering units are made up of the first micro-chip processor, computation chip, clock chip, memory, RS485 interfaces and battery, the metering Chip, clock chip, memory, RS485 interfaces and battery are connected with the first micro-chip processor, and computation chip is adopted with voltage Sample circuit is connected with current sampling circuit, the electric energy number that computation chip collects to voltage sampling circuit and current sampling circuit According to being measured, switch to electric quantity data, each several part of legality measurement unit is responsible for coordinating control by the first micro-chip processor, described The first micro-chip processor obtain electric quantity data after, and by 1 minute interval preserve current electric quantity data.
Administrative unit is made up of the second micro-chip processor, LCD display, communication module, memory module and battery, the LCD Display, communication module, memory module and battery are connected with the second micro-chip processor.The each several part of administrative unit is by second Micro-chip processor is responsible for and controlled.The second described micro-chip processor obtains preservation per minute from the first micro-chip processor Electric quantity data is simultaneously settled accounts.
First micro-chip processor is connected with the second micro-chip processor to be connected using SPI interface, the second micro-chip processor conduct Main SPI, the first micro-chip processor are used as from SPI.Using SPI interface, transmission rate is very fast, and reliability is high.
The utility model separates legality measurement unit with administrative unit, and legality measurement unit is born by the first micro-chip processor Duty, administrative unit are responsible for by the second micro-chip processor, and SPI interface is used between the first micro-chip processor and the second micro-chip processor Connection.After legality measurement unit is isolated with administrative unit, administrative unit breaks down, and without changing whole electric energy meter, only needs Administrative unit is changed, saves maintenance cost.The respective independent operating of first micro-chip processor and the second micro-chip processor, mutually Do not disturb, ensure that accuracy, the safety and reliability of legality measurement unit.Legality measurement unit is isolated with administrative unit Afterwards, the function of administrative unit can be extended, upgraded on the premise of ensureing that metering accuracy is unaffected.
For a person skilled in the art, after reading described above, various changes and modifications undoubtedly will be evident. Therefore, appended claims should regard the whole variations and modifications for covering true intention and scope of the present utility model as. Any and all scope and content of equal value, are all considered as still belonging to intention of the present utility model and model in Claims scope In enclosing.

Claims (6)

1. a kind of intelligent electric energy meter, including legality measurement unit and administrative unit, it is characterised in that
Described legality measurement unit includes the first micro-chip processor, and described administrative unit includes the second micro-chip processor, institute The first micro-chip processor stated is connected with the second micro-chip processor by interface;
After the first described micro-chip processor obtains electric quantity data, and interval preserves current electric quantity data according to set time;Institute The electric quantity data that the second micro-chip processor stated obtains the preservation of setting time interval by interface from the first micro-chip processor is gone forward side by side Row clearing.
2. intelligent electric energy meter according to claim 1, it is characterised in that:The first described micro-chip processor and second micro- place Connected between reason chip using SPI interface, the second micro-chip processor is used as from SPI as main SPI, the first micro-chip processor.
3. intelligent electric energy meter according to claim 1, it is characterised in that:Described legality measurement unit also includes metering core Piece, clock chip, memory, RS485 interfaces and battery;The computation chip, clock chip, memory, RS485 interfaces and battery It is connected with the first micro-chip processor, is responsible for controlling each several part of legal system metering units by the first micro-chip processor;Described Computation chip measures to energy data, switchs to electric quantity data.
4. intelligent electric energy meter according to claim 3, it is characterised in that:Described computation chip is electric with voltage sample respectively Road is connected with current sampling circuit, and the energy data that computation chip collects to voltage sampling circuit and current sampling circuit enters Row metering, switchs to electric quantity data.
5. intelligent electric energy meter according to claim 3, it is characterised in that:Described computation chip is integrated in the first microprocessor On chip.
6. intelligent electric energy meter according to claim 1, it is characterised in that:Described administrative unit also include LCD display, Communication module, memory module and battery, the LCD display, communication module, memory module and battery and the second micro-chip processor phase Connection, it is responsible for controlling each several part of administrative unit by the second micro-chip processor.
CN201720429474.7U 2017-04-21 2017-04-21 A kind of intelligent electric energy meter Active CN206756889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720429474.7U CN206756889U (en) 2017-04-21 2017-04-21 A kind of intelligent electric energy meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720429474.7U CN206756889U (en) 2017-04-21 2017-04-21 A kind of intelligent electric energy meter

Publications (1)

Publication Number Publication Date
CN206756889U true CN206756889U (en) 2017-12-15

Family

ID=60615875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720429474.7U Active CN206756889U (en) 2017-04-21 2017-04-21 A kind of intelligent electric energy meter

Country Status (1)

Country Link
CN (1) CN206756889U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106970252A (en) * 2017-04-21 2017-07-21 国网浙江省电力公司电力科学研究院 A kind of intelligent electric energy meter

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106970252A (en) * 2017-04-21 2017-07-21 国网浙江省电力公司电力科学研究院 A kind of intelligent electric energy meter

Similar Documents

Publication Publication Date Title
CN106970252A (en) A kind of intelligent electric energy meter
CN201327515Y (en) Distributed electrical energy quality online monitoring instrument based on dual-CPU
CN208953594U (en) A kind of electric energy meter legality measurement and non-legal system functional hardware separator
CN108761160A (en) A kind of electric energy meter legality measurement and non-legal system functional hardware separated structure
CN206756889U (en) A kind of intelligent electric energy meter
CN209230638U (en) A kind of navigation control system based on multi-core processor
CN208796055U (en) A kind of laser radar system and its laser radar controller
CN108710024A (en) One kind being based on NB-IOT technology power measurement systems
CN207397017U (en) A kind of electric quantity acquisition based on optical-fibre communications merges device
CN201611357U (en) Intelligent network electric power meter of an outlaid additional function module
CN108037354A (en) A kind of high accuracy, intelligent, multifunctional electric energy meter
CN105277813B (en) A kind of open air electricity charge are paid dues equipment fault risk index prediction meanss and prediction technique
CN110988460A (en) Be applied to two core smart electric meters of marketing and distribution integration
CN209446674U (en) The online real-time phase acquisition device of power grid three-phase alternating current
CN206293871U (en) Breaker controller
CN208061420U (en) Wireless communication collection module and its manufactured electric energy meter
CN202339379U (en) Single-phase kilowatt-hour meter with multiple meter-reading modes
CN206209012U (en) A kind of distribution transformer monitoring terminal system based on double-MSP 430
CN207612428U (en) A kind of Internet of things node module based on CAN
CN214751407U (en) Intelligent controller for water and electricity double meters
CN201259522Y (en) Digital synthetic measurement device
CN204706176U (en) Multi-functional data collector
CN202421327U (en) Three-phase four-wire multi-rate remote electric energy meter
CN202256422U (en) Modularized intelligent electric energy meter
CN204190373U (en) Medium voltage network electric network protection device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Patentee after: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY LIMITED ELECTRIC POWER Research Institute

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Patentee before: ELECTRIC POWER RESEARCH INSTITUTE OF STATE GRID ZHEJIANG ELECTRIC POWER Co.

Patentee before: State Grid Corporation of China

Patentee before: STATE GRID ZHEJIANG ELECTRIC POWER Co.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20220325

Address after: 311100 Building 5, 138 Yunlian Road, Yuhang District, Hangzhou City, Zhejiang Province

Patentee after: Marketing service center of State Grid Zhejiang Electric Power Co.,Ltd.

Patentee after: STATE GRID CORPORATION OF CHINA

Patentee after: STATE GRID ZHEJIANG ELECTRIC POWER Co.,Ltd.

Address before: The eight district of Hangzhou city in Zhejiang province 310014 Huadian Zhaohui under No. 1 Lane

Patentee before: STATE GRID ZHEJIANG ELECTRIC POWER COMPANY LIMITED ELECTRIC POWER Research Institute

Patentee before: STATE GRID CORPORATION OF CHINA