CN206745925U - It is segmented twisting type praise spring boxing person stub pile prepared from wood - Google Patents

It is segmented twisting type praise spring boxing person stub pile prepared from wood Download PDF

Info

Publication number
CN206745925U
CN206745925U CN201720461055.1U CN201720461055U CN206745925U CN 206745925 U CN206745925 U CN 206745925U CN 201720461055 U CN201720461055 U CN 201720461055U CN 206745925 U CN206745925 U CN 206745925U
Authority
CN
China
Prior art keywords
pile
spring
pile body
arc bump
rotating shaft
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720461055.1U
Other languages
Chinese (zh)
Inventor
王静
李振杰
王鑫
李辉
刘雪敏
李坤全
毕建平
王玉振
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Institute of Engineering
Original Assignee
Henan Institute of Engineering
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Institute of Engineering filed Critical Henan Institute of Engineering
Priority to CN201720461055.1U priority Critical patent/CN206745925U/en
Application granted granted Critical
Publication of CN206745925U publication Critical patent/CN206745925U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses one kind to be segmented twisting type praise spring boxing person stub pile prepared from wood, including upper pile body, pile, lower pile body and base, a hand is installed on upper pile body and connected by the upper end of the first twisting component and pile, footing is installed on pile and is connected by the second twisting component with the upper end of lower pile body;Lower pile body is fixed on base.The pile body of traditional person stub pile prepared from wood is divided into three stage structure by the utility model, and upper mutual rotation and reinstatement between pile body and pile is realized by the first twisting component, the upper pile body rotated after the first spring that upper pile body and pile contact position are set enables impact stake hand resets, moreover, the first spring also functions to the effect for limiting upper pile body rotational angle.The utility model is impacting stake hand and can rotated during footing, and does not interfere with each other, and is capable of the change of more preferable simulation real opponents hand feeling dynamics, raising training effect.

Description

It is segmented twisting type praise spring boxing person stub pile prepared from wood
Technical field
The utility model belongs to training device technical field, and in particular to one kind segmentation twisting type praise spring boxing person stub pile prepared from wood.
Background technology
Person stub pile prepared from wood is Traditional Wushu of China --- a kind of important exercising device of-praise spring boxing.Its basic structure be divided into pile body and Stake hand, footing part, by impacting it, can effectively temper the respond of the person's of practising gimmick, figure, footwork, using it as vacation Opponent is thought, so as to simulating actual combat.Traditional person stub pile prepared from wood profile is the wooden structures of a humanoid, and pile body part is one section of circle It is that each several part is fixed in use in wood, stake hand and footing insertion pile body.
Utility model content
To be solved in the utility model to be that existing person stub pile prepared from wood is integrated more fixed, and the poor technology of training authenticity is asked Topic, so as to provide a kind of segmentation twisting type praise spring boxing person stub pile prepared from wood.
In order to solve the above technical problems, technical scheme is as follows used by the utility model:
One kind is segmented twisting type praise spring boxing person stub pile prepared from wood, including upper pile body, pile, lower pile body and base, pacifies on upper pile body Connected equipped with stake hand and by the upper end of the first twisting component and pile, footing is installed and by the second twisting on pile Component is connected with the upper end of lower pile body;Lower pile body is fixed on base.
The first twisting component includes first rotating shaft, the first upper bearing (metal), the first lower bearing, the first stop sleeve and first Spring, above in the rotation hole I of pile body, the first stop sleeve is arranged in rotation hole I and is set in for the top insertion of first rotating shaft In first rotating shaft;First upper bearing (metal) interference is arranged on the first stop sleeve top, and the first lower bearing interference is arranged on the first support Lower cartridge;The bottom interference of first rotating shaft is arranged in the rotation hole II on pile top;First spring is arranged on upper pile body With the contact position of pile.
The second twisting component includes the second rotating shaft, the second upper bearing (metal), the second lower bearing, the second stop sleeve and second Spring, the top of the second rotating shaft are inserted in the rotation hole II of pile, and the second stop sleeve is arranged in rotation hole II and is arranged In the second rotating shaft;Second upper bearing (metal) interference is arranged on the second stop sleeve top, and the second lower bearing interference is arranged on second Support lower cartridge;The bottom interference of second rotating shaft is arranged in the rotation hole III on lower pile body top;Second spring is arranged on middle stake The contact position of body and lower pile body.
Second rotating shaft of the first rotating shaft and the second twisting component is integrally formed.
The bottom of upper pile body is provided with rotation hole I, the lower surface of upper pile body is provided with arc bump I, in arc The side of projection I is symmetrically arranged with spring mounting hole I;The pile is provided with rotation hole II, is set in the upper surface of pile Arc bump II is equipped with, spring mounting hole II, arc bump II and arc bump I are symmetrically arranged with the side of arc bump II It is oppositely arranged and forms two the first spring installing zones, the first spring is arranged in the first spring installing zone and each first spring peace Fill area and correspond to a spring mounting hole II and a spring mounting hole I;The lower surface of pile is provided with arc bump III, Spring mounting hole III is symmetrically arranged with the side of arc bump III;The top of lower pile body is provided with rotation hole III, under The upper surface of pile body is provided with arc bump IV, is symmetrically arranged with spring mounting hole IV in the side of arc bump IV, arc is convex Block IV is oppositely arranged with arc bump III forms two second spring installing zones, and second spring is arranged in second spring installing zone And each second spring installing zone corresponds to a spring mounting hole III and a spring mounting hole IV.
The pile body of traditional person stub pile prepared from wood is divided into three stage structure by the utility model, and realizes upper stake by the first twisting component Mutual rotation and reinstatement between body and pile, to hit in the first spring that upper pile body and pile contact position are set The upper pile body rotated after piling hand can reset, moreover, the first spring also functions to the effect for limiting upper pile body rotational angle.Work as habit When white silk person impacts the stake hand in upper pile body, upper pile body can then be made freely rotate by bearing arrangement around the axis of first rotating shaft, It will compress the first spring when rotating, the first spring has the trend resetted strongly after being pressurized, thus upper pile body is in resilience masterpiece Rotating backward under sets back, and when impacting footing, pile stress is made freely to rotate around the axis of the second rotating shaft, rotates When will compress second spring, second spring has the trend resetted strongly after being pressurized, thus pile is in second spring screen resilience Rotating backward under effect sets back.The utility model can rotate when impacting stake hand and footing, and not do mutually Disturb, be capable of the change of more preferable simulation real opponents hand feeling dynamics, improve training effect.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is pile body, pile and lower pile body assembling schematic diagram on the utility model.
Fig. 3 is the structural representation of pile body on the utility model.
Fig. 4 is the structural representation of the utility model pile.
Fig. 5 is the structural representation of pile body under the utility model.
Embodiment
As Figure 1-5, a kind of segmentation twisting type praise spring boxing person stub pile prepared from wood, including upper pile body 1, pile 2, the and of lower pile body 3 Base 4, a hand is installed on upper pile body 1 and is connected by the first twisting component with the upper end of pile 2, is installed on pile 2 There is footing and be connected by the second twisting component with the upper end of lower pile body 3;Lower pile body 3 is fixed on base 4.
Specifically, the first twisting component includes first rotating shaft 5, the first upper bearing (metal) 6, the support of the first lower bearing 7, first The spring 9 of sleeve 8 and first, above in the 1-1 of rotation hole I of pile body 1, the first stop sleeve 8 is arranged on for the top insertion of first rotating shaft 5 In the 1-1 of rotation hole I and it is set in first rotating shaft 5;The interference of first upper bearing (metal) 6 is arranged on the top of the first stop sleeve 8, under first The interference of bearing 7 is arranged on the bottom of the first stop sleeve 8;The bottom interference of first rotating shaft 5 is arranged on the rotation hole on the top of pile 2 In II 2-1;First spring 9 is arranged on the contact position of upper pile body 1 and pile 2.
The second twisting component includes the second rotating shaft 10, the second upper bearing (metal) 11, the second lower bearing 12, the second stop sleeve In 13 and second spring 14, the 2-1 of rotation hole II of the top insertion pile 2 of the second rotating shaft 10, the second stop sleeve 13 is installed In the 2-1 of rotation hole II and it is set in the second rotating shaft 10;The interference of second upper bearing (metal) 11 is arranged on the top of the second stop sleeve 13, The interference of second lower bearing 12 is arranged on the bottom of the second stop sleeve 13;The bottom interference of second rotating shaft 10 is arranged on lower pile body 3 In the 3-1 of rotation hole III in portion;Second spring 14 is arranged on the contact position of pile 2 and lower pile body 3.
The bottom of upper pile body 1 is provided with the 1-1 of rotation hole I, and the lower surface of upper pile body 1 is provided with the 1- of arc bump I 2, it is symmetrically arranged with the 1-3 of spring mounting hole I in the 1-2 of arc bump I side;The pile 2 is provided with the 2-1 of rotation hole II, The 2-2 of arc bump II is provided with the upper surface of pile 2, spring installation is symmetrically arranged with the 2-2 of arc bump II side The 2-3 of hole II, the 2-2 of arc bump II are oppositely arranged with the 1-2 of arc bump I and form two the first spring installing zones, and the first spring 9 is pacified In the first spring installing zone and the corresponding II 2-3 and spring of a spring mounting hole of each first spring installing zone is pacified Fill the 1-3 of hole I;The 2-4 of arc bump III is provided with the lower surface of pile 2, is symmetrically arranged with the 2-4 of arc bump III side The 2-5 of spring mounting hole III;The top of lower pile body 3 is provided with the 3-1 of rotation hole III, and the upper surface of lower pile body 3 is provided with arc The 3-2 of shape projection IV, spring mounting hole IV 3-3, the 3-2 of arc bump IV and arc are symmetrically arranged with the 3-2 of arc bump IV side The 2-4 of shape projection III be oppositely arranged form two second spring installing zones, second spring 14 be arranged on second spring installing zone in and Each second spring installing zone corresponds to III 2-5 and 3-3 of spring mounting hole IV of a spring mounting hole.
In the present embodiment, the second rotating shaft 10 that the first rotating shaft 5 and second twists component can be it is integrally formed, Can also be separated be independent of each other.
Pile body is divided into three stage structure, and realizes upper mutual rotation between pile body and pile by the first twisting component And reinstatement, the upper pile body rotated after the first spring that upper pile body and pile contact position are set enables impact stake hand Reset, moreover, the first spring also functions to the effect for limiting upper pile body rotational angle.When the person of practising impacts the stake hand in upper pile body When, upper pile body can then be made freely to rotate by bearing arrangement around the axis of first rotating shaft, and it will compress the first bullet when rotating Spring, the first spring has the trend resetted strongly after being pressurized, thus upper pile body rotating backward under rebound effect sets back, When impacting footing, pile stress is made freely to rotate around the axis of the second rotating shaft, will compress second spring during rotation, and second Spring has the trend resetted strongly after being pressurized, thus pile rotates backward recovery original under second spring rebound effect Position.

Claims (5)

1. one kind segmentation twisting type praise spring boxing person stub pile prepared from wood, it is characterised in that:Including upper pile body(1), pile(2), lower pile body(3) And base(4), upper pile body(1)On a hand is installed and by the first twisting component and pile(2)Upper end connection, pile (2)On footing is installed and by the second twisting component and lower pile body(3)Upper end connection;Lower pile body(3)It is fixed on base(4) On.
2. segmentation twisting type praise spring boxing person stub pile prepared from wood according to claim 1, it is characterised in that:The first twisting component bag Include first rotating shaft(5), the first upper bearing (metal)(6), the first lower bearing(7), the first stop sleeve(8)With the first spring(9), first turn Axle(5)The upper pile body of top insertion(1)Rotation hole I(1-1)It is interior, the first stop sleeve(8)Installed in rotation hole I(1-1)It is interior And it is set in first rotating shaft(5)On;First upper bearing (metal)(6)Interference is arranged on the first stop sleeve(8)Top, the first lower bearing (7)Interference is arranged on the first stop sleeve(8)Bottom;First rotating shaft(5)Bottom interference be arranged on pile(2)Top turns Dynamic hole II(2-1)It is interior;First spring(9)Installed in upper pile body(1)And pile(2)Contact position.
3. segmentation twisting type praise spring boxing person stub pile prepared from wood according to claim 2, it is characterised in that:The first rotating shaft(5)With Second rotating shaft of the second twisting component(10)It is integrally formed.
4. segmentation twisting type praise spring boxing person stub pile prepared from wood according to claim 1 or 2, it is characterised in that:The second twisting group Part includes the second rotating shaft(10), the second upper bearing (metal)(11), the second lower bearing(12), the second stop sleeve(13)And second spring (14), the second rotating shaft(10)Top insertion pile(2)Rotation hole II(2-1)It is interior, the second stop sleeve(13)It is arranged on Rotation hole II(2-1)It is interior and be set in the second rotating shaft(10)On;Second upper bearing (metal)(11)Interference is arranged on the second stop sleeve (13)Top, the second lower bearing(12)Interference is arranged on the second stop sleeve(13)Bottom;Second rotating shaft(10)Bottom interference Installed in lower pile body(3)The rotation hole III on top(3-1)It is interior;Second spring(14)Installed in pile(2)With lower pile body(3)'s Contact position.
5. segmentation twisting type praise spring boxing person stub pile prepared from wood according to claim 4, it is characterised in that:Upper pile body(1)Under Portion is provided with rotation hole I(1-1), in upper pile body(1)Lower surface be provided with arc bump I(1-2), in arc bump I(1-2) Side be symmetrically arranged with spring mounting hole I(1-3);The pile(2)It is provided with rotation hole II(2-1), in pile(2) Upper surface be provided with arc bump II(2-2), in arc bump II(2-2)Side be symmetrically arranged with spring mounting hole II (2-3), arc bump II(2-2)With arc bump I(1-2)It is oppositely arranged and forms two the first spring installing zones, the first spring (9)In the first spring installing zone and each first spring installing zone corresponds to a spring mounting hole II(2-3)With one Individual spring mounting hole I(1-3);In pile(2)Lower surface be provided with arc bump III(2-4), in arc bump III(2-4) Side be symmetrically arranged with spring mounting hole III(2-5);The top of lower pile body 3 is provided with rotation hole III(3-1), in lower stake Body(3)Upper surface be provided with arc bump IV(3-2), in arc bump IV(3-2)Side be symmetrically arranged with spring installation Hole IV(3-3), arc bump IV(3-2)With arc bump III(2-4)It is oppositely arranged and forms two second spring installing zones, second Spring(14)In second spring installing zone and each second spring installing zone corresponds to a spring mounting hole III(2-5) With a spring mounting hole IV(3-3).
CN201720461055.1U 2017-04-28 2017-04-28 It is segmented twisting type praise spring boxing person stub pile prepared from wood Expired - Fee Related CN206745925U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720461055.1U CN206745925U (en) 2017-04-28 2017-04-28 It is segmented twisting type praise spring boxing person stub pile prepared from wood

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720461055.1U CN206745925U (en) 2017-04-28 2017-04-28 It is segmented twisting type praise spring boxing person stub pile prepared from wood

Publications (1)

Publication Number Publication Date
CN206745925U true CN206745925U (en) 2017-12-15

Family

ID=60615255

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720461055.1U Expired - Fee Related CN206745925U (en) 2017-04-28 2017-04-28 It is segmented twisting type praise spring boxing person stub pile prepared from wood

Country Status (1)

Country Link
CN (1) CN206745925U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108854015A (en) * 2018-08-28 2018-11-23 吉首大学 A kind of wushu training rotation timber

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108854015A (en) * 2018-08-28 2018-11-23 吉首大学 A kind of wushu training rotation timber

Similar Documents

Publication Publication Date Title
CN109692459B (en) Free combat training rotary boxing target
CN206745925U (en) It is segmented twisting type praise spring boxing person stub pile prepared from wood
CN105536230B (en) A kind of wushu analogue simulation trainer
CN208493159U (en) A kind of sports equipment of P.E. teacher
CN204034227U (en) A kind of tennis training machine with rotatable tennis
CN206240019U (en) A kind of portable tennis ball serving device
CN206660540U (en) Stake hand portion twisting type praise spring boxing person stub pile prepared from wood
CN106902507A (en) Three sections of pile body twisting type praise spring boxing person stub pile prepared from wood
CN206454234U (en) A kind of turnable praise spring boxing person stub pile prepared from wood
CN108211299B (en) Football pitch arc ball trainer
CN106621274A (en) 360-degree freely rotary-type wing chun wooden dummy
CN206792982U (en) It is segmented free rotary type praise spring boxing person stub pile prepared from wood
CN107007990A (en) Spring twisting type praise spring boxing person stub pile prepared from wood
CN204522196U (en) Universal pole table tennis practising device
CN107007989A (en) The free rotary type praise spring boxing person stub pile prepared from wood of three sections of pile bodies
CN206924372U (en) The adjustable sand hill of the amplitude of oscillation
CN212817990U (en) Fighting training device
CN205850171U (en) A kind of tennis-exercising device impact assembly
CN213698774U (en) Boxing training sand bag for physical training
CN209348058U (en) Training device is used in a kind of shooting of football
CN2427196Y (en) Racket frame used as exerciser for the eyes
CN216319838U (en) Golf ball with good stability
KR200267395Y1 (en) Repetition golf trainer
CN206121111U (en) Single ware of practising a ball game of tumbler formula tennis
KR100312845B1 (en) Golf Club Shaft with unevenness on its surface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171215

Termination date: 20180428