CN206745051U - Water heating bed rests the head on integral system - Google Patents
Water heating bed rests the head on integral system Download PDFInfo
- Publication number
- CN206745051U CN206745051U CN201621254468.4U CN201621254468U CN206745051U CN 206745051 U CN206745051 U CN 206745051U CN 201621254468 U CN201621254468 U CN 201621254468U CN 206745051 U CN206745051 U CN 206745051U
- Authority
- CN
- China
- Prior art keywords
- water
- hot
- water heating
- pillow
- mattress
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Mattresses And Other Support Structures For Chairs And Beds (AREA)
Abstract
The utility model discloses a kind of water heating bed to rest the head on integral system, including mattress, the pillow that is removably connected on mattress and be mattress and the hot water apparatus of pillow hot-water supply, hot water apparatus is provided with delivery port and refluxing opening, the first hot-water heating pipe is equipped with mattress, first hot-water heating pipe one end is the first water inlet, the other end is the first water return outlet, first water inlet is connected by the first connector with the delivery port of hot water apparatus, first water return outlet is connected by the second connector with the refluxing opening of hot water apparatus, the second hot-water heating pipe is equipped with pillow, second hot-water heating pipe one end is the second water inlet, the other end is the second water return outlet, second water inlet is connected by the first connector with the delivery port of hot water apparatus, second water return outlet is connected by the second connector with the refluxing opening of hot water apparatus.Its advantage is:Pillow and mattress are detachably set, while heated by hot-water heating mode, whole system is simple in construction while having preferable heating effect, safe and convenient to use.
Description
Technical field
It the utility model is related to household goods field, more particularly to water heating bed pillow integral system.
Background technology
In the winter of cold, warmed oneself on general bed all by the way of electric blanket heating.But electric blanket is due to passing through electricity
Heated filament heats, and substantial amounts of electromagnetic radiation is produced in heating process, human body receives these electromagnetic radiation for a long time undoubtedly can significantly increase
The incidence of the major diseases such as big tumour, mutation.In addition electric blanket easily triggers electricity in the case where continuous conduction time is long
Heat blanket temperature is too high, so as to trigger the accidents such as fire.And electric leakage accident easily occurs for electric blanket.
Utility model content
For the one or more to solve the above problems, the utility model provides a kind of water heating bed pillow integral system.
According to one side of the present utility model, there is provided a kind of water heating bed rests the head on integral system, including mattress, detachable
The pillow that is connected on mattress and be mattress and the hot water apparatus of pillow hot-water supply, hot water apparatus is provided with delivery port and backflow
Mouthful, it is equipped with the first hot-water heating pipe in mattress, first hot-water heating pipe one end is the first water inlet, and the other end is the first water return outlet, first
Water inlet is connected by the first connector with the delivery port of hot water apparatus, and the first water return outlet passes through the second connector and hot water apparatus
Refluxing opening connection, the second hot-water heating pipe is equipped with pillow, second hot-water heating pipe one end be the second water inlet, and the other end is second time
The mouth of a river, the second water inlet are connected by the first connector with the delivery port of hot water apparatus, and the second water return outlet passes through the second connector
Connected with the refluxing opening of hot water apparatus.Its advantage is:Pillow and mattress are detachably set, while entered by hot-water heating mode
Row heating, whole system is simple in construction while having preferable heating effect, safe and convenient to use.
In some embodiments, mattress includes the first bed course and the second bed course, and the first hot-water heating pipe is U-shaped to be layed in first
On bed course or the second bed course.Its advantage is:First hot-water heating pipe is laid on the first bed course or the second bed course, not direct with connecing
Person's contact is touched, hence for having higher comfortableness for user.
The first fixture is provided with the first bed course or the second bed course in some embodiments, the first hot-water heating pipe passed through
First fixture is fixed.Its advantage is:The setting of first fixture can effectively prevent the first hot-water heating pipe long-term
Use during occur displacement sideslip situation, ensure its stability, extend its service life.
In some embodiments, pillow includes the first sandwich layer and the second sandwich layer, and the second hot-water heating pipe is U-shaped to be layed in first
On sandwich layer or second sandwich layer.Its advantage is:Second hot-water heating pipe is laid on the first surface layer or the second surface layer, not directly
Contacted with user, be advantageous to improve the comfortableness of pillow.
The second fixture is provided with the first sandwich layer or the second sandwich layer in some embodiments, the second hot-water heating pipe passes through
Two fixtures are fixed.Its advantage is:The setting of second fixture can effectively prevent the second hot-water heating pipe long-term
Occur the situation of displacement sideslip during use, ensure its stability, extend its service life.
In some embodiments, the first connector is connected by the first water pipe with hot water apparatus.
In some embodiments, the first water pipe is provided with first circulation pump.Its advantage is:First circulation pump is set
Putting can cause mattress, pillow and hot water apparatus to form a circulation, Reusability, avoid wasting.
In some embodiments, the second connector is connected by the second water pipe with hot water apparatus.
In some embodiments, the second water pipe is provided with second circulation pump.Its advantage is:Second circulation pump is set
Putting can cause mattress, pillow and hot water apparatus to form a circulation, Reusability, avoid wasting.
In some embodiments, hot water apparatus is provided with temperature controller.Its advantage is:The setting of temperature controller can be real-time
Monitor the water temperature in hot water apparatus so that user learns the water temperature of hot water apparatus to adjust in real time, safe ready.
Brief description of the drawings
Fig. 1 is that the water heating bed of the embodiment of the utility model one rests the head on the structural representation of integral system.
Mattress 1, the first bed course 101, the second bed course 102, the first hot-water heating pipe 103, the first water inlet 1031, the first water return outlet
1032, the first fixture 104, pillow 2, the first sandwich layer 201, the second sandwich layer 202, the second hot-water heating pipe 203, the second water inlet
2031, the second water return outlet 2032, the second fixture 204, the first connector 3, the second connector 4, the first water pipe 5, the second water pipe
6, temperature controller 7, hot water apparatus 8, delivery port 801, refluxing opening 802, first circulation pump 9, second circulation pump 10.
Embodiment
The utility model is described in further detail below in conjunction with the accompanying drawings.
Reference picture 1, there is provided a kind of water heating bed rests the head on integral system, including mattress 1, the pillow that is removably connected on mattress 1
First 2 and the hot water apparatus 8 for mattress 1 and the hot-water supply of pillow 2, hot water apparatus 8 be provided with delivery port 801 and refluxing opening 802.Its
Middle hot water apparatus 8 can be a common water tank, be heated to the hot water of certain temperature, hot water apparatus 8 during use well inward
Can also be a commercially available heating water tank that can be heated automatically, when the temperature of temperature controller 7 is less than setting value heating water tank from
It is dynamic to be heated to design temperature.The first hot-water heating pipe 103 is equipped with mattress 1, the one end of the first hot-water heating pipe 103 is the first water inlet
1031, the other end is the first water return outlet 1032, and the first water inlet 1031 passes through the delivery port of the first connector 3 and hot water apparatus 8
801 connections, the first water return outlet 1032 are connected with the refluxing opening 802 of hot water apparatus 8 by the second connector 4, are equipped with pillow 2
Second hot-water heating pipe 203, the one end of the second hot-water heating pipe 203 are the second water inlet 2031, and the other end is the second water return outlet 2032, and second enters
The mouth of a river 2031 is connected by the first connector 3 with the delivery port 801 of hot water apparatus 8, and the second water return outlet 2032 passes through the second connection
Part 4 connects with the refluxing opening 802 of hot water apparatus 8.Wherein, the first connector 3 and the second connector 4 are three-way pipe.By pillow 2
Detachably set with mattress 1, wherein dismountable mode can be, a velcro hook is set on mattress 1, at the bottom of pillow 2
Portion sets a velcro generatrix, and both are engaged, and can also have other convenient removablies certainly.Pass through water
Warm mode is heated, and whole system is simple in construction while having preferable heating effect, safe and convenient to use.
Preferably, mattress 1 includes the first bed course 101 and the second bed course 102, and the first hot-water heating pipe 103 is U-shaped to be uniformly layed in
On first bed course 101 or the second bed course 102.First hot-water heating pipe 103 is laid on the first bed course 101 or the second bed course 102, not directly
Connect and contacted with contactee, hence for having higher comfortableness for user.In order to further strengthen the comfortable of mattress 1
Property, it is filled with soft-body, such as cotton, non-woven fabrics in the interval that the first hot-water heating pipe 103 is formed.
Preferably, the first fixture 104 is provided with the first bed course 101 or the second bed course 102, the first hot-water heating pipe 103 is logical
The first fixture 104 was crossed to be fixed.The setting of first fixture 104 can effectively prevent the first hot-water heating pipe 103 long-term
Use during occur displacement sideslip situation, ensure its stability, extend its service life.Wherein, the first fixture 104
Can be sewn to one fixed space of formation on the first bed course 101 or the second bed course 102, or connection ring etc. with cloth, the
One hot-water heating pipe 103 extends there through, and effectively prevents its sideslip.
Preferably, pillow 2 includes the first sandwich layer 201 and the second sandwich layer 202, and the second hot-water heating pipe 203 is U-shaped to be layed in first
On sandwich layer 201 or second sandwich layer 202.Second hot-water heating pipe 203 is laid on the first surface layer or the second surface layer, not direct with making
User contacts, and is advantageous to improve the comfortableness of pillow 2.In order to further strengthen the comfortableness of pillow 2, in the second hot-water heating pipe 203
The interval of formation is filled with soft-body, such as cotton, non-woven fabrics.
Preferably, the second fixture 204 is provided with the first sandwich layer 201 or the second sandwich layer 202, the second hot-water heating pipe 203 is logical
The second fixture 204 is crossed to be fixed.Wherein, the second fixture 204 can be sewn to the first surface layer or the second face with cloth
A fixed space is formed on layer, or connection ring etc., the second hot-water heating pipe 203 extend there through, and effectively prevent its sideslip.Second is solid
Determining the setting of part 204 can effectively prevent the second hot-water heating pipe 203 from occurring the situation for shifting sideslip during long-term use, protect
Its stability is demonstrate,proved, extends its service life.
Preferably, the first connector 3 is connected by the first water pipe 5 with the delivery port 801 of hot water apparatus 8.
Preferably, the first water pipe 5 is provided with first circulation pump 9.The setting of first circulation pump 9 can cause mattress 1, pillow
2 form a circulation with hot water apparatus 8, Reusability, avoid wasting.
Preferably, the second connector 4 is connected by the second water pipe 6 with the refluxing opening 802 of hot water apparatus 8.
Preferably, the second water pipe 6 is provided with second circulation pump 10.The setting of second circulation pump 10 can cause mattress 1, pillow
First 2 form a circulation with hot water apparatus 8, Reusability, avoid wasting.
Preferably, hot water apparatus 8 is provided with temperature controller 7.The setting of temperature controller 7 can monitor the water in hot water apparatus 8 in real time
Temperature so that user learns the water temperature of hot water apparatus 8 to adjust in real time, safe ready.
Preferably, the first hot-water heating pipe 103 and the second hot-water heating pipe 203 can select silica gel hose, soft and comfortable.
Above-described is only some embodiments of the present utility model.For the person of ordinary skill of the art,
On the premise of not departing from the utility model and creating design, various modifications and improvements can be made, these belong to this practicality
New protection domain.
Claims (10)
1. water heating bed rests the head on integral system, it is characterised in that including mattress (1), the pillow being removably connected on mattress (1)
(2) and the hot water apparatus (8) for the mattress (1) and the pillow (2) hot-water supply,
The hot water apparatus (8) is provided with delivery port (801) and refluxing opening (802),
The first hot-water heating pipe (103) is equipped with the mattress (1), described first hot-water heating pipe (103) one end is the first water inlet
(1031), the other end is the first water return outlet (1032), and first water inlet (1031) passes through the first connector (3) and the heat
Delivery port (801) connection of water installations (8), first water return outlet (1032) are filled by the second connector (4) and the hot water
Refluxing opening (802) connection of (8) is put,
The second hot-water heating pipe (203) is equipped with the pillow (2), described second hot-water heating pipe (203) one end is the second water inlet
(2031), the other end is the second water return outlet (2032), and second water inlet (2031) passes through the first connector (3) and the heat
Delivery port (801) connection of water installations (8), second water return outlet (2032) are filled by the second connector (4) and the hot water
Put refluxing opening (802) connection of (8).
2. water heating bed according to claim 1 rests the head on integral system, it is characterised in that the mattress (1) includes the first pad
Layer (101) and the second bed course (102), first hot-water heating pipe (103) is U-shaped to be layed in first bed course (101) or described
On second bed course (102).
3. water heating bed according to claim 2 rests the head on integral system, it is characterised in that first bed course (101) or the
The first fixture (104) is provided with two bed courses (102), first hot-water heating pipe (103) passes through first fixture (104)
It is fixed.
4. water heating bed according to claim 1 rests the head on integral system, it is characterised in that the pillow (2) include pillowcase and
Pillow, the pillow include the first sandwich layer (201) and the second sandwich layer (202), and second hot-water heating pipe (203) is U-shaped to be layed in
On first sandwich layer (201) or second sandwich layer (202).
5. water heating bed according to claim 4 rests the head on integral system, it is characterised in that first sandwich layer (201) or the
The second fixture (204) is provided with two sandwich layers (202), second hot-water heating pipe (203) passes through second fixture (204)
It is fixed.
6. water heating bed according to claim 1 rests the head on integral system, it is characterised in that first connector (3) passes through
First water pipe (5) connects with the hot water apparatus (8).
7. water heating bed according to claim 6 rests the head on integral system, it is characterised in that first water pipe (5) is provided with
First circulation pump (9).
8. water heating bed according to claim 1 rests the head on integral system, it is characterised in that second connector (4) passes through
Second water pipe (6) connects with the hot water apparatus (8).
9. water heating bed according to claim 8 rests the head on integral system, it is characterised in that second water pipe (6) is provided with
Second circulation pump (10).
10. the water heating bed pillow integral system according to any one of claim 1 to 9, it is characterised in that the hot water apparatus
(8) it is provided with temperature controller (7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621254468.4U CN206745051U (en) | 2016-11-22 | 2016-11-22 | Water heating bed rests the head on integral system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621254468.4U CN206745051U (en) | 2016-11-22 | 2016-11-22 | Water heating bed rests the head on integral system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206745051U true CN206745051U (en) | 2017-12-15 |
Family
ID=60606586
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621254468.4U Expired - Fee Related CN206745051U (en) | 2016-11-22 | 2016-11-22 | Water heating bed rests the head on integral system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206745051U (en) |
-
2016
- 2016-11-22 CN CN201621254468.4U patent/CN206745051U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104432624A (en) | Novel water heating suit | |
CN201920225U (en) | Auto-temperature controlled water heating mattress | |
CN203137788U (en) | Hot water blanket | |
CN206745051U (en) | Water heating bed rests the head on integral system | |
CN206910128U (en) | Water heating bed is integrated system | |
CN204169431U (en) | Cold and warm mattress | |
CN205457509U (en) | Health care mattress that adjusts temperature of heating | |
CN206576665U (en) | Quilt | |
CN206025790U (en) | Mattress | |
CN104783555A (en) | Electric-heating bed warming device | |
CN107183997A (en) | A kind of novel and multifunctional hot-water heating is heat insulating bed | |
CN202919641U (en) | Hot pad | |
CN108497821A (en) | A kind of heating mattress system | |
CN106377820A (en) | Hot water bag used for transfusion in medical treatment | |
CN204032865U (en) | A kind of electric bed warmer | |
CN204120616U (en) | A kind of electric bed warmer | |
CN204120617U (en) | A kind of electric bed warmer | |
CN204970741U (en) | Novel cold -proof callus on sole | |
CN202407992U (en) | Automatic-temperature-regulating hot-water circulation mattress | |
CN208458088U (en) | A kind of carpet that can be connected to floor heating | |
CN205908100U (en) | Indoor tent of using | |
CN204617659U (en) | Self-circulating water cotton-padded mattress | |
CN205321869U (en) | Intelligent temperature -control mattress | |
CN211722487U (en) | Warm-keeping seat suitable for winter | |
CN202086085U (en) | Novel heating and warm-keeping mattress |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171215 Termination date: 20181122 |
|
CF01 | Termination of patent right due to non-payment of annual fee |