CN206737926U - Shoveling formula development machine for push pipe operation - Google Patents
Shoveling formula development machine for push pipe operation Download PDFInfo
- Publication number
- CN206737926U CN206737926U CN201720596035.5U CN201720596035U CN206737926U CN 206737926 U CN206737926 U CN 206737926U CN 201720596035 U CN201720596035 U CN 201720596035U CN 206737926 U CN206737926 U CN 206737926U
- Authority
- CN
- China
- Prior art keywords
- drill
- disk
- jacking
- motor
- shoveling
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Excavating Of Shafts Or Tunnels (AREA)
Abstract
The utility model discloses a kind of shoveling formula development machine for push pipe operation, along jacking direction, includes fixed disk and jacking disk successively by rear to preceding;Jacking disk front end face is provided with drill, and the first motor, drill and the power output axis connection of the first motor are fixed with jacking back-end disk face;Horizontal shoveling conveyer belt is provided between fixed disk and jacking disk;Fixed disk is provided with the power output axis connection of the second motor, the driving wheel of shoveling conveyer belt and the second motor;Below drill, through hole is provided with jacking disk, in through hole, the driven pulley of shoveling conveyer belt is rotatably connected in the side wall of jacking disk;Transmission belt surface of cutting the earth is provided with scraper bowl.The beneficial effects of the utility model are:Operating efficiency is improved, reduces manual labor amount, simple in construction, manufacturing cost is cheap.
Description
Technical field
The utility model belongs to push pipe implement technical field, and in particular to a kind of shoveling formula for push pipe operation is dug
Enter machine.
Background technology
Jacking construction is a kind of non-excavating construction method, can not excavate or excavate less and realize piping laying, and it is logical
Cross in working pit by means of pushing up power caused by jacking device, the frictional force of pipeline and surrounding soil is overcome, by pipeline by design
The gradient and direction head into figure, and the earthwork is transported.One section pipe completes to head into soil layer and then lower second section pipe continues
Jacking, its principle are by means of the main top thrust such as oil cylinder and pipeline enclosure, relay well, and instrument pass or development machine are worn out of working pit
Soil layer is crossed to be advanced to always in reception hole.Existing jacking machine lacks the cooperation of drill and earth-moving equipment, after drill is drilled loose soil,
Need manually to take and transport soil, both labor intensive, delayed the duration again.
Utility model content
Lack the cooperation of drill and earth-moving equipment to solve existing jacking machine, need manually to take and transport soil, expend
Manpower, delay the problems such as duration, the purpose of this utility model is to provide a kind of shoveling formula development machine for push pipe operation.
The utility model is achieved through the following technical solutions:For the shoveling formula development machine of push pipe operation, along top
Enter direction, include fixed disk and jacking disk successively by rear to preceding;Above-mentioned jacking disk front end face is provided with drill, after above-mentioned jacking disk
The first motor, above-mentioned drill and the power output axis connection of above-mentioned first motor are fixed with end face;Above-mentioned fixed disk with it is above-mentioned
Horizontal shoveling conveyer belt is provided between jacking disk;Above-mentioned fixed disk is provided with the second motor, the active of above-mentioned shoveling conveyer belt
The power output axis connection of wheel and above-mentioned second motor;Below above-mentioned drill, through hole is provided with above-mentioned jacking disk, above-mentioned logical
At hole, the driven pulley of above-mentioned shoveling conveyer belt is rotatably connected in the side wall of above-mentioned jacking disk;Above-mentioned shoveling transmission belt surface is set
There is scraper bowl.
Preferably, above-mentioned drill includes equally distributed at least two in the horizontal direction to the utility model, in above-mentioned drill
Mandrel is set diagonally downward by above-mentioned jacking disk front end face forward.
Preferably, above-mentioned drill includes vertically equally distributed at least 2 groups to the utility model, above-mentioned shoveling transmission
Band includes vertically equally distributed at least two, and an above-mentioned shoveling conveyer belt is corresponded to respectively below the above-mentioned drill of each group.
Preferably, above-mentioned drill is cylinder to the utility model, and above-mentioned drill surface is provided with screw thread.
Preferably, above-mentioned fixed disk rear end face is provided with push pipe connector to the utility model.
Preferably, above-mentioned fixed disk, jacking disk bottom are equipped with the 3rd motor and roller to the utility model, above-mentioned rollers with
The power output axis connection of above-mentioned 3rd motor.
The utility model preferably, is additionally provided with central controller, above-mentioned first motor, above-mentioned second motor, the above-mentioned 3rd
Motor is connected with above-mentioned central controller by electric signal respectively.
Under the control of central controller, the first motor of control rotates, and drives drill to rotate, after drill is drilled loose soil,
Under the control of central controller, the second motor of control rotates, and the operating of shoveling conveyer belt is driven, in the driven pulley of shoveling conveyer belt
Soil is scooped up and transported at the driving wheel of shoveling conveyer belt from the bottom to top by place, scraper bowl, active of the scraper bowl in shoveling conveyer belt
Overturn at wheel, soil is poured out, realizes the effect of the collection and transmission to soil.Can be below the driving wheel of shoveling conveyer belt
Conveyer belt is set, soil is further sent to farther destination.
Drill forward downward is obliquely installed, and is not only improved brill soil, is also beneficial to the soil of scraper bowl face being drilled loose, convenient shovel
Bucket scoops up loose soil.
Drill and shoveling conveyer belt vertically set at least 2 groups, and the soil horizon on vertical direction can be entered simultaneously
The more efficient jacking effect of row.
Drill is cylinder, and intensity is high, prevents drill from piercing rock and being broken off, drill surface is provided with screw thread, bores native effect
More preferably.
Fixed disk rear end face is provided with push pipe connector, for connecting jacking pipe.
Fixed disk, jacking disk bottom are equipped with the 3rd motor and roller, under the control of central controller, can control
Three motors rotate, and drive roller to rotate, so as to control the advance of fixed disk and jacking disk, backward movement.
The utility model can at least reach less than one beneficial effect:
1. it can be improved operating efficiency by outside soil transport to pipe jacking tunnel, reduce hand labor while boring native
Amount, shortens the duration;
2. drill intensity is high, it is not easily broken;
3. simple in construction, manufacturing cost is cheap, advantageously reduces engineering funds input, is advantageous to marketing.
Brief description of the drawings
Fig. 1 is front view of the present utility model.
Fig. 2 is left view of the present utility model.
Each sequence number and its corresponding title are as follows in accompanying drawing:
Fixed disk 1, jacking disk 2, drill 3, the first motor 4, shoveling conveyer belt 5, driving wheel 6, through hole 7, driven pulley 8, shovel
Bucket 9, push pipe connector 10, roller 11.
Embodiment
Explanation is further explained to the utility model below in conjunction with the accompanying drawings.
Embodiment 1
As depicted in figs. 1 and 2, along jacking direction, fixed disk 1 and jacking disk 2 are included successively by rear to preceding;Before jacking disk 2
End face is provided with drill 3, and the first motor 4 is fixed with the rear end face of jacking disk 2, and the power output shaft of the motor 4 of drill 3 and first connects
Connect;Horizontal shoveling conveyer belt 5 is provided between fixed disk 1 and jacking disk 2;Fixed disk 1 is provided with the second motor, shoveling conveyer belt
The power output axis connection of 5 motor of driving wheel 6 and second;Below drill 3, through hole 7 is provided with jacking disk 2, in through hole 7
Place, the driven pulley 8 of shoveling conveyer belt 5 are rotatably connected in the side wall of jacking disk 2;The surface of shoveling conveyer belt 5 is provided with scraper bowl 9.
Drill 3 includes equally distributed 3 in the horizontal direction, and the central shaft of drill 3 is inclined by the front end face forward of jacking disk 2
Set obliquely.
Drill 3 includes vertically equally distributed 2 groups, and shoveling conveyer belt 5 includes vertically equally distributed 2
Individual, the lower section of each group drill 3 corresponds to a shoveling conveyer belt 5 respectively.
Drill 3 is cylinder, and the surface of drill 3 is provided with screw thread.
The rear end face of fixed disk 1 is provided with push pipe connector 10.
Fixed disk 1, the bottom of jacking disk 2 are equipped with the 3rd motor and roller 11, the power output of the motor of roller 11 and the 3rd
Axis connection.
Central controller is additionally provided with, the first motor 4, the second motor, the 3rd motor pass through telecommunications with central controller respectively
Number connection.
Embodiment 2
As depicted in figs. 1 and 2, along jacking direction, fixed disk 1 and jacking disk 2 are included successively by rear to preceding;Before jacking disk 2
End face is provided with drill 3, and the first motor 4 is fixed with the rear end face of jacking disk 2, and the power output shaft of the motor 4 of drill 3 and first connects
Connect;Horizontal shoveling conveyer belt 5 is provided between fixed disk 1 and jacking disk 2;Fixed disk 1 is provided with the second motor, shoveling conveyer belt
The power output axis connection of 5 motor of driving wheel 6 and second;Below drill 3, through hole 7 is provided with jacking disk 2, in through hole 7
Place, the driven pulley 8 of shoveling conveyer belt 5 are rotatably connected in the side wall of jacking disk 2;The surface of shoveling conveyer belt 5 is provided with scraper bowl 9.
Drill 3 includes equally distributed 3 in the horizontal direction, and the central shaft of drill 3 is inclined by the front end face forward of jacking disk 2
Set obliquely.
Drill 3 includes vertically equally distributed 2 groups, and shoveling conveyer belt 5 includes vertically equally distributed 2
Individual, the lower section of each group drill 3 corresponds to a shoveling conveyer belt 5 respectively.
Drill 3 is cylinder, and the surface of drill 3 is provided with screw thread.
The rear end face of fixed disk 1 is provided with push pipe connector 10.
Fixed disk 1, the bottom of jacking disk 2 are equipped with the 3rd motor and roller 11, the power output of the motor of roller 11 and the 3rd
Axis connection.
Embodiment 3
As depicted in figs. 1 and 2, along jacking direction, fixed disk 1 and jacking disk 2 are included successively by rear to preceding;Before jacking disk 2
End face is provided with drill 3, and the first motor 4 is fixed with the rear end face of jacking disk 2, and the power output shaft of the motor 4 of drill 3 and first connects
Connect;Horizontal shoveling conveyer belt 5 is provided between fixed disk 1 and jacking disk 2;Fixed disk 1 is provided with the second motor, shoveling conveyer belt
The power output axis connection of 5 motor of driving wheel 6 and second;Below drill 3, through hole 7 is provided with jacking disk 2, in through hole 7
Place, the driven pulley 8 of shoveling conveyer belt 5 are rotatably connected in the side wall of jacking disk 2;The surface of shoveling conveyer belt 5 is provided with scraper bowl 9.
Drill 3 includes equally distributed 3 in the horizontal direction, and the central shaft of drill 3 is inclined by the front end face forward of jacking disk 2
Set obliquely.
Drill 3 includes vertically equally distributed 2 groups, and shoveling conveyer belt 5 includes vertically equally distributed 2
Individual, the lower section of each group drill 3 corresponds to a shoveling conveyer belt 5 respectively.
Drill 3 is cylinder, and the surface of drill 3 is provided with screw thread.
The rear end face of fixed disk 1 is provided with push pipe connector 10.
Embodiment 4
As depicted in figs. 1 and 2, along jacking direction, fixed disk 1 and jacking disk 2 are included successively by rear to preceding;Before jacking disk 2
End face is provided with drill 3, and the first motor 4 is fixed with the rear end face of jacking disk 2, and the power output shaft of the motor 4 of drill 3 and first connects
Connect;Horizontal shoveling conveyer belt 5 is provided between fixed disk 1 and jacking disk 2;Fixed disk 1 is provided with the second motor, shoveling conveyer belt
The power output axis connection of 5 motor of driving wheel 6 and second;Below drill 3, through hole 7 is provided with jacking disk 2, in through hole 7
Place, the driven pulley 8 of shoveling conveyer belt 5 are rotatably connected in the side wall of jacking disk 2;The surface of shoveling conveyer belt 5 is provided with scraper bowl 9.
Drill 3 includes equally distributed 3 in the horizontal direction, and the central shaft of drill 3 is inclined by the front end face forward of jacking disk 2
Set obliquely.
Drill 3 includes vertically equally distributed 2 groups, and shoveling conveyer belt 5 includes vertically equally distributed 2
Individual, the lower section of each group drill 3 corresponds to a shoveling conveyer belt 5 respectively.
Drill 3 is cylinder, and the surface of drill 3 is provided with screw thread.
Embodiment 5
As depicted in figs. 1 and 2, along jacking direction, fixed disk 1 and jacking disk 2 are included successively by rear to preceding;Before jacking disk 2
End face is provided with drill 3, and the first motor 4 is fixed with the rear end face of jacking disk 2, and the power output shaft of the motor 4 of drill 3 and first connects
Connect;Horizontal shoveling conveyer belt 5 is provided between fixed disk 1 and jacking disk 2;Fixed disk 1 is provided with the second motor, shoveling conveyer belt
The power output axis connection of 5 motor of driving wheel 6 and second;Below drill 3, through hole 7 is provided with jacking disk 2, in through hole 7
Place, the driven pulley 8 of shoveling conveyer belt 5 are rotatably connected in the side wall of jacking disk 2;The surface of shoveling conveyer belt 5 is provided with scraper bowl 9.
Drill 3 includes equally distributed 3 in the horizontal direction, and the central shaft of drill 3 is inclined by the front end face forward of jacking disk 2
Set obliquely.
Drill 3 includes vertically equally distributed 2 groups, and shoveling conveyer belt 5 includes vertically equally distributed 2
Individual, the lower section of each group drill 3 corresponds to a shoveling conveyer belt 5 respectively.
Embodiment 6
As depicted in figs. 1 and 2, along jacking direction, fixed disk 1 and jacking disk 2 are included successively by rear to preceding;Before jacking disk 2
End face is provided with drill 3, and the first motor 4 is fixed with the rear end face of jacking disk 2, and the power output shaft of the motor 4 of drill 3 and first connects
Connect;Horizontal shoveling conveyer belt 5 is provided between fixed disk 1 and jacking disk 2;Fixed disk 1 is provided with the second motor, shoveling conveyer belt
The power output axis connection of 5 motor of driving wheel 6 and second;Below drill 3, through hole 7 is provided with jacking disk 2, in through hole 7
Place, the driven pulley 8 of shoveling conveyer belt 5 are rotatably connected in the side wall of jacking disk 2;The surface of shoveling conveyer belt 5 is provided with scraper bowl 9.
Drill 3 includes equally distributed 3 in the horizontal direction, and the central shaft of drill 3 is inclined by the front end face forward of jacking disk 2
Set obliquely.
Embodiment 7
As depicted in figs. 1 and 2, along jacking direction, fixed disk 1 and jacking disk 2 are included successively by rear to preceding;Before jacking disk 2
End face is provided with drill 3, and the first motor 4 is fixed with the rear end face of jacking disk 2, and the power output shaft of the motor 4 of drill 3 and first connects
Connect;Horizontal shoveling conveyer belt 5 is provided between fixed disk 1 and jacking disk 2;Fixed disk 1 is provided with the second motor, shoveling conveyer belt
The power output axis connection of 5 motor of driving wheel 6 and second;Below drill 3, through hole 7 is provided with jacking disk 2, in through hole 7
Place, the driven pulley 8 of shoveling conveyer belt 5 are rotatably connected in the side wall of jacking disk 2;The surface of shoveling conveyer belt 5 is provided with scraper bowl 9.
Embodiment 8
Along jacking direction, include fixed disk 1 and jacking disk 2 successively by rear to preceding;The front end face of jacking disk 2 is provided with drill 3,
The first motor 4, the power output axis connection of the motor 4 of drill 3 and first are fixed with the rear end face of jacking disk 2;Fixed disk 1 and jacking
Horizontal shoveling conveyer belt 5 is provided between disk 2;Fixed disk 1 is provided with the second motor, the driving wheel 6 and second of shoveling conveyer belt 5
The power output axis connection of motor;Below drill 3, through hole 7 is provided with jacking disk 2, at through hole 7, shoveling conveyer belt 5 from
Driving wheel 8 is rotatably connected in the side wall of jacking disk 2;The surface of shoveling conveyer belt 5 is provided with scraper bowl 9.
Drill 3 includes equally distributed 2 in the horizontal direction, and the central shaft of drill 3 is inclined by the front end face forward of jacking disk 2
Set obliquely.
Drill 3 includes vertically equally distributed 3 groups, and shoveling conveyer belt 5 includes vertically equally distributed 3
Individual, the lower section of each group drill 3 corresponds to a shoveling conveyer belt 5 respectively.
Drill 3 is cylinder, and the surface of drill 3 is provided with screw thread.
The rear end face of fixed disk 1 is provided with push pipe connector 10.
Fixed disk 1, the bottom of jacking disk 2 are equipped with the 3rd motor and roller 11, the power output of the motor of roller 11 and the 3rd
Axis connection.
Central controller is additionally provided with, the first motor 4, the second motor, the 3rd motor pass through telecommunications with central controller respectively
Number connection.
By taking embodiment 1 as an example, the specific operation principle of the utility model is:
Under the control of central controller, the first motor 4 of control rotates, and drives drill 3 to rotate, after drill 3 is drilled loose soil,
Under the control of central controller, the second motor of control rotates, and drives shoveling conveyer belt 5 to operate, in the driven of shoveling conveyer belt 5
Take turns at 8, soil is scooped up and transported at the driving wheel 6 of shoveling conveyer belt 5 from the bottom to top by scraper bowl 9, and scraper bowl 9 is in shoveling conveyer belt
Overturn at 5 driving wheel 6, soil is poured out, realizes the effect of the collection and transmission to soil.Can be in shoveling conveyer belt 5
The lower section of driving wheel 6 sets conveyer belt, and soil is further sent to farther destination.
The forward downward of drill 3 is obliquely installed, and is not only improved brill soil, is also beneficial to the soil of the face of scraper bowl 9 being drilled loose, convenient
Scraper bowl 9 scoops up loose soil.
Drill 3 and shoveling conveyer belt 5 vertically set at least 2 groups, can be simultaneously to the soil horizon on vertical direction
Carry out more efficient jacking effect.
Drill 3 is cylinder, and intensity is high, prevents drill 3 from piercing rock and being broken off, and the surface of drill 3 is provided with screw thread, bores soil effect
Fruit is more preferable.
The rear end face of fixed disk 1 is provided with push pipe connector 10, for connecting jacking pipe.
Fixed disk 1, the bottom of jacking disk 2 are equipped with the 3rd motor and roller 11, under the control of central controller, can control
The rotation of the 3rd motor is made, drives roller 11 to rotate, so as to control the advance of fixed disk 1 and jacking disk 2, backward movement.
Above-described embodiment is preferred embodiment of the present utility model, is not the limit to technical solutions of the utility model
System, on the premise of the spirit and scope of the utility model is not departed from, the utility model also has various changes and modifications, these changes
Change and improve and be regarded as falling into claimed the scope of the utility model.
Claims (7)
1. the shoveling formula development machine for push pipe operation, it is characterised in that:Along jacking direction, include fixed disk successively by rear to preceding
(1)With jacking disk(2);
The jacking disk(2)Front end face is provided with drill(3), the jacking disk(2)The first motor is fixed with rear end face(4),
The drill(3)With first motor(4)Power output axis connection;
The fixed disk(1)With the jacking disk(2)Between be provided with horizontal shoveling conveyer belt(5);
The fixed disk(1)It is provided with the second motor, the shoveling conveyer belt(5)Driving wheel(6)With second motor
Power output axis connection;
In the drill(3)Lower section, the jacking disk(2)On be provided with through hole(7), in the through hole(7)Place, the transmission of cutting the earth
Band(5)Driven pulley(8)Rotatable connection is in the jacking disk(2)Side wall on;
The shoveling conveyer belt(5)Surface is provided with scraper bowl(9).
2. the shoveling formula development machine according to claim 1 for push pipe operation, it is characterised in that:The drill(3)Bag
Include equally distributed at least two in the horizontal direction, the drill(3)Central shaft by the jacking disk(2)Front end face forward
Set diagonally downward.
3. the shoveling formula development machine according to claim 2 for push pipe operation, it is characterised in that:The drill(3)Bag
Vertically equally distributed at least 2 groups are included, the shoveling conveyer belt(5)Including vertically equally distributed at least 2
It is individual, drill described in each group(3)Lower section corresponds to a shoveling conveyer belt respectively(5).
4. the shoveling formula development machine according to claim 3 for push pipe operation, it is characterised in that:The drill(3)For
Cylinder, the drill(3)Surface is provided with screw thread.
5. the shoveling formula development machine according to claim 4 for push pipe operation, it is characterised in that:The fixed disk(1)
Rear end face is provided with push pipe connector(10).
6. the shoveling formula development machine according to claim 5 for push pipe operation, it is characterised in that:The fixed disk(1)、
Jacking disk(2)Bottom is equipped with the 3rd motor and roller(11), the roller(11)With the power output shaft of the 3rd motor
Connection.
7. the shoveling formula development machine according to claim 6 for push pipe operation, it is characterised in that:It is additionally provided with central control
Device, first motor(4), second motor, the 3rd motor connected with the central controller by electric signal respectively
Connect.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720596035.5U CN206737926U (en) | 2017-05-26 | 2017-05-26 | Shoveling formula development machine for push pipe operation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720596035.5U CN206737926U (en) | 2017-05-26 | 2017-05-26 | Shoveling formula development machine for push pipe operation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206737926U true CN206737926U (en) | 2017-12-12 |
Family
ID=60568105
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720596035.5U Expired - Fee Related CN206737926U (en) | 2017-05-26 | 2017-05-26 | Shoveling formula development machine for push pipe operation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206737926U (en) |
-
2017
- 2017-05-26 CN CN201720596035.5U patent/CN206737926U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206694038U (en) | Hob type push pipe excavator | |
CN204212700U (en) | Drill bit in a kind of conduit jacking | |
CN104358927A (en) | Push pipe construction method and push pipe device | |
CN105780837B (en) | The continuous method for digging and its excavating gear of diaphram wall | |
CN206111195U (en) | Bulldozing car for tunnel construction | |
CN207934081U (en) | A kind of crawler type bucket wheel excavator | |
CN206737926U (en) | Shoveling formula development machine for push pipe operation | |
CN103741742B (en) | Ditcher | |
CN107218053A (en) | Pipe-jacking project excavator | |
CN202117675U (en) | Excavation device for excavator | |
CN107326952A (en) | A kind of pipeline excavator | |
CN206298915U (en) | A kind of hydraulic engineering gutter mining head device | |
CN106894822A (en) | Cutting head of roadheader and stretching structure with rake teeth and subsidiary drilling tool | |
CN2297540Y (en) | Wriggle type self-propelled entry-driving machine for tunnel or gallery | |
CN203834543U (en) | Groove excavation vehicle | |
CN107060799A (en) | A kind of drum-type jacking excavator | |
CN206829145U (en) | Deep Foundation Pit Excavation vertical-lift goes out indigenous equipment | |
CN107387107A (en) | Development machine for pipe-jacking project | |
CN206816261U (en) | A kind of pipe jacking tunnelling machine | |
CN109653266B (en) | Scraper chain type grooving machine | |
CN202652842U (en) | Hydraulic drilling tree planter | |
CN207362905U (en) | Native ditcher is adopted in rotation | |
CN207750080U (en) | Coal mine digging transmission device | |
CN114809141B (en) | Multifunctional detachable self-rotating type high-performance excavation and soil-discharging device | |
CN211314122U (en) | Digging-changing drilling machine |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171212 Termination date: 20180526 |
|
CF01 | Termination of patent right due to non-payment of annual fee |