CN206737899U - A kind of Full-automatic drainage gas recovery facility - Google Patents
A kind of Full-automatic drainage gas recovery facility Download PDFInfo
- Publication number
- CN206737899U CN206737899U CN201720633656.6U CN201720633656U CN206737899U CN 206737899 U CN206737899 U CN 206737899U CN 201720633656 U CN201720633656 U CN 201720633656U CN 206737899 U CN206737899 U CN 206737899U
- Authority
- CN
- China
- Prior art keywords
- gas
- compressor
- knockout drum
- level sensor
- full
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Jet Pumps And Other Pumps (AREA)
Abstract
The utility model discloses a kind of Full-automatic drainage gas recovery facility, and it includes controller, natural gas compressor(1), nitrogen compressor(2), knockout drum(3)And it is fixedly arranged on gas well(4)The closure at top(5), knockout drum(3)Side wall on be provided with inlet(8)And leakage fluid dram(9), inlet(8)With delivery pipe(7)Upper end connects, leakage fluid dram(9)Place is connected with high-pressure pump(10), knockout drum(3)Top be provided with gas outlet(11), gas outlet(11)With natural gas compressor(1)Arrival end connection, natural gas compressor(1)On be provided with blast pipe(12), knockout drum(3)Inside it is provided with high level sensor(14)With low liquid level sensor(15).The beneficial effects of the utility model are:Realize that continuous pressurized gas lift water pumping gas production, reduction gas-producing well hydrops lose caused by stopping production, improve water-producing gas well gas production, production efficiency height.
Description
Technical field
Oil gas field production gas technology field is the utility model is related to, particularly a kind of Full-automatic drainage gas recovery facility.
Background technology
At present, natural gas has turned into the indispensable fuel of people, and gas well depth is deeper, and the water of deposition is got in gas well
Greatly, natural gas pile things on causes the fluid-carrying capability of gas-producing well to decline in underwater, can not realize blowing band liquid aerogenesis, part aquifer yield
Larger gas well stops production caused by hydrops.After stopping production, natural gas causes the great wasting of resources still in gas well, uses
The characteristics of big extraction amount of workload is small be present again in artificial extract.
In recent years, oil gas field has carried out multinomial water drainage-gas recovery technology research and experiment, the master of water-producing gas well water pumping gas production at present
To use foam drainage gas recovery technique.Although foam drainage gas recovery technique is gradually improved and ripe, due to the distribution of gas well,
Collect the limitation of gas transmission mode and technique, part gas well foam helps row to have certain difficulty.Implement rolling development in view of gas field, together
Pressure unbalanced phenomena be present in one gas gathering station, low pressure, water production water-producing gas well gas gathering station part newly operation well pressure it is higher,
Production capacity is preferable, in order to give full play to the high pressure of new Brought-in Gas Wells, the superiority of high production capacity, in combination with yard process characteristic, opens
Open up high-pressure air source gas well gas and lift drainage gas production technology research, achieve certain effect.But the number of high-pressure air source well at present
Measure limited, it is impossible to fully meet the technical requirements of gaslift water pumping gas production.
In addition, the water drainage gas production device that foam drainage gas recovery technique uses can only extrude water and natural gas from gas well,
But the separation of water and natural gas can not be realized, therefore also need to moisture trap and separated, and this moisture trap into
This height, increase gas production input cost.
Utility model content
A kind of the shortcomings that the purpose of this utility model is to overcome prior art, there is provided compact-sized, continuous supercharging of realization
Gaslift water pumping gas production, reduce loss caused by gas-producing well hydrops stops production, improve water-producing gas well gas production, production efficiency it is high it is complete from
Dynamic water pumping gas production equipment.
The purpose of this utility model is achieved through the following technical solutions:A kind of Full-automatic drainage gas recovery facility, it includes
Controller, natural gas compressor, nitrogen compressor, knockout drum and the closure being fixedly arranged at the top of gas well, described is close
Capping top is provided with joint and connects the centre bore of gas well, and delivery pipe, the bottom extension of delivery pipe are installed with centre bore
In in gas well, the upper end of delivery pipe is extended outside gas well, and inlet and row are provided with the side wall of described knockout drum
Liquid mouth, inlet are connected with delivery pipe upper end, and high-pressure pump is connected with leakage fluid dram, outlet is provided with the top of knockout drum
Mouthful, the arrival end of gas outlet and natural gas compressor connects, and is provided with blast pipe on natural gas compressor, is cased with pressing from both sides on blast pipe
Set, the gas outlet of described nitrogen compressor is connected with joint;Be provided with described knockout drum high level sensor and
Low liquid level sensor, described high level sensor, low liquid level sensor and high-pressure pump are connected with controller.
Described controller is connected with natural gas compressor and nitrogen compressor.
Described controller is PLC.
The vertical setting of described delivery pipe.
Described high level sensor is located at the lower section of inlet.
The utility model has advantages below:The utility model realizes continuous pressurized gas lift water pumping gas production, reduces gas-producing well
Loss, raising water-producing gas well gas production, production efficiency are high caused by hydrops stops production.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
In figure, 1- natural gas compressors, 2- nitrogen compressors, 3- knockout drums, 4- gas wells, 5- closures, 6- joints,
7- delivery pipes, 8- inlets, 9- leakage fluid drams, 10- high-pressure pumps, 11- gas outlets, 12- blast pipes, 13- chucks, 14- high levels pass
Sensor, 15- low liquid level sensors.
Embodiment
The utility model is further described below in conjunction with the accompanying drawings, the scope of protection of the utility model be not limited to
It is lower described:
As shown in figure 1, a kind of Full-automatic drainage gas recovery facility, it includes controller, natural gas compressor 1, nitrogen compression
Machine 2, knockout drum 3 and the closure 5 for being fixedly arranged on the top of gas well 4, the described top of closure 5 are provided with joint 6 and connected
Ventilate the centre bore of well 4, be installed with delivery pipe 7 in centre bore, 7 vertical setting of delivery pipe, the bottom of delivery pipe 7 extends gas
In well 4, the upper end of delivery pipe 7 is extended outside gas well 4, and inlet 8 and row are provided with the side wall of described knockout drum 3
Liquid mouth 9, inlet 8 are connected with the upper end of delivery pipe 7, and high-pressure pump 10 is connected with leakage fluid dram 9, and the top of knockout drum 3 is set
Gas outlet 11 is equipped with, gas outlet 11 is connected with the arrival end of natural gas compressor 1, and blast pipe is provided with natural gas compressor 1
12, chuck 13 is cased with blast pipe 12, and the gas outlet of described nitrogen compressor 2 is connected with joint 6;Described knockout drum
High level sensor 14 and low liquid level sensor 15 are provided with 3, high level sensor 14 is located at the lower section of inlet 8, described
High level sensor 14, low liquid level sensor 15 and high-pressure pump 10 be connected with controller.
Described controller is PLC, and controller is connected with natural gas compressor 1 and nitrogen compressor 2, passes through control
Device processed can control the startup or closing of natural gas compressor 1 and nitrogen compressor 2, facilitate operating personnel to operate, and have automatic
The characteristics of change degree is high.
The course of work of the present utility model is as follows:Via controller control nitrogen compressor 2 starts, the output of nitrogen compressor 2
High pressure nitrogen enters in gas well 4 through joint 6, and high pressure nitrogen acts on liquid levels in gas well 4, liquid and overstocks below liquid
Natural gas through delivery pipe 7, inlet 8 enter knockout drum 3 in, liquid under gravity enter knockout drum 3 in,
When liquid level reaches on high level sensor 14, high level sensor 14 sends electric signal to controller, controller control high-pressure pump
10 start, and high-pressure pump 10 is by liquid evacuation in knockout drum 3, to avoid the full liquid of the storage of knockout drum 3, at liquid level
When low liquid level sensor 15, to controller, controller continues to control nitrogen compressor work the electrical signal of low liquid level sensor 15
Make, realize continuous kill-job;And the natural gas produced then enters in natural gas compressor 1 through gas outlet 11, natural gas compressor 1
The natural gas boosting that will be produced, become high pressure-temperature natural gas after supercharging, when high pressure-temperature natural gas enters in blast pipe 12
Cooling water is passed through in backward chuck 13, cooling water absorbs natural gas heat, so as to reduce the heat of natural gas carrying, ensure that most
Natural gas after collecting eventually can be used directly, and realizes and continuously taps natural gas, without follow-up cooling process, greatly improves
Natural gas extraction efficiency.
It can thus be appreciated that the arrangement achieves continuous pressurized gas lift water pumping gas production, no matter more deep gas wells can be exploited,
Further reduce loss caused by gas-producing well hydrops stops production.In addition the arrangement achieves closed gas production, water-producing gas well is increased
Gas production.
Claims (5)
- A kind of 1. Full-automatic drainage gas recovery facility, it is characterised in that:It includes controller, natural gas compressor(1), nitrogen compression Machine(2), knockout drum(3)And it is fixedly arranged on gas well(4)The closure at top(5), described closure(5)Top is provided with Joint(6)With connect gas well(4)Centre bore, be installed with delivery pipe in centre bore(7), delivery pipe(7)Bottom extend Gas well(4)It is interior, delivery pipe(7)Upper end extend gas well(4)Outside, described knockout drum(3)Side wall on be provided with Inlet(8)And leakage fluid dram(9), inlet(8)With delivery pipe(7)Upper end connects, leakage fluid dram(9)Place is connected with high-pressure pump (10), knockout drum(3)Top be provided with gas outlet(11), gas outlet(11)With natural gas compressor(1)Arrival end Connection, natural gas compressor(1)On be provided with blast pipe(12), blast pipe(12)On be cased with chuck(13), described nitrogen pressure Contracting machine(2)Gas outlet and joint(6)Connection;Described knockout drum(3)Inside it is provided with high level sensor(14)With it is low Liquid level sensor(15), described high level sensor(14), low liquid level sensor(15)And high-pressure pump(10)And controller Connection.
- A kind of 2. Full-automatic drainage gas recovery facility according to claim 1, it is characterised in that:Described controller with it is natural Air compressor(1)And nitrogen compressor(2)Connection.
- A kind of 3. Full-automatic drainage gas recovery facility according to claim 2, it is characterised in that:Described controller is PLC Controller.
- A kind of 4. Full-automatic drainage gas recovery facility according to claim 1, it is characterised in that:Described delivery pipe(7)Hang down To setting.
- A kind of 5. Full-automatic drainage gas recovery facility according to claim 1, it is characterised in that:Described high level sensor (14)Positioned at inlet(8)Lower section.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720633656.6U CN206737899U (en) | 2017-06-02 | 2017-06-02 | A kind of Full-automatic drainage gas recovery facility |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720633656.6U CN206737899U (en) | 2017-06-02 | 2017-06-02 | A kind of Full-automatic drainage gas recovery facility |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206737899U true CN206737899U (en) | 2017-12-12 |
Family
ID=60568457
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720633656.6U Expired - Fee Related CN206737899U (en) | 2017-06-02 | 2017-06-02 | A kind of Full-automatic drainage gas recovery facility |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206737899U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108060912A (en) * | 2018-01-08 | 2018-05-22 | 惠安贤江金刚石工具开发有限公司 | A kind of water drainage gas production device for natural gas extraction |
CN111322040A (en) * | 2020-03-16 | 2020-06-23 | 西安诚科石油工程技术服务有限公司 | Water-producing gas well full-life-cycle drainage gas production method and system |
-
2017
- 2017-06-02 CN CN201720633656.6U patent/CN206737899U/en not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108060912A (en) * | 2018-01-08 | 2018-05-22 | 惠安贤江金刚石工具开发有限公司 | A kind of water drainage gas production device for natural gas extraction |
CN108060912B (en) * | 2018-01-08 | 2020-10-02 | 惠安县锋创商贸有限公司 | Water-draining gas-producing device for natural gas exploitation |
CN111322040A (en) * | 2020-03-16 | 2020-06-23 | 西安诚科石油工程技术服务有限公司 | Water-producing gas well full-life-cycle drainage gas production method and system |
CN111322040B (en) * | 2020-03-16 | 2022-03-08 | 西安诚科石油工程技术服务有限公司 | Water-producing gas well full-life-cycle drainage gas production method and system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107120099A (en) | A kind of Full-automatic drainage gas recovery facility | |
CN206722813U (en) | A kind of device that water pumping gas production is circulated using former gas well gas source | |
CN101787702A (en) | Effective vacuum dewatering method | |
CN206290281U (en) | A kind of mine gas extraction pipe negative pressure automatic drainage device | |
CN206737899U (en) | A kind of Full-automatic drainage gas recovery facility | |
CN105332384A (en) | Super pressure suction joint pumping system and operating method thereof | |
CN102865104A (en) | Downward extraction drilling drainage device | |
CN207230015U (en) | A kind of anti-blocking petroleum pipeline | |
CN107023279A (en) | A kind of water drainage gas production device | |
CN104989325A (en) | Method for producing gas by using production pipe column of parallel double-pipe gas well | |
CN101294499A (en) | Double-function vacuum apparatus for extracting mash gas and lifting groundwater for coal mine safety | |
CN206753551U (en) | A kind of hydraulic cylinder type water drainage gas production device | |
CN202832456U (en) | Pressure reduction and yield increase device for natural gas well mouth | |
CN201722698U (en) | Quick well sinking and water precipitating device | |
CN107083938A (en) | A kind of hydraulic cylinder type water drainage gas production device | |
CN207004489U (en) | A kind of water drainage gas production device | |
CN206129597U (en) | Spiral shell sucker -rod pumping is prevented burning with preventing buggy by coal seam gas well | |
CN202900322U (en) | Positive-pressure automatic water discharging device | |
CN202810933U (en) | Downward drilling drainage system | |
CN208702385U (en) | A kind of water drainage gas production device for natural gas extraction | |
CN202745934U (en) | Downward extraction borehole drainage device | |
CN201152276Y (en) | Negative-pressure water storage tank type centrifugal pump | |
CN110318711B (en) | Liquid draining method and device for liquid-containing low-yield oil-gas well | |
CN210264639U (en) | Liquid drainage device of liquid-containing low-yield oil-gas well | |
CN203808042U (en) | Vacuum preloading treatment negative-pressure water discharging device of soft foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171212 Termination date: 20190602 |
|