CN206736978U - 高层建筑地下水位较高处的桩头防水构造 - Google Patents
高层建筑地下水位较高处的桩头防水构造 Download PDFInfo
- Publication number
- CN206736978U CN206736978U CN201720308204.0U CN201720308204U CN206736978U CN 206736978 U CN206736978 U CN 206736978U CN 201720308204 U CN201720308204 U CN 201720308204U CN 206736978 U CN206736978 U CN 206736978U
- Authority
- CN
- China
- Prior art keywords
- metallic plate
- pile crown
- skyscraper
- endless belt
- pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Piles And Underground Anchors (AREA)
Abstract
本实用新型涉及一种高层建筑地下水位较高处的桩头防水构造,桩头伸入设置在承台内部,承台接缝处从上到下依次设置有细石混凝土保护层、柔性防水层和素混凝土垫层,长钢筋头预埋在伸入承台内部的桩头上部,长钢筋头与桩头内部的主筋连接,环形带状金属板环绕桩身周围通过长钢筋头焊接在桩身上,金属板止水环环绕桩身周围呈水平地焊接在环形带状金属板上;桩身上固定金属板止水环和环形带状金属板的位置位于细石混凝土保护层的上方一定距离处。本实用新型可彻底和长久地解决桩头防水这个薄弱环节问题,从而彻底解决高层建筑地下工程防水的难题,并延长建筑物使用寿命。
Description
技术领域
本实用新型属于建筑工程技术领域,具体涉及一种高层建筑地下水位较高处的桩头防水构造。
背景技术
在桩头防水构造中,桩头与承台是两次浇注砼,而这个部位多数情况下是在地下水位以下,即使在地下水位以上使用过程也可能被水浸。那么桩基防水就对这中间的施工缝起到保护作用,主要是保护施工缝薄弱环节中的受力钢筋。而这些钢筋正是传递扩散地震能量时抗剪、抗拨受力的主要承担者。另外,地下水从桩头与混凝土基础、承台接缝处渗入,腐蚀桩头和基础、承台受力钢筋。降低建筑物使用寿命,造成地下车库或地下室渗、漏水。使地下建筑物内部阴冷潮湿,不宜人类居留。而且现有的桩头防水构造结构在施工中一般采用聚合物水泥防水砂浆、水泥基渗透结晶型防水涂料和遇水膨胀止水条等构造,导致工序烦琐,而且止水效果不好。而且若建筑物处于地震带时,频繁的小震甚至大、中地震的作用将使桩身与承台处的接缝变宽,进一步加剧上述影响。
发明内容
本实用新型的目的在于提供一种高层建筑地下水位较高处的桩头防水构造。本实用新型可彻底和长久地解决桩头防水这个薄弱环节问题,从而彻底解决高层建筑地下工程防水的难题,并延长建筑物使用寿命。
本实用新型采用的技术方案:一种高层建筑地下水位较高处的桩头防水构造,它包括细石混凝土保护层、柔性防水层、素混凝土垫层、金属板止水环、环形带状金属板和长钢筋头,桩头伸入设置在承台内部,承台接缝处从上到下依次设置有细石混凝土保护层、柔性防水层和素混凝土垫层,长钢筋头预埋在伸入承台内部的桩头上部,长钢筋头与桩头内部的主筋连接,环形带状金属板环绕桩身周围通过长钢筋头焊接在桩身上,金属板止水环环绕桩身周围呈水平地焊接在环形带状金属板上;桩身上固定金属板止水环和环形带状金属板的位置位于细石混凝土保护层的上方一定距离处。
进一步地,所述的金属板止水环的厚度为6毫米。可以是钢板。
进一步地,所述的长钢筋头长度为40毫米。
进一步地,所述的环形带状金属板的厚度为6毫米。可以是钢板。
进一步地,柔性防水层到金属板止水环之间的承台的混凝土厚度为300毫米。
进一步地,还包括一预埋在桩身上的位置指示钢筋,所述位置指示钢筋用于指示预埋环形带状金属板的高度。
本实用新型与现有技术相比其有益效果是:本实用新型在桩身上增加了钢板止水环结构,替代了传统桩基防水施工中的聚合物水泥防水砂浆、水泥基渗透结晶型防水涂料和遇水膨胀止水条等繁琐工序,不仅止水效果好,而且施工效率大大提高。更彻底和长久地解决了桩头防水这个薄弱环节问题,从而彻底解决高层建筑地下工程防水的难题,并延长建筑物使用寿命。
附图说明
图1为桩头伸入承台的一种剖面示意图;
图2为桩头伸入承台的另一种剖面示意图;
图3为钢板止水环和环形带状扁钢与桩身的连接结构示意图;
图4为图3中沿A-A剖面线的剖面图。
具体实施方式
如图1和图2所示,一种高层建筑地下水位较高处的桩头7防水构造,它包括细石混凝土保护层1、柔性防水层2、素混凝土垫层3、钢板止水环4、环形带状扁钢5、长钢筋头6和位置指示钢筋9,桩头7伸入设置在承台8内部,承台8接缝处从上到下依次设置有细石混凝土保护层1、柔性防水层2和素混凝土垫层3,如图3和图4,长钢筋头6预埋在伸入承台8内部的桩头7上部,长钢筋头6与桩头7内部的主筋10连接,环形带状扁钢5环绕桩身周围通过长钢筋头6焊接在桩身上,钢板止水环4环绕桩身周围呈水平地焊接环形带状扁钢5上;桩身上固定钢板止水环4和环形带状扁钢5的位置位于细石混凝土保护层1的上方一定距离处。
本实用新型所述的钢板止水环4的厚度为6毫米。长钢筋头6长度为40毫米。环形带状扁钢5的厚度为6毫米。柔性防水层2到钢板止水环4之间的承台8的混凝土厚度为300毫米。还包括一预埋在桩身上的位置指示钢筋9,所述位置指示钢筋9用于指示预埋环形带状扁钢5的高度。
Claims (6)
1.高层建筑地下水位较高处的桩头防水构造,它包括细石混凝土保护层、柔性防水层、素混凝土垫层、金属板止水环、环形带状金属板和长钢筋头,桩头伸入设置在承台内部,其特征在于,承台接缝处从上到下依次设置有细石混凝土保护层、柔性防水层和素混凝土垫层,长钢筋头预埋在伸入承台内部的桩头上部,长钢筋头与桩头内部的主筋连接,环形带状金属板环绕桩身周围通过长钢筋头焊接在桩身上,金属板止水环环绕桩身周围呈水平地焊接在环形带状金属板上;桩身上固定金属板止水环和环形带状金属板的位置位于细石混凝土保护层的上方一定距离处。
2.根据权利要求1所述的高层建筑地下水位较高处的桩头防水构造,其特征在于,所述的金属板止水环的厚度为6毫米。
3.根据权利要求1所述的高层建筑地下水位较高处的桩头防水构造,其特征在于,所述的长钢筋头长度为40毫米。
4.根据权利要求1所述的高层建筑地下水位较高处的桩头防水构造,其特征在于,所述的环形带状金属板的厚度为6毫米。
5.根据权利要求1所述的高层建筑地下水位较高处的桩头防水构造,其特征在于,柔性防水层到金属板止水环之间的承台的混凝土厚度为300毫米。
6.根据权利要求1所述的高层建筑地下水位较高处的桩头防水构造,其特征在于,还包括一预埋在桩身上的位置指示钢筋,所述位置指示钢筋用于指示预埋环形带状金属板的高度。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720308204.0U CN206736978U (zh) | 2017-03-28 | 2017-03-28 | 高层建筑地下水位较高处的桩头防水构造 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720308204.0U CN206736978U (zh) | 2017-03-28 | 2017-03-28 | 高层建筑地下水位较高处的桩头防水构造 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206736978U true CN206736978U (zh) | 2017-12-12 |
Family
ID=60558455
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720308204.0U Expired - Fee Related CN206736978U (zh) | 2017-03-28 | 2017-03-28 | 高层建筑地下水位较高处的桩头防水构造 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206736978U (zh) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374425A (zh) * | 2018-02-09 | 2018-08-07 | 中交二航局第四工程有限公司 | 承台及其基坑垫层施工结构和浇筑方法 |
CN108755931A (zh) * | 2018-07-04 | 2018-11-06 | 中铁隧道局集团有限公司 | 一种同桩连接的大跨径预制拼装底板及其拼装结构和安装方法 |
-
2017
- 2017-03-28 CN CN201720308204.0U patent/CN206736978U/zh not_active Expired - Fee Related
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108374425A (zh) * | 2018-02-09 | 2018-08-07 | 中交二航局第四工程有限公司 | 承台及其基坑垫层施工结构和浇筑方法 |
CN108374425B (zh) * | 2018-02-09 | 2023-12-22 | 中交二航局第四工程有限公司 | 承台及其基坑垫层施工结构和浇筑方法 |
CN108755931A (zh) * | 2018-07-04 | 2018-11-06 | 中铁隧道局集团有限公司 | 一种同桩连接的大跨径预制拼装底板及其拼装结构和安装方法 |
CN108755931B (zh) * | 2018-07-04 | 2024-01-16 | 中铁隧道局集团有限公司 | 一种同桩连接的大跨径拼装结构及其安装方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106758786B (zh) | 一种预制装配式中空夹层钢管混凝土格构式桥墩 | |
CN106869017A (zh) | 一种墩底设置柔性层的预制拼装桥墩—承台节点连接方式及其作法 | |
CN106869315B (zh) | 配预应力筋的钢管混凝土框架及其施工方法 | |
CN207194146U (zh) | 预应力装配式混凝土框架节点连接结构 | |
CN207905121U (zh) | 预制混凝土构件约束浆锚搭接连接结构 | |
CN103510540B (zh) | 浆砌片石挡土墙加固施工方法及其结构 | |
CN104153287A (zh) | 具有自复位能力的节段拼装混凝土框架桥墩系统及方法 | |
CN207228402U (zh) | 内置预应力钢斜撑的钢筋混凝土剪力墙 | |
CN206736978U (zh) | 高层建筑地下水位较高处的桩头防水构造 | |
CN109208494B (zh) | 一种加筋钢波纹板拱型桥涵结构 | |
CN107268432A (zh) | 一种减震抗冲击桥梁伸缩缝机构及其施工方法 | |
CN106812229A (zh) | 组合约束双钢板混凝土剪力墙及其施工方法 | |
CN108867341A (zh) | 一种gfrp管-混凝土-型钢组合柱脚节点及其施工方法 | |
CN106930436A (zh) | 一种内置预应力钢斜撑的钢筋混凝土剪力墙 | |
CN108360561A (zh) | 筏板基础的地下室改造构造 | |
CN107366289A (zh) | 现场挖孔浇筑的基坑混凝土支护桩结构及其制作方法 | |
CN109868830A (zh) | 浸水路堤边坡抗渗防护结构及施工方法 | |
CN109778891A (zh) | 一种基于海上钢斜桩基础的增强封底握裹力的方法 | |
CN206681208U (zh) | 一种组合约束双钢板混凝土剪力墙 | |
CN205529904U (zh) | 一种带弧形筋的预制桥面板连接结构 | |
CN204898660U (zh) | 腐蚀环境下的抗压抗拔复合桩 | |
CN108643215A (zh) | 一种旋喷压入变截面后锚墩式基础施工方法 | |
CN103498571A (zh) | 采用穿墙钢筋骨架外加钢丝网的加固石结构及其施工方法 | |
CN207958980U (zh) | 一种减震抗冲击桥梁伸缩缝机构 | |
CN206941607U (zh) | 现场挖孔浇筑的基坑混凝土支护桩结构 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171212 Termination date: 20210328 |
|
CF01 | Termination of patent right due to non-payment of annual fee |