CN206736882U - A kind of induction band for subgrade settlement automatic Observation - Google Patents
A kind of induction band for subgrade settlement automatic Observation Download PDFInfo
- Publication number
- CN206736882U CN206736882U CN201621456620.7U CN201621456620U CN206736882U CN 206736882 U CN206736882 U CN 206736882U CN 201621456620 U CN201621456620 U CN 201621456620U CN 206736882 U CN206736882 U CN 206736882U
- Authority
- CN
- China
- Prior art keywords
- flexible pipe
- subgrade settlement
- automatic observation
- induction band
- settlement automatic
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model discloses a kind of induction band for subgrade settlement automatic Observation, and it includes the flexible pipe of the flat for being embedded in base course, and several areas are divided into the flexible pipe and are separately provided for the resistance coil of sensing sedimentation stretching change;Each resistance coil mutually insulated, and individually pass through the end of wire transmission signal to flexible pipe;The both ends sealing of the flexible pipe, one end is connected on signal output port by transfer wire.The purpose of this utility model is to provide a kind of induction band for subgrade settlement automatic Observation, conveniently continues efficiently to monitor subgrade settlement situation, and can feed back to continuity the situation in whole roadbed section, and high sensitivity is convenient and practical, is not limited by road conditions.
Description
Technical field
The utility model belongs to roadbed monitoring field, specially a kind of induction band for subgrade settlement automatic Observation.
Background technology
Highway subgrade is especially more multiple in regional area Hydroclimate condition throughout the year by the percussion of vehicular load
It is miscellaneous, cause roadbed that sedimentation and deformation easily occurs.In recent years, with the development of transportation, vehicle flow is growing day by day, vehicle
Load also has the trend constantly increased, or even the situation that overweight car load exceedes 3 ~ 4 times of design load occurs, and these factors are tight
The operation situation of roadbed is degrading again.Sedimentation, which occurs, for roadbed will cause Uneven road suitable, influence the comfortableness and peace of vehicle operation
Quan Xing.In privileged sites, such as bridgehead position, the degree that car is jumped in conference increase is crossed in subgrade settlement, and the percussion of formation is in turn
Meeting Accelerated subsidence, forms vicious circle.The load that railway bed is subject to is bigger, and ride comfort requires higher, therefore sedimentation is wanted
Ask also tightened up.
Roadbed as shown in Figure 1, in use for some time, because the sedimentation of bottom roadbed 80 is caved in, when causing to pave the way
First basic unit 81, the second basic unit 82, the 3rd basic unit 83 follow sedimentation to be formed 85 at surfaces collapse, ultimately result in road surface 84 and are formed such as
86 at slight crack in diagram, so cause road surface 84 to destroy, influence vehicle pass-through, or even traffic accident can be caused.
At present, being generally used for the measuring method of road foundation sedimentation both at home and abroad includes:Embedded sedimentation plate, such as Fig. 2, Fig. 3 institute
Show, after the completion of the arrangement of roadbed 80, after detection meets basic unit's construction conditions, laid in the position of intermediate isolating band 87 of road
Measurement mark component as shown in Figure 3, it includes the bottom plate vertical rod 71 for being arranged on the bottom plate 70 of bottom, being vertically connected with bottom plate 70
And expose the measurement mark 72 on road surface;Then one layer is often laid, one layer of measurement mark component is put, to detect the sedimentation feelings of this layer
Condition.After the completion of road surfacing, the elevation information of periodic detection measurement mark 72, continuity data are formed, monitor sedimentation situation.Cause
If being settled for road surface, it occurs that the bottom plate 70 as shown in the right in Fig. 2 follows the situation of sedimentation, so as to feed back to measurement
On the elevation of mark 72, i.e., sedimentation D occurs for a certain basic unit, then the elevation change for representing the measurement mark 72 of the basic unit corresponds to D.
Low with upper type measuring accuracy, test automation degree is low, and can only reflect certain point(It placed bottom plate 70
Put) sedimentation change, and need pavement structure to support, can have the pre-buried measurement mark component in position, and also have for pre-buried
Construction requirement, it is cumbersome, it is more difficult to promote the use of a large area.
It is understood that resistance=resistance coefficient × length ÷ cross-sectional areas, resistance strain gage stretching, then electrical resistance wire grid elongation,
Cross-sectional area diminishes simultaneously, so resistance increases.Resistance value size it can be considered to measure resistance strain gage is come actual anti-
Answer the tensile deformation relation of resistance.
The application consideration is pre-buried pre-buried to replace measuring mark component by resistance-strain equipment, is changed by detection resistance real-time
Perceive the sedimentation change of base course.
Utility model content
The purpose of this utility model is to be directed to problem above, there is provided a kind of induction band for subgrade settlement automatic Observation,
Conveniently continue efficiently to monitor subgrade settlement situation, and can feed back to continuity the situation in whole roadbed section, high sensitivity, side
Just it is practical, do not limited by road conditions.
To realize object above, the technical solution adopted in the utility model is:It is a kind of for subgrade settlement automatic Observation
Induction band, it includes the flexible pipe of the flat for being embedded in base course(1), the flexible pipe(1)Inside it is divided into several
Area and the resistance coil for being separately provided for sensing sedimentation stretching change(2);Each resistance coil(2)Mutually insulated, and point
Not separately through wire(3)Transmit signals to flexible pipe(1)End;The flexible pipe(1)Both ends sealing, one end passes through biography
Transporting line(3)It is connected to signal output port(7)On.
Further, the flexible pipe(1)Outer surface be provided with top layer sheath(6), and outside the both sides of top layer sheath
Side is evenly arranged with the mounting hole for being fixed on roadbed(10).
Further, the top layer sheath(6)It is made of flexible silica gel material, and top layer sheath(6)Surface it is uniform
Have it is some grab ground stud(61), the thickness of layer of silica gel is 1cm ~ 2cm, grabs ground stud(61)Protrusion height be 1cm ~ 2cm.
Further, the flexible pipe(1)It is made of polytetrafluoroethylmaterial material.
Further, the flexible pipe(1)The resistance coil of interior setting(2)Subregion is fixed on flexible pipe(1)It is internal.
Further, the flexible pipe(1)The resistance coil of interior setting(2)It is fixed by inertia glue.
Further, the signal output port(7)On be provided with junction block(8).
The beneficial effects of the utility model:A kind of induction band for subgrade settlement automatic Observation of the utility model, it is convenient
Continue efficiently to monitor subgrade settlement situation, and can feed back to continuity the situation in whole roadbed section, high sensitivity is convenient real
With not limited by road conditions.
The sedimentation situation of change continuously reflected using resistance strain measuring device at sedimentation base course, is surveyed by resistance-strain
Resistance variations caused by the stretching that amount device occurs with subgrade settlement carry out accurate characterization settling data, its accuracy and reliability
It is stronger.
Brief description of the drawings
Fig. 1 is that schematic diagram is demonstrated in existing road structure and sedimentation.
Fig. 2 is existing subgrade settlement measurement demonstration schematic diagram.
Fig. 3 is the measurement mark component diagram used when existing subgrade settlement measures.
Fig. 4 is the utility model overlooking structure figure schematic diagram.
Fig. 5 is B-B schematic cross-sectional views in Fig. 4.
Fig. 6 is C-C schematic cross-sectional views in Fig. 5.
Fig. 7 is close-up schematic view at A in Fig. 6.
Label character is expressed as described in figure:1st, flexible pipe;2nd, resistance coil;3rd, transfer wire;4th, sealed end;6th, top layer
Sheath;61st, ground stud is grabbed;7th, signal output port;8th, junction block;10th, mounting hole;
70th, bottom plate;71st, bottom plate vertical rod;72nd, measurement mark;
80th, roadbed;81st, the first basic unit;82nd, the second basic unit;83rd, the 3rd basic unit;84th, road surface;85th, cave in place;86th, slight crack
Place;87th, intermediate isolating band;
C1, C2, C3 ... are respectively subgrade settlement detection zone.
Embodiment
Embodiment
In order that those skilled in the art more fully understand the technical solution of the utility model, below in conjunction with the accompanying drawings to this reality
Be described in detail with new, the description of this part be only it is exemplary and explanatory, should not be to the scope of protection of the utility model
There is any restriction effect.
As shown in fig. 4-5, concrete structure of the present utility model is:A kind of sensing for subgrade settlement automatic Observation
Band, it includes the flexible pipe 1 of the flat for being embedded in base course, is divided into several areas and difference in the flexible pipe 1
It is provided with the resistance coil 2 that stretching change is settled for sensing;Each mutually insulated of resistance coil 2, and individually pass through biography
Transporting line 3 transmits signals to the end of flexible pipe 1;The both ends sealing of the flexible pipe 1, one end is connected to by transfer wire 3
On signal output port 7.
Preferably, the outer surface of the flexible pipe 1 is provided with top layer sheath 6, and on the outside of the both sides of top layer sheath uniformly
It is provided with the mounting hole 10 for being fixed on roadbed.
Preferably, the top layer sheath 6 is made of flexible silica gel material, and the surface of top layer sheath 6 be evenly equipped with it is some
Ground stud 61 is grabbed, the thickness of layer of silica gel is 1cm ~ 2cm, and the protrusion height for grabbing ground stud 61 is 1cm ~ 2cm.Using grabbing stud 61
The present apparatus can be effectively fixed, refers to soil grass-root can be followed to realize sedimentation together.
Preferably, the flexible pipe 1 is made of polytetrafluoroethylmaterial material.
Preferably, the subregion of resistance coil 2 set in the flexible pipe 1 is fixed on inside flexible pipe 1.
Preferably, the resistance coil 2 set in the flexible pipe 1 is fixed by inertia glue.
When specifically used, the utility model device is embedded in as in the base course in Fig. 2, the whole basic unit of lateral direction penetrating,
Then signal output port 7 is connected on resistivity-measuring devices, the situation of change of monitoring resistor.
As Figure 4-Figure 7, the utility model device flexible pipe being embedded in soil layer, the cross section of roadbed divide into, C1,
Several decanting zones of C2, C3 ..., resistance coil 2 realize sedimentation with soil grass-root, and tensile deformation occurs.
If sub-surface settles, the resistance coil 2 being attached in basic unit can be stretched, and its resistance value can increase;
The resistance value of change can reflect sedimentation tension values herein, and the method is similar with the method in Fig. 2-Fig. 3:All pass through
The method of pre-embedded device carries out the sedimentation situation of side feedback basic unit in basic unit;But the application can be continuously in the whole of basic unit
Individual cross section is configured, and it is more accurate true to feed back the sedimentation of basic unit, can only feed back the sedimentation feelings of a point in the prior art
Condition;As shown in Figure 6, it is existing if several subgrade settlement detection zones that each layer of subgrade cross section are divided into C1, C2, C3 ...
There is technology(Shown in Fig. 1-Fig. 3)Ordinary circumstance can only feed back the sedimentation situation of some middle sedimentation detection zone, and it can not be accurate
Really reflect the sedimentation situation in whole cross section;And in the application as shown in figs. 4-7, its resistance coil 2 is transversal through whole basic unit
Face, it can completely monitor the sedimentation situation of every layer of roadbed.
It should be noted that herein, term " comprising ", "comprising" or its any other variant are intended to non-row
His property includes, so that process, method, article or equipment including a series of elements not only include those key elements, and
And also include the other element being not expressly set out, or also include for this process, method, article or equipment institute inherently
Key element.
Specific case used herein is set forth to principle of the present utility model and embodiment, above example
Illustrate that being only intended to help understands method and its core concept of the present utility model.Described above is only of the present utility model preferred
Embodiment, it is noted that due to the finiteness of literal expression, and unlimited concrete structure objectively be present, for this technology
For the those of ordinary skill in field, on the premise of the utility model principle is not departed from, some improvement, retouching can also be made
Or change, above-mentioned technical characteristic can also be combined by rights;These improve retouching, change or combination, or not
It is improved that the design of utility model and technical scheme are directly applied into other occasions, it is regarded as protection of the present utility model
Scope.
Claims (7)
1. a kind of induction band for subgrade settlement automatic Observation, it is characterised in that it includes being used to be embedded in base course
The flexible pipe of flat(1), the flexible pipe(1)Inside it is divided into several areas and is separately provided for sensing sedimentation stretching change
Resistance coil(2);Each resistance coil(2)Mutually insulated, and individually pass through wire(3)Transmit signals to flexible pipe
(1)End;The flexible pipe(1)Both ends sealing, one end passes through transfer wire(3)It is connected to signal output port(7)On.
A kind of 2. induction band for subgrade settlement automatic Observation according to claim 1, it is characterised in that the flexibility
Pipe(1)Outer surface be provided with top layer sheath(6), and be evenly arranged with the outside of the both sides of top layer sheath for being fixed on roadbed
On mounting hole(10).
A kind of 3. induction band for subgrade settlement automatic Observation according to claim 2, it is characterised in that the top layer
Sheath(6)It is made of flexible silica gel material, and top layer sheath(6)Surface be evenly equipped with it is some grab ground stud(61), layer of silica gel
Thickness be 1cm ~ 2cm, grab ground stud(61)Protrusion height be 1cm ~ 2cm.
A kind of 4. induction band for subgrade settlement automatic Observation according to claim 1, it is characterised in that the flexibility
Pipe(1)It is made of polytetrafluoroethylmaterial material.
5. a kind of induction band for subgrade settlement automatic Observation according to claim 1-4 any one, its feature exist
In the flexible pipe(1)The resistance coil of interior setting(2)Subregion is fixed on flexible pipe(1)It is internal.
A kind of 6. induction band for subgrade settlement automatic Observation according to claim 5, it is characterised in that the flexibility
Pipe(1)The resistance coil of interior setting(2)It is fixed by inertia glue.
A kind of 7. induction band for subgrade settlement automatic Observation according to claim 5, it is characterised in that the signal
Output port(7)On be provided with junction block(8).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621456620.7U CN206736882U (en) | 2016-12-28 | 2016-12-28 | A kind of induction band for subgrade settlement automatic Observation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201621456620.7U CN206736882U (en) | 2016-12-28 | 2016-12-28 | A kind of induction band for subgrade settlement automatic Observation |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206736882U true CN206736882U (en) | 2017-12-12 |
Family
ID=60555489
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201621456620.7U Active CN206736882U (en) | 2016-12-28 | 2016-12-28 | A kind of induction band for subgrade settlement automatic Observation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206736882U (en) |
-
2016
- 2016-12-28 CN CN201621456620.7U patent/CN206736882U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206440269U (en) | One kind is used for subgrade settlement automatic monitoring system | |
CN207197500U (en) | A kind of distributed optical fiber sensing system of implanted sinking deformation monitoring | |
CN106546218B (en) | A kind of high mountain permafrost differentiation cloth subgrade settlement monitoring system and method | |
CN113418641B (en) | Road stress and strain comprehensive monitoring method based on FBG fiber bragg grating sensing technology | |
Li et al. | Development of mechanistic–empirical design procedure for fully permeable pavement under heavy traffic | |
CN102519812A (en) | Method for evaluating high-temperature stability of asphalt pavement structure or asphalt mixture | |
CN104458398A (en) | Semi-rigid base asphalt pavement reflection crack testing device | |
CN206353020U (en) | A kind of reference induction band for subgrade settlement automatic Observation | |
CN206736882U (en) | A kind of induction band for subgrade settlement automatic Observation | |
Liu et al. | Sensor-Based Structural Health Monitoring of Asphalt Pavements with Semi-Rigid Bases Combining Accelerated Pavement Testing and a Falling Weight Deflectometer Test | |
CN105157999A (en) | Method for assessing pile integrity and lateral displacement based on distributed optical fiber sensing technology | |
CN102213583A (en) | Low-modulus optical fiber sensing probe for testing internal stress of flexible road structure | |
CN102095363B (en) | Multidimensional sensor for detecting dynamic response of bituminous pavement | |
CN115127513A (en) | Long-distance pavement structure settlement monitoring method combining distributed optical fiber sensing technology and parameter inversion analysis | |
CN112523045A (en) | Acceleration array-based cement concrete pavement flatness monitoring structure and method | |
CN104236761A (en) | Method for measuring force transmission coefficients based on concrete road flexure | |
CN104215365A (en) | Pavement structure layer internal shearing stress testing sensor and embedding technology and application thereof | |
CN209745467U (en) | Embedded system of stress strain gauge for pavement monitoring | |
CN112097977A (en) | Fixing device and mounting method suitable for embedded sensor in cement concrete pavement | |
CN204988568U (en) | A device for measuring abutment pressure | |
CN203298763U (en) | Subgrade settlement monitoring system | |
CN203489874U (en) | Automatic monitoring system for subgrade settlement | |
Bruinsma et al. | Using Falling Weight Deflectometer Data with Mechanistic-Empirical Design and Analysis, Volume II: Case Study Reports | |
Islam et al. | Measuring thermal effect in the structural response of flexible pavement based on field instrumentation | |
CN209055104U (en) | A kind of subgrade settlement automated watch-keeping facility |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |