CN206722656U - Bridge-cut energy-saving casement window - Google Patents
Bridge-cut energy-saving casement window Download PDFInfo
- Publication number
- CN206722656U CN206722656U CN201720429310.4U CN201720429310U CN206722656U CN 206722656 U CN206722656 U CN 206722656U CN 201720429310 U CN201720429310 U CN 201720429310U CN 206722656 U CN206722656 U CN 206722656U
- Authority
- CN
- China
- Prior art keywords
- frame
- jamb
- zhongting
- fan
- bridge
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000004088 foaming agent Substances 0.000 claims description 32
- 239000011521 glass Substances 0.000 claims description 14
- 239000012530 fluid Substances 0.000 claims description 10
- 239000000565 sealant Substances 0.000 claims description 10
- 238000001802 infusion Methods 0.000 claims 3
- 230000000694 effects Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000006011 modification reaction Methods 0.000 description 2
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 239000004411 aluminium Substances 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminum Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000009435 building construction Methods 0.000 description 1
- 239000003795 chemical substances by application Substances 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 238000005187 foaming Methods 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000004321 preservation Methods 0.000 description 1
- 230000001737 promoting Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000010792 warming Methods 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Abstract
The utility model provides a kind of bridge-cut energy-saving casement window, is related to building doors and windows technical field.In the bridge-cut energy-saving casement window, bridge cut-off window frame includes left jamb, upper jamb, right jamb and the lower jamb of head and the tail connection successively.Horizontal Zhongting is connected across between left jamb and right jamb.Perpendicular Zhongting is connected across between horizontal Zhongting and lower jamb.First double glazing is by frame line ball in the space that left jamb, upper jamb, right jamb and horizontal Zhongting are surrounded.First is opened flat forms is arranged on left jamb, in the space that horizontal Zhongting, perpendicular Zhongting and lower jamb are surrounded by the first sliding support.Second, which is opened flat forms, is arranged on by the second sliding support in the space that perpendicular Zhongting, horizontal Zhongting, right jamb and lower jamb surrounded.The bridge-cut energy-saving casement window structure is simple, thermal and insulating performance is good, energy-conserving and environment-protective.
Description
Technical field
Building doors and windows technical field is the utility model is related to, in particular to a kind of bridge-cut energy-saving casement window.
Background technology
With the introducing that modern economy theory and socio-economic development are seen, it is very important that energy-conserving and environment-protective turn into building field
Problem.External wall adds heat-insulation layer, door- and window-frames structure using heat-insulating bridge-cut-off structural shape etc. measure, be all a purpose i.e.
Reduce the outer temperature difference transmission of Indoor environment.
Currently, AND ENERGY RESOURCES CONSUMPTION IN CHINA and waste getting worse, particularly in cold area in north warming and southern summer
Season, air conditioner refrigerating all consumed the substantial amounts of energy, promoted Building Energy Saving green technology imperative therefore, promoting energetically.Cause
This, the heat-insulating energy-saving window from quality better in building construction is most important.
Casement window is the conventional building structure in modern architecture field, and its is easy to use, is favored by user.But
The weakness such as complicated, air-tightness, watertightness, heat insulating ability difference be present in existing casement window.
Therefore, it is technical problem urgently to be resolved hurrily at present to design a kind of casement window simple in construction, good heat preservation performance.
Utility model content
The purpose of this utility model is the first the bridge-cut energy-saving casement window provided, and it aims to solve the problem that existing casement window
Technical problem complicated, heat insulating ability is poor, poor air-tightness, watertightness are poor.
The first technical scheme provided by the utility model:
A kind of bridge-cut energy-saving casement window includes bridge cut-off window frame, horizontal Zhongting, perpendicular Zhongting, frame line ball, the first double glazing, first
It is opened flat forms, second is opened flat forms, the first sliding support and the second sliding support;
The bridge cut-off window frame includes left jamb, upper jamb, right jamb and the lower jamb of head and the tail connection successively;
The horizontal Zhongting is connected across between the left jamb and the right jamb;The perpendicular Zhongting is connected across the horizontal Zhongting and institute
State between lower jamb;
First double glazing is arranged on the left jamb, the upper jamb, the right side by the frame line ball
In the space that jamb and the horizontal Zhongting are surrounded;Described first is opened flat forms by first sliding support installed in described
In the space that left jamb, the horizontal Zhongting, the perpendicular Zhongting and the lower jamb are surrounded;Described second is opened flat forms
Enclosed by second sliding support installed in the perpendicular Zhongting, the horizontal Zhongting, the right jamb and the lower jamb
Into space in.
Further, described first forms are opened flat include the first fan frame, the first fan line ball and the second double glazing;
First left fan frame of first fan frame including head and the tail connection successively, fan frame, the first right wing frame on first
And the first lower fan frame;Frame is fanned on described first and the first lower fan frame is connected to by first sliding support respectively
The horizontal Zhongting and the lower jamb;
Second double glazing is arranged in first fan frame by the described first fan line ball.
Further, described second forms are opened flat include the second fan frame, the second fan line ball and the 3rd double glazing;
Second left fan frame of second fan frame including head and the tail connection successively, fan frame, the second right wing frame on second
And the second lower fan frame;Frame is fanned on described second and the second lower fan frame is connected to by second sliding support respectively
The horizontal Zhongting and the lower jamb;
3rd double glazing is arranged in second fan frame by the described second fan line ball.
Further, the left jamb includes the first left rim half, the second left rim half and the first foaming agent;Described
One left rim half is connected with the described second left rim half by first foaming agent;Is provided with the first left rim half
One baffle plate, the frame line ball are arranged in the described second left rim half, and the first baffle is oppositely arranged with the frame line ball, institute
The first double glazing is stated to be clamped between the first baffle and the frame line ball.
Further, the described first left fan frame includes the first left fan rim half, the second left fan rim half and the second foaming
Agent;The first left fan rim half is connected with the described second left fan rim half by second foaming agent;The first fan pressure
Line is arranged in the described first left fan rim half, and the second left fan rim half is provided with second baffle, the first fan line ball
Be oppositely arranged with the second baffle, second double glazing be clamped in the first fan line ball and the second baffle it
Between.
Further, frame is fanned on described first to be included fanning rim half on first, fans rim half and the 3rd foaming on second
Agent;Rim half is fanned on described first to be connected by the 3rd foaming agent with fanning rim half on described second;The first fan pressure
Line is arranged on described first and fanned in rim half, and rim half is fanned on described second and is provided with third baffle, the first fan line ball
Be oppositely arranged with the third baffle, second double glazing be clamped in the first fan line ball and the third baffle it
Between.
Further, the perpendicular Zhongting includes the first perpendicular half Zhongting, the second perpendicular half Zhongting and the 4th foaming agent;Described first
Perpendicular half Zhongting is connected with the described second perpendicular half Zhongting by the 4th foaming agent.
Further, the horizontal Zhongting includes the first horizontal half Zhongting, the second horizontal half Zhongting and the 5th foaming agent;Described first
Horizontal half Zhongting is connected with the described second horizontal half Zhongting by the 5th foaming agent;Described first horizontal half Zhongting is provided with fourth gear
Plate, the frame line ball are arranged on the described second horizontal half Zhongting, and the fourth gear plate is oppositely arranged with the frame line ball, and described the
One double glazing is clamped between the fourth gear plate and the frame line ball.
Further, first double glazing includes bonding frame, fluid sealant and two pieces of glass plates;Two pieces of glass plates
Be oppositely arranged, the bonding frame is bonded between two pieces of glass plates, the fluid sealant coated in two pieces of glass plates it
Between, the fluid sealant is positioned at the periphery of the bonding frame.
Second of technical scheme provided by the utility model:
A kind of bridge-cut energy-saving casement window includes bridge cut-off window frame, perpendicular Zhongting, first is opened flat forms, second is opened flat forms, first
Sliding support and the second sliding support;
The bridge cut-off window frame includes left jamb, upper jamb, right jamb and the lower jamb of head and the tail connection successively;
The perpendicular Zhongting is connected across between the upper jamb and the lower jamb;
Described first is opened flat forms is arranged on the left jamb, the upper jamb, described by first sliding support
In the space that perpendicular Zhongting and the lower jamb are surrounded;Described second is opened flat forms is arranged on institute by second sliding support
State in the space that perpendicular Zhongting, the upper jamb, the right jamb and the lower jamb are surrounded.
Compared to existing casement window, the beneficial effect of bridge-cut energy-saving casement window provided by the utility model is:
First, the first double glazing is arranged on left jamb, upper jamb, right jamb and horizontal Zhongting by frame line ball
In the space surrounded.First is opened flat forms is arranged on left jamb, horizontal Zhongting, perpendicular Zhongting and lower window side by the first sliding support
In the space that frame is surrounded.Second is opened flat forms is arranged on perpendicular Zhongting, horizontal Zhongting, right jamb and lower window by the second sliding support
In the space that frame is surrounded.So, it is not only simple in structure, is easily manufactured, and air-tightness is good, watertightness is good.Secondly, use
First sliding support and the second sliding support realize that being opened flat to first forms and second is opened flat the keying operation of forms, so, open and close
Flexibly, it is easy to repair and change.Finally, material can not only be saved using the first double glazing, and there is good insulation
Property.
Brief description of the drawings
, below will be to required use in embodiment in order to illustrate more clearly of the technical scheme of the utility model embodiment
Accompanying drawing be briefly described, it will be appreciated that the following drawings illustrate only some embodiments of the present utility model, therefore should not be by
Regard the restriction to scope as, for those of ordinary skill in the art, on the premise of not paying creative work, may be used also
To obtain other related accompanying drawings according to these accompanying drawings.
Fig. 1 is the structural representation for the bridge-cut energy-saving casement window that the utility model embodiment provides.
Fig. 2 is along the cross-sectional view of line A-A in Fig. 1.
Fig. 3 is along the cross-sectional view of line B-B in Fig. 1.
Fig. 4 is along the cross-sectional view of line C-C in Fig. 1.
Fig. 5 is the structural representation of the first double glazing in Fig. 1.
Icon:100- bridge-cut energy-saving casement windows;The left jambs of 110-;The first left rim halfs of 111-;1111- first baffles;
The second left rim halfs of 112-;The foaming agents of 113- first;The upper jambs of 120-;The right jambs of 130-;Jamb under 140-;150-
Perpendicular Zhongting;151- first erects half Zhongting;152- second erects half Zhongting;The foaming agents of 153- the 4th;The horizontal Zhongtings of 160-;161- first
Horizontal half Zhongting;1611- fourth gear plates;Horizontal half Zhongtings of 162- second;The foaming agents of 163- the 5th;170- frame line balls;180- first
Double glazing;181- is bonded frame;182- fluid sealants;183- glass plates;190- first is opened flat forms;The left fan frames of 191- first;
The left fan rim halfs of 1911- first;The left fan rim halfs of 1912- second;1913- second baffles;The foaming agents of 1914- second;192-
Frame is fanned on one;Rim half is fanned on 1921- first;Rim half is fanned on 1922- second;1923- third baffles;1924- the 3rd
Foaming agent;193- the first right wing frames;194- the first lower fan frames;195- first fans line ball;The double glazings of 196- second;200-
Second is opened flat forms;The sliding supports of 210- first;The sliding supports of 220- second.
Embodiment
It is new below in conjunction with this practicality to make the purpose, technical scheme and advantage of the utility model embodiment clearer
Accompanying drawing in type embodiment, the technical scheme in the embodiment of the utility model is clearly and completely described, it is clear that is retouched
The embodiment stated is the utility model part of the embodiment, rather than whole embodiments.Generally here described in accompanying drawing and
The component of the utility model embodiment shown can be configured to arrange and design with a variety of.
Therefore, the detailed description of the embodiment of the present utility model to providing in the accompanying drawings is not intended to limit requirement below
The scope of the utility model of protection, but it is merely representative of selected embodiment of the present utility model.Based in the utility model
Embodiment, the every other embodiment that those of ordinary skill in the art are obtained under the premise of creative work is not made, all
Belong to the scope of the utility model protection.
It should be noted that:Similar label and letter represents similar terms in following accompanying drawing, therefore, once a certain Xiang Yi
It is defined, then it further need not be defined and explained in subsequent accompanying drawing in individual accompanying drawing.
In description of the present utility model, it is to be understood that term " " center ", " on ", " under ", it is "left", "right", " perpendicular
Directly ", the orientation of the instruction such as " level ", " interior ", " outer " or position relationship be based on orientation shown in the drawings or position relationship, or
The utility model product using when the orientation usually put or position relationship, or those skilled in the art usually understand
Orientation or position relationship, it is for only for ease of description the utility model and simplifies description, rather than indicates or imply signified set
Standby or element must have specific orientation, with specific azimuth configuration and operation, therefore it is not intended that to the utility model
Limitation.
In addition, term " first ", " second ", " the 3rd " etc. are only used for distinguishing description, and it is not intended that instruction or hint
Relative importance.
In description of the present utility model, it is also necessary to which explanation, unless otherwise clearly defined and limited, term " are set
Put ", " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected,
Or it is integrally connected;Can be mechanical connection or electrical connection;Can be joined directly together, intermediary can also be passed through
It is indirectly connected, can is the connection of two element internals.For the ordinary skill in the art, can be managed with concrete condition
Solve concrete meaning of the above-mentioned term in the utility model.
Fig. 1 is the structural representation for the bridge-cut energy-saving casement window 100 that the utility model embodiment provides, and Fig. 2 is
Along the cross-sectional view of line A-A in Fig. 1, Fig. 1 and Fig. 2 are referred to.
Present embodiments provide a kind of bridge-cut energy-saving casement window 100.Bridge-cut energy-saving casement window 100 includes bridge cut-off window frame, horizontal stroke
Zhongting 160, perpendicular Zhongting 150, frame line ball 170, the first double glazing 180, first be opened flat forms 190, second be opened flat forms 200,
First sliding support 210 and the second sliding support 220.
Bridge cut-off window frame includes left jamb 110, upper jamb 120, right jamb 130 and the lower window of head and the tail connection successively
Frame 140.Horizontal Zhongting 160 is connected across between left jamb 110 and right jamb 130.Perpendicular Zhongting 150 is connected across horizontal Zhongting 160
Between lower jamb 140.
First double glazing 180 is arranged on left jamb 110, upper jamb 120, right jamb 130 by frame line ball 170
And in the space that is surrounded of horizontal Zhongting 160.First be opened flat forms 190 by the first sliding support 210 be arranged on left jamb 110,
In the space that horizontal Zhongting 160, perpendicular Zhongting 150 and lower jamb 140 are surrounded.Second, which is opened flat forms 200, passes through the second sliding support
220 are arranged in the space that perpendicular Zhongting 150, horizontal Zhongting 160, right jamb 130 and lower jamb 140 are surrounded.
Bridge cut-off window frame, horizontal Zhongting 160 and perpendicular Zhongting 150 are made of aluminium.So, not only lighter weight, cost
It is relatively low, and preparation is convenient, heat insulating effect is preferable.
Fig. 3 is along the cross-sectional view of line B-B in Fig. 1, and Fig. 4 is the cross-sectional view in Fig. 1 along C-C lines,
Refer to Fig. 3 and Fig. 4.
Left jamb 110 includes the first left rim half 111, the second left foaming agent 113 of rim half 112 and first.First is left
Rim half 111 is connected with the second left rim half 112 by the first foaming agent 113.First gear is provided with first left rim half 111
Plate 1111, frame line ball 170 are arranged in the second left rim half 112, and first baffle 1111 is oppositely arranged with frame line ball 170, and first
Double glazing 180 is clamped between first baffle 1111 and frame line ball 170.
The structure of upper jamb 120, right jamb 130 and lower jamb 140 is close with the structure of left jamb 110,
Here repeat no more.
First, which is opened flat forms 190, includes the first fan frame, the first fan double glazing 196 of line ball 195 and second.First fan frame bag
Include and fan frame 192, the first right wing frame 193 and the first lower fan side on the first left fan frame 191, first of head and the tail connection successively
Frame 194.The lower fan frame 194 of frame 192 and first is fanned on first horizontal Zhongting 160 is connected to under by the first sliding support 210 respectively
Jamb 140.Second double glazing 196 is arranged in the first fan frame by the first fan line ball 195.
First left fan frame 191 includes the first left fan rim half 1911, the second left fan foaming agent of rim half 1912 and second
1914.First left fan rim half 1911 is connected with the second left fan rim half 1912 by the second foaming agent 1914.First fan line ball
195 are arranged in the first left fan rim half 1911, and the second left fan rim half 1912 is provided with second baffle 1913, the first fan line ball
195 are oppositely arranged with second baffle 1913, the second double glazing 196 be clamped in the first fan line ball 195 and second baffle 1913 it
Between.
Frame 192 is fanned on first to be included fanning the fan foaming agent of rim half 1922 and the 3rd in rim half 1921, second on first
1924.Rim half 1921 is fanned on first to be connected by the 3rd foaming agent 1924 with fanning rim half 1922 on second.First fan line ball
195 are arranged on first in fan rim half 1921, and rim half 1922 is fanned on second and is provided with third baffle 1923, the first fan line ball
195 are oppositely arranged with third baffle 1923, the second double glazing 196 be clamped in the first fan line ball 195 and third baffle 1923 it
Between.
The structure of first right wing frame 193 is close with the structure of the first left fan frame 191, the knot of the first lower fan frame 194
Structure is close with the structure that frame 192 is fanned on first, repeats no more here.
Second, which is opened flat forms 200, includes the second fan frame, the second fan line ball and the 3rd double glazing.Second fan frame is included successively
Second left fan frame of head and the tail connection, frame, the second right wing frame and the second lower fan frame are fanned on second.Frame is fanned on second
Horizontal Zhongting 160 and lower jamb 140 are connected to by the second sliding support 220 respectively with the second lower fan frame.3rd double glazing leads to
The second fan line ball is crossed to be arranged in the second fan frame.
Second left fan frame, the structure of frame, the second right wing frame and the second lower fan frame is fanned on second respectively with the
It is close that the structure of frame 192, the first right wing frame 193 and the first lower fan frame 194 is fanned on one left fan frame 191, first,
Here repeat no more.
Perpendicular Zhongting 150 includes the first perpendicular half Zhongting 151, second and erects half Zhongting 152 and the 4th foaming agent 153.First perpendicular half
Zhongting 151 is connected with the second perpendicular half Zhongting 152 by the 4th foaming agent 153.Horizontal Zhongting 160 include the first horizontal half Zhongting 161,
Second horizontal half Zhongting 162 and the 5th foaming agent 163.The Zhongting 161 of first horizontal stroke half and the second horizontal half Zhongting 162 pass through the 5th foaming agent
163 connections.First horizontal half Zhongting 161 is provided with fourth gear plate 1611, and frame line ball 170 is arranged on the second horizontal half Zhongting 162, the
Four baffle plates 1611 are oppositely arranged with frame line ball 170, the first double glazing 180 be clamped in fourth gear plate 1611 and frame line ball 170 it
Between.
By using foaming agent, not only make overall lighter in weight, cost relatively low, and further increase air-tightness,
Watertightness and heat insulating ability.
Fig. 5 is the structural representation of the first double glazing 180 in Fig. 1, refers to Fig. 5.First double glazing 180 includes viscous
Connect frame 181, fluid sealant 182 and two pieces of glass plates 183.Two pieces of glass plates 183 are oppositely arranged, and bonding frame 181 is bonded in two pieces of glass
Between glass plate 183, fluid sealant 182 is coated between two pieces of glass plates 183, and fluid sealant 182 is positioned at the periphery of bonding frame 181.
The structure of second double glazing 196 and the 3rd double glazing is close with the structure of the first double glazing 180, here
Repeat no more.
It is easily understood that the bridge-cut energy-saving casement window 100 that present embodiment provides can also have other deformations, example
Such as save the first double glazing 180 and its dependency structure, make bridge-cut energy-saving casement window 100 include bridge cut-off window frame, perpendicular Zhongting 150,
First is opened flat forms 190, second is opened flat forms 200, the first sliding support 210 and the second sliding support 220.So, casement window can also be realized
Function.
The bridge-cut energy-saving casement window 100 that present embodiment provides, overall structure is simple, serious generous, attractive appearance,
It is happy;Coordinate double glazing so that sound-insulating and heat-insulating saves and decorative effect protrudes, and has high airtight, high watertight, high safety, height
The performance characteristics such as draining and high precision, and light weight, cost are relatively low.
Preferred embodiment of the present utility model is these are only, is not limited to the utility model, for this area
Technical staff for, the utility model can have various modifications and variations.It is all within the spirit and principles of the utility model,
Any modification, equivalent substitution and improvements made etc., should be included within the scope of protection of the utility model.
Claims (10)
1. a kind of bridge-cut energy-saving casement window, it is characterised in that the bridge-cut energy-saving casement window includes bridge cut-off window frame, horizontal Zhongting, erected
Zhongting, frame line ball, the first double glazing, first are opened flat forms, second are opened flat forms, the first sliding support and the second sliding support;
The bridge cut-off window frame includes left jamb, upper jamb, right jamb and the lower jamb of head and the tail connection successively;It is described
Horizontal Zhongting is connected across between the left jamb and the right jamb;The perpendicular Zhongting be connected across the horizontal Zhongting with it is described under
Between jamb;
First double glazing is arranged on the left jamb, the upper jamb, the right window side by the frame line ball
In the space that frame and the horizontal Zhongting are surrounded;Described first is opened flat forms is arranged on the left window by first sliding support
In the space that frame, the horizontal Zhongting, the perpendicular Zhongting and the lower jamb are surrounded;Described second, which is opened flat forms, passes through
Second sliding support is arranged on what the perpendicular Zhongting, the horizontal Zhongting, the right jamb and the lower jamb were surrounded
In space.
2. bridge-cut energy-saving casement window according to claim 1, it is characterised in that described first, which is opened flat forms, includes the first fan
Frame, the first fan line ball and the second double glazing;
First fan frame include the first left fan frame of head and the tail connection successively, fan on first frame, the first right wing frame and
First lower fan frame;Fan frame and the first lower fan frame are connected to described by first sliding support respectively on described first
Horizontal Zhongting and the lower jamb;
Second double glazing is arranged in first fan frame by the described first fan line ball.
3. bridge-cut energy-saving casement window according to claim 2, it is characterised in that described second, which is opened flat forms, includes the second fan
Frame, the second fan line ball and the 3rd double glazing;
Second fan frame include the second left fan frame of head and the tail connection successively, fan on second frame, the second right wing frame and
Second lower fan frame;Fan frame and the second lower fan frame are connected to described by second sliding support respectively on described second
Horizontal Zhongting and the lower jamb;
3rd double glazing is arranged in second fan frame by the described second fan line ball.
4. bridge-cut energy-saving casement window according to claim 2, it is characterised in that the left jamb includes first left one side of something
Frame, the second left rim half and the first foaming agent;The first left rim half is sent out with the described second left rim half by described first
Infusion connects;First baffle is provided with the first left rim half, the frame line ball is arranged in the described second left rim half,
The first baffle is oppositely arranged with the frame line ball, and first double glazing is clamped in the first baffle and the frame pressure
Between line.
5. bridge-cut energy-saving casement window according to claim 4, it is characterised in that it is left that the first left fan frame includes first
Fan rim half, the second left fan rim half and the second foaming agent;The first left fan rim half is led to the described second left fan rim half
Cross the second foaming agent connection;The first fan line ball is arranged in the described first left fan rim half, the second left fan half
Frame is provided with second baffle, and the first fan line ball is oppositely arranged with the second baffle, the second double glazing clamping
Between the described first fan line ball and the second baffle.
6. bridge-cut energy-saving casement window according to claim 5, it is characterised in that frame is fanned on described first to be included on first
Fan rim half, rim half and the 3rd foaming agent are fanned on second;Rim half is fanned on described first with fanning rim half on described second to lead to
Cross the 3rd foaming agent connection;The first fan line ball, which is arranged on described first, to be fanned in rim half, fan half on described second
Frame is provided with third baffle, and the first fan line ball is oppositely arranged with the third baffle, the second double glazing clamping
Between the described first fan line ball and the third baffle.
7. bridge-cut energy-saving casement window according to claim 6, it is characterised in that the perpendicular Zhongting is included in first perpendicular half
Front yard, the second perpendicular half Zhongting and the 4th foaming agent;Described first perpendicular half Zhongting passes through the described 4th hair with the described second perpendicular half Zhongting
Infusion connects.
8. bridge-cut energy-saving casement window according to claim 7, it is characterised in that the horizontal Zhongting is included in first horizontal half
Front yard, the second horizontal half Zhongting and the 5th foaming agent;Described first horizontal half Zhongting passes through the described 5th hair with the described second horizontal half Zhongting
Infusion connects;Described first horizontal half Zhongting is provided with fourth gear plate, and the frame line ball is arranged on the described second horizontal half Zhongting, institute
State fourth gear plate to be oppositely arranged with the frame line ball, first double glazing is clamped in the fourth gear plate and the frame line ball
Between.
9. bridge-cut energy-saving casement window according to claim 1, it is characterised in that first double glazing includes bonding
Frame, fluid sealant and two pieces of glass plates;Two pieces of glass plates are oppositely arranged, it is described bonding frame be bonded in two pieces of glass plates it
Between, the fluid sealant is coated between two pieces of glass plates, and the fluid sealant is positioned at the periphery of the bonding frame.
10. a kind of bridge-cut energy-saving casement window, it is characterised in that the bridge-cut energy-saving casement window includes bridge cut-off window frame, perpendicular Zhongting, the
One is opened flat forms, second is opened flat forms, the first sliding support and the second sliding support;
The bridge cut-off window frame includes left jamb, upper jamb, right jamb and the lower jamb of head and the tail connection successively;It is described
Perpendicular Zhongting is connected across between the upper jamb and the lower jamb;
Described first be opened flat forms by first sliding support be arranged on the left jamb, the upper jamb, it is described it is perpendicular in
In the space that front yard and the lower jamb are surrounded;Described second is opened flat forms is arranged on described erect by second sliding support
In the space that Zhongting, the upper jamb, the right jamb and the lower jamb are surrounded.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720429310.4U CN206722656U (en) | 2017-04-21 | 2017-04-21 | Bridge-cut energy-saving casement window |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720429310.4U CN206722656U (en) | 2017-04-21 | 2017-04-21 | Bridge-cut energy-saving casement window |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206722656U true CN206722656U (en) | 2017-12-08 |
Family
ID=60505159
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720429310.4U Expired - Fee Related CN206722656U (en) | 2017-04-21 | 2017-04-21 | Bridge-cut energy-saving casement window |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206722656U (en) |
-
2017
- 2017-04-21 CN CN201720429310.4U patent/CN206722656U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210459663U (en) | Unit upright post structure with heat insulation blanket | |
CN206722656U (en) | Bridge-cut energy-saving casement window | |
CN107939219A (en) | A kind of middle stile's connection glue injection sealing structure and window | |
CN202299956U (en) | Structure of novel aluminium plate vertical hinged door | |
CN205477230U (en) | Energy -conserving al -alloy door & window | |
CN202401901U (en) | Hidden pivoted window of unit curtain wall | |
CN206722655U (en) | The outer casement window of energy-conservation | |
CN206722657U (en) | Bridge-cut energy-saving vertical hinged door | |
CN103452431A (en) | Energy-saving plastic injection type side-hung window | |
CN209959057U (en) | Five sealed windows | |
CN202913887U (en) | Top-hung window of unit curtain | |
CN207377376U (en) | A kind of aluminium alloy inwardly opened window | |
CN206722722U (en) | Band yarn energy-saving sliding window | |
CN207377381U (en) | A kind of aluminium alloy inwardly opened window | |
CN202706841U (en) | Novel energy-saving window made of aluminium-plastic composite material | |
CN203515152U (en) | Energy-saving side hung window with adhesive injected | |
CN203559713U (en) | Thermal insulating aluminum alloy window | |
CN209568862U (en) | A kind of cell curtain wall projecting top-hung window structure | |
CN207177606U (en) | A kind of adhesive tape sealing structure of swinging-out casement window four | |
CN201635586U (en) | Energy-saving window and door structure | |
CN208056925U (en) | A kind of heat-insulated internal-open and inner tilt Energy Saving Windows | |
CN206053802U (en) | It is a kind of for preventing door and window and cladding glass condensation flow to the adhesive tape of windowsill | |
CN206722658U (en) | Save framed ground bounce door | |
CN107476718A (en) | A kind of aluminium alloy inwardly opened window | |
CN206917585U (en) | One kind is opened flat integrated screen door structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 408400 No.5 Jinsheng Road, Longyan Industrial Park, Nanchuan District, Chongqing Patentee after: Chongqing Haisu Nanbang Aluminum Co.,Ltd. Address before: 408400 No.5 Jinsheng Road, Longyan Industrial Park, Nanchuan District, Chongqing Patentee before: CHONGQING NANBANG ALUMINUM Co.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171208 Termination date: 20200421 |