A kind of high pre-stress anchor pole with expansion sleeve Download PDF

Info

Publication number
CN206721876U
CN206721876U CN201720509945.5U CN201720509945U CN206721876U CN 206721876 U CN206721876 U CN 206721876U CN 201720509945 U CN201720509945 U CN 201720509945U CN 206721876 U CN206721876 U CN 206721876U
Authority
CN
China
Prior art keywords
rod
expansion sleeve
head
sawtooth
anchor pole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720509945.5U
Other languages
Chinese (zh)
Inventor
王占奎
田丽军
薛兴亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720509945.5U priority Critical patent/CN206721876U/en
Application granted granted Critical
Publication of CN206721876U publication Critical patent/CN206721876U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a kind of high pre-stress anchor pole with expansion sleeve in mooring rod technique field,Including the body of rod,Supporting plate and expansion sleeve,The outer wall right side opening of the body of rod is provided with screw thread,The supporting plate is spirally connected with screw thread,The interior of the body of rod is provided with cavity,The expansion sleeve is socketed on the left of the outer wall of the body of rod,The left side of the body of rod is provided with head,The outer wall of the body of rod is uniformly provided with sawtooth,The left side of the head is provided with bar point,The inner chamber of the supporting plate is provided with input duct,The right side inwall of the cavity is provided with inlet,Water under high pressure is injected to input duct by giant during the use,Water under high pressure flows to inlet by input duct,Then cavity is flowed into,Water under high pressure expands the body of rod,Extrude foundation ditch hole wall country rock,Produce great frictional force,The body of rod is set firmly to be embedded in foundation ditch by sawtooth,It is engaged by bar point with sawtooth,Anchor pole can be reduced and squeeze into resistance caused by foundation ditch.

Description

A kind of high pre-stress anchor pole with expansion sleeve
Technical field
It the utility model is related to mooring rod technique field, specially a kind of high pre-stress anchor pole with expansion sleeve.
Background technology
Anchor pole, English " Bolt ";" bolting (accurate appellation) ";" anchor (early stage appellation) " is among contemporary colliery The most basic part of roadway support, the surrounding rock consolidation in tunnel together, is made country rock itself supporting itself by him.Present anchor Bar is applied not only to mine, is also used in engineering technology, side slope, tunnel, and dam body carries out main body reinforcing.Anchor pole, which is used as, gos deep into stratum Tensional element, its one end is connected with engineering structure, and the other end gos deep into stratum, and traditional anchor pole needs anchor when in use Bar squeezes into foundation ditch, and resistance is larger when squeezing into foundation ditch, in order to increase the bonding rubbing action of anchoring body and soil layer and increase anchoring body Pressure-bearing effect, people's generally use injection cement slurry, but be formed into cement slurry and need supporting Mixing Machine and big The manpower and materials of amount, and it is of long duration, operating efficiency is low, be this it is proposed that a kind of high pre-stress anchor pole with expansion sleeve.
Utility model content
The purpose of this utility model is to provide a kind of high pre-stress anchor pole with expansion sleeve, to solve above-mentioned background technology Traditional anchor pole of middle proposition needs anchor pole squeezing into foundation ditch when in use, and resistance is larger when squeezing into foundation ditch, in order to increase anchoring The bonding rubbing action of body and soil layer and the pressure-bearing effect for increasing anchoring body, people's generally use injection cement slurry, but make Need supporting Mixing Machine and substantial amounts of manpower and materials into cement slurry, and it is of long duration, operating efficiency is low the problem of.
To achieve the above object, the utility model provides following technical scheme:A kind of high pre-stress anchor pole with expansion sleeve, Including the body of rod, supporting plate and expansion sleeve, the outer wall right side opening of the body of rod is provided with screw thread, and the supporting plate is spirally connected with screw thread, the support The right side of plate is provided with fixing bolt, and the fixing bolt is spirally connected with screw thread, and the interior of the body of rod is provided with cavity, the expansion sleeve set It is connected on the left of the outer wall of the body of rod, the left side of the body of rod is provided with head, and the outer wall of the body of rod is uniformly provided with sawtooth, the head Left side be provided with bar point, the inner chamber of the supporting plate is provided with input duct, and the right side inwall of the cavity is provided with inlet, described Inlet is connected with input duct.
Preferably, the head is reverse wedge shape, and the maximum gauge of head is more than endoporus maximum gauge when expansion sleeve expands.
Preferably, the sawtooth is the gradual change sawtooth that gradually increases, and minimum two groups of positions it is corresponding sawtooth both ends it is straight Linear distance is more than the maximum gauge of head.
Preferably, the bar point is welded in the left side outer wall of head.
Compared with prior art, the beneficial effects of the utility model are:Noted during use by giant to input duct Enter water under high pressure, water under high pressure flows to inlet by input duct, then flows into cavity, and water under high pressure expands the body of rod, extrudes foundation ditch Hole wall country rock, great frictional force is produced, the body of rod is firmly embedded in foundation ditch by sawtooth, pass through bar point and sawtooth It is engaged, it is possible to reduce anchor pole squeezes into resistance caused by foundation ditch, and when the insertion body of rod meets obstructions, expansion sleeve is opened by head Power expands expansion sleeve, expansion sleeve expand when wrap head, can be significantly greatly increased with hole wall caused by frictional force, this practicality newly Type is rational in infrastructure, easy to use, can greatly improve operating efficiency.
Brief description of the drawings
Fig. 1 is the utility model structure diagram.
In figure:1 body of rod, 2 screw threads, 3 supporting plates, 4 fixing bolts, 5 cavitys, 6 expansion sleeves, 7 heads, 8 sawtooth, 9 bars point, 10 are entered Liquid pipe road, 11 inlets.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Referring to Fig. 1, the utility model provides a kind of high pre-stress mooring rod technique scheme with expansion sleeve:A kind of band expansion The high pre-stress anchor pole of set, including the body of rod 1, supporting plate 3 and expansion sleeve 6, the outer wall right side opening of the body of rod 1 is provided with screw thread 2, described Supporting plate 3 is spirally connected with screw thread 2, and the right side of the supporting plate 3 is provided with fixing bolt 4, and the fixing bolt 4 is spirally connected with screw thread 2, the bar The interior of body 1 is provided with cavity 5, and the expansion sleeve 6 is socketed on the left of the outer wall of the body of rod 1, and the left side of the body of rod 1 is provided with head 7, institute The outer wall for stating the body of rod 1 is uniformly provided with sawtooth 8, and the left side of the head 7 is provided with bar point 9, and the inner chamber of the supporting plate 3 is provided with feed liquor Pipeline 10, the right side inwall of the cavity 5 are provided with inlet 11, and the inlet 11 is connected with input duct 10.
Wherein, the head 7 is reverse wedge shape, and to be more than endoporus when expansion sleeve 6 expands maximum straight for the maximum gauge of head 7 Footpath, the sawtooth 8 are the gradual change sawtooth that gradually increases, and the corresponding both ends air line distance of sawtooth 8 in minimum two groups of positions is more than The maximum gauge of head 7, the bar point 9 are welded in the left side outer wall of head 7.
Operation principle:Water under high pressure is injected to input duct 10 by giant during use, water under high pressure passes through input duct 10 flow to inlet 11, then flow into cavity 5, and water under high pressure expands the body of rod 1, extrude foundation ditch hole wall country rock, and generation greatly rubs Power is wiped, the body of rod 1 is firmly embedded in foundation ditch by sawtooth 8, is engaged by bar point 9 with sawtooth 8, it is possible to reduce anchor Bar squeezes into resistance caused by foundation ditch, and when the insertion body of rod 1 meets obstructions, expansion sleeve 6 is made expansion sleeve 6 swollen by the tension force of head 7 It is swollen, expansion sleeve 6 expand when wrap head 7, can be significantly greatly increased with hole wall caused by frictional force, the utility model structure close Reason, it is easy to use, it can greatly improve operating efficiency.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of high pre-stress anchor pole with expansion sleeve, including the body of rod (1), supporting plate (3) and expansion sleeve (6), it is characterised in that:Institute The outer wall right side opening for stating the body of rod (1) is provided with screw thread (2), and the supporting plate (3) is spirally connected with screw thread (2), is set on the right side of the supporting plate (3) There is fixing bolt (4), the fixing bolt (4) is spirally connected with screw thread (2), and the interior of the body of rod (1) is provided with cavity (5), described swollen Expansion set (6) is socketed on the left of the outer wall of the body of rod (1), and the left side of the body of rod (1) is provided with head (7), the outer wall of the body of rod (1) Sawtooth (8) is uniformly provided with, the left side of the head (7) is provided with bar point (9), and the inner chamber of the supporting plate (3) is provided with input duct (10), the right side inwall of the cavity (5) is provided with inlet (11), and the inlet (11) is connected with input duct (10).
A kind of 2. high pre-stress anchor pole with expansion sleeve according to claim 1, it is characterised in that:The head (7) is Reverse wedge shape, and the maximum gauge of head (7) is more than endoporus maximum gauge when expansion sleeve (6) expands.
A kind of 3. high pre-stress anchor pole with expansion sleeve according to claim 1, it is characterised in that:The sawtooth (8) is The gradual change sawtooth gradually increased, and corresponding sawtooth (8) both ends air line distance in minimum two groups of positions is more than the maximum of head (7) Diameter.
A kind of 4. high pre-stress anchor pole with expansion sleeve according to claim 1, it is characterised in that:The bar sharp (9) weldering It is connected to the left side outer wall of head (7).
CN201720509945.5U 2017-05-09 2017-05-09 A kind of high pre-stress anchor pole with expansion sleeve Expired - Fee Related CN206721876U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720509945.5U CN206721876U (en) 2017-05-09 2017-05-09 A kind of high pre-stress anchor pole with expansion sleeve

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720509945.5U CN206721876U (en) 2017-05-09 2017-05-09 A kind of high pre-stress anchor pole with expansion sleeve

Publications (1)

Publication Number Publication Date
CN206721876U true CN206721876U (en) 2017-12-08

Family

ID=60508992

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720509945.5U Expired - Fee Related CN206721876U (en) 2017-05-09 2017-05-09 A kind of high pre-stress anchor pole with expansion sleeve

Country Status (1)

Country Link
CN (1) CN206721876U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323702A (en) * 2021-06-17 2021-08-31 文山麻栗坡紫金钨业集团有限公司 Transmission expansion type anchor rod and installation method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113323702A (en) * 2021-06-17 2021-08-31 文山麻栗坡紫金钨业集团有限公司 Transmission expansion type anchor rod and installation method thereof

Similar Documents

Publication Publication Date Title
CN201103397Y (en) Yielding deformed steel bar slip-casting anchor bar
CN109209455A (en) A kind of expansion shell type prestressing force hollow grouting anchor with plasma resistance plug
CN206035500U (en) Adopt prestressing steel's section of jurisdiction connecting device
CN108589723A (en) Band only starches the segmentation hollow grouting anchor of the segmenting slip casting of branch sleeve
CN205422773U (en) Novel hollow grouting anchor bolt
CN206396742U (en) A kind of prefabricated pile
CN105422150A (en) FRP sprinkling irrigation combined anchor bolt
CN206721876U (en) A kind of high pre-stress anchor pole with expansion sleeve
CN208884849U (en) A kind of self-locking reinforcing bar connection grout sleeve
CN208950616U (en) A kind of expansion shell type prestressing force hollow grouting anchor with plasma resistance plug
CN104213554A (en) Construction method of slip-casting variable-cross section steel pipe pile and expansion and extrusion device of slip-casting variable-cross section steel pipe pile
CN104328781B (en) A kind of unfavorable geologic body controlling oozes profit chemical grouting method
CN108867639A (en) The replaceable anchor pole of overall length inflatable gib
CN206941588U (en) A kind of simple positioning tool of steel-pipe pile spreading
CN106480880B (en) Recoverable soil nailing and the construction method for using recoverable soil nail
CN204419218U (en) A kind of novel combination type steel strand anchor rod
CN204827500U (en) Pinniform wedge body stock
CN208701667U (en) Band only starches the segmentation hollow grouting anchor of the segmenting slip casting of connection sleeve
CN205116564U (en) Bar splicing connection structure who contains FRP confinement ring
CN211230518U (en) Hollow pressure grouting anchor rod
CN103643633A (en) Manufacturing method for ribbed FRP members
CN202124857U (en) Splitting pile
CN205501994U (en) All steel sleeve pipe dado bored concrete pile of high bearing capacity
CN208168908U (en) A kind of high intensity seamless drilling pipe of anti-pulling
CN207420609U (en) A kind of detachable hollow grouting anchor of constant resistance and large deformation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208