CN206718124U - Prefabricated components curing means - Google Patents

Prefabricated components curing means Download PDF

Info

Publication number
CN206718124U
CN206718124U CN201720440308.7U CN201720440308U CN206718124U CN 206718124 U CN206718124 U CN 206718124U CN 201720440308 U CN201720440308 U CN 201720440308U CN 206718124 U CN206718124 U CN 206718124U
Authority
CN
China
Prior art keywords
insulating layer
aeration insulating
strip
prefabricated components
curing means
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720440308.7U
Other languages
Chinese (zh)
Inventor
石从黎
杨再富
陈敬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Construction Materials Logistics Co Ltd
Chongqing Construction Engineering Group Co Ltd
Original Assignee
Chongqing Construction Materials Logistics Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Construction Materials Logistics Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical Chongqing Construction Materials Logistics Co Ltd
Priority to CN201720440308.7U priority Critical patent/CN206718124U/en
Application granted granted Critical
Publication of CN206718124U publication Critical patent/CN206718124U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

It the utility model is related to technical field of buildings, more particularly to a kind of prefabricated components curing means, including shower, aeration insulating layer and supporting part, shower is located at the upper end of concrete component, the middle part of the shower is connected by three-way pipe with external water pipe, and shower is provided with several apopores;Aeration insulating layer is externally provided with separation layer, supporting part is that a plurality of alternating tilts down the strip projection being arranged on the inside of aeration insulating layer, strip is raised to be formed through air chamber between aeration insulating layer, for the raised most significant end of lower floor's strip beyond the raised least significant end of upper strata strip, the outside of aeration insulating layer is provided with the inflation exhaust outlet for inflation/deflation;Using the prefabricated components curing means of technical solutions of the utility model, solves the problem of existing maintenance of traditional maintenance method is of poor benefits, and service life is short, influences prefabricated components quality.

Description

Prefabricated components curing means
Technical field
It the utility model is related to technical field of buildings, and in particular to a kind of prefabricated components curing means.
Background technology
In prefabricated components work progress, due to the presence of the table temperature difference in concrete and structure boundary constraint system, cause Inside configuration produces a series of temperature stress, when temperature stress is more than concrete tensile strength, it will generation coagulation soil cracking Line, temperature stress is bigger, and crack width is bigger.
In order to which the concrete for ensureing to have poured reaches the intensity and durability of design requirement within regulation age, and prevent Contraction and thermal cracking are produced, maintenance work must be carried out after concreting.It is traditional by the way of covered rearing with plastic film, deposit Fragile in plastic sheeting, the problem of heat and moisture preserving effect difference, plastic sheeting contacts not close with concrete surface, is also easy to produce gas Bubble and space, sealing is bad to cause moisture evaporation, and local concrete curing is of poor quality, influences the maintenance effect of prefabricated components;And Plastics plastic sheeting can not realize reuse, add plastics recovery burden, and being not suitable with current energy-conserving and environment-protective social development will Ask;Traditional uses constantly for the mode of prefabricated components watering, and not only water resources consumption is big, also wastes substantial amounts of manpower money Source, maintenance cost are high.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of prefabricated components curing means, solves traditional maintenance The existing maintenance of mode is of poor benefits, can not reuse with water resource waste it is serious the problem of.
In order to solve the above-mentioned technical problem, the utility model provides a kind of prefabricated components curing means, including shower, fills Gas heat-insulation layer and supporting part, wherein, the shower is located at the upper end of concrete component, passes through three-way pipe in the middle part of the shower It is connected with external water pipe, shower is provided with several apopores;The aeration insulating layer is externally provided with separation layer, the supporting part It is raised that the strip being arranged on the inside of the aeration insulating layer is tilted down for a plurality of alternating, the strip is raised to protect with the inflation Air chamber is formed through between warm layer, the raised most significant end of strip described in lower floor exceeds the raised least significant end of strip described in upper strata, The outside of the aeration insulating layer is provided with the inflation exhaust outlet for inflation/deflation;The inner side of the aeration insulating layer is provided with multiple use In the strong magnets being fixed on the aeration insulating layer on concrete component, the thickness of the strong magnets is not more than the length Height under bar projection top off state, it is additionally provided with for connecting adjacent aeration insulating layer around the aeration insulating layer Slide fastener is connected, the connection slide fastener of correspondence position is mutually matched.
Using the beneficial effect of the prefabricated components curing means of above-mentioned technical proposal:Aeration insulating layer to its inside by filling After full gas, the gas of not convection current has good heat preservation and insulation, than traditional tarpaulin, the heat-insulated effect of gunnysack covering and heat insulating Fruit is more preferable, avoids the temperature of concrete surface by ectocine;Because the inner side of aeration insulating layer is provided with, strip is raised, and strip is convex Rising can ensure to leave gap between concrete surface and aeration insulating layer, realize that taking advantage of a situation for top shower water flows down, grow in addition Bar is raised to set diagonally downward, and the raised most significant end of lower floor's strip is beyond the raised least significant end of upper strata strip, and current are along length The raised flowing of bar, slows down water velocity, adds residence time of the curing water in concrete surface, have and save maintenance water Advantage, and maintenance effect is more preferable;Strong magnets can attract each other or directly in the form of deadweight with reinforcing bar in prefabricated components Fixed aeration insulating layer, so as to which aeration insulating layer is well fixed on into prefabricated components surface, has structure design simple, fix Effect is good and the advantage of simple operation;Due to being additionally provided with the company for connecting adjacent aeration insulating layer around aeration insulating layer Slide fastener is connect, the connection slide fastener of correspondence position is mutually matched, and is designed to realize according to the chis of prefabricated components by connecting slide fastener The very little usage quantity for freely increasing and decreasing curing means, after inflation, Assembling, take-down time are short, and inflation exhaust can be completed, every Absciss layer has the characteristics of loss prevention effect is good, ensure that the durability of curing means, and the curing means is reusable, saves maintenance Cost, meet the social development requirement of energy-conserving and environment-protective.
Preferably, in order to facilitate the dismounting of strong magnets, the strong magnets are provided with T-shaped fixture block, described to fill The inner side of gas heat-insulation layer is provided with the neck coordinated with the T-shaped fixture block.
Preferably, in order to ensure appropriate water velocity, the raised folder formed between horizontal line of the strip Angle is 5-20 °.
Preferably, in order to ensure the adsorption effect of strong magnets and concrete surface, the thickness of the strong magnets Degree is equal to the height under the strip projection top off state.
Preferably, in order to realize the circulation of the air-flow before aeration insulating layer and strip projection, the strip is convex Act the intercommunicating pore being provided with aeration insulating layer insertion.
Preferably, in order to realize preferable inflation/deflation effect, the inflation exhaust outlet is located at the aeration insulating layer Middle part.
Preferably, in order to ensure the fixed effect of aeration insulating layer, the strong magnets are along horizontally and vertically side To being equidistantly provided with least two.
Preferably, it is described in order to further strengthen the stability of structure between aeration insulating layer and strip projection Aeration insulating layer and strip projection are integral type structure.
Brief description of the drawings
Fig. 1 is side structure schematic view of the present utility model;
Fig. 2 is positive structure diagram of the present utility model;
Fig. 3 is the attachment structure schematic diagram of the utility model strong magnets and aeration insulating layer;
Fig. 4 is the structural representation of the utility model assembling effect.
Wherein:Shower 1;Aeration insulating layer 2;Concrete component 3;Elastic force flexible glue wearing layer 4;Strip projection 5;Air chamber 6;Intercommunicating pore 7;Inflate exhaust outlet 8;Strong magnets 9;Connect slide fastener 10;T-shaped fixture block 11;Neck 12.
Embodiment
Technical solutions of the utility model are further illustrated with reference to the accompanying drawings and examples:
As shown in Figures 1 to 4, a kind of prefabricated components curing means, including shower 1, aeration insulating layer 2 and supporting part, Wherein, shower 1 is located at the upper end of concrete component 3, and the middle part of the shower 1 is connected by three-way pipe with external water pipe, real It is now the lasting water supply of shower 1, shower 1 is provided with several apopores, and apopore is along length direction of shower 1 etc. Spacing is set, and the aperture of apopore is 0.2-1mm, preferably 0.5mm, and the spacing between adjacent apopore is 40-150mm, preferably 50mm;Aeration insulating layer 2 is externally provided with separation layer, and aeration insulating layer 2 is plastic gas bag, and separation layer uses surface as concavo-convex bullet Power flexible glue wearing layer 4, preferably butyl rubber, avoids repairing damage, reduction caused by aeration insulating layer 2 by ectocine herein Mend, ensure that the durability of the curing means;Supporting part is that a plurality of alternating tilts down the length for being pasted on the inner side of aeration insulating layer 2 Bar projection 5, be alternately provided with 6 strip projections 5 in strip 5 the present embodiment of projection, and in order to further strengthen aeration insulating layer 2 and The stability of structure between strip projection 5, it is Nian Jie integral structure between aeration insulating layer 2 and strip projection 5, in order to ensure Appropriate water velocity, the angle that is formed is 10 ° between strip projection 5 and horizontal line, strip projection 5 and aeration insulating layer 2 it Between be formed through air chamber 6, in order to avoid directly contact concrete component 3 strip projection 5 damage, the material of strip projection 5 It is preferred that wear-resisting thickness is not less than 2mm butyl rubber, in order to realize aeration insulating layer 2 and the air-flow before strip projection 5 Circulation, strip projection 5 are provided with the intercommunicating pore 7 penetrated with aeration insulating layer 2, and after gas is full of, the gas of not convection current has Good heat insulation and preservation effect, the most significant end of lower floor's strip projection 5 exceed the least significant end of upper strata strip projection 5, and current can be along Strip projection 5, which is taken advantage of a situation, to be flowed down, and extends the descent path of current, extends residence time of the current in concrete surface, necessarily The saving of degree maintenance water, while maintenance effect is ensure that, the middle part in the outside of aeration insulating layer 2, which is provided with, is used for inflation/deflation Inflation exhaust outlet 8, facilitate to the inflation/deflation of aeration insulating layer 2 action operation;The inner side of aeration insulating layer 2 is provided with multiple use In the strong magnets 9 being fixed on aeration insulating layer 2 on concrete component 3, the present embodiment is provided with two for every layer in the horizontal direction Individual strong magnets 9, vertically spaced set have three strong magnets 9, ensure that the fixed effect of aeration insulating layer 2; Strong magnets 9 are provided with T-shaped fixture block 11, and the inner side of aeration insulating layer 2 is fixed with the neck 12 coordinated with T-shaped fixture block 11, neck 12 be plastic material, and the inner side of the neck 12 with aeration insulating layer 2 by way of bonding is fixedly connected, neck 12 and T-shaped card The cooperation of block 11 facilitates the installation and dismounting of strong magnets 9;The thickness of strong magnets 9 is equal to the raised 5 top off shapes of strip Height under state, strong magnets 9 can be attracted each other or be fixed directly in the form of deadweight and fill with reinforcing bar in prefabricated components 3 Gas heat-insulation layer 2, so as to which aeration insulating layer 2 is fixed on concrete surface well, also it is bonded with around aeration insulating layer 2 For connecting the connection slide fastener 10 of adjacent aeration insulating layer 2, the edge of connection slide fastener 10 is plastic edge, and the connection of correspondence position is drawn Chain 10 is mutually matched, and facilitates the regulation that curing means quantity is used according to needed for various sizes of prefabricated components.
Aeration insulating layer 2 is inflated by inflating exhaust outlet 8, after gas is full of, strong magnets 9 is installed to and filled The inner side of gas heat-insulation layer 2, Assembling curing means as needed, move integrally afterwards to region to be conserved, successively installation spray Shower pipe 1 and aeration insulating layer 2, shower 1 are fixed on the upper end of concrete component 3 by fixing device, afterwards aeration insulating layer 2 Realized by strong magnets 9 and be fixedly connected with concrete surface, installation process is convenient and swift.
Using above-mentioned prefabricated components curing means in maintenance, curing water is entered in shower 1 by external water pipe, is led to The apopore outflow crossed on shower 1, current are taken advantage of a situation along strip projection 5 and flowed down, slow down current, add curing water in coagulation The residence time on native surface, while aeration insulating layer 2 has good heat insulation and preservation effect, ensure that the maintenance matter of prefabricated components Amount.
After completing maintenance work, aeration insulating layer 2 is exhausted, strong magnets 9 are removed afterwards, by strong magnets 9 Pull down individually placed, provided conveniently for directly storage aeration insulating layer 2, pull down shower 1.
The above is only preferred embodiment of the present utility model, it is noted that for those skilled in the art, On the premise of the utility model structure is not departed from, several modifications and improvements can also be made, these should also be considered as this practicality New protection domain, these are all without the effect and practical applicability for influenceing the utility model implementation.

Claims (8)

1. a kind of prefabricated components curing means, including shower, aeration insulating layer and supporting part, it is characterised in that:The spray Pipe is connected located at the upper end of concrete component, the middle part of the shower by three-way pipe with external water pipe, if shower is provided with Dry apopore;The aeration insulating layer is externally provided with separation layer, the supporting part be a plurality of alternating tilt down be arranged at it is described Strip on the inside of aeration insulating layer is raised, and the strip is raised to be formed through air chamber, lower floor between the aeration insulating layer Beyond the raised least significant end of strip described in upper strata, the outside of the aeration insulating layer is provided with to be used for the raised most significant end of the strip The inflation exhaust outlet of inflation/deflation;The inner side of the aeration insulating layer is provided with multiple for the aeration insulating layer to be fixed on into coagulation Strong magnets on native component, the thickness of the strong magnets are not more than the height under the strip projection top off state, The connection slide fastener for connecting adjacent aeration insulating layer, the connection of correspondence position are additionally provided with around the aeration insulating layer Slide fastener is mutually matched.
2. prefabricated components curing means according to claim 1, it is characterised in that:The strong magnets are provided with T-shaped card Block, the inner side of the aeration insulating layer are provided with the neck coordinated with the T-shaped fixture block.
3. prefabricated components curing means according to claim 1, it is characterised in that:The strip is raised between horizontal line The angle of formation is 5-20 °.
4. prefabricated components curing means according to claim 1, it is characterised in that:The thickness of the strong magnets is equal to institute State the height under strip projection top off state.
5. prefabricated components curing means according to claim 1, it is characterised in that:The strip projection be provided with it is described The intercommunicating pore of aeration insulating layer insertion.
6. prefabricated components curing means according to claim 1, it is characterised in that:The inflation exhaust outlet fills located at described The middle part of gas heat-insulation layer.
7. prefabricated components curing means according to claim 1, it is characterised in that:The strong magnets are along horizontally and vertically Direction is equidistantly provided with least two.
8. prefabricated components curing means according to claim 1, it is characterised in that:The aeration insulating layer and the strip Projection is integral type structure.
CN201720440308.7U 2017-04-25 2017-04-25 Prefabricated components curing means Expired - Fee Related CN206718124U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720440308.7U CN206718124U (en) 2017-04-25 2017-04-25 Prefabricated components curing means

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720440308.7U CN206718124U (en) 2017-04-25 2017-04-25 Prefabricated components curing means

Publications (1)

Publication Number Publication Date
CN206718124U true CN206718124U (en) 2017-12-08

Family

ID=60506608

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720440308.7U Expired - Fee Related CN206718124U (en) 2017-04-25 2017-04-25 Prefabricated components curing means

Country Status (1)

Country Link
CN (1) CN206718124U (en)

Similar Documents

Publication Publication Date Title
CN109591173A (en) A kind of concrete curing structure and care products and method using it
CN206287310U (en) A kind of concrete prefabricated element production line maintenance cover system
CN206718124U (en) Prefabricated components curing means
CN107060248A (en) A kind of prefabricated outer wall panel ornamental surface heat insulation is integrally formed the preparation method of heat preserving exterior wall
CN207553328U (en) A kind of slip casting type water-swellable steel side waterstop
CN212835254U (en) Expansion joint double water-stop seepage-proofing structure for water delivery aqueduct project
CN203939193U (en) A kind of water draining and accumulating plate
CN211113468U (en) Concrete face dam surface layer seam prevention of seepage protective structure
CN109778768A (en) Ice-melt defroster before a kind of dam
CN201567822U (en) Aeration refrigerator thermal insulator
CN203834791U (en) Inflation bottle building block
CN204456641U (en) A kind of foaming partition board being convenient to assemble
CN206326924U (en) Strengthen backing type waterproof roll and waterproof construction
CN206205299U (en) Steel structural roof thermal insulation structure structure
CN209633324U (en) A kind of column concrete structure curing means
CN209588482U (en) A kind of cooling device of waterproof roll
CN207093141U (en) A kind of underground airtight wall with biological modeling self-healing performance
CN207700078U (en) A kind of concrete hollow block build culvert
CN218580395U (en) Artificial turf convenient to concatenation installation
CN206971615U (en) A kind of heat insulating decorative board anchor structure
CN208122208U (en) A kind of polymer floor edge closing bar
CN205206062U (en) Double -deck thermal -insulation shed membrane with fill gassing function
CN211144571U (en) Heat-insulating integrated drainage system for tunnel auxiliary heat
CN208862494U (en) A kind of quick detachable cable testing bridge
CN203877915U (en) Vertical groove for producing insoluble sulfur

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171208

CF01 Termination of patent right due to non-payment of annual fee