CN206712546U - Power supply management system and power network - Google Patents

Power supply management system and power network Download PDF

Info

Publication number
CN206712546U
CN206712546U CN201720288588.4U CN201720288588U CN206712546U CN 206712546 U CN206712546 U CN 206712546U CN 201720288588 U CN201720288588 U CN 201720288588U CN 206712546 U CN206712546 U CN 206712546U
Authority
CN
China
Prior art keywords
power
power consumption
user
management platform
cloud management
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720288588.4U
Other languages
Chinese (zh)
Inventor
吴丽娟
张波
马帅
赵兴利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201720288588.4U priority Critical patent/CN206712546U/en
Application granted granted Critical
Publication of CN206712546U publication Critical patent/CN206712546U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The utility model provides a kind of power supply management system and power network, it is related to the technical field of power system, the power supply management system includes the city's electric connection terminal being sequentially connected, the total lock of electricity system, power harvester group and terminal block end group, the terminal block end that the power harvester and terminal block end group that power harvester group is included are included connects one to one, the power consumption of the corresponding user collected is uploaded to cloud management platform by power harvester, cloud management platform compares power consumption with predetermined power, and power consumption is being compared more than in the case of predetermined power, prompt message is sent to corresponding user equipment, to remind user to adjust power consumption.The utility model detects the power consumption of user, the user's adjustment power consumption for allowing power consumption to be more than predetermined power by sending prompt message, alleviates the technical problem for the unreasonable management that same electric power system directly trips when total power load is too high.

Description

Power supply management system and power network
Technical field
The technical field of power system is the utility model is related to, more particularly, to a kind of power supply management system and power network.
Background technology
With the continuous improvement of people's living standards, every household has been owned by household electrical appliance.It is fast in current development in science and technology Under the environment of times of speed, the optional function of every household electrical appliance and the optional gear of each function are numerous, the power bracket of consumption across Spend larger.In addition, the household electrical appliance species of every household is various, quantity differs, and updates rapid.Thus, other family of each household The consumption general power excursion of electrical appliance is big and is not easy control, and the consumption general power difference with other is not very big yet.
The work of numerous household electrical appliance all be unable to do without the offer of electric energy, however, electrical energy supply system is to power supply at present Many defects also be present in terms of Collective stewardship.Wherein, lacking when the same electric power system that the total brake tube of same electricity system is had jurisdiction over When the power consumption of number resident at a time is much larger than the power consumption of other residents, if causing total power load mistake Height, it also can only take and jump the total lock of electricity system and limit the measure of all residential electricity consumptions, so that the electricity consumption of a few family residents is born Lotus is unreasonable and influences the electricity consumption of all residents in the range of the total brake tube linchpin of electricity system, especially has influence on some only basic use The resident of electric demand, such as the only resident of electric consumption on lighting demand, so as to which the life to resident brings very big inconvenience.
Directly tripped unreasonable for electrical energy supply system when total power load of same electric power system is too high The technical problem of management, lack effective solution at present.
Utility model content
In view of this, the purpose of this utility model is to provide a kind of power supply management system and power network, to alleviate existing skill The technical problem for the unreasonable management that same electric power system present in art directly trips when total power load is too high.
In a first aspect, the utility model embodiment provides a kind of power supply management system, including:City's electric connection terminal, electricity consumption The total lock of system, power harvester group and terminal block end group, wherein,
Terminal block end group includes at least one terminal block end, and the power harvester group includes at least one work( Rate collector, the power harvester group are connected by the total lock of the electricity system with city's electric connection terminal, and described Power harvester connects one to one with the terminal block end;
The power harvester group communication link is connected to cloud management platform, for gathering corresponding use according to prefixed time interval The power consumption at family, and the power consumption collected is uploaded into the cloud management platform, wherein, corresponding user User corresponding to the terminal block end being connected for the power harvester;
The cloud management platform is connected with group of user equipments, and the group of user equipments includes at least one user equipment, and And user corresponding to each terminal block end is respectively provided with a user equipment, the cloud management platform is used for by described in Power consumption is comparing the power consumption more than in the case of the predetermined power compared with predetermined power, Xiang Xiang The user equipment answered sends prompt message, to remind user to adjust power consumption.
With reference in a first aspect, the utility model embodiment provides the first possible embodiment of first aspect, its In, the numerical value of the predetermined power includes:Multiple predetermined power values that numerical value differs, appointing in the multiple predetermined power value The difference for two neighboring predetermined power value of anticipating is all equal, and in the multiple predetermined power value arbitrary neighborhood two predetermined powers One performance number section of value composition, when the power consumption is in different performance number sections, or, it is pre- more than the multiple If during maximum preset performance number in performance number, the prompt message that the cloud management platform is sent is different.
With reference to the first possible embodiment of first aspect, the utility model embodiment provides the of first aspect Two kinds of possible embodiments, wherein, the cloud management platform is also connected with the total lock of the electricity system, the cloud management platform It is described after the power consumption for continuously checking same user reaches preset times more than the number of the maximum preset performance number Cloud management platform disconnects the total lock of electricity system, to cut off electric energy of the city's electric connection terminal to terminal block end group Conveying.
With reference to the first possible embodiment of first aspect, the utility model embodiment provides the of first aspect Three kinds of possible embodiments, wherein, the user equipment includes terminal device, the terminal device and the cloud management platform Communication connection, the terminal device include display screen, and the display screen is used to show the prompt message, to remind user to adjust Whole power consumption.
With reference to the third possible embodiment of first aspect, the utility model embodiment provides the of first aspect Four kinds of possible embodiments, wherein, the terminal device includes at least one of:Mobile phone, computer, information display instrument, its In, the mobile phone is connected with each other with the cloud management platform by 3G/4G networks, so as to receive the prompt message;The electricity Brain or information display instrument are connected with each other with the cloud management platform by wireless network, so as to receive the prompt message.
With reference to the first possible embodiment of first aspect, the utility model embodiment provides the of first aspect Five kinds of possible embodiments, wherein, the user equipment includes:Driving equipment and alarm, wherein, the driving equipment is used Reported in the prompt message for receiving the cloud management platform transmission, and according to the prompt message driving alarm Alert instruction, to remind user to adjust power consumption.
With reference to the 5th kind of possible embodiment of first aspect, the utility model embodiment provides the of first aspect Six kinds of possible embodiments, wherein, the alarm includes at least one of:Phonetic alarm, indicator lamp, the voice Alarm represents different prompt messages by different tones and/or the sound of different volumes, and the indicator lamp passes through different Light color represents different prompt messages.
With reference in a first aspect, the utility model embodiment provides the 7th kind of possible embodiment of first aspect, its In, the predetermined power includes:Multiple predetermined power values that gear differs, the predetermined power value of different stalls is each unequal, The predetermined power value of each corresponding gear of power consumption is compared by the cloud management platform, wherein, it is described right It is multiple default that the predetermined power value for answering gear is that user corresponding to each power consumption differs in the gear in advance Choose and obtain in performance number.
With reference in a first aspect, the utility model embodiment provides the 8th kind of possible embodiment of first aspect, its In, the port of the power harvester is RS485 ports, and the communications protocol built in the power harvester is led to for MODBUS Interrogate agreement.
Second aspect, the utility model embodiment provide a kind of power network, including:Generator unit, electrical energy transportation unit and Power supply management system as described above, wherein, the quantity of the power supply management system is at least one, the electrical energy transportation unit It is connected with each city's electric connection terminal in the power supply management system, so as to each city's electric connection terminal inputing power.
The utility model embodiment brings following beneficial effect:Power harvester corresponds with terminal block end to be connected Connect, power harvester gathers the power consumption of corresponding user, and the power consumption collected is uploaded into cloud management and put down Platform, cloud management platform compare the power consumption received with predetermined power, and are more than default work(comparing power consumption In the case of rate, prompt message is sent to corresponding user equipment, to remind user to adjust power consumption.The utility model passes through User's adjustment power consumption that prompt message allows power consumption to reach predetermined power is sent, is alleviated same present in prior art The irrational technical problem of management that one electric power system directly trips when total power load is too high.
Other feature and advantage of the present utility model will illustrate in the following description, also, partly from specification In become apparent, or understood by implementing the utility model.The purpose of this utility model and other advantages are illustrating Specifically noted structure is realized and obtained in book, claims and accompanying drawing.
To enable above-mentioned purpose of the present utility model, feature and advantage to become apparent, preferred embodiment cited below particularly, and Accompanying drawing appended by cooperation, is described in detail below.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, describe below In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is a kind of structural representation for power supply management system that the utility model embodiment one provides;
Fig. 2 is that the power harvester group of the offer of the utility model embodiment one and a kind of connected mode of cloud management platform are shown It is intended to;
Fig. 3 is the power harvester group that the utility model embodiment one provides and another connected mode of cloud management platform Schematic diagram;
Fig. 4 is the structural representation for another power supply management system that the utility model embodiment one provides;
Fig. 5 is the structural representation for another power supply management system that the utility model embodiment one provides;
Fig. 6 is a kind of structural representation for power network that the utility model embodiment two provides.
Icon:1- cities electric connection terminal;The total lock of 2- electricity systems;3- power harvester groups;4- terminal blocks end group; 5- cloud management platforms;6- group of user equipments;7- information transferring devices;8- gear selected equipment groups;9- generator units; 10- electrical energy transportation units.
Embodiment
To make the purpose, technical scheme and advantage of the utility model embodiment clearer, below in conjunction with accompanying drawing to this The technical scheme of utility model is clearly and completely described, it is clear that described embodiment is that the utility model part is real Apply example, rather than whole embodiments.Based on the embodiment in the utility model, those of ordinary skill in the art are not making The every other embodiment obtained under the premise of creative work, belong to the scope of the utility model protection.
Current same electric power system, directly using the measure of tripping operation, seriously affects same when total power load is too high Some in one electric power system only have the life of basic power consumption requirements user.Based on this, the utility model embodiment provide one Kind of power supply management system and power network, can alleviate same electric power system when total power load is too high and that directly trips do not conform to Manage the technical problem of management.
Embodiment one:
A kind of power supply management system that the utility model embodiment provides, as shown in figure 1, including:City's electric connection terminal 1, use The total lock 2 of electric system, power harvester group 3 and terminal block end group 4, wherein:
Terminal block end group 4 includes at least one terminal block end, and power harvester group 3 includes at least one power collecting Device, power harvester group 3 is connected by the total lock 2 of electricity system with city's electric connection terminal 1, and power harvester and terminal block End connects one to one;
The communication link of power harvester group 3 is connected to cloud management platform 5, for gathering corresponding user according to prefixed time interval Power consumption, and the power consumption collected is uploaded into cloud management platform 5, wherein, corresponding user is power harvester User corresponding to the terminal block end being connected;
Cloud management platform 5 is connected with group of user equipments 6, and group of user equipments 6 includes at least one user equipment, and each User corresponding to terminal block end is respectively provided with a user equipment, and cloud management platform 5 is used for power consumption and predetermined power phase Compare, and comparing power consumption more than in the case of predetermined power, prompt message is sent to corresponding user equipment, so as to User is reminded to adjust power consumption.
In power supply management system shown in Fig. 1, power harvester group 3 includes N number of power harvester:Power harvester 31, Power harvester 32 ... ..., power harvester 3N;And terminal block end group 4 also includes N number of terminal block end:Terminal block end 41, terminal block end 42 ... ..., terminal block end 4N, wherein, power harvester 31 is connected with terminal block end 41, power Collector 32 is connected with terminal block end 42 ... ..., and power harvester 3N is connected with terminal block end 4N;User equipment 61 For user corresponding to terminal block end 41, user equipment 62 is user ... ... corresponding to terminal block end 42, and user equipment 6N is User corresponding to the 4N of terminal block end.Wherein, cloud management platform 5 compares power consumption with predetermined power, it is assumed that compares The power consumption that power harvester 32 gathers is more than predetermined power, then sends prompt message to user equipment 62, make to remind The power consumption of the household electrical appliance of accessing user's terminals 42 is adjusted with the user at terminal block end 42.
Specifically, power harvester group 3 and the communication connection mode of cloud management platform 5 include following two, wherein:
The first, as shown in Fig. 2 each power harvester and cloud management platform 5 communicate to connect, each power harvester The power consumption of corresponding user is gathered according to prefixed time interval, and when collecting the power consumption of corresponding user, will Power consumption uploads to cloud management platform 5.
Second, it is in the same localities as shown in figure 3, power harvester all in power harvester group 3 is set, and Same information transferring device 7 is connected to by order wire, information transferring device 7 and cloud management platform 5 communicate to connect.Wherein, Each power harvester gathers the power consumption of corresponding user according to prefixed time interval, is collected in all power harvesters During the power consumption of respective user, power consumption is delivered to information transferring device 7, information transferring device 7 will be all The power consumption of power harvester collection uploads to cloud management platform 5 in synchronization, wherein, own in power harvester group 3 Power harvester collection power consumption at the time of it is the same.Power harvester group 3 and such a communication connection side of cloud management platform 5 Formula more saves channel resource.
In addition, the prefixed time interval of the adjacent power consumption for gathering relative users twice of power harvester can be set as It is equal, wherein, prefixed time interval is controlled by cloud management platform 5.
In the utility model embodiment, power harvester connects one to one with terminal block end, power harvester collection The power consumption of corresponding user, and the power consumption collected is uploaded into cloud management platform 5, cloud management platform 5 will receive To power consumption compared with predetermined power, and power consumption is being compared more than in the case of predetermined power, to corresponding User equipment sends prompt message, to remind user to adjust power consumption.The utility model allows power consumption by sending prompt message The user that power reaches predetermined power adjusts power consumption, and it is straight when total power load is too high to alleviate same electric power system Connect the irrational technical problem of management of tripping operation.
In one optional embodiment of the utility model embodiment, the numerical value of predetermined power includes:What numerical value differed Multiple predetermined power values, the difference of two predetermined power values of arbitrary neighborhood in multiple predetermined power values are all equal and multiple pre- If two predetermined power values of arbitrary neighborhood form a performance number section in performance number, when power consumption is in different power It is worth in section, or, during more than maximum preset performance number in multiple predetermined power values, prompting letter that cloud management platform 5 is sent Cease different.
Specifically, it is assumed that the numerical value of predetermined power includes tri- predetermined power values of a, b, c, then power consumption be in a and b it Between, i.e., between section (a, b), b and c, i.e., section (b, c), more than c when, i.e., section (c ,+∞), cloud management platform 5 send carry Show that information is different.For example, the prompt message in these three sections, which can be followed successively by, represents dangerous one-level, secondary threat and three-level Dangerous prompt message.It should be noted that cut off value on each section division (including:It is attributed to less than cut off value Section, or, more than the section of cut off value), as long as consistent to the regulation of the cut off value in all sections, will not repeat.
The utility model embodiment, the setting of the multiple predetermined power values differed by numerical value, and issue the user with Different prompt messages so that the management to user's power consumption is more detailed-oriented, allows feelings of the user to oneself power consumption Condition becomes apparent from.
As shown in figure 4, in another optional embodiment of the utility model embodiment, cloud management platform 5 is gone back and electricity consumption The total lock 2 of system connects, and cloud management platform 5 is more than time of maximum preset performance number in the power consumption for continuously checking same user After number reaches preset times, cloud management platform 5 disconnects the total lock 2 of electricity system, to cut off city's electric connection terminal 1 to terminal block end The conveying of the electric energy of group 4.
It should be noted that preset times gather user's power consumption with maximum preset performance number and power harvester Prefixed time interval is related.Wherein, for example, maximum preset performance number close to cause electric wire catch fire etc dangerous numerical value when, Preset times are arranged to once.
In the utility model embodiment, the power consumption of same user reaches more than the read-around ratio of maximum preset performance number After preset times, the measure of the total lock 2 of electricity system is disconnected, is to receive prompt message but no adjustment power consumption for user Special circumstances.
In another optional embodiment of the utility model embodiment, user equipment includes terminal device, terminal device Communicated to connect with cloud management platform 5, terminal device includes display screen, and display screen is used for display reminding information, to remind user Adjust power consumption.
In another optional embodiment of the utility model embodiment, terminal device includes at least one of:Mobile phone, Computer, information display instrument, wherein, mobile phone is connected with each other with cloud management platform 5 by 3G/4G networks, so as to receive prompt message; Computer or information display instrument are connected with each other with cloud management platform 5 by wireless network, so as to receive prompt message.
It should be noted that information display instrument, which is a kind of, has the terminal device for receiving information prompting function.
In another optional embodiment of the utility model embodiment, user equipment includes:Driving equipment and alarm, Wherein, driving equipment is used for the prompt message for receiving the transmission of cloud management platform 5, and drives alarm to be reported according to prompt message Alert instruction, to remind user to adjust power consumption.
In another optional embodiment of the utility model embodiment, alarm includes at least one of:Voice reporting Alert device, indicator lamp, phonetic alarm represent different prompt messages, instruction by different tones and/or the sound of different volumes Lamp represents different prompt messages by different light colors.
Specifically, can by higher tone, and/or, higher volume represents the larger power consumption institute of user Corresponding prompt message.
In another optional embodiment of the utility model embodiment, predetermined power includes:Gear differs multiple Predetermined power value, the predetermined power value of different stalls is each unequal, and cloud management platform 5 is by the corresponding gear of each power consumption Predetermined power value be compared, wherein, the predetermined power value of respective notch exists in advance for user corresponding to each power consumption Choose and obtain in multiple predetermined power values that gear differs.
Specifically, user corresponding to power consumption, i.e. consume the user of the power consumption.
In the utility model embodiment, the user comprising essential high-power electronic device can in some household electrical appliance To apply for the larger gear of predetermined power value, gear that the administrative staff of electric power system are chosen in advance by user, to same The predetermined power of user in the total compass of competency of lock 2 of electricity system carries out reasonable disposition.
Specifically, as shown in figure 5, power supply management system also includes gear selected equipment group 8, gear selected equipment group 8 is wrapped The gear selected equipment set by user corresponding to each terminal block end is included, gear selected equipment group 8 and cloud management platform 5 are logical Letter connection, for choosing the predetermined power value of respective notch in multiple predetermined power values that gear differs in advance for user. Above-mentioned gear selected equipment can be arranged on user in oneself, gear choose function it is effective at the time of can be by cloud management platform 5 Control.For example, the end of month only in every month, the gear that user is chosen by gear selected equipment, cloud management platform 5 can just incite somebody to action Predetermined power of the predetermined power value corresponding with the gear as user's next month.Wherein, gear selected equipment includes being used to select The selection module of gear is taken, above-mentioned selection module includes at least one of:The operation panel of the button composition of expression different stalls, The touch-screen of all expression different stalls images is presented, user is represented to choose gear corresponding with button by operation button, led to The different images crossed on point touching screen represent to choose gear corresponding with image.
In another optional embodiment of the utility model embodiment, the port of power harvester communicates for RS485 Mouthful, the communications protocol built in power harvester is MODBUS communications protocol, and the power collected is passed through RS485 by power harvester Port is sent.
Embodiment two:
A kind of power network that the utility model embodiment provides, as shown in fig. 6, including generator unit 9, electrical energy transportation unit 10 With the power supply management system described in above-described embodiment one, wherein, the quantity of power supply management system is at least one, and electric energy is defeated Unit 10 is sent to be connected with each city's electric connection terminal in power supply management system, so as to each city's electric connection terminal inputing power.
Specifically, Fig. 6 show electrical energy transportation unit 10 and is connected with M power supply management system:Power supply management system 101, Power supply management system 102 ... power supply management system 10M, electrical energy transportation unit 10 respectively with city's electric connection terminal 11, city's electrical connection City electric connection terminal 1M is connected for each city's electric connection terminal inputing power at end 12 ....
In the utility model embodiment, power harvester connects one to one with terminal block end, power harvester collection The power consumption of corresponding user, and the power consumption collected is uploaded into cloud management platform 5, cloud management platform 5 will receive To power consumption compared with predetermined power, and power consumption is being compared more than in the case of predetermined power, to corresponding User equipment sends prompt message, to remind user to adjust power consumption.The utility model allows power consumption by sending prompt message The user that power reaches predetermined power adjusts power consumption, and it is straight when total power load is too high to alleviate same electric power system Connect the irrational technical problem of management of tripping operation.
The power supply management system and the computer program product of power network that the utility model embodiment is provided, including store The computer-readable recording medium of program code, the instruction that described program code includes can be used for performing in previous methods embodiment Described method, specific implementation can be found in embodiment of the method, will not be repeated here.
It is apparent to those skilled in the art that for convenience and simplicity of description, the system of foregoing description With the specific work process of device, the corresponding process in preceding method embodiment is may be referred to, will not be repeated here.
In addition, in the description of the utility model embodiment, unless otherwise clearly defined and limited, term " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be being fixedly connected or being detachably connected, or integratedly be connected Connect;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary, can To be the connection of two element internals.For the ordinary skill in the art, above-mentioned term can be understood with concrete condition Concrete meaning in the utility model.
If the function is realized in the form of SFU software functional unit and is used as independent production marketing or in use, can be with It is stored in a computer read/write memory medium.Based on such understanding, the technical solution of the utility model substantially or Person says that the part of the part to be contributed to prior art or the technical scheme can be embodied in the form of software product, The computer software product is stored in a storage medium, including some instructions are causing a computer equipment (can be with Personal computer, server, or network equipment etc.) perform each embodiment methods described of the utility model whole or portion Step by step.And foregoing storage medium includes:USB flash disk, mobile hard disk, read-only storage (ROM, Read-Only Memory), with Machine access memory (RAM, Random Access Memory), magnetic disc or CD etc. are various can be with Jie of store program codes Matter.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular Directly ", the orientation of the instruction such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only Described for the ease of description the utility model and simplifying, rather than instruction or imply signified device or element must have it is specific Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or hint relative importance.
Finally it should be noted that:Embodiment described above, only specific embodiment of the present utility model, to illustrate this The technical scheme of utility model, rather than its limitations, the scope of protection of the utility model is not limited thereto, although with reference to foregoing The utility model is described in detail embodiment, it will be understood by those within the art that:It is any to be familiar with this skill For the technical staff in art field in the technical scope that the utility model discloses, it still can be to the skill described in previous embodiment Art scheme is modified or can readily occurred in change, or carries out equivalent substitution to which part technical characteristic;And these modifications, Change is replaced, and the essence of appropriate technical solution is departed from the spirit and model of the utility model embodiment technical scheme Enclose, should all cover within the scope of protection of the utility model.Therefore, the scope of protection of the utility model described should be wanted with right The protection domain asked is defined.

Claims (10)

  1. A kind of 1. power supply management system, it is characterised in that including:The total lock of city's electric connection terminal, electricity system, power harvester group and Terminal block end group, wherein,
    Terminal block end group includes at least one terminal block end, and the power harvester group is adopted comprising at least one power Storage, the power harvester group is connected by the total lock of the electricity system with city's electric connection terminal, and the power Collector connects one to one with the terminal block end;
    The power harvester group communication link is connected to cloud management platform, for gathering corresponding user's according to prefixed time interval Power consumption, and the power consumption collected is uploaded into the cloud management platform, wherein, corresponding user is institute State user corresponding to the terminal block end that power harvester is connected;
    The cloud management platform is connected with group of user equipments, and the group of user equipments includes at least one user equipment, and often User corresponding to the individual terminal block end is respectively provided with a user equipment, and the cloud management platform is used for the power consumption Power is comparing the power consumption more than in the case of the predetermined power compared with predetermined power, to corresponding User equipment sends prompt message, to remind user to adjust power consumption.
  2. 2. system according to claim 1, it is characterised in that the numerical value of the predetermined power includes:What numerical value differed Multiple predetermined power values, the difference of two predetermined power values of arbitrary neighborhood in the multiple predetermined power value is all equal, and institute Two predetermined power values for stating arbitrary neighborhood in multiple predetermined power values form a performance number section, at the power consumption In in different performance number sections, or, during more than maximum preset performance number in the multiple predetermined power value, the cloud pipe The prompt message that platform is sent is different.
  3. 3. system according to claim 2, it is characterised in that cloud management platform lock also total with the electricity system connects Connect, the number that the cloud management platform is more than the maximum preset performance number in the power consumption for continuously checking same user reaches To after preset times, the cloud management platform disconnects the total lock of electricity system, to cut off city's electric connection terminal to described The conveying of the electric energy of terminal block end group.
  4. 4. system according to claim 2, it is characterised in that the user equipment includes terminal device, and the terminal is set Standby to be connected with the cloud management Platform communication, the terminal device includes display screen, and the display screen is used to show the prompting Information, to remind user to adjust power consumption.
  5. 5. system according to claim 4, it is characterised in that the terminal device includes at least one of:Hand is mechanical, electrical Brain, information display instrument, wherein, the mobile phone is connected with each other with the cloud management platform by 3G/4G networks, described so as to receive Prompt message;The computer or described information display instrument are connected with each other with the cloud management platform by wireless network, so as to connect Receive the prompt message.
  6. 6. system according to claim 2, it is characterised in that the user equipment includes:Driving equipment and alarm, its In, the driving equipment is used to receive the prompt message that the cloud management platform is sent, and is driven according to the prompt message The dynamic alarm carries out police instruction, to remind user to adjust power consumption.
  7. 7. system according to claim 6, it is characterised in that the alarm includes at least one of:Audio alert Device, indicator lamp, the phonetic alarm represent different prompt messages, institute by different tones and/or the sound of different volumes State indicator lamp and different prompt messages is represented by different light colors.
  8. 8. system according to claim 1, it is characterised in that the predetermined power includes:Gear differs multiple pre- If performance number, the predetermined power value of different stalls is each unequal, and the cloud management platform is right with it by each power consumption The predetermined power value of gear is answered to be compared, wherein, the predetermined power value of the respective notch is each power consumption pair The user answered chooses in multiple predetermined power values that the gear differs obtain in advance.
  9. 9. system according to claim 1, it is characterised in that the port of the power harvester is RS485 ports, Communications protocol built in the power harvester is MODBUS communications protocol.
  10. A kind of 10. power network, it is characterised in that including:Any in generator unit, electrical energy transportation unit and such as claim 1-9 Power supply management system described in, wherein, the quantity of the power supply management system is at least one, the electrical energy transportation unit and Each city's electric connection terminal in the power supply management system is connected, so as to each city's electric connection terminal inputing power.
CN201720288588.4U 2017-03-22 2017-03-22 Power supply management system and power network Active CN206712546U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720288588.4U CN206712546U (en) 2017-03-22 2017-03-22 Power supply management system and power network

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720288588.4U CN206712546U (en) 2017-03-22 2017-03-22 Power supply management system and power network

Publications (1)

Publication Number Publication Date
CN206712546U true CN206712546U (en) 2017-12-05

Family

ID=60471047

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720288588.4U Active CN206712546U (en) 2017-03-22 2017-03-22 Power supply management system and power network

Country Status (1)

Country Link
CN (1) CN206712546U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109861235A (en) * 2019-03-29 2019-06-07 西安艾润物联网技术服务有限责任公司 Power consumption management method, electricity management terminal and readable storage medium storing program for executing

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109861235A (en) * 2019-03-29 2019-06-07 西安艾润物联网技术服务有限责任公司 Power consumption management method, electricity management terminal and readable storage medium storing program for executing

Similar Documents

Publication Publication Date Title
CN105934976B (en) The method, apparatus and master-slave network electricity-saving system of master-slave network suspend mode and wake-up
CN101673968A (en) Electric equipment control device and method
CN106787190B (en) A kind of monitoring system and monitoring method for DC micro power grid system
JP2012244665A (en) Energy management system
CN103346939A (en) Intelligent household system terminal
CN204925706U (en) Remove wisdom energy supervisory control based on thing networking
CN108449393A (en) Combustion gas data transmission method and Internet of things system
CN104423358A (en) Intelligent home furnishing management and control system based on intelligent power grid and new energy sources
CN103490509A (en) Electric energy monitoring method and system for household appliances
CN105227212A (en) Reverse power supply management method, Apparatus and system
CN206712546U (en) Power supply management system and power network
CN204731623U (en) A kind of intelligent control system
CN203324775U (en) Intelligent household handset network control system
CN202488501U (en) Remotely-managed electric power information network system
CN204536758U (en) A kind of interactive indoor air chemical pollution based on ARM controls and abnormal alarm system
CN108600870A (en) A kind of novel building speakerphone and communication means
CN101900997A (en) Digital house safety monitoring system and method
CN202475484U (en) Internet of Things protocol converting device
CN202334585U (en) Intelligent home gateway
CN205405216U (en) Intelligence charges of electricity monitored control system based on thing networking
CN108563132A (en) A kind of voice control terminal with timing or subscription time management function
CN203164692U (en) Intelligent household energy management system based on G.hn
CN201886041U (en) Network electric energy meter controlling electric equipment through power carrier
CN105371424A (en) Domestic humidifier control system based on power line carrier
CN205160803U (en) Fill formula intelligence wiFi equipment with oneself soon

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant