CN206712332U - Bicyclic clip rope-settling device - Google Patents
Bicyclic clip rope-settling device Download PDFInfo
- Publication number
- CN206712332U CN206712332U CN201720437897.3U CN201720437897U CN206712332U CN 206712332 U CN206712332 U CN 206712332U CN 201720437897 U CN201720437897 U CN 201720437897U CN 206712332 U CN206712332 U CN 206712332U
- Authority
- CN
- China
- Prior art keywords
- nut
- support frame
- rope
- bicyclic
- utility
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 125000002619 bicyclic group Chemical group 0.000 title claims abstract description 11
- 238000012423 maintenance Methods 0.000 abstract description 9
- 230000000694 effects Effects 0.000 abstract description 2
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 4
- 230000005540 biological transmission Effects 0.000 description 2
- 229910052742 iron Inorganic materials 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 238000011835 investigation Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Landscapes
- Ropes Or Cables (AREA)
Abstract
The utility model discloses bicyclic clip rope-settling device, and it includes support frame(4), branch line bar(2), support frame as described above is in "] " and shape, nut I is arranged at intervals with support frame top(3)With nut II(6), ring of tiing knots is provided with the right part supporting surface of support frame(5), one end of branch line bar can be movably connected in nut I or nut II, and the other end of support bar is connected with wire rope handling ring(1).Compared with prior art, the finishing time of single rope was from 25 minutes before use, 5 minutes shortened to after use for the utility model, and contracting is up to 80%;The circuit live-line maintenance operation time by original average 3.4 hours, is reduced to 2.65 hours after activity, less than desired value 3.0 hours, can save cost depletions every year more than 850,000 yuan.
Description
Technical field
Electric power transmission line power tool technical field is the utility model is related to, more particularly, to a kind of bicyclic clip reason rope
Device.
Background technology
Circuit live-line maintenance operation:Under transmission line of electricity live state, to line facility(Mainly charging equipment)Carry out
The operating type of repair and maintenance, according to the electric potential relation between operating personnel and charging equipment, can be divided into equipotential, ground potential,
Three kinds of modes of intermediate potential, common livewire work project have, and change line insulator(String), change stockbridge damper, change interval
Rod, change drainage thread, change fastening bolt etc..Livewire work would generally use the livewire work rope to various length on bar,
Circuit live-line maintenance operation needs to undergo " Job readiness ", " work is carried out ", " scene arranges " three ranks from work start to finish
Section.Drawn a conclusion by repeatedly investigating:The time that circuit hotline maintenance is arranged with the scene after Job readiness and work accounts for
The 64.93% of whole working time, the time carried out much larger than work, in addition, circuit of the time of work progress in corporate policy
In live-line maintenance operation standardized work time range(≤ 1.5 hours), thus cause live-line maintenance operation overlong time because
Element should be found from " Job readiness " and " scene arranges " two stages, and be found by long-term practice, in the two stages
In, rope housekeeping has in Job readiness and scene two stages of arrangement, and time accounting is very big, account for 0.62 respectively
Hour(52.99%)With 0.4 hour(59.7%), add up to 1.02 hours;Time used in other events in operation is substantially in zone of reasonableness
It is interior.Total duration is accounted for than great for what is found out in on-site investigation, and more irrational subject matter " rope arrangement " working time
It is long, the factor for influenceing " rope arrangement " time is analyzed, is mainly manifested in following several aspects:1st, training system is endless
It is kind;2nd, without suitable tools;3rd, suitable rope is chosen not according to using length;4th, transport process and dial disorder cable rope;5th, do not locate during rope closing
Manage inertia distortion;6th, plants burst out in profusion at scene;7th, ground out-of-flatness.Confirm by inquiry, cause circuit live-line maintenance operation rope
Finishing time length seven end factors in for will because be:Disorder cable rope is dialled without being adapted to work and transport process, and from existing market
It was found that fail to find suitable existing product.
Utility model content
The purpose of this utility model is to overcome insufficient present in above-mentioned prior art rope finishing tool, there is provided a kind of
Save activity duration, folding and unfolding be convenient, rope not tangled up and knotted, it is portable, the bicyclic clip rope-settling device that warehouse suspension member uses can be done.
The technical problems to be solved in the utility model is adopted the technical scheme that:Bicyclic clip rope-settling device, including support
Frame, branch line bar, support frame as described above are in "] " shape, support frame top is arranged at intervals with nut I and nut II, the right part branch of support frame
Ring of tiing knots is provided with support face, one end of branch line bar can be movably connected in nut I or nut II, the other end connection of support bar
There is wire rope handling ring.
Further, in addition to auxiliary fixed screw, the auxiliary fixed screw can be movably connected in nut II or nut I
In.
The utility model beneficial effect:Compared with prior art, 1, the finishing time of single rope is from 25 minutes before use,
5 minutes shortened to after use, contracting is up to 80%;2nd, the circuit live-line maintenance operation time is by original average 3.4 hours, drop
Low to 2.65 hours, less than desired value 3.0 hours, cost depletions can be saved every year more than 850,000 yuan.
Brief description of the drawings
Fig. 1 is main structure diagram of the present utility model,
Fig. 2 is right side structural representation of the present utility model.
In figure, 1, wire rope handling ring 2, branch line bar 3, nut I 4, support frame 5, ring 6 of tiing knots, nut II.
Embodiment
In order that those skilled in the art more fully understand the technical solution of the utility model, combine and have below according to accompanying drawing
The utility model is described in further detail in body embodiment.
As shown in Figure 1, 2, the bicyclic clip rope-settling device, including support frame 4, branch line bar 2, support frame as described above are in "] " shape
Opening(Conveniently it is fixed on the supporters such as the band iron of operation field), support frame as described above top interval is symmetrically arranged with the He of nut I 3
Nut II 6, ring 5 of tiing knots is provided with the right part supporting surface of support frame, one end of branch line bar can be movably connected in nut I or nut
In II(When being connected with support bar in II one of nut of nut I or nut, the fixed spiral shell of auxiliary can be connected in another nut
Silk is so as to further fixing support rack), the other end of support bar is connected with wire rope handling ring 1(Wire rope handling ring can play wire rope handling, also can be
Play convenient rotation branch line bar during fixing support rack).
When using bicyclic clip rope-settling device, now support frame is clipped on the band iron or other fixtures of electric pole, then
By that in branch line bar rotating nuts I or nut II, when the rope of arrangement is heavier, auxiliary can be set to fix in another nut
Screw increases the stability of bicyclic clip rope-settling device, then one end tubercle for the rope for needing to arrange is being tied knots on ring, then
It is wound on branch line bar from coil to coil and arranges rope, finally the other end of rope is passed through and finished rope binding after wire rope handling ring, is finally led to
Overregulate branch line bar and auxiliary fixed screw again removes rope-settling device so as to subsequent handling rope.
Embodiment of above is only to illustrate the technical solution of the utility model and unrestricted, although with reference to specific embodiment
The utility model is described in detail, it will be understood by those within the art that, can be to skill of the present utility model
Art scheme is modified or equivalent substitution, without departing from the essence of technical solutions of the utility model] refreshing and scope, it all should cover
In protective scope of the claims of the present utility model.
Claims (2)
1. bicyclic clip rope-settling device, it is characterised in that:It includes support frame(4), branch line bar(2), support frame as described above is in "] " and shape,
Support frame top is arranged at intervals with nut I(3)With nut II(6), ring of tiing knots is provided with the right part supporting surface of support frame(5),
One end of branch line bar can be movably connected in nut I or nut II, and the other end of support bar is connected with wire rope handling ring(1).
2. bicyclic clip rope-settling device according to claim 1, it is characterised in that:Also include auxiliary fixed screw, it is described auxiliary
Fixed screw is helped to be movably connected in nut II or nut I.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720437897.3U CN206712332U (en) | 2017-04-25 | 2017-04-25 | Bicyclic clip rope-settling device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720437897.3U CN206712332U (en) | 2017-04-25 | 2017-04-25 | Bicyclic clip rope-settling device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206712332U true CN206712332U (en) | 2017-12-05 |
Family
ID=60457176
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720437897.3U Expired - Fee Related CN206712332U (en) | 2017-04-25 | 2017-04-25 | Bicyclic clip rope-settling device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206712332U (en) |
-
2017
- 2017-04-25 CN CN201720437897.3U patent/CN206712332U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105337221A (en) | Portable line tightening device | |
CN206712332U (en) | Bicyclic clip rope-settling device | |
CN207748631U (en) | A kind of electrician's wire barrow | |
CN208849235U (en) | A kind of distribution board convenient for cabling installation | |
CN202099009U (en) | Small electric crane | |
CN109733964B (en) | Portable earth connection containing box of transformer substation | |
CN103567922A (en) | Transformer fixture | |
CN206259254U (en) | A kind of coil winding machine coil clamp fixed jig | |
CN203624728U (en) | Steel wire winding mechanism | |
CN205076543U (en) | A line rolls kinking ware for flexible line cable | |
CN211830055U (en) | Novel service wire support | |
CN208119477U (en) | Grounding wire pole bundled device | |
CN208368947U (en) | Portable lightning protection system | |
CN111039071A (en) | Portable house line paying-off trolley and using method | |
CN208284979U (en) | A kind of electric power distribution line lightning arrester | |
CN209923585U (en) | Novel sewing machine thread frame | |
CN203361744U (en) | Stay wire manufacturing tool | |
CN207293834U (en) | A kind of low-voltage cable take-up and pay-off device | |
CN202130918U (en) | Pole type grounding wire collecting and mounting device | |
CN209532642U (en) | A kind of coil roller erecting bed | |
CN203754130U (en) | Fixed-length wire truncating device | |
CN110127434A (en) | A kind of power construction actinobacillus device | |
CN204796365U (en) | Frame is binded to grape | |
CN204741087U (en) | Fixed subassembly of earthing terminal of earth connection | |
CN204138049U (en) | A kind of can the cable reel device of rapid wiring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171205 Termination date: 20180425 |