CN206710560U - Voltage-time type logic tester - Google Patents

Voltage-time type logic tester Download PDF

Info

Publication number
CN206710560U
CN206710560U CN201720328661.6U CN201720328661U CN206710560U CN 206710560 U CN206710560 U CN 206710560U CN 201720328661 U CN201720328661 U CN 201720328661U CN 206710560 U CN206710560 U CN 206710560U
Authority
CN
China
Prior art keywords
time
relay
series
branch road
contactor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720328661.6U
Other languages
Chinese (zh)
Inventor
刘跃文
郝新星
毛军
马帅
江婷婷
李英
潘勇
王瑞玲
赵遵龙
吴峰
张云海
李燕
赵建国
张卓
亓晓国
罗建
侯文龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
Original Assignee
State Grid Corp of China SGCC
Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, Laiwu Power Supply Co of State Grid Shandong Electric Power Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN201720328661.6U priority Critical patent/CN206710560U/en
Application granted granted Critical
Publication of CN206710560U publication Critical patent/CN206710560U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The utility model discloses voltage-time type logic tester, including, distribution terminal logic testing module includes control loop, and the contactor in control loop is connected with the main output loop of contactor, and the main output loop of contactor is connected with power output end;Block switch opening time test module includes cumulative timer, and cumulative timer records switch opening time automatically;Peak switching current test module includes the current transformer being connected on distribution terminal output port, and peak switching current is measured by ammeter;Digital & analog signal subtest module includes adjustable voltage current output module and analog switch, and adjustable voltage current output module exports adjustable voltage x current, coordinates analog switch to complete remote measure and communication functional test.Voltage-time type distribution terminal logic verify, the test of block switch peak switching current, the test of block switch opening time, the test of remote measure and communication miscellaneous function can be realized.

Description

Voltage-time type logic tester
Technical field
It the utility model is related to intelligent switch logic testing technical field, more particularly to a kind of voltage-time type logic testing Instrument.
Background technology
Electrical power distribution automatization system application time is still short, and associated specifications, standard are not perfect, and equipment dependability can not Meet to require.In many hilly countries, the voltage-time type feeder line of ground mode is widely used, accounting has reached 92%, to set Standby application brings condition.
By taking certain city's distribution as an example, 2014, repeatedly there is event caused by voltage-time type distribution terminal logical action mistake Barrier scope expands, fault section judges that caused unsuccessful reclosing, switch switching current cause greatly inaccurate, switch opening velocity slowly Distribution terminal such as burns at the accident.For a long time, not for the detecting instrument of intelligent network distribution equipment, causing should be before putting into operation The equipment deficiency of elimination is exposed, and very big hidden danger is brought to distribution network operation.
Utility model content
The purpose of this utility model is exactly to solve the above problems, there is provided a kind of voltage-time type logic tester, energy Enough realize that voltage-time type distribution terminal logic verify, the test of block switch peak switching current, block switch opening time are surveyed Examination, the test of remote measure and communication miscellaneous function.
To achieve these goals, the utility model adopts the following technical scheme that:
Voltage-time type logic tester, including distribution terminal logic testing module, block switch opening time test mould Block, peak switching current test module and digital & analog signal subtest module;
The distribution terminal logic testing module includes control loop, the contactor in the control loop and contactor master Output loop is connected, and the main output loop of contactor is connected with power output end;
The block switch opening time test module includes cumulative timer, when the cumulative timer records switch separating brake automatically Between;
The peak switching current test module includes the current transformer being connected on distribution terminal output port, passes through Ammeter measures peak switching current;
The digital & analog signal subtest module includes adjustable voltage current output module and analog switch, adjustable economize on electricity Current voltage output module exports adjustable voltage x current, coordinates analog switch to complete remote measure and communication functional test.
The distribution terminal logic testing module, block switch opening time test module, peak switching current test mould Block and digital & analog signal subtest module are integrated in same portable casing;The distribution terminal logic testing module, divide Duan Kaiguan opening times test module and peak switching current test module share a power supply interface.
The control loop includes the mains side control loop and load side control loop being connected on main line, is gone here and there on main line Two air master switchs G1 and G2 are associated with, indicator lamp T0 is connected with main line;The main line includes live wire and zero line;Pass through setting The time relay realizes the accurate output of distribution terminal mains side and load side voltage pulse, so as to which analog line is in various failures The voltage change situation of distribution terminal, realizes the logic testing to distribution terminal under state
The mains side control loop includes nine branch roads being connected in parallel on live wire and zero line, and power supply is in series with a branch road Side start button QA1 and time relay sj 4;The mains side start button QA1, the time relay are in series with one branch road SJ4 normally-closed contact, trip button TA1 normally-closed contact and contactor K1;It is in series with auxiliary reclay SJ1Z's on one branch road Normally opened contact, auxiliary reclay SJ2Z normally-closed contact and the contactor K1;Time relay sj 3 is in series with one branch road Normally-closed contact and the contactor K1;Trip button TA1 normally opened contact and time relay SJ1 are in series with one branch road;One Auxiliary reclay SJ1Z normally opened contact and time relay sj 2 are in series with branch road;Auxiliary reclay is in series with one branch road SJ2Z normally opened contact and time relay sj 3;The normally opened contact of time relay sj 1 and middle relay are in series with one branch road Device SJ1Z;The normally opened contact and auxiliary reclay SJ2Z of time relay sj 2 are in series with one branch road.
The load side control loop includes nine branch roads being connected in parallel on live wire and zero line, and load is in series with a branch road Side start button QA2 and contactor K2;Contactor K2 normally opened contact is in series with one branch road, the normally closed of trip button TA2 is touched Point and the contactor K2;Be in series with one branch road auxiliary reclay SJ5Z normally opened contact, auxiliary reclay SJ6Z it is normally closed Contact and the contactor K2;The normally opened contact of time relay sj 7 and the contactor K2 are in series with one branch road;One branch road On be in series with trip button TA2 normally opened contact and time relay SJ5;The normal of auxiliary reclay SJ5Z is in series with one branch road Open contact and time relay sj 6;Auxiliary reclay SJ6Z normally opened contact and time relay sj 7 are in series with one branch road; The normally opened contact and auxiliary reclay SJ5Z of time relay sj 5 are in series with one branch road;Time relay is in series with one branch road Device SJ6 normally opened contact and auxiliary reclay SJ6Z.
The block switch opening time test module includes cumulative timer, the input connection relay J1 of the cumulative timer Normally opened contact connect relay J2 normally-closed contact simultaneously, relay J1 both ends are directly connected to 220V power supplys, relay J2 Connected with the normally-closed contact of block switch auxiliary contact and be followed by 220V power supplys.
Adjustable voltage current output module includes pressure regulator, the output end tandem tap K of the pressure regulator, slip variable resistance Device R1, slide-wire rheostat R2 and ammeter;
The analog switch includes six end points, and six end points are externally integrated into an analog switch interface, 1 and 2 end points Between connect relay J normally opened contact, 3 and 4 end points are hanging, and indicator lamp T3 and relay J are parallel between 5 and 6 end points.
The beneficial effects of the utility model:
The utility model can realize that voltage-time type distribution terminal logic verify, block switch peak switching current are surveyed Examination, the test of block switch opening time, the test of remote measure and communication miscellaneous function.
Brief description of the drawings
Fig. 1 is control loop circuit diagram;
Fig. 2 is contactor major loop figure;
Fig. 3 is power output end figure;
Fig. 4 is that delay closes timing diagram;
Fig. 5 is X time limit locking timing diagrams;
Fig. 6 is both sides voltage blocking timing diagram;
Fig. 7 is Y time limit locking timing diagrams;
Fig. 8 is block switch opening time test loop figure;
Fig. 9 is peak switching current test chart;
Figure 10 is digital & analog signal test loop figure;
Figure 11 is analog switch loop diagram;
Figure 12 is analog switch interface schema.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
Voltage-time type logic tester, including distribution terminal logic testing module, block switch opening time test mould Block, peak switching current test module and digital & analog signal subtest module;
The distribution terminal logic testing module includes control loop, the contactor in the control loop and contactor master Output loop is connected, and the main output loop of contactor is connected with power output end;
The block switch opening time test module includes cumulative timer, when the cumulative timer records switch separating brake automatically Between;
As shown in figure 9, the peak switching current test module includes the electric current being connected on distribution terminal output port Transformer, peak switching current is measured by ammeter;
The digital & analog signal subtest module includes adjustable voltage current output module and analog switch, adjustable economize on electricity Current voltage output module exports adjustable voltage x current, coordinates analog switch to complete remote measure and communication functional test.
The distribution terminal logic testing module, block switch opening time test module, peak switching current test mould Block and digital & analog signal subtest module are integrated in same portable casing;The distribution terminal logic testing module, divide Duan Kaiguan opening times test module and peak switching current test module share a power supply interface.
As shown in figure 1, the control loop includes the mains side control loop being connected on main line and load side controls back Road, two air master switchs G1 and G2 are in series with main line, indicator lamp T0 is connected with main line;The main line includes live wire and zero Line;By setting the time relay to realize the accurate output of distribution terminal mains side and load side voltage pulse, so as to artificial line The voltage change situation of road distribution terminal under various malfunctions, realizes the logic testing to distribution terminal
The mains side control loop includes nine branch roads being connected in parallel on live wire and zero line, and power supply is in series with a branch road Side start button QA1 and time relay sj 4;The mains side start button QA1, the time relay are in series with one branch road SJ4 normally-closed contact, trip button TA1 normally-closed contact and contactor K1;It is in series with auxiliary reclay SJ1Z's on one branch road Normally opened contact, auxiliary reclay SJ2Z normally-closed contact and the contactor K1;Time relay sj 3 is in series with one branch road Normally-closed contact and the contactor K1;Trip button TA1 normally opened contact and time relay SJ1 are in series with one branch road;One Auxiliary reclay SJ1Z normally opened contact and time relay sj 2 are in series with branch road;Auxiliary reclay is in series with one branch road SJ2Z normally opened contact and time relay sj 3;The normally opened contact of time relay sj 1 and middle relay are in series with one branch road Device SJ1Z;The normally opened contact and auxiliary reclay SJ2Z of time relay sj 2 are in series with one branch road.
The load side control loop includes nine branch roads being connected in parallel on live wire and zero line, and load is in series with a branch road Side start button QA2 and contactor K2;Contactor K2 normally opened contact is in series with one branch road, the normally closed of trip button TA2 is touched Point and the contactor K2;Be in series with one branch road auxiliary reclay SJ5Z normally opened contact, auxiliary reclay SJ6Z it is normally closed Contact and the contactor K2;The normally opened contact of time relay sj 7 and the contactor K2 are in series with one branch road;One branch road On be in series with trip button TA2 normally opened contact and time relay SJ5;The normal of auxiliary reclay SJ5Z is in series with one branch road Open contact and time relay sj 6;Auxiliary reclay SJ6Z normally opened contact and time relay sj 7 are in series with one branch road; The normally opened contact and auxiliary reclay SJ5Z of time relay sj 5 are in series with one branch road;Time relay is in series with one branch road Device SJ6 normally opened contact and auxiliary reclay SJ6Z.
As Figure 2-3, the main output loop of contactor includes the loop where contactor K1 and K2, contactor K1 and power supply 1,3 ports of output end are connected, and indicator lamp is also associated between 1,3 ports in the main output loop of contactor where contactor K1 2,3 ports of T1, contactor K2 and power output end connect, 2,3 ports in the main output loop of contactor where contactor K2 Between be also associated with indicator lamp T2.
As shown in figure 8, the block switch opening time test module includes cumulative timer, the input of the cumulative timer connects Contact relay J1 normally opened contact connects relay J2 normally-closed contact simultaneously, and relay J1 both ends are directly connected to 220V electricity Source, relay J2 connect with the normally-closed contact of block switch auxiliary contact and are followed by 220V power supplys.
As shown in Figure 10, adjustable voltage current output module includes pressure regulator, and the output end series connection of the pressure regulator is opened Close K, slide-wire rheostat R1, slide-wire rheostat R2 and ammeter;
As depicted in figs. 11-12, the analog switch includes six end points, and six end points are externally integrated into an analog switch Interface, relay J normally opened contact is connected between 1 and 2 end points, 3 and 4 end points are hanging, and indicator lamp is parallel between 5 and 6 end points T3 and relay J.Six end points of analog switch correspond with six end points of analog switch interface respectively.
Voltage-time type logic tester method of testing, including,
Distribution terminal logic testing is carried out, including enters line delay and closes logic testing, carry out X time limits locking test, carry out Both sides voltage blocking test, carry out Y time limits locking test;
Block switch opening time test is carried out, it is automatic to record block switch opening time value, if during block switch separating brake Between value more than transformer substation switch reclosure time, then block switch opening time is normal;
Block switch opening time is tested for testing block switch opening time, it is ensured that opening time is opened more than transformer station The reclosure time of pass.In order to avoid block switch not yet disconnects during circuit successful reclosing, trouble point is directly coincided with.Use special test The present apparatus is connected by cable with block switch, terminal, and after switch separating brake terminates, the time shown on cumulative timer is switch separating brake Time.
When carrying out logic testing using segmentation terminal logic test device, cumulative timer can record switch opening time automatically Be worth (cumulative timer operation principle, there is two groups of electric shocks, starts contact and pause contact, when starting the 2 points of connections in contact, for a long time thereon Device can be automatically into time status, and when suspending contacting, cumulative timer shows numerical value automatically into halted state, next time Meeting automatic clear restarts when restarting) (block switch auxiliary contact are switch internal indicating contacts, and switch aids in when closing position Contact is also connected, and contact is opened when switch divides position).Time is accurate to 0.01S, and the time is circuit decompression to switching auxiliary contact Time used in opening.
Peak switching current test is carried out, in block switch making process, records the maximum current during this automatically Value, if the maximum current value meets the capacity requirement of closing relay and insurance, peak switching current test is normal;Switch exists In making process, crest ammeter can record the maximum current during this automatically.
Digital & analog signal subtest is carried out, by changing the state of analog switch, the combined floodgate situation of block switch is observed, sentences The correctness of disconnected digital & analog signal function.
When entering line delay and closing logic testing, as shown in Fig. 1, Fig. 4 and Figure 11, (voltage-time type distribution is whole for segmentation terminal End) mains side has a pressure, and terminal delay closes (the specific time can voluntarily be set, and this explanation is by taking X time limits 7s as an example), and setting is " during X The time of limit test " time relay sj 4 is 5 minutes, closes " general supply " and is spaced apart G1, G2, presses " mains side startup " button QA1, block switch indicator lamp T3 is observed, if block switch time-delay closing, terminal locking lamp (terminal device carries) does not work, explanation It is normal that terminal delay closes logic.
When carrying out X time limits locking test, as shown in Fig. 1, Fig. 5 and Figure 11, terminal X time limit interior powers side dead electricity, now eventually Locking is held, caller terminal delay closes mains side again;Load side caller terminal keeps locking, and switch does not close a floodgate.
It is 5 minutes to set the time of " the X time limits tests " time relay sj 4, during " first time reclosing " time relay sj 1 Between be 2s, the time of " output time after coincidence " time relay sj 2 is 5s, the time of " second of reclosing " time relay sj 3 For 2s, turning on the power, press " mains side startup " button QA1, tester " mains side voltage " indicator lamp T1 is bright (in Fig. 2), etc. " failure generation " button TA1 is pressed after block switch combined floodgate 5s, block switch indicator lamp T3 (in Figure 11) extinguishes, by about 16s or so block switch indicator lamps brighten, and observation terminal locking lamp is changed into often bright and be changed into extinguishing from extinguishing, then X latching logics Normally.
When carrying out the test of both sides voltage blocking, as shown in figures 1 to 6, to prevent maloperation, block switch both sides are come simultaneously Terminal locking is pressed in pressure, Terminal Design both sides voltage blocking functions, both sides simultaneously, and block switch does not close a floodgate, and ensures distribution peace Row for the national games.
Start " general supply " and be spaced apart G1, G2, starting device, press " mains side startup " button QA1, and press rapidly " negative Lotus side starts " button QA2, observation segmentation terminal locking lamp is changed into Chang Liang, and block switch indicator lamp do not worked, then terminal both sides are pressed Latching logic is normal.
It is to determine whether accident, terminal meeting after switch combined floodgate as shown in Figure 1 and Figure 7 when carrying out Y time limits locking test When carrying out Y quantum clocks, if decompression in the Y time limits, terminal locking lantern festival Chang Liang, mains side carrys out electric switch again to close a floodgate, load Side carrys out electric switch and can be delayed to close.
It is 5 minutes to set the time of " the X time limits test " time relay sj 4, the time of " single shot reclosing " time relay sj 1 For 2s, the time of " output time after coincidence " time relay sj 2 is 8s, and the time of " second of reclosing " time relay sj 3 is 2s, turn on the power, press " mains side startup " button QA1, tester " mains side voltage " indicator lamp T1 is bright (in Fig. 2), decile " failure generation " button TA1 is pressed after Duan Kaiguan combined floodgates 5s, block switch indicator lamp and terminal are observed, if block switch indicator lamp It experienced point, the action process of splitting or integrating, terminal locking lamp is changed into Chang Liang from extinguishing, then is proving terminal Y time limits latching logic just Often.
It is not new to this practicality although above-mentioned specific embodiment of the present utility model is described with reference to accompanying drawing The limitation of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability Field technique personnel need not pay the various modifications that creative work can make or deformation still in protection model of the present utility model Within enclosing.

Claims (7)

1. voltage-time type logic tester, it is characterized in that, including distribution terminal logic testing module, block switch opening time Test module, peak switching current test module and digital & analog signal subtest module;
The distribution terminal logic testing module includes control loop, the contactor in the control loop and the main output of contactor Loop is connected, and the main output loop of contactor is connected with power output end;
The block switch opening time test module includes cumulative timer, and the cumulative timer records switch opening time automatically;
The peak switching current test module includes the current transformer being connected on distribution terminal output port, passes through electric current Table measures peak switching current;
The digital & analog signal subtest module includes adjustable voltage current output module and analog switch, adjustable voltage electricity Flow output module and export adjustable voltage x current, coordinate analog switch to complete remote measure and communication functional test.
2. voltage-time type logic tester as claimed in claim 1, it is characterized in that, the distribution terminal logic testing module, Block switch opening time test module, peak switching current test module and digital & analog signal subtest module are integrated in same In individual portable casing;The distribution terminal logic testing module, block switch opening time test module and combined floodgate peak value electricity Current test module shares a power supply interface.
3. voltage-time type logic tester as claimed in claim 1, it is characterized in that, the control loop includes being connected on main line On mains side control loop and load side control loop, be in series with two air master switchs G1 and G2 on main line, connect on main line It is connected to indicator lamp T0;The main line includes live wire and zero line;By setting the time relay to realize distribution terminal mains side and bearing The accurate output of lotus side voltage pulse, it is real so as to the voltage change situation of analog line distribution terminal under various malfunctions Now to the logic testing of distribution terminal.
4. voltage-time type logic tester as claimed in claim 3, it is characterized in that, the mains side control loop includes parallel connection Nine branch roads on live wire and zero line, mains side start button QA1 and time relay sj 4 are in series with a branch road;One The mains side start button QA1, the normally-closed contact of time relay sj 4, trip button TA1 normally-closed contact are in series with road And contactor K1;Be in series with one branch road auxiliary reclay SJ1Z normally opened contact, auxiliary reclay SJ2Z normally-closed contact and The contactor K1;The normally-closed contact of time relay sj 3 and the contactor K1 are in series with one branch road;Connected on one branch road There are trip button TA1 normally opened contact and time relay SJ1;Auxiliary reclay SJ1Z normally opened contact is in series with one branch road With time relay sj 2;Auxiliary reclay SJ2Z normally opened contact and time relay sj 3 are in series with one branch road;One branch road On be in series with the normally opened contact and auxiliary reclay SJ1Z of time relay sj 1;Time relay sj 2 is in series with one branch road Normally opened contact and auxiliary reclay SJ2Z.
5. voltage-time type logic tester as claimed in claim 3, it is characterized in that, the load side control loop includes parallel connection Nine branch roads on live wire and zero line, load side starting button QA2 and contactor K2 are in series with a branch road;Gone here and there on one branch road It is associated with contactor K2 normally opened contact, trip button TA2 normally-closed contact and the contactor K2;Centre is in series with one branch road Relay SJ5Z normally opened contact, auxiliary reclay SJ6Z normally-closed contact and the contactor K2;When being in series with one branch road Between relay SJ7 normally opened contact and the contactor K2;Trip button TA2 normally opened contact and time are in series with one branch road Relay SJ5;Auxiliary reclay SJ5Z normally opened contact and time relay sj 6 are in series with one branch road;Connected on one branch road There are auxiliary reclay SJ6Z normally opened contact and time relay sj 7;The normally opened of time relay sj 5 is in series with one branch road to touch Point and auxiliary reclay SJ5Z;The normally opened contact and auxiliary reclay SJ6Z of time relay sj 6 are in series with one branch road.
6. voltage-time type logic tester as claimed in claim 1, it is characterized in that, the block switch opening time tests mould Block includes cumulative timer, and the input connection relay J1 of cumulative timer normally opened contact connects the normally closed of relay J2 and touched simultaneously Point, relay J1 both ends are directly connected to 220V power supplys, after relay J2 connects with the normally-closed contact of block switch auxiliary contact Connect 220V power supplys.
7. voltage-time type logic tester as claimed in claim 1, it is characterized in that, adjustable voltage current output module includes Pressure regulator, output end tandem tap K, slide-wire rheostat R1, slide-wire rheostat R2 and the ammeter of the pressure regulator;
The analog switch includes six end points, and six end points are externally integrated into an analog switch interface, between 1 and 2 end points Relay J normally opened contact is connected, 3 and 4 end points are hanging, and indicator lamp T3 and relay J are parallel between 5 and 6 end points.
CN201720328661.6U 2017-03-30 2017-03-30 Voltage-time type logic tester Active CN206710560U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720328661.6U CN206710560U (en) 2017-03-30 2017-03-30 Voltage-time type logic tester

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720328661.6U CN206710560U (en) 2017-03-30 2017-03-30 Voltage-time type logic tester

Publications (1)

Publication Number Publication Date
CN206710560U true CN206710560U (en) 2017-12-05

Family

ID=60468366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720328661.6U Active CN206710560U (en) 2017-03-30 2017-03-30 Voltage-time type logic tester

Country Status (1)

Country Link
CN (1) CN206710560U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107064790A (en) * 2017-03-30 2017-08-18 国网山东省电力公司莱芜供电公司 Voltage-time type logic tester and method of testing

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107064790A (en) * 2017-03-30 2017-08-18 国网山东省电力公司莱芜供电公司 Voltage-time type logic tester and method of testing
CN107064790B (en) * 2017-03-30 2023-09-19 国网山东省电力公司莱芜供电公司 Voltage time type logic tester and testing method

Similar Documents

Publication Publication Date Title
CN107064790A (en) Voltage-time type logic tester and method of testing
CN203981788U (en) A kind of photovoltaic combining inverter automatic detection device
CN101853554B (en) Fireproofing pre-warning monitoring method for unmanned base station and system thereof
CN204575757U (en) Charger output characteristics automatic detection device
CN203838264U (en) Subway vehicle battery charger test bench
CN206710560U (en) Voltage-time type logic tester
CN208384025U (en) A kind of test macro of direct-current charging post
CN107450019A (en) Handcart type breaker low-voltage motion test instrument
CN203849376U (en) Breaker anti-tripping loop testing apparatus
CN206460144U (en) A kind of extra-high voltage switch intelligent device for measuring
CN107037376B (en) Storage battery pack charge-discharge current monitoring system and monitoring method
CN106556741A (en) A kind of device and method of storage battery internal resistance measurement
CN202815146U (en) Polarity detector for mutual inductor
CN205229347U (en) Haul oneself willingly into tester fully
CN201984117U (en) Capacitor group switching testing device
CN110174560B (en) Relay protection device state variable testing method
CN207008031U (en) A kind of batteries charging and discharging currents monitoring system
CN206759153U (en) A kind of backup auto-activating device for possessing self-diagnostic function
CN203396938U (en) Intelligent electric energy meter with remote calibration device
CN102305897B (en) Relay protecting exit tester
CN206450802U (en) Lithium battery automatic tester for performance
CN206038764U (en) Battery cell acquisition circuit's quiescent power dissipation detection device
CN108646177A (en) A kind of magnetic-levitation train electrical cubicle test device
CN201600421U (en) Testing device of switch protector and switch protector
CN211878138U (en) On-line monitoring device for internal resistance of storage battery of power system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant