CN206710560U - Voltage-time type logic tester - Google Patents
Voltage-time type logic tester Download PDFInfo
- Publication number
- CN206710560U CN206710560U CN201720328661.6U CN201720328661U CN206710560U CN 206710560 U CN206710560 U CN 206710560U CN 201720328661 U CN201720328661 U CN 201720328661U CN 206710560 U CN206710560 U CN 206710560U
- Authority
- CN
- China
- Prior art keywords
- time
- relay
- series
- branch road
- contactor
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012360 testing method Methods 0.000 claims abstract description 76
- 230000001186 cumulative effect Effects 0.000 claims abstract description 18
- 238000004891 communication Methods 0.000 claims abstract description 7
- 238000011990 functional testing Methods 0.000 claims abstract description 4
- 230000005611 electricity Effects 0.000 claims description 6
- 230000008859 change Effects 0.000 claims description 3
- 240000002853 Nelumbo nucifera Species 0.000 claims description 2
- 235000006508 Nelumbo nucifera Nutrition 0.000 claims description 2
- 235000006510 Nelumbo pentapetala Nutrition 0.000 claims description 2
- 230000007257 malfunction Effects 0.000 claims description 2
- 238000010586 diagram Methods 0.000 description 6
- 230000000903 blocking effect Effects 0.000 description 4
- 238000000034 method Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000011218 segmentation Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000006837 decompression Effects 0.000 description 2
- 230000004888 barrier function Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 230000003111 delayed effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000009131 signaling function Effects 0.000 description 1
- 238000010998 test method Methods 0.000 description 1
Landscapes
- Testing Electric Properties And Detecting Electric Faults (AREA)
Abstract
The utility model discloses voltage-time type logic tester, including, distribution terminal logic testing module includes control loop, and the contactor in control loop is connected with the main output loop of contactor, and the main output loop of contactor is connected with power output end;Block switch opening time test module includes cumulative timer, and cumulative timer records switch opening time automatically;Peak switching current test module includes the current transformer being connected on distribution terminal output port, and peak switching current is measured by ammeter;Digital & analog signal subtest module includes adjustable voltage current output module and analog switch, and adjustable voltage current output module exports adjustable voltage x current, coordinates analog switch to complete remote measure and communication functional test.Voltage-time type distribution terminal logic verify, the test of block switch peak switching current, the test of block switch opening time, the test of remote measure and communication miscellaneous function can be realized.
Description
Technical field
It the utility model is related to intelligent switch logic testing technical field, more particularly to a kind of voltage-time type logic testing
Instrument.
Background technology
Electrical power distribution automatization system application time is still short, and associated specifications, standard are not perfect, and equipment dependability can not
Meet to require.In many hilly countries, the voltage-time type feeder line of ground mode is widely used, accounting has reached 92%, to set
Standby application brings condition.
By taking certain city's distribution as an example, 2014, repeatedly there is event caused by voltage-time type distribution terminal logical action mistake
Barrier scope expands, fault section judges that caused unsuccessful reclosing, switch switching current cause greatly inaccurate, switch opening velocity slowly
Distribution terminal such as burns at the accident.For a long time, not for the detecting instrument of intelligent network distribution equipment, causing should be before putting into operation
The equipment deficiency of elimination is exposed, and very big hidden danger is brought to distribution network operation.
Utility model content
The purpose of this utility model is exactly to solve the above problems, there is provided a kind of voltage-time type logic tester, energy
Enough realize that voltage-time type distribution terminal logic verify, the test of block switch peak switching current, block switch opening time are surveyed
Examination, the test of remote measure and communication miscellaneous function.
To achieve these goals, the utility model adopts the following technical scheme that:
Voltage-time type logic tester, including distribution terminal logic testing module, block switch opening time test mould
Block, peak switching current test module and digital & analog signal subtest module;
The distribution terminal logic testing module includes control loop, the contactor in the control loop and contactor master
Output loop is connected, and the main output loop of contactor is connected with power output end;
The block switch opening time test module includes cumulative timer, when the cumulative timer records switch separating brake automatically
Between;
The peak switching current test module includes the current transformer being connected on distribution terminal output port, passes through
Ammeter measures peak switching current;
The digital & analog signal subtest module includes adjustable voltage current output module and analog switch, adjustable economize on electricity
Current voltage output module exports adjustable voltage x current, coordinates analog switch to complete remote measure and communication functional test.
The distribution terminal logic testing module, block switch opening time test module, peak switching current test mould
Block and digital & analog signal subtest module are integrated in same portable casing;The distribution terminal logic testing module, divide
Duan Kaiguan opening times test module and peak switching current test module share a power supply interface.
The control loop includes the mains side control loop and load side control loop being connected on main line, is gone here and there on main line
Two air master switchs G1 and G2 are associated with, indicator lamp T0 is connected with main line;The main line includes live wire and zero line;Pass through setting
The time relay realizes the accurate output of distribution terminal mains side and load side voltage pulse, so as to which analog line is in various failures
The voltage change situation of distribution terminal, realizes the logic testing to distribution terminal under state
The mains side control loop includes nine branch roads being connected in parallel on live wire and zero line, and power supply is in series with a branch road
Side start button QA1 and time relay sj 4;The mains side start button QA1, the time relay are in series with one branch road
SJ4 normally-closed contact, trip button TA1 normally-closed contact and contactor K1;It is in series with auxiliary reclay SJ1Z's on one branch road
Normally opened contact, auxiliary reclay SJ2Z normally-closed contact and the contactor K1;Time relay sj 3 is in series with one branch road
Normally-closed contact and the contactor K1;Trip button TA1 normally opened contact and time relay SJ1 are in series with one branch road;One
Auxiliary reclay SJ1Z normally opened contact and time relay sj 2 are in series with branch road;Auxiliary reclay is in series with one branch road
SJ2Z normally opened contact and time relay sj 3;The normally opened contact of time relay sj 1 and middle relay are in series with one branch road
Device SJ1Z;The normally opened contact and auxiliary reclay SJ2Z of time relay sj 2 are in series with one branch road.
The load side control loop includes nine branch roads being connected in parallel on live wire and zero line, and load is in series with a branch road
Side start button QA2 and contactor K2;Contactor K2 normally opened contact is in series with one branch road, the normally closed of trip button TA2 is touched
Point and the contactor K2;Be in series with one branch road auxiliary reclay SJ5Z normally opened contact, auxiliary reclay SJ6Z it is normally closed
Contact and the contactor K2;The normally opened contact of time relay sj 7 and the contactor K2 are in series with one branch road;One branch road
On be in series with trip button TA2 normally opened contact and time relay SJ5;The normal of auxiliary reclay SJ5Z is in series with one branch road
Open contact and time relay sj 6;Auxiliary reclay SJ6Z normally opened contact and time relay sj 7 are in series with one branch road;
The normally opened contact and auxiliary reclay SJ5Z of time relay sj 5 are in series with one branch road;Time relay is in series with one branch road
Device SJ6 normally opened contact and auxiliary reclay SJ6Z.
The block switch opening time test module includes cumulative timer, the input connection relay J1 of the cumulative timer
Normally opened contact connect relay J2 normally-closed contact simultaneously, relay J1 both ends are directly connected to 220V power supplys, relay J2
Connected with the normally-closed contact of block switch auxiliary contact and be followed by 220V power supplys.
Adjustable voltage current output module includes pressure regulator, the output end tandem tap K of the pressure regulator, slip variable resistance
Device R1, slide-wire rheostat R2 and ammeter;
The analog switch includes six end points, and six end points are externally integrated into an analog switch interface, 1 and 2 end points
Between connect relay J normally opened contact, 3 and 4 end points are hanging, and indicator lamp T3 and relay J are parallel between 5 and 6 end points.
The beneficial effects of the utility model:
The utility model can realize that voltage-time type distribution terminal logic verify, block switch peak switching current are surveyed
Examination, the test of block switch opening time, the test of remote measure and communication miscellaneous function.
Brief description of the drawings
Fig. 1 is control loop circuit diagram;
Fig. 2 is contactor major loop figure;
Fig. 3 is power output end figure;
Fig. 4 is that delay closes timing diagram;
Fig. 5 is X time limit locking timing diagrams;
Fig. 6 is both sides voltage blocking timing diagram;
Fig. 7 is Y time limit locking timing diagrams;
Fig. 8 is block switch opening time test loop figure;
Fig. 9 is peak switching current test chart;
Figure 10 is digital & analog signal test loop figure;
Figure 11 is analog switch loop diagram;
Figure 12 is analog switch interface schema.
Embodiment
The utility model is described in further detail with embodiment below in conjunction with the accompanying drawings.
Voltage-time type logic tester, including distribution terminal logic testing module, block switch opening time test mould
Block, peak switching current test module and digital & analog signal subtest module;
The distribution terminal logic testing module includes control loop, the contactor in the control loop and contactor master
Output loop is connected, and the main output loop of contactor is connected with power output end;
The block switch opening time test module includes cumulative timer, when the cumulative timer records switch separating brake automatically
Between;
As shown in figure 9, the peak switching current test module includes the electric current being connected on distribution terminal output port
Transformer, peak switching current is measured by ammeter;
The digital & analog signal subtest module includes adjustable voltage current output module and analog switch, adjustable economize on electricity
Current voltage output module exports adjustable voltage x current, coordinates analog switch to complete remote measure and communication functional test.
The distribution terminal logic testing module, block switch opening time test module, peak switching current test mould
Block and digital & analog signal subtest module are integrated in same portable casing;The distribution terminal logic testing module, divide
Duan Kaiguan opening times test module and peak switching current test module share a power supply interface.
As shown in figure 1, the control loop includes the mains side control loop being connected on main line and load side controls back
Road, two air master switchs G1 and G2 are in series with main line, indicator lamp T0 is connected with main line;The main line includes live wire and zero
Line;By setting the time relay to realize the accurate output of distribution terminal mains side and load side voltage pulse, so as to artificial line
The voltage change situation of road distribution terminal under various malfunctions, realizes the logic testing to distribution terminal
The mains side control loop includes nine branch roads being connected in parallel on live wire and zero line, and power supply is in series with a branch road
Side start button QA1 and time relay sj 4;The mains side start button QA1, the time relay are in series with one branch road
SJ4 normally-closed contact, trip button TA1 normally-closed contact and contactor K1;It is in series with auxiliary reclay SJ1Z's on one branch road
Normally opened contact, auxiliary reclay SJ2Z normally-closed contact and the contactor K1;Time relay sj 3 is in series with one branch road
Normally-closed contact and the contactor K1;Trip button TA1 normally opened contact and time relay SJ1 are in series with one branch road;One
Auxiliary reclay SJ1Z normally opened contact and time relay sj 2 are in series with branch road;Auxiliary reclay is in series with one branch road
SJ2Z normally opened contact and time relay sj 3;The normally opened contact of time relay sj 1 and middle relay are in series with one branch road
Device SJ1Z;The normally opened contact and auxiliary reclay SJ2Z of time relay sj 2 are in series with one branch road.
The load side control loop includes nine branch roads being connected in parallel on live wire and zero line, and load is in series with a branch road
Side start button QA2 and contactor K2;Contactor K2 normally opened contact is in series with one branch road, the normally closed of trip button TA2 is touched
Point and the contactor K2;Be in series with one branch road auxiliary reclay SJ5Z normally opened contact, auxiliary reclay SJ6Z it is normally closed
Contact and the contactor K2;The normally opened contact of time relay sj 7 and the contactor K2 are in series with one branch road;One branch road
On be in series with trip button TA2 normally opened contact and time relay SJ5;The normal of auxiliary reclay SJ5Z is in series with one branch road
Open contact and time relay sj 6;Auxiliary reclay SJ6Z normally opened contact and time relay sj 7 are in series with one branch road;
The normally opened contact and auxiliary reclay SJ5Z of time relay sj 5 are in series with one branch road;Time relay is in series with one branch road
Device SJ6 normally opened contact and auxiliary reclay SJ6Z.
As Figure 2-3, the main output loop of contactor includes the loop where contactor K1 and K2, contactor K1 and power supply
1,3 ports of output end are connected, and indicator lamp is also associated between 1,3 ports in the main output loop of contactor where contactor K1
2,3 ports of T1, contactor K2 and power output end connect, 2,3 ports in the main output loop of contactor where contactor K2
Between be also associated with indicator lamp T2.
As shown in figure 8, the block switch opening time test module includes cumulative timer, the input of the cumulative timer connects
Contact relay J1 normally opened contact connects relay J2 normally-closed contact simultaneously, and relay J1 both ends are directly connected to 220V electricity
Source, relay J2 connect with the normally-closed contact of block switch auxiliary contact and are followed by 220V power supplys.
As shown in Figure 10, adjustable voltage current output module includes pressure regulator, and the output end series connection of the pressure regulator is opened
Close K, slide-wire rheostat R1, slide-wire rheostat R2 and ammeter;
As depicted in figs. 11-12, the analog switch includes six end points, and six end points are externally integrated into an analog switch
Interface, relay J normally opened contact is connected between 1 and 2 end points, 3 and 4 end points are hanging, and indicator lamp is parallel between 5 and 6 end points
T3 and relay J.Six end points of analog switch correspond with six end points of analog switch interface respectively.
Voltage-time type logic tester method of testing, including,
Distribution terminal logic testing is carried out, including enters line delay and closes logic testing, carry out X time limits locking test, carry out
Both sides voltage blocking test, carry out Y time limits locking test;
Block switch opening time test is carried out, it is automatic to record block switch opening time value, if during block switch separating brake
Between value more than transformer substation switch reclosure time, then block switch opening time is normal;
Block switch opening time is tested for testing block switch opening time, it is ensured that opening time is opened more than transformer station
The reclosure time of pass.In order to avoid block switch not yet disconnects during circuit successful reclosing, trouble point is directly coincided with.Use special test
The present apparatus is connected by cable with block switch, terminal, and after switch separating brake terminates, the time shown on cumulative timer is switch separating brake
Time.
When carrying out logic testing using segmentation terminal logic test device, cumulative timer can record switch opening time automatically
Be worth (cumulative timer operation principle, there is two groups of electric shocks, starts contact and pause contact, when starting the 2 points of connections in contact, for a long time thereon
Device can be automatically into time status, and when suspending contacting, cumulative timer shows numerical value automatically into halted state, next time
Meeting automatic clear restarts when restarting) (block switch auxiliary contact are switch internal indicating contacts, and switch aids in when closing position
Contact is also connected, and contact is opened when switch divides position).Time is accurate to 0.01S, and the time is circuit decompression to switching auxiliary contact
Time used in opening.
Peak switching current test is carried out, in block switch making process, records the maximum current during this automatically
Value, if the maximum current value meets the capacity requirement of closing relay and insurance, peak switching current test is normal;Switch exists
In making process, crest ammeter can record the maximum current during this automatically.
Digital & analog signal subtest is carried out, by changing the state of analog switch, the combined floodgate situation of block switch is observed, sentences
The correctness of disconnected digital & analog signal function.
When entering line delay and closing logic testing, as shown in Fig. 1, Fig. 4 and Figure 11, (voltage-time type distribution is whole for segmentation terminal
End) mains side has a pressure, and terminal delay closes (the specific time can voluntarily be set, and this explanation is by taking X time limits 7s as an example), and setting is " during X
The time of limit test " time relay sj 4 is 5 minutes, closes " general supply " and is spaced apart G1, G2, presses " mains side startup " button
QA1, block switch indicator lamp T3 is observed, if block switch time-delay closing, terminal locking lamp (terminal device carries) does not work, explanation
It is normal that terminal delay closes logic.
When carrying out X time limits locking test, as shown in Fig. 1, Fig. 5 and Figure 11, terminal X time limit interior powers side dead electricity, now eventually
Locking is held, caller terminal delay closes mains side again;Load side caller terminal keeps locking, and switch does not close a floodgate.
It is 5 minutes to set the time of " the X time limits tests " time relay sj 4, during " first time reclosing " time relay sj 1
Between be 2s, the time of " output time after coincidence " time relay sj 2 is 5s, the time of " second of reclosing " time relay sj 3
For 2s, turning on the power, press " mains side startup " button QA1, tester " mains side voltage " indicator lamp T1 is bright (in Fig. 2), etc.
" failure generation " button TA1 is pressed after block switch combined floodgate 5s, block switch indicator lamp T3 (in Figure 11) extinguishes, by about
16s or so block switch indicator lamps brighten, and observation terminal locking lamp is changed into often bright and be changed into extinguishing from extinguishing, then X latching logics
Normally.
When carrying out the test of both sides voltage blocking, as shown in figures 1 to 6, to prevent maloperation, block switch both sides are come simultaneously
Terminal locking is pressed in pressure, Terminal Design both sides voltage blocking functions, both sides simultaneously, and block switch does not close a floodgate, and ensures distribution peace
Row for the national games.
Start " general supply " and be spaced apart G1, G2, starting device, press " mains side startup " button QA1, and press rapidly " negative
Lotus side starts " button QA2, observation segmentation terminal locking lamp is changed into Chang Liang, and block switch indicator lamp do not worked, then terminal both sides are pressed
Latching logic is normal.
It is to determine whether accident, terminal meeting after switch combined floodgate as shown in Figure 1 and Figure 7 when carrying out Y time limits locking test
When carrying out Y quantum clocks, if decompression in the Y time limits, terminal locking lantern festival Chang Liang, mains side carrys out electric switch again to close a floodgate, load
Side carrys out electric switch and can be delayed to close.
It is 5 minutes to set the time of " the X time limits test " time relay sj 4, the time of " single shot reclosing " time relay sj 1
For 2s, the time of " output time after coincidence " time relay sj 2 is 8s, and the time of " second of reclosing " time relay sj 3 is
2s, turn on the power, press " mains side startup " button QA1, tester " mains side voltage " indicator lamp T1 is bright (in Fig. 2), decile
" failure generation " button TA1 is pressed after Duan Kaiguan combined floodgates 5s, block switch indicator lamp and terminal are observed, if block switch indicator lamp
It experienced point, the action process of splitting or integrating, terminal locking lamp is changed into Chang Liang from extinguishing, then is proving terminal Y time limits latching logic just
Often.
It is not new to this practicality although above-mentioned specific embodiment of the present utility model is described with reference to accompanying drawing
The limitation of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability
Field technique personnel need not pay the various modifications that creative work can make or deformation still in protection model of the present utility model
Within enclosing.
Claims (7)
1. voltage-time type logic tester, it is characterized in that, including distribution terminal logic testing module, block switch opening time
Test module, peak switching current test module and digital & analog signal subtest module;
The distribution terminal logic testing module includes control loop, the contactor in the control loop and the main output of contactor
Loop is connected, and the main output loop of contactor is connected with power output end;
The block switch opening time test module includes cumulative timer, and the cumulative timer records switch opening time automatically;
The peak switching current test module includes the current transformer being connected on distribution terminal output port, passes through electric current
Table measures peak switching current;
The digital & analog signal subtest module includes adjustable voltage current output module and analog switch, adjustable voltage electricity
Flow output module and export adjustable voltage x current, coordinate analog switch to complete remote measure and communication functional test.
2. voltage-time type logic tester as claimed in claim 1, it is characterized in that, the distribution terminal logic testing module,
Block switch opening time test module, peak switching current test module and digital & analog signal subtest module are integrated in same
In individual portable casing;The distribution terminal logic testing module, block switch opening time test module and combined floodgate peak value electricity
Current test module shares a power supply interface.
3. voltage-time type logic tester as claimed in claim 1, it is characterized in that, the control loop includes being connected on main line
On mains side control loop and load side control loop, be in series with two air master switchs G1 and G2 on main line, connect on main line
It is connected to indicator lamp T0;The main line includes live wire and zero line;By setting the time relay to realize distribution terminal mains side and bearing
The accurate output of lotus side voltage pulse, it is real so as to the voltage change situation of analog line distribution terminal under various malfunctions
Now to the logic testing of distribution terminal.
4. voltage-time type logic tester as claimed in claim 3, it is characterized in that, the mains side control loop includes parallel connection
Nine branch roads on live wire and zero line, mains side start button QA1 and time relay sj 4 are in series with a branch road;One
The mains side start button QA1, the normally-closed contact of time relay sj 4, trip button TA1 normally-closed contact are in series with road
And contactor K1;Be in series with one branch road auxiliary reclay SJ1Z normally opened contact, auxiliary reclay SJ2Z normally-closed contact and
The contactor K1;The normally-closed contact of time relay sj 3 and the contactor K1 are in series with one branch road;Connected on one branch road
There are trip button TA1 normally opened contact and time relay SJ1;Auxiliary reclay SJ1Z normally opened contact is in series with one branch road
With time relay sj 2;Auxiliary reclay SJ2Z normally opened contact and time relay sj 3 are in series with one branch road;One branch road
On be in series with the normally opened contact and auxiliary reclay SJ1Z of time relay sj 1;Time relay sj 2 is in series with one branch road
Normally opened contact and auxiliary reclay SJ2Z.
5. voltage-time type logic tester as claimed in claim 3, it is characterized in that, the load side control loop includes parallel connection
Nine branch roads on live wire and zero line, load side starting button QA2 and contactor K2 are in series with a branch road;Gone here and there on one branch road
It is associated with contactor K2 normally opened contact, trip button TA2 normally-closed contact and the contactor K2;Centre is in series with one branch road
Relay SJ5Z normally opened contact, auxiliary reclay SJ6Z normally-closed contact and the contactor K2;When being in series with one branch road
Between relay SJ7 normally opened contact and the contactor K2;Trip button TA2 normally opened contact and time are in series with one branch road
Relay SJ5;Auxiliary reclay SJ5Z normally opened contact and time relay sj 6 are in series with one branch road;Connected on one branch road
There are auxiliary reclay SJ6Z normally opened contact and time relay sj 7;The normally opened of time relay sj 5 is in series with one branch road to touch
Point and auxiliary reclay SJ5Z;The normally opened contact and auxiliary reclay SJ6Z of time relay sj 6 are in series with one branch road.
6. voltage-time type logic tester as claimed in claim 1, it is characterized in that, the block switch opening time tests mould
Block includes cumulative timer, and the input connection relay J1 of cumulative timer normally opened contact connects the normally closed of relay J2 and touched simultaneously
Point, relay J1 both ends are directly connected to 220V power supplys, after relay J2 connects with the normally-closed contact of block switch auxiliary contact
Connect 220V power supplys.
7. voltage-time type logic tester as claimed in claim 1, it is characterized in that, adjustable voltage current output module includes
Pressure regulator, output end tandem tap K, slide-wire rheostat R1, slide-wire rheostat R2 and the ammeter of the pressure regulator;
The analog switch includes six end points, and six end points are externally integrated into an analog switch interface, between 1 and 2 end points
Relay J normally opened contact is connected, 3 and 4 end points are hanging, and indicator lamp T3 and relay J are parallel between 5 and 6 end points.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720328661.6U CN206710560U (en) | 2017-03-30 | 2017-03-30 | Voltage-time type logic tester |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720328661.6U CN206710560U (en) | 2017-03-30 | 2017-03-30 | Voltage-time type logic tester |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206710560U true CN206710560U (en) | 2017-12-05 |
Family
ID=60468366
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720328661.6U Active CN206710560U (en) | 2017-03-30 | 2017-03-30 | Voltage-time type logic tester |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206710560U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107064790A (en) * | 2017-03-30 | 2017-08-18 | 国网山东省电力公司莱芜供电公司 | Voltage-time type logic tester and method of testing |
-
2017
- 2017-03-30 CN CN201720328661.6U patent/CN206710560U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107064790A (en) * | 2017-03-30 | 2017-08-18 | 国网山东省电力公司莱芜供电公司 | Voltage-time type logic tester and method of testing |
CN107064790B (en) * | 2017-03-30 | 2023-09-19 | 国网山东省电力公司莱芜供电公司 | Voltage time type logic tester and testing method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107064790A (en) | Voltage-time type logic tester and method of testing | |
CN203981788U (en) | A kind of photovoltaic combining inverter automatic detection device | |
CN101853554B (en) | Fireproofing pre-warning monitoring method for unmanned base station and system thereof | |
CN204575757U (en) | Charger output characteristics automatic detection device | |
CN203838264U (en) | Subway vehicle battery charger test bench | |
CN206710560U (en) | Voltage-time type logic tester | |
CN208384025U (en) | A kind of test macro of direct-current charging post | |
CN107450019A (en) | Handcart type breaker low-voltage motion test instrument | |
CN203849376U (en) | Breaker anti-tripping loop testing apparatus | |
CN206460144U (en) | A kind of extra-high voltage switch intelligent device for measuring | |
CN107037376B (en) | Storage battery pack charge-discharge current monitoring system and monitoring method | |
CN106556741A (en) | A kind of device and method of storage battery internal resistance measurement | |
CN202815146U (en) | Polarity detector for mutual inductor | |
CN205229347U (en) | Haul oneself willingly into tester fully | |
CN201984117U (en) | Capacitor group switching testing device | |
CN110174560B (en) | Relay protection device state variable testing method | |
CN207008031U (en) | A kind of batteries charging and discharging currents monitoring system | |
CN206759153U (en) | A kind of backup auto-activating device for possessing self-diagnostic function | |
CN203396938U (en) | Intelligent electric energy meter with remote calibration device | |
CN102305897B (en) | Relay protecting exit tester | |
CN206450802U (en) | Lithium battery automatic tester for performance | |
CN206038764U (en) | Battery cell acquisition circuit's quiescent power dissipation detection device | |
CN108646177A (en) | A kind of magnetic-levitation train electrical cubicle test device | |
CN201600421U (en) | Testing device of switch protector and switch protector | |
CN211878138U (en) | On-line monitoring device for internal resistance of storage battery of power system |