Prior art keywords
ramp
partition wall
top plate
underground garage
cement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720467371.XU
Other languages
Chinese (zh)
Inventor
李树凤
刘振
邢小燕
陈淑敏
王成伟
孙海青
高海涛
孟曼曼
王建东
金宗山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gaochuang Industrial Co ltd
Original Assignee
Hi Tech Construction Ltd By Share Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hi Tech Construction Ltd By Share Ltd filed Critical Hi Tech Construction Ltd By Share Ltd
Priority to CN201720467371.XU priority Critical patent/CN206707150U/en
Application granted granted Critical
Publication of CN206707150U publication Critical patent/CN206707150U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model belongs to garage ramp field, and in particular to a kind of underground garage ramp.Including ground, bottom plate is provided with above ground, the first partition wall is provided with bottom plate, second partition wall, 3rd partition wall, 4th partition wall and the 5th partition wall, 3rd partition wall, 4th partition wall forms fire cistern with ramp top plate, 4th partition wall, 5th partition wall forms fire water pump chamber with ramp top plate, ramp top plate is made up of hang plate and level board, cement air entrained concrete fragment is filled with above level board and on the outside of the first partition wall, cement air entrained concrete fragment is collectively forming basic ramp with hang plate, basic ramp includes the first ramp, second ramp and the 3rd ramp, the gradient in the second ramp is more than first, the gradient in the 3rd ramp, anti-skidding sawtooth is provided with above the cement sand bed in the second ramp.Because anti-skidding sawtooth adds the frictional force between wheel of the bus and ramp, skid resistance is strong, good antiskid effect.

Description

Underground garage ramp
Technical field
The utility model belongs to garage ramp field, and in particular to a kind of underground garage ramp.
Background technology
As the improvement of people's living standards, there is higher requirement to quality of life, increasing people is in order to go on a journey It is convenient, buying car is all selected, but city space is few, an inch of land is an inch of gold, especially the center in city, the quantity of parking stall far can not reach To demand.There are Large Underground garage or floor garage parking, garage disengaging in the place such as Modern Residence, shopping centre and transport hub Mouth typically has ramp.As the ramp of underground garage connection ground, its quality directly affects the use of this underground garage The safety of effect and vehicles while passing.
The content of the invention
The purpose of this utility model provides a kind of underground garage ramp, and rational in infrastructure simple, skid resistance is strong, building cost It is relatively low, durable, good antiskid effect.
The purpose of this utility model is realized in the following manner:Underground garage ramp, including ground, ground top are set Have bottom plate, be provided with the first partition wall, the second partition wall, the 3rd partition wall, the 4th partition wall and the 5th partition wall on the bottom plate, first every Wall, the second partition wall and ramp top plate formation confined space, the second partition wall, the 3rd partition wall and ramp top plate formation exhaust air box, the 3rd Partition wall, the 4th partition wall and ramp top plate form fire cistern, and the 4th partition wall, the 5th partition wall and ramp top plate form fire pump Room, ramp top plate are made up of hang plate and level board, and cement air entrained concrete is filled with above level board and on the outside of the first partition wall Fragment, cement air entrained concrete fragment are collectively forming basic ramp with hang plate, lay pea gravel concreten layer on basic ramp, carefully Being set above stone concrete layer and be equipped with cement sand bed, basic ramp includes the first ramp, the second ramp and the 3rd ramp, the The gradient in two ramps is more than the gradient in the first, the 3rd ramp, and anti-skidding sawtooth is provided with above the cement sand bed in the second ramp.
The fire cistern bottom is provided with pick trough.
The depth of the anti-skidding sawtooth is 6~8mm, and width is 50~100mm.
Gutter is respectively arranged with the outside of first ramp and on the outside of the 3rd ramp.
The exhaust air box bottom and fire water pump chamber bottom are separately filled with concrete cushion.
The thickness of the pea gravel concreten layer is not less than 20mm.
The beneficial effects of the utility model are:Because anti-skidding sawtooth adds the frictional force between wheel of the bus and ramp, Skid resistance is strong, good antiskid effect, and the structures such as fire cistern, fire water pump chamber are set below ramp, saves space, structure letter Single and reasonable in design, input construction cost is relatively low, and construction equipment used is few.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the mplifying structure schematic diagram at A in Fig. 1.
Embodiment
As shown in Figure 1 and Figure 2, underground garage ramp, including ground 16, the top of ground 16 are provided with bottom plate 14, the bottom plate Be provided with the first partition wall 4, the second partition wall 7, the 3rd partition wall 8, the 4th partition wall 9 and the 5th partition wall 5 on 14, the first partition wall 4, second every Wall 7 and ramp top plate form confined space 15, and the second partition wall 7, the 3rd partition wall 8 and ramp top plate form exhaust air box 13, the 3rd every Wall 8, the 4th partition wall 9 and ramp top plate form fire cistern 12, and the bottom of fire cistern 12 is provided with pick trough 11, the 4th partition wall 9, 5th partition wall 5 forms fire water pump chamber 10 with ramp top plate, and the bottom of exhaust air box 13 and the bottom of fire water pump chamber 10 are separately filled with Concrete cushion 3, ramp top plate are made up of hang plate 17 and level board 18, and the top of level board 18 and the outside of the first partition wall 4 are filled There is cement air entrained concrete fragment 2, cement air entrained concrete fragment 2 is collectively forming basic ramp, basic ramp with hang plate 17 Upper laying pea gravel concreten layer 19, the thickness of pea gravel concreten layer 19 are not less than 20mm, and the top of pea gravel concreten layer 19 sets paving Provided with cement sand bed 20, basic ramp includes the first ramp 24, the second ramp 23 and the 3rd ramp 22, the slope in the second ramp 23 Degree is more than the gradient in the first, the 3rd ramp, and the outside of the first ramp 24 and the outside of the 3rd ramp 22 are respectively arranged with gutter 1, the Be provided with anti-skidding sawtooth 21 above the cement sand bed in two ramps, the depth of anti-skidding sawtooth 21 be 6~8mm, width for 50~ 100mm。

Claims (6)

1. underground garage ramp, including ground, ground top is provided with bottom plate, it is characterised in that:Is provided with the bottom plate One partition wall, the second partition wall, the 3rd partition wall, the 4th partition wall and the 5th partition wall, the first partition wall, the second partition wall and ramp top plate form close Space is closed, the second partition wall, the 3rd partition wall and ramp top plate form exhaust air box, and the 3rd partition wall, the 4th partition wall and ramp top plate are formed Fire cistern, the 4th partition wall, the 5th partition wall and ramp top plate form fire water pump chamber, and ramp top plate has hang plate and level board group Into above level board and the first partition wall outside is filled with cement air entrained concrete fragment, and cement air entrained concrete fragment is with tilting Plate is collectively forming basic ramp, and pea gravel concreten layer is laid on basic ramp, is set above pea gravel concreten layer and is equipped with cement Screed, basic ramp include the first ramp, the second ramp and the 3rd ramp, and the gradient in the second ramp is more than the first, the 3rd slope The gradient in road, the cement sand bed top in the second ramp are provided with anti-skidding sawtooth.
2. underground garage ramp according to claim 1, it is characterised in that:The fire cistern bottom is provided with water suction Groove.
3. underground garage ramp according to claim 1, it is characterised in that:The depth of the anti-skidding sawtooth is 6~8mm, Width is 50~100mm.
4. underground garage ramp according to claim 1, it is characterised in that:On the outside of first ramp and outside the 3rd ramp Side is respectively arranged with gutter.
5. underground garage ramp according to claim 1, it is characterised in that:The exhaust air box bottom and fire water pump chamber bottom Portion is separately filled with concrete cushion.
6. underground garage ramp according to claim 1, it is characterised in that:The thickness of the pea gravel concreten layer is not less than 20mm。
CN201720467371.XU 2017-04-28 2017-04-28 Underground garage ramp Expired - Fee Related CN206707150U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720467371.XU CN206707150U (en) 2017-04-28 2017-04-28 Underground garage ramp

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720467371.XU CN206707150U (en) 2017-04-28 2017-04-28 Underground garage ramp

Publications (1)

Publication Number Publication Date
CN206707150U true CN206707150U (en) 2017-12-05

Family

ID=60457745

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720467371.XU Expired - Fee Related CN206707150U (en) 2017-04-28 2017-04-28 Underground garage ramp

Country Status (1)

Country Link
CN (1) CN206707150U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424648A (en) * 2019-07-29 2019-11-08 中国十七冶集团有限公司 Ramp entrance and the construction method for extending pipeline connector
CN110777950A (en) * 2019-10-14 2020-02-11 中国十七冶集团有限公司 Construction method for blocking entrance and exit of automobile ramp of basement
CN112962882A (en) * 2021-01-29 2021-06-15 北京万兴建筑集团有限公司 Construction method for preventing slope way of disabled people outside residential building from sinking in building engineering
CN113123541A (en) * 2021-03-28 2021-07-16 杭州顿硕信息科技有限公司 Garage ramp anti-skid device based on artificial intelligence
CN115030221A (en) * 2022-07-29 2022-09-09 中国二十二冶集团有限公司 Construction method for preventing water seepage of slope surface of automobile ramp in underground garage of building

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110424648A (en) * 2019-07-29 2019-11-08 中国十七冶集团有限公司 Ramp entrance and the construction method for extending pipeline connector
CN110777950A (en) * 2019-10-14 2020-02-11 中国十七冶集团有限公司 Construction method for blocking entrance and exit of automobile ramp of basement
CN112962882A (en) * 2021-01-29 2021-06-15 北京万兴建筑集团有限公司 Construction method for preventing slope way of disabled people outside residential building from sinking in building engineering
CN113123541A (en) * 2021-03-28 2021-07-16 杭州顿硕信息科技有限公司 Garage ramp anti-skid device based on artificial intelligence
CN115030221A (en) * 2022-07-29 2022-09-09 中国二十二冶集团有限公司 Construction method for preventing water seepage of slope surface of automobile ramp in underground garage of building

Similar Documents

Publication Publication Date Title
CN206707150U (en) Underground garage ramp
CN205443840U (en) Car lane permeable pavement structure
CN108049278A (en) The paving structure and its method for paving of a kind of permeable pavement structure
CN104947566A (en) Assembled grade crossing
CN105421189B (en) Road structure with permeable barricade
CN203256560U (en) Hollow floor tile
CN1644799A (en) Porous brickwalk laying method
CN203403343U (en) Car ramp anti-skid structure for underground garage
CN206902495U (en) A kind of drainage pavement paving structure
CN207362621U (en) Complex layered anti-skid surface structure
CN205134501U (en) Prefabricated ground in bathroom
CN205443843U (en) Epoxy wrinkle type antiskid terrace
CN206784095U (en) A kind of town and country gardens anti-slip type water-permeable brick
CN203188083U (en) Anti-sliding tunnel pavement
CN203096547U (en) Pervious concrete floor structure
CN202989722U (en) Permeable road kerb
CN106758678A (en) Multifunctional permeable water storage brick
CN205329470U (en) Sponge body -building place
CN106049227B (en) A kind of road side stone and its laying method
CN207210889U (en) A kind of double-decker water-permeable brick
CN205839502U (en) A kind of permeable road structure
CN205062603U (en) Road surface structure suitable for residence community
CN205368951U (en) Sponge garden way
CN110924263A (en) Water-permeable ecological brick fixing device and laying method
CN205077351U (en) Road surface is laid to wear -resisting ceramic tile

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee after: Gaochuang Industrial Co.,Ltd.

Address before: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan.

Patentee before: GAOCHUANG CONSTRUCTION Corp.,Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171205