CN206707150U - Underground garage ramp - Google Patents
Underground garage ramp Download PDFInfo
- Publication number
- CN206707150U CN206707150U CN201720467371.XU CN201720467371U CN206707150U CN 206707150 U CN206707150 U CN 206707150U CN 201720467371 U CN201720467371 U CN 201720467371U CN 206707150 U CN206707150 U CN 206707150U
- Authority
- CN
- China
- Prior art keywords
- ramp
- partition wall
- top plate
- underground garage
- cement
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000005192 partition Methods 0.000 claims abstract description 49
- 239000004568 cement Substances 0.000 claims abstract description 15
- 239000012634 fragment Substances 0.000 claims abstract description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 8
- 239000004576 sand Substances 0.000 claims abstract description 6
- 230000000694 effects Effects 0.000 abstract description 4
- 230000015572 biosynthetic process Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- PCHJSUWPFVWCPO-UHFFFAOYSA-N gold Chemical compound [Au] PCHJSUWPFVWCPO-UHFFFAOYSA-N 0.000 description 1
- 239000010931 gold Substances 0.000 description 1
- 229910052737 gold Inorganic materials 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
The utility model belongs to garage ramp field, and in particular to a kind of underground garage ramp.Including ground, bottom plate is provided with above ground, the first partition wall is provided with bottom plate, second partition wall, 3rd partition wall, 4th partition wall and the 5th partition wall, 3rd partition wall, 4th partition wall forms fire cistern with ramp top plate, 4th partition wall, 5th partition wall forms fire water pump chamber with ramp top plate, ramp top plate is made up of hang plate and level board, cement air entrained concrete fragment is filled with above level board and on the outside of the first partition wall, cement air entrained concrete fragment is collectively forming basic ramp with hang plate, basic ramp includes the first ramp, second ramp and the 3rd ramp, the gradient in the second ramp is more than first, the gradient in the 3rd ramp, anti-skidding sawtooth is provided with above the cement sand bed in the second ramp.Because anti-skidding sawtooth adds the frictional force between wheel of the bus and ramp, skid resistance is strong, good antiskid effect.
Description
Technical field
The utility model belongs to garage ramp field, and in particular to a kind of underground garage ramp.
Background technology
As the improvement of people's living standards, there is higher requirement to quality of life, increasing people is in order to go on a journey
It is convenient, buying car is all selected, but city space is few, an inch of land is an inch of gold, especially the center in city, the quantity of parking stall far can not reach
To demand.There are Large Underground garage or floor garage parking, garage disengaging in the place such as Modern Residence, shopping centre and transport hub
Mouth typically has ramp.As the ramp of underground garage connection ground, its quality directly affects the use of this underground garage
The safety of effect and vehicles while passing.
The content of the invention
The purpose of this utility model provides a kind of underground garage ramp, and rational in infrastructure simple, skid resistance is strong, building cost
It is relatively low, durable, good antiskid effect.
The purpose of this utility model is realized in the following manner:Underground garage ramp, including ground, ground top are set
Have bottom plate, be provided with the first partition wall, the second partition wall, the 3rd partition wall, the 4th partition wall and the 5th partition wall on the bottom plate, first every
Wall, the second partition wall and ramp top plate formation confined space, the second partition wall, the 3rd partition wall and ramp top plate formation exhaust air box, the 3rd
Partition wall, the 4th partition wall and ramp top plate form fire cistern, and the 4th partition wall, the 5th partition wall and ramp top plate form fire pump
Room, ramp top plate are made up of hang plate and level board, and cement air entrained concrete is filled with above level board and on the outside of the first partition wall
Fragment, cement air entrained concrete fragment are collectively forming basic ramp with hang plate, lay pea gravel concreten layer on basic ramp, carefully
Being set above stone concrete layer and be equipped with cement sand bed, basic ramp includes the first ramp, the second ramp and the 3rd ramp, the
The gradient in two ramps is more than the gradient in the first, the 3rd ramp, and anti-skidding sawtooth is provided with above the cement sand bed in the second ramp.
The fire cistern bottom is provided with pick trough.
The depth of the anti-skidding sawtooth is 6~8mm, and width is 50~100mm.
Gutter is respectively arranged with the outside of first ramp and on the outside of the 3rd ramp.
The exhaust air box bottom and fire water pump chamber bottom are separately filled with concrete cushion.
The thickness of the pea gravel concreten layer is not less than 20mm.
The beneficial effects of the utility model are:Because anti-skidding sawtooth adds the frictional force between wheel of the bus and ramp,
Skid resistance is strong, good antiskid effect, and the structures such as fire cistern, fire water pump chamber are set below ramp, saves space, structure letter
Single and reasonable in design, input construction cost is relatively low, and construction equipment used is few.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is the mplifying structure schematic diagram at A in Fig. 1.
Embodiment
As shown in Figure 1 and Figure 2, underground garage ramp, including ground 16, the top of ground 16 are provided with bottom plate 14, the bottom plate
Be provided with the first partition wall 4, the second partition wall 7, the 3rd partition wall 8, the 4th partition wall 9 and the 5th partition wall 5 on 14, the first partition wall 4, second every
Wall 7 and ramp top plate form confined space 15, and the second partition wall 7, the 3rd partition wall 8 and ramp top plate form exhaust air box 13, the 3rd every
Wall 8, the 4th partition wall 9 and ramp top plate form fire cistern 12, and the bottom of fire cistern 12 is provided with pick trough 11, the 4th partition wall 9,
5th partition wall 5 forms fire water pump chamber 10 with ramp top plate, and the bottom of exhaust air box 13 and the bottom of fire water pump chamber 10 are separately filled with
Concrete cushion 3, ramp top plate are made up of hang plate 17 and level board 18, and the top of level board 18 and the outside of the first partition wall 4 are filled
There is cement air entrained concrete fragment 2, cement air entrained concrete fragment 2 is collectively forming basic ramp, basic ramp with hang plate 17
Upper laying pea gravel concreten layer 19, the thickness of pea gravel concreten layer 19 are not less than 20mm, and the top of pea gravel concreten layer 19 sets paving
Provided with cement sand bed 20, basic ramp includes the first ramp 24, the second ramp 23 and the 3rd ramp 22, the slope in the second ramp 23
Degree is more than the gradient in the first, the 3rd ramp, and the outside of the first ramp 24 and the outside of the 3rd ramp 22 are respectively arranged with gutter 1, the
Be provided with anti-skidding sawtooth 21 above the cement sand bed in two ramps, the depth of anti-skidding sawtooth 21 be 6~8mm, width for 50~
100mm。
Claims (6)
1. underground garage ramp, including ground, ground top is provided with bottom plate, it is characterised in that:Is provided with the bottom plate
One partition wall, the second partition wall, the 3rd partition wall, the 4th partition wall and the 5th partition wall, the first partition wall, the second partition wall and ramp top plate form close
Space is closed, the second partition wall, the 3rd partition wall and ramp top plate form exhaust air box, and the 3rd partition wall, the 4th partition wall and ramp top plate are formed
Fire cistern, the 4th partition wall, the 5th partition wall and ramp top plate form fire water pump chamber, and ramp top plate has hang plate and level board group
Into above level board and the first partition wall outside is filled with cement air entrained concrete fragment, and cement air entrained concrete fragment is with tilting
Plate is collectively forming basic ramp, and pea gravel concreten layer is laid on basic ramp, is set above pea gravel concreten layer and is equipped with cement
Screed, basic ramp include the first ramp, the second ramp and the 3rd ramp, and the gradient in the second ramp is more than the first, the 3rd slope
The gradient in road, the cement sand bed top in the second ramp are provided with anti-skidding sawtooth.
2. underground garage ramp according to claim 1, it is characterised in that:The fire cistern bottom is provided with water suction
Groove.
3. underground garage ramp according to claim 1, it is characterised in that:The depth of the anti-skidding sawtooth is 6~8mm,
Width is 50~100mm.
4. underground garage ramp according to claim 1, it is characterised in that:On the outside of first ramp and outside the 3rd ramp
Side is respectively arranged with gutter.
5. underground garage ramp according to claim 1, it is characterised in that:The exhaust air box bottom and fire water pump chamber bottom
Portion is separately filled with concrete cushion.
6. underground garage ramp according to claim 1, it is characterised in that:The thickness of the pea gravel concreten layer is not less than
20mm。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720467371.XU CN206707150U (en) | 2017-04-28 | 2017-04-28 | Underground garage ramp |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720467371.XU CN206707150U (en) | 2017-04-28 | 2017-04-28 | Underground garage ramp |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206707150U true CN206707150U (en) | 2017-12-05 |
Family
ID=60457745
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720467371.XU Expired - Fee Related CN206707150U (en) | 2017-04-28 | 2017-04-28 | Underground garage ramp |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206707150U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424648A (en) * | 2019-07-29 | 2019-11-08 | 中国十七冶集团有限公司 | Ramp entrance and the construction method for extending pipeline connector |
CN110777950A (en) * | 2019-10-14 | 2020-02-11 | 中国十七冶集团有限公司 | Construction method for blocking entrance and exit of automobile ramp of basement |
CN112962882A (en) * | 2021-01-29 | 2021-06-15 | 北京万兴建筑集团有限公司 | Construction method for preventing slope way of disabled people outside residential building from sinking in building engineering |
CN113123541A (en) * | 2021-03-28 | 2021-07-16 | 杭州顿硕信息科技有限公司 | Garage ramp anti-skid device based on artificial intelligence |
CN115030221A (en) * | 2022-07-29 | 2022-09-09 | 中国二十二冶集团有限公司 | Construction method for preventing water seepage of slope surface of automobile ramp in underground garage of building |
-
2017
- 2017-04-28 CN CN201720467371.XU patent/CN206707150U/en not_active Expired - Fee Related
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110424648A (en) * | 2019-07-29 | 2019-11-08 | 中国十七冶集团有限公司 | Ramp entrance and the construction method for extending pipeline connector |
CN110777950A (en) * | 2019-10-14 | 2020-02-11 | 中国十七冶集团有限公司 | Construction method for blocking entrance and exit of automobile ramp of basement |
CN112962882A (en) * | 2021-01-29 | 2021-06-15 | 北京万兴建筑集团有限公司 | Construction method for preventing slope way of disabled people outside residential building from sinking in building engineering |
CN113123541A (en) * | 2021-03-28 | 2021-07-16 | 杭州顿硕信息科技有限公司 | Garage ramp anti-skid device based on artificial intelligence |
CN115030221A (en) * | 2022-07-29 | 2022-09-09 | 中国二十二冶集团有限公司 | Construction method for preventing water seepage of slope surface of automobile ramp in underground garage of building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206707150U (en) | Underground garage ramp | |
CN205443840U (en) | Car lane permeable pavement structure | |
CN108049278A (en) | The paving structure and its method for paving of a kind of permeable pavement structure | |
CN104947566A (en) | Assembled grade crossing | |
CN105421189B (en) | Road structure with permeable barricade | |
CN203256560U (en) | Hollow floor tile | |
CN1644799A (en) | Porous brickwalk laying method | |
CN203403343U (en) | Car ramp anti-skid structure for underground garage | |
CN206902495U (en) | A kind of drainage pavement paving structure | |
CN207362621U (en) | Complex layered anti-skid surface structure | |
CN205134501U (en) | Prefabricated ground in bathroom | |
CN205443843U (en) | Epoxy wrinkle type antiskid terrace | |
CN206784095U (en) | A kind of town and country gardens anti-slip type water-permeable brick | |
CN203188083U (en) | Anti-sliding tunnel pavement | |
CN203096547U (en) | Pervious concrete floor structure | |
CN202989722U (en) | Permeable road kerb | |
CN106758678A (en) | Multifunctional permeable water storage brick | |
CN205329470U (en) | Sponge body -building place | |
CN106049227B (en) | A kind of road side stone and its laying method | |
CN207210889U (en) | A kind of double-decker water-permeable brick | |
CN205839502U (en) | A kind of permeable road structure | |
CN205062603U (en) | Road surface structure suitable for residence community | |
CN205368951U (en) | Sponge garden way | |
CN110924263A (en) | Water-permeable ecological brick fixing device and laying method | |
CN205077351U (en) | Road surface is laid to wear -resisting ceramic tile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder | ||
CP01 | Change in the name or title of a patent holder |
Address after: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan. Patentee after: Gaochuang Industrial Co.,Ltd. Address before: 450046 6 floor, 3 East International Plaza, 85 Jinshui East Road, Zheng Dong New District, Zhengzhou, Henan. Patentee before: GAOCHUANG CONSTRUCTION Corp.,Ltd. |
|
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171205 |