CN206706984U - A kind of integrated prefabricated small-sized PE pumping plants - Google Patents

A kind of integrated prefabricated small-sized PE pumping plants Download PDF

Info

Publication number
CN206706984U
CN206706984U CN201720244097.XU CN201720244097U CN206706984U CN 206706984 U CN206706984 U CN 206706984U CN 201720244097 U CN201720244097 U CN 201720244097U CN 206706984 U CN206706984 U CN 206706984U
Authority
CN
China
Prior art keywords
water pump
prefabricated
cylinders
water
sized
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720244097.XU
Other languages
Chinese (zh)
Inventor
石景润
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Firone Water Industrial Equipment Co Ltd
Original Assignee
Anhui Firone Water Industrial Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Firone Water Industrial Equipment Co Ltd filed Critical Anhui Firone Water Industrial Equipment Co Ltd
Priority to CN201720244097.XU priority Critical patent/CN206706984U/en
Application granted granted Critical
Publication of CN206706984U publication Critical patent/CN206706984U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of integrated prefabricated small-sized PE pumping plants, including prefabricated PE cylinders, water inlet and delivery port, the side of prefabricated PE cylinders is welded with two water inlets, the opposite side of prefabricated PE cylinders is provided with a delivery port, the inner bottom of prefabricated PE cylinders is provided with water pump, the water side of water pump connects water pump conduit and pressure pipeline system by water pump self coupling, one end of water pump conduit and pressure pipeline system is both connected on delivery port, the top of prefabricated PE cylinders is provided with Aluminum Drum lid, and Aluminum Drum, which covers, is provided with electric control cabinet;Integrated prefabricated PE pumping plants of the present utility model have the characteristics that integrated degree is high, floor space is small, short construction period, reliable in quality;Pumping plant only need to complete all pipe-line system installations in factory, and after being docked to project scene intake-outlet, debugging use can be backfilled by being put into water pump, greatly shorten the site operation cycle.

Description

A kind of integrated prefabricated small-sized PE pumping plants
Technical field
A kind of PE pumping plants are the utility model is related to, more particularly to a kind of integrated prefabricated small-sized PE pumping plants.
Background technology
With the increase of the size of population, industrial expansion, the amount of sanitary sewage and trade effluent is increasing, therefore occurs Various sewage disposal devices, pumping plant are one of them.Traditional pumping plant be built at the scene by concrete etc. and Into construction period is usually 2-3 months, is taken a substantial amount of time, material resources, financial resources, and for this situation, prefabricated pumping plant should Transport and give birth to, it can provide the working effect of normal pumping plant, while install and more facilitate.
But in the prior art, the installation of prefabricated pumping plant is still more troublesome, and first the weight of prefabricated pumping plant in itself is larger, Second needed during installation assembled compared with multiple component, can not cause the phenomenon of leakage if processing in place when assembled, Environment is polluted, simultaneously as the height of prefabricated pumping plant is universal higher, it is very inconvenient to install various parts, especially installs water For pump etc. located at the important spare part of the cylinder of prefabricated pumping plant, its position influences whether that the overall of prefabricated pumping plant is made if error Industry.
Utility model content
The utility model proposes a kind of integrated prefabricated small-sized PE pumping plants, solve prefabricated pumping plant installation in the prior art Trouble, site operation cycle length, the problem of wasting time and energy.
In order to solve the above-mentioned technical problem, the utility model provides following technical scheme:
A kind of integrated prefabricated small-sized PE pumping plants of the utility model, including prefabricated PE cylinders, water inlet and delivery port, it is described The side of prefabricated PE cylinders is welded with two water inlets, and the opposite side of the prefabricated PE cylinders is provided with a delivery port, described The inner bottom of prefabricated PE cylinders is provided with water pump, and the water side of the water pump connects water pump conduit and pressure by water pump self coupling Pipe-line system, one end of the water pump conduit and pressure pipeline system are both connected on delivery port, the top of the prefabricated PE cylinders End is provided with Aluminum Drum lid, and the Aluminum Drum, which covers, is provided with electric control cabinet, and the electric control cabinet connects water pump by wire.
As a kind of optimal technical scheme of the present utility model, the water side of the water pump is provided with water pump self coupling, described Water pump conduit and pressure pipeline system are arranged on water pump self coupling.
As a kind of optimal technical scheme of the present utility model, the shell of the water pump is waterproof case.
As a kind of optimal technical scheme of the present utility model, the electric control cabinet mainly includes PLC and remote Process control device.
As a kind of optimal technical scheme of the present utility model, liquid level detection device is installed in the prefabricated PE cylinders, And the electric control cabinet is electrically connected with liquid level detection device.
The beneficial effect that the utility model is reached is:Integrated prefabricated PE pumping plants of the present utility model are mainly by prefabricated PE Cylinder, water pump, pressure pipeline system, liquid level detection device, electric control cabinet composition;Starting mode of pump is controlled by PLC, and nothing can be achieved People is on duty, remote control, remote monitoring function;Prefabricated PE cylinders are integrally formed by die sinking, and intake-outlet uses special seal Structure, realizes cylinder high-intensity sealing, no Groundwater infiltration, and pumping plant top cover particular design is non-applied to cell, villa, plant area Chang Meiguan;Integrated prefabricated PE pumping plants have small integrated degree height, floor space, short construction period, reliable in quality etc. Feature;Pumping plant only need to complete all pipe-line system installations in factory, after being docked to project scene intake-outlet, be put into water pump Backfill debugging uses, and greatly shortens the site operation cycle;Wherein water pump is connected using automatic coupling device, easy installation and reliable, Later stage need not enter inside pumping plant i.e. it is proposed that water pump is maintained.
Brief description of the drawings
Accompanying drawing is used for providing further understanding to of the present utility model, and a part for constitution instruction, with this practicality New embodiment is used to explain the utility model together, does not form to limitation of the present utility model.In the accompanying drawings:
Fig. 1 is subjective structural representation of the present utility model;
Fig. 2 is prefabricated PE cylinders overlooking the structure diagram of the present utility model;
In figure:1st, prefabricated PE cylinders;2nd, water pump;3rd, water pump self coupling;4th, water inlet;5th, water pump conduit;6th, pressure piping system System;7th, delivery port;8th, Aluminum cover;9th, electric control cabinet.
Embodiment
Preferred embodiment of the present utility model is illustrated below in conjunction with accompanying drawing, it will be appreciated that described herein excellent Select embodiment to be merely to illustrate and explain the utility model, be not used to limit the utility model.
Embodiment 1
As shown in Figure 1-2, the utility model provides a kind of integrated prefabricated small-sized PE pumping plants, including prefabricated PE cylinders 1, enters The mouth of a river 4 and delivery port 7, the side of prefabricated PE cylinders 1 are welded with two water inlets 4, and the opposite side of prefabricated PE cylinders 1 is provided with one Individual delivery port 7, the inner bottom of prefabricated PE cylinders 1 are provided with water pump 2, and the water side of water pump 2 connects water pump by water pump self coupling 3 Conduit 5 and pressure pipeline system 6, water pump 2 is connected using automatic coupling device, easy installation and reliable, and the later stage is without entering pumping plant I.e. it is proposed that water pump 2 is maintained, one end of water pump conduit 5 and pressure pipeline system 6 is both connected to delivery port 7 for inside On, the top of prefabricated PE cylinders 1 is provided with Aluminum Drum lid 8, and electric control cabinet 9 is provided with Aluminum Drum lid 8, and electric control cabinet 9 passes through Wire connects water pump 2, and water pump 2 starts to be controlled by the PLC in electric control cabinet 9, and unattended, long-range control can be achieved System, remote monitoring function.
The water side of water pump 2 is provided with water pump self coupling 3, and water pump conduit 5 and pressure pipeline system 6 are arranged on water pump self coupling 3 On.
The shell of water pump 2 is waterproof case, can prevent the situation that water pump 2 is damaged by water inlet from occurring, be advantageous to improve The service life of water pump 2.
Electric control cabinet 9 mainly includes PLC and remote control, it is possible to achieve unattended, remote control, Remote monitoring function.
Liquid level detection device is installed, and electric control cabinet 9 is electrically connected with liquid level detection device, is easy in prefabricated PE cylinders By measuring water level, the work of pumping plant is controlled.
Specifically, in use, after factory completes the installation of all pipe-line systems, to project scene by prefabricated PE cylinders 1 After intake-outlet completes docking, water pump 2 is put into, by water pump self coupling 3, coupling water pump conduit 5 and pressure pipeline system 6, you can Backfill debugging uses, and greatly shortens the site operation cycle;Wherein water pump 2 is connected using automatic coupling device, easy installation and reliable, Later stage need not enter inside pumping plant i.e. it is proposed that water pump 2 is maintained.
Integrated prefabricated PE pumping plants of the present utility model are mainly by prefabricated PE cylinders 1, water pump 2, pressure pipeline system 6, liquid Level detecting apparatus, electric control cabinet 9 form;Water pump 2 starts to be controlled by PLC, and unattended, remote control, long-range prison can be achieved Control function;Prefabricated PE cylinders 1 are integrally formed by die sinking, and intake-outlet uses special seal structure, realizes that cylinder high intensity is close Envelope, no Groundwater infiltration, pumping plant top cover particular design are very attractive in appearance applied to cell, villa, plant area;Integrated prefabricated PE pumps Standing has the characteristics that integrated degree is high, floor space is small, short construction period, reliable in quality;Pumping plant only need to be complete in factory Installed into all pipe-line systems, after being docked to project scene intake-outlet, debugging use can be backfilled by being put into water pump 2, be contracted significantly The short site operation cycle;Wherein water pump 2 is connected using automatic coupling device, easy installation and reliable, and the later stage need not enter in pumping plant Portion is i.e. it is proposed that water pump 2 is maintained.
Finally it should be noted that:Preferred embodiment of the present utility model is the foregoing is only, is not limited to this Utility model, although the utility model is described in detail with reference to the foregoing embodiments, for those skilled in the art For, it can still modify to the technical scheme described in foregoing embodiments, or to which part technical characteristic Carry out equivalent substitution.All any modification, equivalent substitution and improvements within the spirit and principles of the utility model, made etc., It should be included within the scope of protection of the utility model.

Claims (5)

1. a kind of integrated prefabricated small-sized PE pumping plants, including prefabricated PE cylinders(1), water inlet(4)And delivery port(7), its feature It is, the prefabricated PE cylinders(1)Side be welded with two water inlets(4), the prefabricated PE cylinders(1)Opposite side installation There is a delivery port(7), the prefabricated PE cylinders(1)Inner bottom water pump is installed(2), the water pump(2)Water side Pass through water pump self coupling(3)Connect water pump conduit(5)And pressure pipeline system(6), the water pump conduit(5)And pressure pipeline system (6)One end be both connected to delivery port(7)On, the prefabricated PE cylinders(1)Top Aluminum Drum lid is installed(8), the Aluminum Drum Lid(8)On electric control cabinet is installed(9), the electric control cabinet(9)Water pump is connected by wire(2).
2. the integrated prefabricated small-sized PE pumping plants of one kind according to claim 1, it is characterised in that the water pump(2)Go out Water end (W.E.) is provided with water pump self coupling(3), the water pump conduit(5)And pressure pipeline system(6)Installed in water pump self coupling(3)On.
3. the integrated prefabricated small-sized PE pumping plants of one kind according to claim 2, it is characterised in that the water pump(2)It is outer Shell is waterproof case.
4. the integrated prefabricated small-sized PE pumping plants of one kind according to claim 1, it is characterised in that the electric control cabinet (9)Mainly include PLC and remote control.
5. the integrated prefabricated small-sized PE pumping plants of one kind according to claim 1, it is characterised in that in the prefabricated PE cylinders Liquid level detection device, and the electric control cabinet are installed(9)It is electrically connected with liquid level detection device.
CN201720244097.XU 2017-03-14 2017-03-14 A kind of integrated prefabricated small-sized PE pumping plants Active CN206706984U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720244097.XU CN206706984U (en) 2017-03-14 2017-03-14 A kind of integrated prefabricated small-sized PE pumping plants

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720244097.XU CN206706984U (en) 2017-03-14 2017-03-14 A kind of integrated prefabricated small-sized PE pumping plants

Publications (1)

Publication Number Publication Date
CN206706984U true CN206706984U (en) 2017-12-05

Family

ID=60470507

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720244097.XU Active CN206706984U (en) 2017-03-14 2017-03-14 A kind of integrated prefabricated small-sized PE pumping plants

Country Status (1)

Country Link
CN (1) CN206706984U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149775A (en) * 2017-12-26 2018-06-12 舒朋士泵业常州有限公司 A kind of prefabricated Boosting pumping station of PE and its mounting process

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108149775A (en) * 2017-12-26 2018-06-12 舒朋士泵业常州有限公司 A kind of prefabricated Boosting pumping station of PE and its mounting process

Similar Documents

Publication Publication Date Title
CN206159690U (en) Feeding and discharging pipeline connection device
CN204988368U (en) Utility tunnel intelligence drainage monitoring devices
CN112648443B (en) Waterproof sealing assembly for horizontal through-wall pipeline and leakage detection method thereof
CN206706984U (en) A kind of integrated prefabricated small-sized PE pumping plants
CN105201070A (en) Intelligent integrated prefabrication pump station
CN206721992U (en) A kind of intelligent fire bolt with hydraulic pressure detection
CN204784990U (en) Spring float -type water seal arrangement suitable for thermal power factory
CN212178091U (en) Special waterproof sleeve pipe of ground source heat pump
CN210344604U (en) Water leakage proof device at tap water pipeline interface
CN110004958B (en) Bottom-hollow type underwater prestressed steel cofferdam device for water taking working well
CN212479218U (en) Pressure-bearing wellhead device of earthquake observation station
CN202165737U (en) Connecting structure for plastic inspection well and smooth wall tube
CN206815486U (en) A kind of big water burst counter-slope tunnel three-level discharge structure
CN208348725U (en) A kind of hydraulic engineering pipeline protection cover
CN207063090U (en) A kind of drain assembly
CN206289729U (en) One kind is used for automatic hydraulic flushing device for municipal drainage pipelines
CN201202035Y (en) Anti-return water drainage structure of drum-type washing machine
CN201874845U (en) Movable ground operation device of submersible pump
CN206706985U (en) Integrated prefabricated drainage pumping stations
CN205016952U (en) CPVC cable protection pipe
CN218510361U (en) Hydraulic pipeline connecting device for hydraulic engineering
CN218347583U (en) Energy-saving hoisting system
CN214466928U (en) Connecting structure of drainage pipeline and water collecting well
CN202298659U (en) Connection structure for base of inspection well and pipelines
CN218493119U (en) Be used for pre-buried sleeve pipe of underground side wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant