CN206706960U - Jetting type draining four-way inspection shaft - Google Patents
Jetting type draining four-way inspection shaft Download PDFInfo
- Publication number
- CN206706960U CN206706960U CN201720409791.2U CN201720409791U CN206706960U CN 206706960 U CN206706960 U CN 206706960U CN 201720409791 U CN201720409791 U CN 201720409791U CN 206706960 U CN206706960 U CN 206706960U
- Authority
- CN
- China
- Prior art keywords
- pipe
- mouth
- jet
- upstream
- chute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Chutes (AREA)
Abstract
A kind of jetting type draining four-way inspection shaft is the utility model is related to, belongs to drainage system field, more particularly to reduces the drainage inspection well of water turbulence.Mainly it is made up of charge for remittance device, well body, workbench, charge for remittance device is to cross water component using what high molecule plastic material was molded into being molded, upstream is responsible for and separated independently of each other with two side branch chutes, current are not liquidated mutually before a flow direction is accumulated in well and turbulent flow, three strands of current collect after flowing to same direction completely, substantially reduce the loss of flood peak.The special tectonic and smooth surface of chute can ensure good hydraulics, and frosting is smooth, and roughness greatly reduces, and reduces turbulent flow phenomenon, so as to improve the flow of four-way inspection shaft.Plastics charge for remittance device and brick, concrete combine, and chute easy construction and can guarantee that quality, and brick mix structure can ensure the intensity of inspection shaft.
Description
Technical field
A kind of jetting type draining four-way inspection shaft is the utility model is related to, belongs to drainage system field, more particularly to reduces
The drainage inspection well of water turbulence.
Background technology
City rainwater drainage is typically all functional in organized water drainage, and the rainwater on ground drains into storm sewer by runoff gathering, then
Natural water is discharged into by Stormwater Drainage System.Most of urban rainwater pipeline system is laid along under road, and urban road is indulged
Traversed by is pitched, and the unit of both sides of the road or the rainwater access urban rainwater pipeline of residential area, are accessed by four-way inspection shaft.
When carrying out urban rainwater pipeline design, designer is typically all to apply mechanically standard drawing.Existing national standard drawing《06MS201 cities
Political affairs drainage pipeline project and affiliated facility》Four-way inspection shaft, branch diameter and supervisor caliber it is smaller when use circular inspection well,
Branch pipe is accessed to current with downstream supervisor using 90 °~135 ° of access downstream, the reduction of pipe with small pipe diameter drainage inspection well flow, branch pipe
Influence it is little.When being responsible for 900~2000mm of caliber, rectangle four-way inspection shaft should be used, rectangle four-way inspection in standard drawing
Well stream groove very little, rainwater inspection well chute are highly only the half of caliber, and branch pipe and upstream supervisor connect in 90 °, branch pipe with it is upper
Substantially no chute blocks between play pipe road, current and the upstream opposite jet flow of branch pipe, very strong turbulent flow is formed, even if downstream master
Pipe is according to upstream supervisor and branch pipe flow design, and because local head loss is larger, importing the water of inspection shaft can not effectively arrange
Downstream pipeline, when especially the branch pipe gradient is larger, branch pipe flow rate of water flow is larger, and turbulent flow phenomenon is even more serious, therefore, in reality
In engineering often there is four-way inspection shaft draining and do not occur waterlogging suddenly in heavy rain or rainstorm weather, and flowing full does not show downstream line
As.
Patent No. CN201410275893.0 utility model patent《Prevent the draining four-way inspection shaft of opposite jet flow》, adopt
With the radius of turn of increase branch pipe chute, set isolation platform to prevent opposite jet flow, reduce branch pipe current and the current of upstream supervisor
It the angle of cut, can effectively reduce the local head loss of four-way inspection shaft, improve the discharge capacity of inspection shaft.But upstream current with
Two side branch current are in 15~30 ° of the angle of cut, and three strands of current, which converge, still can produce certain turbulent flow, and influence inspection shaft crosses water
Ability.
Existing four-way drainage inspection well is all to use brick or concreting chute, and curved surface chute being built by laying bricks or stones and smearing
Face, complex process, difficulty of construction is big, and quality is difficult to ensure that, the curve form of chute and the roughness on surface all directly affect inspection
Look into the displacement of well.
The content of the invention
The purpose of this utility model is:A kind of jetting type draining four-way inspection shaft is provided, mainly by charge for remittance device, well body, work
Make platform composition, charge for remittance device is to cross water component using what high molecule plastic material was molded into being molded, by upstream supervisor and two side branch streams
Groove separates independently of each other, and current do not liquidate mutually before a flow direction is accumulated in well and turbulent flow, three strands of current are complete
Collect after flowing to same direction, substantially reduce the loss of flood peak.Beneficial effect is:Charge for remittance device adopt it is made of plastic, chute
Special tectonic and smooth surface can ensure good hydraulics, and frosting is smooth, and roughness greatly reduces, and reduce disorderly
Flow phenomenon, so as to improve the flow of four-way inspection shaft.Plastics charge for remittance device and brick, concrete combine, chute easy construction and energy
Ensure quality, brick mix structure can ensure the intensity of inspection shaft.
The utility model is realized by following technology:Jetting type draining four-way inspection shaft, mainly by charge for remittance device 1, well
Body 2, workbench 3 form.Described charge for remittance device 1 is arranged in well body 2, and the space between charge for remittance device 1 and well body 2 uses concrete
Filling pours to form workbench 3.Charge for remittance device 1 be four-way inspection shaft cross water component, mainly by the upstream mouth of pipe 4, the downstream mouth of pipe 5,
The branch pipe mouth of pipe 6, branch pipe chute 7, jet pipe 8, mixing channel 9 form, and the branch pipe mouth of pipe 6 passes through branch pipe chute 7 and mixing channel 9 and downstream
The mouth of pipe 5 connects, and the floor projection angle of the downstream mouth of pipe 5 and the center line of the branch pipe mouth of pipe 6 is in 90 °, and the upstream mouth of pipe 4 connects jet pipe
8, jet pipe 8 is stretched into branch pipe chute 7, and the center line of the floor projection of jet pipe 8 overlaps with the center line of the downstream mouth of pipe 5, jet
The outlet of pipe 8 is jet orifice 10, is mixing channel 9 between jet orifice 10 and the downstream mouth of pipe 5, the downstream mouth of pipe 5, mixing channel 9, branch pipe stream
Groove 7, the branch pipe mouth of pipe 6, jet pipe 8 combine in " individual " font.
The upstream mouth of pipe 4 of charge for remittance device 1 is flushed with the downstream mouth of pipe 5 and the branch pipe mouth of pipe 6 using top in pipe, and the upstream mouth of pipe 4 is with
Play pipe mouth 5 is identical with crest level in the pipe of the branch pipe mouth of pipe 6.The upper edge of branch pipe chute 7 and mixing channel 9, the interior top 150 of high outlet pipe~
300 millimeters, workbench 3 is concordant with the upper edge of branch pipe chute 7 and mixing channel 9, forms an operation for being available for well servicing under people
Platform.
Jet pipe 8 is tapered reducer pipe, and the upstream of jet pipe 8 is connected with the upstream mouth of pipe 4, and the downstream of jet pipe 8 is jet
Mouth 10,0.8~0.9 times of a diameter of upstream mouth of pipe 4 of jet orifice 10, the caliber of jet pipe 8 is gradual by the internal diameter of the upstream mouth of pipe 4
Reduce and be changed into the internal diameter of jet orifice 10, jet pipe 8 is in eccentric gradually-reducing shape, and floor projection direction is from the downstream jet of the upstream mouth of pipe 4
10 liang of lateral centerlines of mouth are tapered, and upright projection direction tube top is tapered downwards and ttom of pipe does not contract, and bottom is with penetrating in the pipe of the upstream mouth of pipe 4
It is a straight line that head piece 10, which manages interior bottom, and charge for remittance device 1 is arranged in well body 2, the upstream mouth of pipe 4 and bottom elevation phase in the pipe of jet orifice 10
Together.The jet pipe 8 that caliber shrinks, larger pressure is produced at jet orifice 10, formed around the current sprayed at mixing channel 9
Negative pressuren zone, be advantageous to the current of two side branch chute 7 and flow into the downstream mouth of pipe 5.
Charge for remittance device 1 is molded into being molded using high molecule plastic material, and the intersection of branch pipe chute 7 of both sides is under jet pipe 8
Portion forms lower clapboard 11, forms upper spacer 12 on the top of jet pipe 8, the branch pipe chute 7 of both sides is separated, lower clapboard 11
Support in the bottom of branch pipe chute 7, the upper of branch pipe chute 7 is supported on by wale piece 13 in the position upper spacer 12 of jet orifice 10
Edge, jet pipe 8 is set to be stably fixed in catchment tray 1.
Charge for remittance device 1 plays the guide functions of current in four-way gully, is poured in the periphery of charge for remittance device 1 using brick or concrete
Well body 2 is built, the space between charge for remittance device 1 and well body 2 pours to form workbench 3 using Concrete Filled.The upstream mouth of pipe 4 and upstream
Pipeline 14 is connected, and the downstream mouth of pipe 5 is connected with downstream line 15, and the branch pipe mouth of pipe 6 is connected with branch pipeline 16, and the top of well body 2 is set
Cover plate and well head 17, maintainer can G.I.H study attended operation on workbench 3.Charge for remittance device 1 has made of plastics
Good waterpower guide functions and barrier performance, brick or concrete structure have higher intensity carrying ground and the lateral earth pressure of well two
Load.
Brief description of the drawings
Fig. 1 is the utility model plan;
Fig. 2 is that upstream and downstream is responsible for position sectional elevation(Fig. 1 A-A is cutd open);
Fig. 3 is two side branch position sectional elevations(Fig. 1 B-B is cutd open);
Fig. 4 is the sectional elevation of jet orifice position(Fig. 1 C-C is cutd open);
Fig. 5 is charge for remittance device plan;
Fig. 6 is charge for remittance device side elevational view;
Fig. 7 is the elevation in charge for remittance device upstream mouth of pipe direction;
Fig. 8 is the elevation in charge for remittance device downstream mouth of pipe direction;
Fig. 9 is charge for remittance device three-dimensional effect diagram.
In figure:1- charge for remittance devices, 2- well bodies, 3- workbench, the 4- upstreams mouth of pipe, the 5- downstreams mouth of pipe, the 6- branch pipe mouths of pipe, 7- branch pipes
Chute, 8- jet pipes, 9- mixing channels, 10- jet orifices, 11- lower clapboards, 12- upper spacers, 13- wale pieces, 14- upstream lines,
15- downstream lines, 16- branch pipelines, 17- well heads.
Embodiment
The utility model charge for remittance device 1, well body 2, workbench 3 mainly by being made up of.Charge for remittance device 1 is one and uses polymer plastic
Material material is molded into the pipe fitting of shaping, there is 4, downstream mouths of pipe 5 of a upstream mouth of pipe and two branch pipe mouths of pipe 6.The utility model
Plan is shown in Fig. 1, and charge for remittance device 1 is arranged in well body 2, and charge for remittance device 1 plays the guide functions of current in four-way gully, charge for remittance device
Space between 1 and well body 2 is poured to form workbench 3 using Concrete Filled, and the upstream mouth of pipe 4 is connected with upstream line 14, under
Play pipe mouth 5 is connected with downstream line 15, and the branch pipe mouth of pipe 6 is connected with branch pipeline 16.Upstream and downstream supervisor's position sectional elevation is shown in figure
2, the A-A that the figure is Fig. 1 is cutd open;Two side branch position sectional elevations are shown in Fig. 3, and the B-B that the figure is Fig. 1 is cutd open;Stand jet orifice position
Profile is shown in Fig. 4, and the C-C that the figure is Fig. 1 is cutd open;Fig. 2, Fig. 3, Fig. 4 show inspection shaft diverse location sectional elevation.Well body 2 it is upper
Portion sets cover plate and well head 17, maintainer can G.I.H study attended operation on workbench 3.
Charge for remittance device 1 is the water component excessively of four-way inspection shaft, is molded into being molded using high molecule plastic material, the plane of charge for remittance device 1
Figure is shown in Fig. 5.Charge for remittance device 1 is mainly by the upstream mouth of pipe 4, the downstream mouth of pipe 5, the branch pipe mouth of pipe 6, branch pipe chute 7, jet pipe 8, mixing channel 9
Composition.The branch pipe mouth of pipe 6 is connected by branch pipe chute 7 and mixing channel 9 with the downstream mouth of pipe 5, in the downstream mouth of pipe 5 and the branch pipe mouth of pipe 6
The floor projection angle of heart line is in 90 °, and the upstream mouth of pipe 4 connects jet pipe 8, and jet pipe 8 is stretched into branch pipe chute 7, the water of jet pipe 8
The center line of flat projection overlaps with the center line of the downstream mouth of pipe 5, and the outlet of jet pipe 8 is jet orifice 10, jet orifice 10 and downstream
It is mixing channel 9 between the mouth of pipe 5, the downstream mouth of pipe 5, mixing channel 9, branch pipe chute 7, the branch pipe mouth of pipe 6, jet pipe 8 are in " individual " glyph group
Close.
The side elevational view of charge for remittance device 1 is shown in Fig. 6, and the elevation in upstream mouth of pipe direction is shown in Fig. 7, and the elevation in downstream mouth of pipe direction is shown in
Fig. 8.The upstream mouth of pipe 4 of charge for remittance device 1 is flushed with the downstream mouth of pipe 5 and the branch pipe mouth of pipe 6 using top in pipe, the upstream mouth of pipe 4 and downstream tube
Mouth 5 is identical with crest level in the pipe of the branch pipe mouth of pipe 6.The upper edge of branch pipe chute 7 and mixing channel 9, the interior top 150~300 of high outlet pipe
Millimeter, charge for remittance device 1 are built by laying bricks or stones in well body 2, and workbench 3 is concordant with the upper edge of branch pipe chute 7 and mixing channel 9, and forming one can
For the operating platform of well servicing under people.Jet pipe 8 is tapered reducer pipe, and the upstream of jet pipe 8 is connected with the upstream mouth of pipe 4, jet
The downstream of pipe 8 is jet orifice 10, and 0.8~0.9 times of a diameter of upstream mouth of pipe 4 of jet orifice 10, the caliber of jet pipe 8 is by upstream
The internal diameter of the mouth of pipe 4 is gradually reduced the internal diameter for being changed into jet orifice 10, and jet pipe 8 is in eccentric gradually-reducing shape, and floor projection direction is from upstream
Downstream 10 liang of lateral centerlines of jet orifice are tapered for the mouth of pipe 4, and upright projection direction tube top is tapered downwards and ttom of pipe does not contract, upstream tube
It is a straight line that interior bottom is managed in bottom with jet orifice 10 in the pipe of mouth 4, and charge for remittance device 1 is arranged in well body 2, the upstream mouth of pipe 4 and jet orifice 10
Pipe in bottom elevation it is identical.The jet pipe 8 that caliber shrinks, larger pressure is produced at jet orifice 10, sprayed at mixing channel 9
Current around form negative pressuren zone, be advantageous to the current of two side branch chute 7 flow into the downstream mouth of pipe 5.The branch pipe chute 7 of both sides crosses
Lower clapboard 11 is formed at the bottom for being in jet pipe 8, forms upper spacer 12 on the top of jet pipe 8, the branch pipe chute 7 of both sides is divided
Separate, lower clapboard 11 is supported on the bottom of branch pipe chute 7, is supported in the position upper spacer 12 of jet orifice 10 by wale piece 13
The upper edge of branch pipe chute 7, makes jet pipe 8 be stably fixed in catchment tray 1.The three-dimensional effect diagram of charge for remittance device 1 is shown in Fig. 9.
The utility model is mainly used in the larger Large Diameter Pipeline drainage pipeline of flow, prevents opposite jet flow from forming turbulent flow.Due to
Large Diameter Pipeline drainage pipeline is more using concrete reinforced pipe at present, and Fig. 1, Fig. 2, Fig. 3, Fig. 4 show charge for remittance device 1 and pipe joint shape
Formula is caliber pipe of concrete, and different interface shapes can be used according to actual in practical application, also can be by the interface system of charge for remittance device 1
Into unified form, it is connected using interface conversion ring from different pipelines.The utility model cancels the branch pipe mouth of pipe 6 and branch of side
Pipe chute 7, it is also applicable in the threeway drainage inspection well of side access.
Construction described by present utility model application file is only one embodiment, no matter the whether tapered reducing of jet pipe 8,
Charge for remittance device 1 is made using what material, and upstream supervisor is stretched into two side branch chutes reduces turbulent flow all in the protection model of the application
Enclose.
Claims (4)
- A kind of 1. jetting type draining four-way inspection shaft, mainly by charge for remittance device(1), well body(2), workbench(3)Composition, its feature It is:Described charge for remittance device(1)It is arranged on well body(2)It is interior, charge for remittance device(1)And well body(2)Between space use Concrete Filled Pour to form workbench(3), described charge for remittance device(1)It is the wet part excessively of four-way inspection shaft, mainly by the upstream mouth of pipe(4), under Play pipe mouth(5), the branch pipe mouth of pipe(6), branch pipe chute(7), jet pipe(8), mixing channel(9)Composition, the branch pipe mouth of pipe(6)Pass through branch pipe Chute(7)And mixing channel(9)With the downstream mouth of pipe(5)Connection, the downstream mouth of pipe(5)With the branch pipe mouth of pipe(6)Center line horizontal throwing Shadow angle is in 90 °, the upstream mouth of pipe(4)Connect jet pipe(8), jet pipe(8)Stretch into branch pipe chute(7)It is interior, jet pipe(8)It is horizontal The center line of projection and the downstream mouth of pipe(5)Center line overlap, jet pipe(8)Outlet be jet orifice(10), jet orifice(10) With the downstream mouth of pipe(5)Between be mixing channel(9), the downstream mouth of pipe(5), mixing channel(9), branch pipe chute(7), the branch pipe mouth of pipe(6), penetrate Flow tube(8)Combined in " individual " font.
- 2. jetting type draining four-way inspection shaft according to claim 1, it is characterized in that:Described charge for remittance device(1)Upstream The mouth of pipe(4)With the downstream mouth of pipe(5)With the branch pipe mouth of pipe(6)Flushed using top in pipe, the upstream mouth of pipe(4)With the downstream mouth of pipe(5)And branch The pipe mouth of pipe(6)Pipe in crest level it is identical, branch pipe chute(7)And mixing channel(9)Upper edge, the milli of top 150~300 in high outlet pipe Rice, workbench(3)With branch pipe chute(7)And mixing channel(9)Upper edge it is concordant.
- 3. jetting type draining four-way inspection shaft according to claim 1, it is characterized in that:Described jet pipe(8)To be tapered Reducer pipe, jet pipe(8)Upstream and the upstream mouth of pipe(4)Connection, jet pipe(8)Downstream be jet orifice(10), jet orifice (10)A diameter of upstream mouth of pipe(4)0.8~0.9 times, jet pipe(8)Caliber by the upstream mouth of pipe(4)Internal diameter gradually contract It is small to be changed into jet orifice(10)Internal diameter, jet pipe(8)In eccentric gradually-reducing shape, floor projection direction is from the upstream mouth of pipe(4)Downstream Jet orifice(10)Two lateral centerlines are tapered, and upright projection direction tube top is tapered downwards and ttom of pipe does not contract, the upstream mouth of pipe(4)Pipe Interior bottom and jet orifice(10)Bottom is a straight line in pipe, charge for remittance device(1)Installed in well body(2)It is interior, the upstream mouth of pipe(4)With jet orifice (10)Pipe in bottom elevation it is identical.
- 4. jetting type draining four-way inspection shaft according to claim 1, it is characterized in that:Described charge for remittance device(1)Using height Molecule plastic material is molded into being molded, the branch pipe chute of both sides(7)Intersection is in jet pipe(8)Bottom formed lower clapboard(11), In jet pipe(8)Top formed upper spacer(12), by the branch pipe chute of both sides(7)Separate, lower clapboard(11)It is supported on Pipe chute(7)Bottom, in jet orifice(10)Position upper spacer(12)Pass through wale piece(13)It is supported on branch pipe chute(7)'s Upper edge, jet pipe 8 is set to be stably fixed in catchment tray 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720409791.2U CN206706960U (en) | 2017-04-19 | 2017-04-19 | Jetting type draining four-way inspection shaft |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720409791.2U CN206706960U (en) | 2017-04-19 | 2017-04-19 | Jetting type draining four-way inspection shaft |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206706960U true CN206706960U (en) | 2017-12-05 |
Family
ID=60456118
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720409791.2U Expired - Fee Related CN206706960U (en) | 2017-04-19 | 2017-04-19 | Jetting type draining four-way inspection shaft |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206706960U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060045A (en) * | 2017-04-19 | 2017-08-18 | 广东中科华冉智网科技有限公司 | Jetting type draining four-way inspection shaft |
CN111894109A (en) * | 2020-08-12 | 2020-11-06 | 中冶建工集团有限公司 | Well-completion drainage construction method for loose earth surface |
-
2017
- 2017-04-19 CN CN201720409791.2U patent/CN206706960U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060045A (en) * | 2017-04-19 | 2017-08-18 | 广东中科华冉智网科技有限公司 | Jetting type draining four-way inspection shaft |
CN107060045B (en) * | 2017-04-19 | 2022-08-23 | 中国瑞林工程技术股份有限公司东莞分公司 | Jet type drainage four-way inspection well |
CN111894109A (en) * | 2020-08-12 | 2020-11-06 | 中冶建工集团有限公司 | Well-completion drainage construction method for loose earth surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204570904U (en) | Turnover plate type sewage intercepting chamber | |
CN206706960U (en) | Jetting type draining four-way inspection shaft | |
CN109372085A (en) | A kind of shunting well | |
CN104018569B (en) | Prevent the draining four-way manhole of opposite jet flow | |
CN209837268U (en) | Multifunctional integrated sewage intercepting well | |
CN203795373U (en) | River channel bank protection structure | |
CN205259214U (en) | Pin -connected panel rainwater regulation pond of method of sinking construction | |
CN107060045A (en) | Jetting type draining four-way inspection shaft | |
CN210195818U (en) | Culvert drainage structures | |
CN202831184U (en) | Urban rain sewage split-flow inspection well | |
CN203866950U (en) | Drainage four-way inspection well for preventing water flow opposite flowing | |
CN204589761U (en) | A kind of water drainage skid sidewalk | |
CN106836456B (en) | A kind of fairing improving rainfall pumping station water outlet box culvert assignment of traffic uniformity | |
CN207392366U (en) | Modified sewerage system | |
CN110005043B (en) | Prefabricated concrete for road rainwater guide opening and preparation method and application thereof | |
CN209339282U (en) | A kind of shunting well | |
CN210049366U (en) | Road rainwater leading opening prefabricated concrete and road rainwater leading opening prefabricated concrete unit body | |
CN206888162U (en) | The siphonic roof storm system of energy dissipating well and application the energy dissipating well | |
CN207109995U (en) | A kind of town road drainage arrangement | |
CN106049651A (en) | Urban water-logging prevention and control method | |
CN207244776U (en) | A kind of building roof rainwater utilization system | |
CN204780503U (en) | Road drainage structures | |
CN103643610A (en) | Road pavement draining side ditch trepanning water-seepage-type concrete pipe | |
CN109295832A (en) | A kind of highway drainage kerbstone and pavement brick comprehensive draining collection drainage facility | |
CN204644824U (en) | Road equipment structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171205 Termination date: 20200419 |