CN206697828U - Precast combined switch board - Google Patents

Precast combined switch board Download PDF

Info

Publication number
CN206697828U
CN206697828U CN201720511353.7U CN201720511353U CN206697828U CN 206697828 U CN206697828 U CN 206697828U CN 201720511353 U CN201720511353 U CN 201720511353U CN 206697828 U CN206697828 U CN 206697828U
Authority
CN
China
Prior art keywords
loop
combining unit
cabinet
intelligent terminal
gis
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720511353.7U
Other languages
Chinese (zh)
Inventor
彭勇
谌嘉图
梁亮
邓毅波
兰志丰
盘格武
曲旺
张君跃
李雄军
钟志强
刘汝墨
陈蓓
杨帅
颜萍
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yiyang Electric Power Survey And Design Institute Co Ltd
Original Assignee
Yiyang Electric Power Survey And Design Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yiyang Electric Power Survey And Design Institute Co Ltd filed Critical Yiyang Electric Power Survey And Design Institute Co Ltd
Priority to CN201720511353.7U priority Critical patent/CN206697828U/en
Application granted granted Critical
Publication of CN206697828U publication Critical patent/CN206697828U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Remote Monitoring And Control Of Power-Distribution Networks (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

Power transformation engineering technical field is the utility model is related to, discloses a kind of precast combined switch board, to meet the requirement of power network standard dispatching formula intelligent substation.In the utility model; GIS secondary components and loop feature and process layer, wall secondary device part are vertically separated into same cabinet; GIS secondary components and loop feature include on/off switch switching circuitry, a distant place/on the spot change-over switch loop, anti-jump loop, pressure and position instruction loop, need relay to think highly of dynamic alarm signal loop, and secondary device includes combining unit Intelligent terminal integration device, protection observing and controlling integrating device and digital watt-hour meter;And connected in the cabinet between each modularization entity through the prefabricated plug and play interface of both-end; the combining unit Intelligent terminal integration device is connected with the GIS secondary components and loop feature through pre-fabricated electric cables, and the combining unit Intelligent terminal integration device is connected with the protection observing and controlling integrating device through prefabricated optical cable.

Description

Precast combined switch board
Technical field
It the utility model is related to power transformation engineering technical field, more particularly to a kind of precast combined switch board.
Background technology
Indoor GIS intelligent primary equipment can integrally be divided into four parts:Primary equipment body (band mechanism case), tradition are converged Control cabinet, Intelligent control cabinet process layer segment, Intelligent control cabinet blank layer portions.
At present, it is only by intelligence mostly although intelligent substation GIS convergence control cabinets are with Intelligent control cabinet integrated design Energy control device is transferred in convergence control cabinet, and entirely without all devices remained in traditional GIS convergence control cabinet deleted.In engineering In implementation, one or two times producer needs matching design, completed in a factory primary connection and part secondary connection (primary equipment with Between second process layer equipment), complete remaining secondary connection at the scene (between second process layer and bay device).One or two times Interface is unintelligible, often result in producer design among the problem of, it is necessary to repeatedly confirm modification.
Traditional convergence control cabinet is by subsidiary control loop (such as unbalanced three-phase lines loop, tank circuit, the locked loop of breaker Deng), on the spot signal circuit, TA secondary current, TV secondary voltage after the pooling, with controlling the protection at the interval, observing and controlling etc. Contact.Primary equipment producer melts hair designed capacity due to lack of wisdom for a long time, and GIS linear quadratic control part (is converged on the spot Control cabinet) rest on be made up of original terminal block, relay, contactor, optical word row etc. always, this is design, operation, safeguard, Maintenance etc. is all made troubles.And originally due to primary and secondary specialty subdivision so that many work(in former Traditional control cabinet Function phase that can be with protection control in secondary repeats, such as anti-jump, pressure atresia, unbalanced three-phase lines etc..
Utility model content
The utility model purpose is to disclose a kind of precast combined switch board, by traditional convergence control cabinet, Intelligent control cabinet Process layer segment, Intelligent control cabinet blank layer portions are integrated in one, and are easy to implement in factory and complete production, assembling, debugging, mark Standardization design, batch production processing, assembled construction, meet the requirement of power network standard dispatching formula intelligent substation.
To achieve the above object, it is vertical in same cabinet the utility model discloses a kind of precast combined switch board It is separated into GIS secondary components and loop feature and process layer, wall secondary device part, GIS secondary components and loop portion Point include on/off switch switching circuitry, a distant place/on the spot change-over switch loop, anti-jump loop, pressure and position instruction loop, needs after The alarm signal loop that electrical equipment moves again, process layer, wall secondary device include combining unit Intelligent terminal integration device, protection Observing and controlling integrating device and digital watt-hour meter;And connect in cabinet between each modularization entity through the prefabricated plug and play interface of both-end Connect, combining unit Intelligent terminal integration device is connected with GIS secondary components and loop feature through pre-fabricated electric cables, combining unit intelligence Terminal integrating device is connected with protection observing and controlling integrating device through prefabricated optical cable.
Preferably, reserved area is also remained with the utility model cabinet by the necessary loop of breaker normal operating and cabinet Outer supporting actuation means docking.
Optionally, combining unit Intelligent terminal integration device connects with protection observing and controlling integrating device through ST-ST heads prefabricated optical cable Connect.Further, the utility model is transmitted based on GOOSE network realizes the position of the switch, block signal instead of traditional hardwire With the transmission of the real time information such as trip signal.
The utility model has the advantages that:
On the one hand, traditional convergence control cabinet, Intelligent control cabinet process layer segment, Intelligent control cabinet blank layer portions are integrated in one Body, the secondary circuit of repetition can be greatly reduced;And the GIS Intelligent control cabinets based on a secondary integration can effectively cancel and Simplify redundant loop, improve the reliability of whole secondary circuit, while also shorten process layer to the distance of bay device, The use of fiber optic cable can be effectively reduced, saves optical electrical cable and laying investment, the mutual inductance under being applied based on the utility model energetically Device is with protecting the electrical distance of control device to greatly shorten so that the Capacity Selection of transformer is more easy, also mutual for small-power The application of sensor (LPCT) creates condition;On the other hand, inserted i.e. between each modularization entity through both-end is prefabricated in cabinet Connected with interface, be easy to implement in factory and complete production, assembling, debugging, standardized designs, batch production processing, assembled construction, Meet the requirement of power network standard dispatching formula intelligent substation.
Below with reference to accompanying drawings, the utility model is described in further detail.
Brief description of the drawings
The accompanying drawing for forming the part of the application is used for providing further understanding to of the present utility model, of the present utility model Schematic description and description is used to explain the utility model, does not form to improper restriction of the present utility model.In accompanying drawing In:
Fig. 1 is the composition frame chart of precast combined switch board disclosed in the utility model embodiment.
Embodiment
Embodiment of the present utility model is described in detail below in conjunction with accompanying drawing, but the utility model can be by right It is required that the multitude of different ways for limiting and covering is implemented.
Embodiment 1
The present embodiment discloses a kind of precast combined switch board.
As shown in figure 1, the present embodiment is vertically separated into GIS secondary components and loop feature 1 and process in same cabinet Layer, wall secondary device part 2, GIS secondary components and loop feature include on/off switch switching circuitry 11, a distant place/turn on the spot Change switching circuitry 12, anti-jump loop 13, pressure and position instruction loop 14, need relay to think highly of dynamic alarm signal loop 15, Process layer, wall secondary device include protection observing and controlling integrating device 21, combining unit Intelligent terminal integration device 22 and numeral Formula kilowatt-hour meter 23;And connected in cabinet between each modularization entity through the prefabricated plug and play interface of both-end, combining unit intelligence Terminal integrating device is connected with GIS secondary components and loop feature through pre-fabricated electric cables, combining unit Intelligent terminal integration device with Protection observing and controlling integrating device connects through prefabricated optical cable.Optionally, combining unit Intelligent terminal integration device integrates with protection observing and controlling Device connects through ST-ST heads optical cable.The connection between precast combined switch board and primary equipment in the present embodiment is mainly disconnected The control cable of road device, isolating switch mechanism to switch board secondary circuit, it is preferred to use the prefabricated aviation plug of both-end is realized.
Preferably, reserved area is also remained with the present embodiment cabinet by outside the necessary loop of breaker normal operating and cabinet Supporting actuation means docking.Further, the present embodiment replaces traditional hardwire to realize switch based on GOOSE network transmission The transmission of the real time information such as position, block signal and trip signal.
The present embodiment has the advantages that:
On the one hand, traditional convergence control cabinet, Intelligent control cabinet process layer segment, Intelligent control cabinet blank layer portions are integrated in one Body, the secondary circuit of repetition can be greatly reduced;And the GIS Intelligent control cabinets based on a secondary integration can effectively cancel and Simplify redundant loop, improve the reliability of whole secondary circuit, while also shorten process layer to the distance of bay device, The use of fiber optic cable can be effectively reduced, saves optical electrical cable and laying investment, the mutual inductance under being applied based on the utility model energetically Device is with protecting the electrical distance of control device to greatly shorten so that the Capacity Selection of transformer is more easy, also mutual for small-power The application of sensor (LPCT) creates condition;On the other hand, inserted i.e. between each modularization entity through both-end is prefabricated in cabinet Connected with interface, be easy to implement in factory and complete production, assembling, debugging, standardized designs, batch production processing, assembled construction, Meet the requirement of power network standard dispatching formula intelligent substation.
To sum up, precast combined Intelligent control cabinet disclosed in the present embodiment, it is by prefabricated Intelligent control cabinet cabinet, cabinet GIS secondary devices loop, protection measuring and controlling equipment, multi-function watt-hour meter and combining unit intelligent terminal integrate in auxiliary equipment, cabinet Equipment etc. is formed, and the work such as related layouts, debugging are completed in factory, as a whole Transporting to job site, is carried out Installation, wiring and debugging, can significantly shorten the construction period;Realize efficiently, the linear quadratic control connected mode of standard, reduce scene Wiring workload, improve connection reliability.
Preferred embodiment of the present utility model is the foregoing is only, is not limited to the utility model, for this For the technical staff in field, the utility model can have various modifications and variations.It is all in the spirit and principles of the utility model Within, any modification, equivalent substitution and improvements made etc., it should be included within the scope of protection of the utility model.

Claims (4)

1. a kind of precast combined switch board, it is characterised in that GIS secondary components and loop are vertically separated into same cabinet Part and process layer, wall secondary device part, GIS secondary components and loop feature include on/off switch switching circuitry, remote Side/on the spot change-over switch loop, anti-jump loop, pressure and position instruction loop, need relay to think highly of dynamic alarm signal loop, Process layer, wall secondary device include combining unit Intelligent terminal integration device, protection observing and controlling integrating device and digital electric Spend table;And connected in the cabinet between each modularization entity through the prefabricated plug and play interface of both-end, the combining unit intelligence Energy terminal integrating device is connected with the GIS secondary components and loop feature through pre-fabricated electric cables, the combining unit intelligent terminal Integrating device is connected with the protection observing and controlling integrating device through prefabricated optical cable.
2. precast combined switch board according to claim 1, it is characterised in that reserved area is also remained with cabinet will Docked with actuation means supporting outside cabinet in the necessary loop of breaker normal operating.
3. precast combined switch board according to claim 1, it is characterised in that the combining unit intelligent terminal integrates Device is connected with the protection observing and controlling integrating device through ST-ST head prefabricated optical cables.
4. precast combined switch board according to any one of claims 1 to 3, it is characterised in that transmitted based on GOOSE network The transmission of the position of the switch, block signal and trip signal real time information is realized instead of traditional hardwire.
CN201720511353.7U 2017-05-09 2017-05-09 Precast combined switch board Active CN206697828U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720511353.7U CN206697828U (en) 2017-05-09 2017-05-09 Precast combined switch board

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720511353.7U CN206697828U (en) 2017-05-09 2017-05-09 Precast combined switch board

Publications (1)

Publication Number Publication Date
CN206697828U true CN206697828U (en) 2017-12-01

Family

ID=60449253

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720511353.7U Active CN206697828U (en) 2017-05-09 2017-05-09 Precast combined switch board

Country Status (1)

Country Link
CN (1) CN206697828U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109193435A (en) * 2018-08-28 2019-01-11 中国电建集团河北省电力勘测设计研究院有限公司 A kind of electrification secondary device
CN114069832A (en) * 2020-07-30 2022-02-18 南京南瑞继保电气有限公司 GIS intelligent system based on primary and secondary equipment fusion

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109193435A (en) * 2018-08-28 2019-01-11 中国电建集团河北省电力勘测设计研究院有限公司 A kind of electrification secondary device
CN114069832A (en) * 2020-07-30 2022-02-18 南京南瑞继保电气有限公司 GIS intelligent system based on primary and secondary equipment fusion
CN114069832B (en) * 2020-07-30 2023-11-17 南京南瑞继保电气有限公司 GIS intelligent system based on integration of secondary equipment

Similar Documents

Publication Publication Date Title
CN206697828U (en) Precast combined switch board
CN108682579B (en) Remote control method for power supply of isolating switch motor
JP4593923B2 (en) Medium pressure integrated switchgear
CN103107595A (en) Substation automation system in prefabricated transformer substation
CN104701991A (en) Overhauling method of intelligent substation relay protection device
CN101150246A (en) 110kV and higher modular transformer substation and its construction method
CN109696863B (en) Distributed intelligent switch and control system thereof
CN110600251A (en) Combined voltage transformer with zero sequence voltage output function
WO2019169950A1 (en) Railway power supply system and outdoor parallel modular device for railway power supply system
CN102708256B (en) Standardization design method for five-prevention blocking function of transformer substation
CN109119283A (en) A kind of one or two fusion outdoor SF6 gas breakers
US11799274B2 (en) Tower mounted high voltage switchgear
CN105958354A (en) 110kV/10kV and 110kV/35kV two pre-installed integrated intelligent substations
CN201774313U (en) Process layer combining unit
CN101510671A (en) Interchanging type whole solid insulation fixing switch loop
CN105024454A (en) Transformer substation secondary equipment monitoring system
CN208445179U (en) A kind of 110 kilovolts of modular assembly formula indoor substations
CN104917091A (en) Plateau type intelligent withdrawable alternating-current metal-enclosed switchgear
CN104409973A (en) Intelligent switching station
CN104201591B (en) A kind of energy whole Transporting and the change power distribution transformer assembly that installs
CN209948370U (en) Bypass node type PT cabinet
CN208489574U (en) A kind of low-voltage comprehensive distribution box with emergency power supply plug
CN207021223U (en) A kind of convergence control cabinet using integrated control device
CN206727731U (en) Transformer station's switch board
CN206834555U (en) Telemechanical type railway power source special

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant