CN206693311U - Raw water supply channel and system - Google Patents
Raw water supply channel and system Download PDFInfo
- Publication number
- CN206693311U CN206693311U CN201720470267.6U CN201720470267U CN206693311U CN 206693311 U CN206693311 U CN 206693311U CN 201720470267 U CN201720470267 U CN 201720470267U CN 206693311 U CN206693311 U CN 206693311U
- Authority
- CN
- China
- Prior art keywords
- valve
- pipeline
- raw water
- supply channel
- water supply
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Pipeline Systems (AREA)
Abstract
Raw water supply channel technical field is the utility model is related to, more particularly, to a kind of raw water supply channel and system.Including:The first pipeline, the second pipeline that one end turns on the water intake end of first pipeline and the other end turns on the raw water box, the first valve for being arranged at first pipeline, the second valve for being arranged at second pipeline and the electric control gear for controlling first valve and second valve opening and closing that both ends turn on running water pipe and raw water box respectively.In the case of the hydraulic pressure deficiency of running water pipe, electric control gear only needs one valve of control to open, and in the case of the hydraulic pressure deficiency of running water pipe, can control two valves while open to ensure that the sufficient water body of raw water box is fed.
Description
Technical field
Raw water supply channel technical field is the utility model is related to, more particularly, to a kind of raw water supply channel and system.
Background technology
In manufacturing, raw water box can be used in water storage, and the water of storage is produced for company.Water in raw water box by
The water body of running water pipe is supplemented, and still, when Running-water Company's water supply pressure deficiency, the water of raw water box can not be mended in time
Fill, equipment will be caused out of service, after the water abundance of raw water box, can just resume work, the production of company is easily by running water
The influence of company's water supply pressure.
Thus, the problem of raw water box insufficient water in the prior art be present.
Utility model content
The purpose of this utility model is to provide a kind of raw water supply channel and system, to alleviate present in prior art
The technical problem of raw water box insufficient water.
In order to solve the above technical problems, technical scheme provided by the utility model is:
A kind of raw water supply channel, including:The first pipeline that both ends turn on running water pipe and raw water box respectively, one end with
First pipeline water intake end conducting and the other end turned on the raw water box the second pipeline, be arranged at it is described first manage
First valve on road, the second valve for being arranged at second pipeline and for controlling first valve and second valve
The electric control gear of door opening and closing.
Further,
It is additionally included under flow action and produces electric energy and the electric energy is transferred to the electric control gear, first valve
With the performance device of second valve.
Further,
The performance device includes the hydraulic turbine, generator and battery;
The hydraulic turbine is arranged in the pipeline of first pipeline and/or second pipeline, in flow action
Lower to rotate and drive the generator to rotate to generate electricity, the battery is used to store the electric energy as caused by the generator.
Further,
Also include detection means, the detection means is used to detect the liquid level data of the raw water box and the running water
The hydraulic pressure data of pipe, and by the liquid level data and the hydraulic pressure data transfer to the electric control gear.
Further,
The detection means includes the liquid level sensor being arranged in the raw water box, and is arranged at the running water pipe
Close first pipeline end pressure sensor.
Further,
The electric control gear includes single-chip microcomputer, and the single-chip microcomputer is used for:
When the real time data of detection means detection be higher than first threshold, first valve closing and the are controlled
Two valves are opened;
When the real time data of detection means detection is between first threshold and Second Threshold, the first valve is controlled
Open, the second valve closure;
When the real time data of detection means detection is less than Second Threshold, the first valve and the second valve is controlled to beat
Open.
Further,
First valve and second valve are arranged to magnetic valve.
Further,
Also include the screen pack for being arranged at first pipeline and second pipeline.
Further,
The caliber of first pipeline is 110mm, and the caliber of second pipeline is 50mm.
A kind of raw water water system of the raw water supply channel including described in any of the above-described, in addition to raw water box.
With reference to above technical scheme, the beneficial effect that the utility model can reach is:
The utility model provides a kind of raw water supply channel, including:Both ends turn on running water pipe and raw water box respectively
The first pipeline, one end is turned on the water intake end of first pipeline and the other end turns on the raw water box the second pipe
Road, the first valve for being arranged at first pipeline, the second valve for being arranged at second pipeline and described for controlling
The electric control gear of first valve and second valve opening and closing.Due to connection running water pipe of the prior art and the pipe of raw water box
Road only has all the way, thus is easy to occur the technical problem of raw water box insufficient water in running water pipe hydraulic pressure deficiency.To solve
Above-mentioned technical problem, technical scheme provided by the utility model are provided with the first pipeline and the second pipeline, and on the first pipeline
The first valve is provided with, is provided with the second valve on the second pipeline, electric control gear can control the first valve and the second valve
Opening and closing, so as to which electric control gear can control the conduction status of the first pipeline and the second pipeline.Sufficient in the hydraulic pressure of running water pipe
In the case of, electric control gear only needs one valve of control to open, and in the hydraulic pressure deficiency of running water pipe, two valves can be controlled same
When open with ensure the sufficient water body of raw water box feed.
Brief description of the drawings
, below will be right in order to illustrate more clearly of the utility model embodiment or technical scheme of the prior art
The required accompanying drawing used is briefly described in embodiment or description of the prior art, it should be apparent that, describe below
In accompanying drawing be some embodiments of the present utility model, for those of ordinary skill in the art, do not paying creativeness
On the premise of work, other accompanying drawings can also be obtained according to these accompanying drawings.
Fig. 1 is the structural representation for the raw water supply channel that the utility model embodiment provides;
Fig. 2 is the schematic diagram for the performance device that the utility model embodiment provides;
Fig. 3 is the control principle drawing for the raw water supply channel that the utility model embodiment provides;
Fig. 4 is the schematic diagram for the detection means that the utility model embodiment provides.
Icon:The pipelines of 100- first;The pipelines of 200- second;The valves of 110- first;The valves of 210- second;300- is former
Water tank.
Embodiment
The technical solution of the utility model is clearly and completely described below in conjunction with accompanying drawing, it is clear that described
Embodiment is the utility model part of the embodiment, rather than whole embodiments.Based on the embodiment in the utility model, sheet
The every other embodiment that field those of ordinary skill is obtained under the premise of creative work is not made, belongs to this practicality
Novel protected scope.
, it is necessary to explanation in description of the present utility model, term " " center ", " on ", " under ", it is "left", "right", " perpendicular
Directly ", the orientation of the instruction such as " level ", " interior ", " outer " or position relationship are based on orientation shown in the drawings or position relationship, are only
Described for the ease of description the utility model and simplifying, rather than instruction or imply signified device or element must have it is specific
Orientation, with specific azimuth configuration and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " the
One ", " second ", " the 3rd " are only used for describing purpose, and it is not intended that instruction or hint relative importance.
, it is necessary to which explanation, unless otherwise clearly defined and limited, term " are pacified in description of the present utility model
Dress ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or integratedly
Connection;Can be mechanical connection or electrical connection;Can be joined directly together, can also be indirectly connected by intermediary,
It can be the connection of two element internals.For the ordinary skill in the art, above-mentioned art can be understood with concrete condition
Concrete meaning of the language in the utility model.
Embodiment 1 and embodiment 2 are described in detail below in conjunction with the accompanying drawings:
Fig. 1 is the structural representation for the raw water supply channel that the utility model embodiment provides;Fig. 2 is that the utility model is real
The schematic diagram of the performance device of example offer is provided;Fig. 3 is the control principle for the raw water supply channel that the utility model embodiment provides
Figure;Fig. 4 is the schematic diagram for the detection means that the utility model embodiment provides.
Embodiment 1
A kind of raw water supply channel is present embodiments provided, refer to Fig. 1 to Fig. 4, including:Both ends respectively with running water pipe
With raw water box 300 turn on the first pipeline 100, one end is turned on the water intake end of the first pipeline 100 and the other end and raw water box
Second pipeline 200 of 300 conductings, it is arranged at the first valve 110 of the first pipeline 100, is arranged at the second valve of the second pipeline 200
Door 210 and the electric control gear for controlling the first valve 110 and the opening and closing of the second valve 210.
Due to the pipeline of connection running water pipe of the prior art and raw water box 300 only all the way, thus in running water pipe
It is easy to occur the technical problem of the insufficient water of raw water box 300 during hydraulic pressure deficiency.In order to solve the above technical problems, the utility model
The technical scheme of offer is provided with the first pipeline 100 and the second pipeline 200, and is provided with the first valve on the first pipeline 100
110, it is provided with the second valve 210 on the second pipeline 200, electric control gear can control the first valve 110 and the second valve 210
Opening and closing, so as to which electric control gear can control the conduction status of the first pipeline 100 and the second pipeline 200.In the water of running water pipe
In the case of abundance, electric control gear only needs one valve of control to open, and when the water of running water pipe is inadequate, can control two
Individual valve is opened to ensure that the sufficient water body of raw water box 300 is fed simultaneously.
In alternative of the present utility model, further,
Raw water supply channel also includes performance device, and performance device produces electric energy under flow action and is transferred to electric energy
Electric control gear, the first valve 110 and the second valve 210.
In above-mentioned alternative, further,
Performance device includes the hydraulic turbine, generator and battery;
In more detail:
The hydraulic turbine is arranged in the pipeline of the first pipeline 100 and/or the second pipeline 200, for being rotated under flow action
And driving generator to rotate to generate electricity, battery is used to store the electric energy as caused by generator.
More preferably, the position of the hydraulic turbine and quantity can be configured according to particular condition in use, such as first
At least one hydraulic turbine is set in pipeline 100, in another example setting at least one hydraulic turbine in the second pipeline 200, then for example existed
At least one hydraulic turbine is respectively provided with first pipeline 100 and the second pipeline 200.The hydraulic turbine is preferably micro hydraulic turbine, with convenient
Installation and use.
More preferably, generator can be dc generator or alternating current generator.When generator is dc generator
When, mechanical energy driving dc generator directly produces direct current again by accumulators store caused by the hydraulic turbine.When generator is friendship
When flowing generator, it is also necessary to a rectifier is configured, mechanical energy driving alternator produces alternating current as caused by the hydraulic turbine,
Direct current is converted to again by accumulators store after the rectified device of alternating current.
More preferably, battery be preferably rated voltage be 6v or 4.5v battery, it is necessary to explanation, this practicality
New battery can also be substituted by electric capacity.
In alternative of the present utility model, further:
Raw water supply channel also includes detection means, detection means be used for the liquid level data for detecting raw water box 300 and from
Carry out the hydraulic pressure data of water pipe, and by liquid level data and hydraulic pressure data transfer to electric control gear.
Specifically:
The liquid level data of detection means detection raw water box 300 and the hydraulic pressure data of running water pipe, then by liquid level data
With hydraulic pressure data transfer to electric control gear, after electric control gear receives above-mentioned liquid level data and hydraulic pressure data, the first valve 110 is controlled
Open and the second valve 210 closes, or the first valve 110 of control closes and the second valve 210 is opened, or control
First valve 110 and the second valve 210 are opened.Specifically, when hydraulic pressure data and liquid level data are within critical field
When, electric control gear controls the first valve 110 to open and the second valve 210 closes, or the first valve 110 of control close and
Second valve 210 is opened, and when hydraulic pressure data and liquid level data are respectively positioned under critical field, electric control gear controls the first valve
110 and second valve 210 open.
In alternative of the present utility model, further,
Detection means includes being arranged at liquid level sensor in raw water box 300, and be arranged at running water pipe close to the
The pressure sensor of the end of one pipeline 100.Liquid level sensor is used for the liquid level data for detecting raw water box 300, pressure sensor
For detecting the pressure data of running water pipe.After electric control gear receives above-mentioned liquid level data and hydraulic pressure data, the first valve is controlled
110 openings and the second valve 210 are closed, and either the first valve 110 of control is closed and the second valve 210 is opened or controlled
Make the first valve 110 and the second valve 210 is opened.
In alternative of the present utility model, further,
Electric control gear includes single-chip microcomputer, and single-chip microcomputer is used for:
When the real time data of detection means detection is higher than first threshold, the first valve 110 of control is closed and the second valve
Door 210 is opened;
When the real time data of detection means detection is between first threshold and Second Threshold, the first valve 110 is controlled
Open, the second valve 210 closes;
When the real time data of detection means detection is less than Second Threshold, the first valve 110 and the second valve 210 is controlled to beat
Open.
It should be noted that above-mentioned first threshold includes the first level threshold and the first hydraulic pressure threshold value.Second Threshold bag
Include the second level threshold and the second hydraulic pressure threshold value.Also, the first level threshold is more than the second level threshold, the first hydraulic pressure threshold value is big
In the second hydraulic pressure threshold value.It is more than the first level threshold, also, pressure sensor in the real-time level data of liquid level sensor detection
When the real-time hydraulic pressure data of detection are more than the first hydraulic pressure threshold value, electric control gear the first valve 110 of control is closed and the second valve
210 open.In the real-time level data that liquid level sensor detects between the first level threshold and the second level threshold, and
And pressure sensor detection real-time hydraulic pressure data between the first hydraulic pressure threshold value and the second hydraulic pressure threshold value when, electric control gear
The first valve 110 is controlled to open, the second valve 210 closes.It is less than the second liquid in the real-time level data of liquid level sensor detection
During the threshold value of position, also, the real-time hydraulic pressure data of pressure sensor detection are when be less than the second hydraulic pressure threshold value, automatically controlled solemnly to control first
The valve 210 of valve 110 and second is opened.
In alternative of the present utility model, further,
First valve 110 and the second valve 210 are arranged to magnetic valve.Magnetic valve is in the conduction state when being powered, disconnected
It is closed when electric.
In alternative of the present utility model, further,
Also include the screen pack for being arranged at the first pipeline 100 and the second pipeline 200.Screen pack can for example be arranged at first
The water side of the pipeline 200 of pipeline 100 and second, it is preferable that screen pack detachably connects with the first pipeline 100 and the second pipeline 200
Connect, with facilitate the dirty accumulation on screen pack to a certain degree when screen pack is torn open from the first pipeline 100 and the second pipeline 200
Remove and screen pack is cleaned.
In alternative of the present utility model, further,
The caliber of first pipeline 100 is 110mm, and the caliber of the second pipeline 200 is 50mm.
It is experimentally verified that, the work that the caliber of the first pipeline 100 is 110mm and the caliber of the second pipeline 200 is 50mm
Effect is preferable.
Embodiment 2
Present embodiments provide a kind of raw water water system of the raw water supply channel including embodiment 1, in addition to raw water
Case 300.
In more detail:
Including:The first pipeline 100 that raw water box 300, both ends turn on running water pipe and raw water box 300 respectively, one end with
The water intake end conducting of first pipeline 100 and the other end and the second pipeline 200 of the conducting of raw water box 300, it is arranged at the first pipeline
100 the first valve 110, the second valve 210 for being arranged at the second pipeline 200 and for control the first valve 110 and second
The electric control gear that valve 210 is opened and closed.
Due to the pipeline of connection running water pipe of the prior art and raw water box 300 only all the way, thus in running water pipe
It is easy to occur the technical problem of the insufficient water of raw water box 300 during hydraulic pressure deficiency.In order to solve the above technical problems, the utility model
The technical scheme of offer is provided with the first pipeline 100 and the second pipeline 200, and is provided with the first valve on the first pipeline 100
110, it is provided with the second valve 210 on the second pipeline 200, electric control gear can control the first valve 110 and the second valve 210
Opening and closing, so as to which electric control gear can control the conduction status of the first pipeline 100 and the second pipeline 200.In the hydraulic pressure of running water pipe
In the case of deficiency, electric control gear only needs one valve of control to open, and in the case of the hydraulic pressure deficiency of running water pipe, can control
Two valves of system are opened to ensure that the sufficient water body of raw water box 300 is fed simultaneously.
Finally it should be noted that:Various embodiments above is only to illustrate the technical solution of the utility model, rather than it is limited
System;Although the utility model is described in detail with reference to foregoing embodiments, one of ordinary skill in the art should
Understand:It can still modify to the technical scheme described in foregoing embodiments, either to which part or whole
Technical characteristic carries out equivalent substitution;And these modifications or replacement, the essence of appropriate technical solution is departed from this practicality newly
The scope of each embodiment technical scheme of type.
Claims (10)
- A kind of 1. raw water supply channel, it is characterised in that including:The first pipe that both ends turn on running water pipe and raw water box respectively Road, the second pipeline that one end turns on the water intake end of first pipeline and the other end turns on the raw water box, it is arranged at First valve of first pipeline, the second valve for being arranged at second pipeline and for control first valve and The electric control gear of second valve opening and closing.
- 2. raw water supply channel according to claim 1, it is characterised in thatIt is additionally included under flow action and produces electric energy and the electric energy is transferred to the electric control gear, first valve and institute State the performance device of the second valve.
- 3. raw water supply channel according to claim 2, it is characterised in thatThe performance device includes the hydraulic turbine, generator and battery;The hydraulic turbine is arranged in the pipeline of first pipeline and/or second pipeline, for turning under flow action Move and drive the generator to rotate to generate electricity, the battery is used to store the electric energy as caused by the generator.
- 4. raw water supply channel according to claim 1, it is characterised in thatAlso include detection means, the detection means is used for the liquid level data for detecting the raw water box and the running water pipe Hydraulic pressure data, and by the liquid level data and the hydraulic pressure data transfer to the electric control gear.
- 5. raw water supply channel according to claim 4, it is characterised in thatThe detection means includes the liquid level sensor being arranged in the raw water box, and is arranged at leaning on for the running water pipe The pressure sensor of the end of nearly first pipeline.
- 6. raw water supply channel according to claim 4, it is characterised in thatThe electric control gear includes single-chip microcomputer, and the single-chip microcomputer is used for:When the real time data of detection means detection is higher than first threshold, the first valve closing and the second valve are controlled Door is opened;When the real time data of detection means detection is between first threshold and Second Threshold, the first valve of control is beaten Open, the second valve closure;When the real time data of detection means detection is less than Second Threshold, the first valve and the second valve is controlled to open.
- 7. raw water supply channel according to claim 1, it is characterised in thatFirst valve and second valve are arranged to magnetic valve.
- 8. raw water supply channel according to claim 1, it is characterised in thatAlso include the screen pack for being arranged at first pipeline and second pipeline.
- 9. raw water supply channel according to claim 1, it is characterised in thatThe caliber of first pipeline is 110mm, and the caliber of second pipeline is 50mm.
- 10. a kind of raw water water system of the raw water supply channel including as described in claim any one of 1-9, its feature exist In, in addition to raw water box.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720470267.6U CN206693311U (en) | 2017-04-28 | 2017-04-28 | Raw water supply channel and system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720470267.6U CN206693311U (en) | 2017-04-28 | 2017-04-28 | Raw water supply channel and system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206693311U true CN206693311U (en) | 2017-12-01 |
Family
ID=60447006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720470267.6U Expired - Fee Related CN206693311U (en) | 2017-04-28 | 2017-04-28 | Raw water supply channel and system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206693311U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824545A (en) * | 2018-05-30 | 2018-11-16 | 泉州科维嘉电力有限公司 | A kind of intelligence water storage system |
CN116447066A (en) * | 2023-06-07 | 2023-07-18 | 中国建筑设计研究院有限公司 | Pipeline pressure control and power generation system and control method thereof |
-
2017
- 2017-04-28 CN CN201720470267.6U patent/CN206693311U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108824545A (en) * | 2018-05-30 | 2018-11-16 | 泉州科维嘉电力有限公司 | A kind of intelligence water storage system |
CN116447066A (en) * | 2023-06-07 | 2023-07-18 | 中国建筑设计研究院有限公司 | Pipeline pressure control and power generation system and control method thereof |
CN116447066B (en) * | 2023-06-07 | 2024-03-22 | 中国建筑设计研究院有限公司 | Pipeline pressure control and power generation system and control method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206693311U (en) | Raw water supply channel and system | |
CN104079029B (en) | Electric energy feedback type battery charging and discharging and partial volume equipment | |
CN206457875U (en) | A kind of intelligent water supply and share system based on PLC | |
CN209708788U (en) | A kind of transformer oiling auxiliary system | |
CN206704204U (en) | A kind of railway passenger train water-supply apparatus | |
CN204551587U (en) | Distributed photovoltaic automatic rain water collection device | |
CN104064797B (en) | A kind of lithium ion flow battery system | |
CN202463813U (en) | Intelligent water feeding device of passenger train | |
CN203810027U (en) | Gas storage tank | |
CN105416073A (en) | Electric motor coach drive control system and method | |
CN201946691U (en) | Heat preservation system for fuel cells | |
CN206514552U (en) | A kind of water economizer | |
CN206553234U (en) | A kind of fully automatic integral intelligent oil separation equipment | |
CN206833262U (en) | Cell cistern water level automatically controls and warning system | |
CN206506339U (en) | A kind of BUCK charging devices | |
CN206758613U (en) | A kind of battery heat preservation system suitable for cold district new energy pure electric coach | |
CN206260323U (en) | A kind of power set for hay mover | |
CN206457243U (en) | Fuel tank refueling device based on converter technique | |
CN109488830A (en) | A kind of pressure valve voltage adjusting device | |
CN201458458U (en) | Elevator by utilizing wind energy | |
CN107611331A (en) | Battery water filling car | |
CN205475449U (en) | Full -automatic steady voltage water supply installation | |
CN108110334A (en) | Battery liquid Regeneration and Repair device | |
CN208891779U (en) | A kind of glue filling device convenient for product shoes production | |
CN209686517U (en) | A kind of connected applications structure of intelligence clear water tanks and intelligent remote water feeding tank |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171201 Termination date: 20210428 |