CN206693299U - A kind of water supply installation with voltage stabilizing function - Google Patents

A kind of water supply installation with voltage stabilizing function Download PDF

Info

Publication number
CN206693299U
CN206693299U CN201720207252.0U CN201720207252U CN206693299U CN 206693299 U CN206693299 U CN 206693299U CN 201720207252 U CN201720207252 U CN 201720207252U CN 206693299 U CN206693299 U CN 206693299U
Authority
CN
China
Prior art keywords
water
pipe
steady flow
flow compensation
water supply
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720207252.0U
Other languages
Chinese (zh)
Inventor
杨泽平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Yuanjian Tongda Water Supply Equipment Co Ltd
Original Assignee
Fujian Yuanjian Tongda Water Supply Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Yuanjian Tongda Water Supply Equipment Co Ltd filed Critical Fujian Yuanjian Tongda Water Supply Equipment Co Ltd
Priority to CN201720207252.0U priority Critical patent/CN206693299U/en
Application granted granted Critical
Publication of CN206693299U publication Critical patent/CN206693299U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Water Treatment By Sorption (AREA)
  • Domestic Plumbing Installations (AREA)

Abstract

The utility model discloses a kind of water supply installation with voltage stabilizing function, including steady flow compensation tank, isocon, water pump and check-valves, the steady flow compensation tank side is provided with vacuum suppresser, the vacuum suppresser side is provided with water inlet, the steady flow compensation tank opposite side is provided with ionization water purifier, the steady flow compensation pot bottom is provided with flow pipe, flow pipe side is connected with isocon, the isocon side is provided with drinking-water pipe, the drinking-water pipe side is connected with water pump, the water pump side is provided with check-valves, the non-return valve surface switchs provided with non-return, feed pipe is provided with the top of the check-valves.The utility model, novelty reasonable in design, it is easy to use, voltage stabilizing processing can be carried out with water to city high rise building layer, the service efficiency of water supply installation is higher, and weatherability condition is preferable, ionization process can be carried out to feeding water source simultaneously, ensure the normal use of water user, there is higher practicality, be adapted to be widely popularized and use.

Description

A kind of water supply installation with voltage stabilizing function
Technical field
A kind of supply equipment is the utility model is related to, more particularly to a kind of water supply installation with voltage stabilizing function.
Background technology
With developing rapidly for social economy, water increasingly strengthens people's lives and industrial influence, for city For water, requirement of the people to the quality of water supply and security reliability improves constantly, and user's water number be often to become It is dynamic, therefore insufficient water or the superfluous situation that supplies water often occur, the control system of prior art supply equipment, usually because with Water pressure fluctuations, which occurs, in family pipe network causes water pump frequent start-stop, not only causes user to cut off the water but also causes shadow to the service life of water pump Ring, while the situation for because hydraulic pressure does not reach designated value, making water supply produce deficiency is tasted in high-rise water user, influence normal Water source use.A kind of therefore, it is proposed that water supply installation with voltage stabilizing function.
Utility model content
Main purpose of the present utility model is to provide a kind of water supply installation with voltage stabilizing function, novelty reasonable in design, It is easy to use, voltage stabilizing processing can be carried out with water to city high rise building layer, the service efficiency of water supply installation is higher, weatherability condition compared with It is good, while ionization process can be carried out to feeding water source, ensure the normal use of water user, there is higher practicality, Ke Yiyou Effect is solved the problems, such as in background technology.
To achieve the above object, the technical scheme that the utility model is taken is:
A kind of water supply installation with voltage stabilizing function, including steady flow compensation tank, isocon, water pump and check-valves are described steady Stream compensating tank side is provided with vacuum suppresser, and the vacuum suppresser side is provided with water inlet, the steady flow compensation tank opposite side Provided with ionization water purifier, the steady flow compensation pot bottom is provided with flow pipe, and flow pipe side is connected with isocon, the isocon Side is provided with drinking-water pipe, and the drinking-water pipe side is connected with water pump, and the water pump side is provided with check-valves, the non-return valve surface Switched provided with non-return, be provided with feed pipe at the top of the check-valves, the water supply pipe surface is provided with vacuum tank, the vacuum tank side Provided with pressure detector.
Further, the flow pipe bottom is provided with mounting seat, and the mounting seat is made up of the base of stainless steel.
Further, the pipe surface of drawing water is provided with Water supply switch valve.
Further, the steady flow compensation tank and shunting pipe surface are equipped with anti-frost protection layer, and the anti-frost protection layer is Protective layer made of protection cotton.
Further, the steady flow compensation pot bottom is provided with flange coupling connector, and the steady flow compensation tank is connected by flange Device is connected with flow pipe.
Compared with prior art, the utility model has the advantages that:Pass through steady flow compensation tank and the knot of isocon Close, wherein by steady flow compensation tank and the anti-frost protection layer of shunting pipe surface, anti-frost protection layer is protective layer made of protection cotton, is protected Shield cotton effectively can be protected to steady flow compensation tank and isocon, avoid using under low temp area and low temperature environment, lead Cause the water source inside steady flow compensation tank and isocon to freeze, supply equipment is easily damaged after opening water supply installation, influence normal Use, by the vacuum suppresser of steady flow compensation tank side, wherein vacuum suppresser can suppress to produce negative pressure in water system, protect The pressure balanced equipment of tap water pipe network is held, the resident stayed in skyscraper can be efficiently solved because hydraulic pressure not enough can not be just The problem of often using running water, it is more practical, by water inlet to being supplied water inside steady flow compensation tank, make steady flow compensation tank another The ionization water purifier of side, which is powered, to be run, and the water source inside steady flow compensation tank is carried out into ionization process, increases the depuration quality at water source, Ensure that the water source inside steady flow compensation tank is in the state that health uses simultaneously, it is more practical, it is provided with by steady flow compensation pot bottom Flange coupling connector, steady flow compensation tank are connected by flange coupling connector with flow pipe, by flange connection flow pipe seal compared with It is good, avoid connection from not causing leak and pressure leakages closely, influence normally to supply water, by flow pipe by inside steady flow compensation tank Water source is delivered to inside isocon, is shunted by isocon, water pump is powered operation, by drinking-water pipe by the water inside isocon Source is twitched, wherein the Water supply switch valve for pipe surface of drawing water, can carry out cutout processing to the water source inside drinking-water pipe, to need not More water pumps work simultaneously when, can by without using water pump and corresponding Water supply switch valve closed, avoid influenceing other The work of water pump, more practical, the water source extracted out by water pump enters inside check-valves, is switched and carried out by the non-return of non-return valve surface Regulation, it can prevent that the water source that water pump is extracted out from being flowed back, influence the normal use of supply equipment, the water source flowed through by check-valves Into feed pipe, carried out sending water to user by feed pipe, the water source inside feed pipe can be increased again by vacuum tank Or decompression processing, ensure that the flow of water source outflow is identical, can be to the pressure of supply water at feed pipe inside water source by pressure detector Detected in real time, ensure the normal use of supply equipment, more practical, the utility model, novelty reasonable in design, user Just, voltage stabilizing processing can be carried out with water to city high rise building layer, the service efficiency of water supply installation is higher, and weatherability condition is preferable, simultaneously Can to feed water source carry out ionization process, ensure the normal use of water user, there is higher practicality, be adapted to be widely popularized with Use.
Brief description of the drawings
Fig. 1 is a kind of overall structure diagram of the water supply installation with voltage stabilizing function of the utility model.
Fig. 2 is a kind of check valve structure schematic diagram of the water supply installation with voltage stabilizing function of the utility model.
Fig. 3 is a kind of anti-frost protection Rotating fields schematic diagram of water supply installation with voltage stabilizing function of the utility model.
In figure:1st, steady flow compensation tank;2nd, isocon;3rd, water pump;4th, check-valves;5th, vacuum suppresser;6th, water inlet;7th, it is electric From water purifier;8th, flow pipe;9th, mounting seat;10th, drinking-water pipe;11st, Water supply switch valve;12nd, non-return switchs;13rd, feed pipe;14、 Pressure detector;15th, vacuum tank;16th, anti-frost protection layer.
Embodiment
Technological means, creation characteristic, reached purpose and effect to realize the utility model are easy to understand, below With reference to embodiment, the utility model is expanded on further.
As Figure 1-3, a kind of water supply installation with voltage stabilizing function, including steady flow compensation tank 1, isocon 2, water pump 3 With check-valves 4, the side of steady flow compensation tank 1 is provided with vacuum suppresser 5, and the side of vacuum suppresser 5 is provided with water inlet 6, The opposite side of steady flow compensation tank 1 is provided with ionization water purifier 7, and the bottom of steady flow compensation tank 1 is provided with flow pipe 8, flow pipe 8 one Side is connected with isocon 2, and the side of isocon 2 is provided with drinking-water pipe 10, and the side of drinking-water pipe 10 is connected with water pump 3, described The side of water pump 3 is provided with check-valves 4, and the surface of check-valves 4 is provided with non-return switch 12, and the top of check-valves 4 is provided with feed pipe 13, the surface of feed pipe 13 is provided with vacuum tank 15, and the side of vacuum tank 15 is provided with pressure detector 14.
Wherein, the bottom of flow pipe 8 is provided with mounting seat 9, and the mounting seat 9 is made up of the base of stainless steel.
Wherein, the surface of drinking-water pipe 10 is provided with Water supply switch valve 11.
Wherein, steady flow compensation tank 1 and isocon 2 surface is equipped with anti-frost protection layer 16, the anti-frost protection layer 16 For protective layer made of protection cotton.
Wherein, the bottom of steady flow compensation tank 1 is provided with flange coupling connector, and the steady flow compensation tank 1 passes through flange coupling connector It is connected with flow pipe 8.
It should be noted that a kind of water supply installation with voltage stabilizing function of the utility model, when in use, is mended by current stabilization The combination of tank 1 and isocon 2 is repaid, wherein by steady flow compensation tank 1 and the anti-frost protection layer 16 on the surface of isocon 2, anti-frost protection layer 16 be protective layer made of protection cotton, and protection cotton can effectively be protected to steady flow compensation tank 1 and isocon 2, avoided Used under low temp area and low temperature environment, cause the water source inside steady flow compensation tank 1 and isocon 2 to freeze, open water supply installation After be easily damaged supply equipment, influence normally to use, by the vacuum suppresser 5 of the side of steady flow compensation tank 1, wherein vacuum suppresses Device 5 can suppress to produce negative pressure in water system, keep the pressure balanced equipment of tap water pipe network, can efficiently solve and stay in Resident in skyscraper because hydraulic pressure not enough can not normal use running water the problem of, it is more practical, current stabilization is mended by water inlet 6 Repay and supplied water inside tank 1, the ionization water purifier 7 of the opposite side of steady flow compensation tank 1 is powered and run, inside steady flow compensation tank 1 Water source carry out ionization process, increase the depuration quality at water source, while ensure that the water source inside steady flow compensation tank 1 makes in health State, it is more practical, be provided with flange coupling connector by the bottom of steady flow compensation tank 1, steady flow compensation tank 1 by flange coupling connector and Flow pipe 8 is connected, and the seal of flow pipe 8 connected by flange is preferable, avoids connection from not causing leak and pressure leakages closely, Normal water supply is influenceed, the water source inside steady flow compensation tank 1 is delivered to inside isocon 2 by flow pipe 8, carried out by isocon 2 Shunting, water pump 3 is powered and run, twitched the water source inside isocon 2 by drinking-water pipe 10, wherein the surface of drinking-water pipe 10 Water supply switch valve 11, cutout processing can be carried out to the water source inside drinking-water pipe 10, during to being worked without more water pumps 3 simultaneously, Can by without using water pump 3 and corresponding Water supply switch valve 11 closed, avoid influenceing the work of other water pumps 3, more Practicality, the water source extracted out by water pump 3 enter inside check-valves 4, are adjusted by the non-return switch 12 on the surface of check-valves 4, can be with Prevent that the water source that water pump 3 is extracted out from being flowed back, influence the normal use of supply equipment, the water source flowed through by check-valves 4, which enters, to be supplied Water pipe 13, carried out sending water to user by feed pipe 13, the water source inside feed pipe 13 can be increased again by vacuum tank 15 Add or decompression is handled, ensure that the flow of water source outflow is identical, can be to the confession at the inside water source of feed pipe 13 by pressure detector 14 Water pressure is detected in real time, ensures the normal use of supply equipment, more practical.
The advantages of general principle and principal character of the present utility model and the utility model has been shown and described above.One's own profession The technical staff of industry is it should be appreciated that the utility model is not restricted to the described embodiments, described in above-described embodiment and specification Simply illustrate principle of the present utility model, on the premise of the spirit and scope of the utility model is not departed from, the utility model is also Various changes and modifications are had, these changes and improvements are both fallen within claimed the scope of the utility model.The utility model Claimed scope is by appended claims and its equivalent thereof.

Claims (5)

1. a kind of water supply installation with voltage stabilizing function, including steady flow compensation tank, isocon, water pump and check-valves, its feature exist In:The steady flow compensation tank side is provided with vacuum suppresser, and the vacuum suppresser side is provided with water inlet, the steady flow compensation Tank opposite side is provided with ionization water purifier, and the steady flow compensation pot bottom is provided with flow pipe, and flow pipe side is connected with isocon, institute State isocon side and be provided with drinking-water pipe, the drinking-water pipe side is connected with water pump, and the water pump side is provided with check-valves, described to stop Return valve surface to switch provided with non-return, feed pipe is provided with the top of the check-valves, the water supply pipe surface is provided with vacuum tank, described steady Pressure tank side is provided with pressure detector.
A kind of 2. water supply installation with voltage stabilizing function according to claim 1, it is characterised in that:The flow pipe bottom Provided with mounting seat, the mounting seat is made up of the base of stainless steel.
A kind of 3. water supply installation with voltage stabilizing function according to claim 1, it is characterised in that:The pipe surface of drawing water Provided with Water supply switch valve.
A kind of 4. water supply installation with voltage stabilizing function according to claim 1, it is characterised in that:The steady flow compensation tank Anti-frost protection layer is equipped with shunting pipe surface, the anti-frost protection layer is protective layer made of protection cotton.
A kind of 5. water supply installation with voltage stabilizing function according to claim 1, it is characterised in that:The steady flow compensation tank Bottom is provided with flange coupling connector, and the steady flow compensation tank is connected by flange coupling connector with flow pipe.
CN201720207252.0U 2017-03-06 2017-03-06 A kind of water supply installation with voltage stabilizing function Expired - Fee Related CN206693299U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720207252.0U CN206693299U (en) 2017-03-06 2017-03-06 A kind of water supply installation with voltage stabilizing function

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720207252.0U CN206693299U (en) 2017-03-06 2017-03-06 A kind of water supply installation with voltage stabilizing function

Publications (1)

Publication Number Publication Date
CN206693299U true CN206693299U (en) 2017-12-01

Family

ID=60442370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720207252.0U Expired - Fee Related CN206693299U (en) 2017-03-06 2017-03-06 A kind of water supply installation with voltage stabilizing function

Country Status (1)

Country Link
CN (1) CN206693299U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593356A (en) * 2019-10-11 2019-12-20 山东沂源瑞特自动化设备有限公司 Two-tank three-cavity type non-negative pressure water supply equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110593356A (en) * 2019-10-11 2019-12-20 山东沂源瑞特自动化设备有限公司 Two-tank three-cavity type non-negative pressure water supply equipment

Similar Documents

Publication Publication Date Title
CN205617483U (en) Bring water flow control's box no negative pressure water supply equipment into
CN206693299U (en) A kind of water supply installation with voltage stabilizing function
CN104806881B (en) A kind of air cooling Roots pendular ring closed vacuum system and its control method
CN106855143A (en) A kind of diaphragm check valve
CN207633410U (en) A kind of tap water flow control system
CN205332636U (en) A automatic water supply device for valve room water cooling system
CN107809079A (en) A kind of temperature control cable feeder pillar
CN207553200U (en) A kind of non-negative pressure method of water supply device of intelligent control
CN107700585A (en) A kind of tap water flow control system
CN206572817U (en) Carbon dioxide, freon refrigeration system barrel pump turbine combination type oil return apparatus
CN209419234U (en) A kind of cooling outer cold water aerial drainage control system of Converter Station Valve
CN207227335U (en) A kind of water circle device of coke oven coke oven uprising tube
CN206583309U (en) A kind of cooling of high-temperature metal and protection device
CN206206327U (en) A kind of automation hydraulic oil cooling device of column type hydraulic rotary drilling rig
CN206693321U (en) Without negative-pressure intelligent water work
CN207422527U (en) Cooling water circulation system
CN207457864U (en) Transmitter high-power electronic device circulating cooling control device
CN105257634A (en) Auxiliary cooling system of hydraulic oil and engineering machinery
CN205277812U (en) Vacuum apparatus and vacuum apparatus solvent recycling system
CN206221978U (en) Vacuum source switching device
CN206709395U (en) A kind of air source heat pump winterization system
CN207702812U (en) A kind of fast cooling device for dynamic environment cabin
CN204591693U (en) Energy-efficient rubber ball cleaning pump
CN206174045U (en) Frequency conversion deep -well pump
CN211500977U (en) Three-blade roots blower oil leakage prevention exhaust device for industrial production

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171201

CF01 Termination of patent right due to non-payment of annual fee