CN206693198U - A kind of highway engineering drawing out soil equipment - Google Patents

A kind of highway engineering drawing out soil equipment Download PDF

Info

Publication number
CN206693198U
CN206693198U CN201720257328.0U CN201720257328U CN206693198U CN 206693198 U CN206693198 U CN 206693198U CN 201720257328 U CN201720257328 U CN 201720257328U CN 206693198 U CN206693198 U CN 206693198U
Authority
CN
China
Prior art keywords
drilling rod
radially installed
drilling
installed hole
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720257328.0U
Other languages
Chinese (zh)
Inventor
朱威
李鸣鸣
袁方
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720257328.0U priority Critical patent/CN206693198U/en
Application granted granted Critical
Publication of CN206693198U publication Critical patent/CN206693198U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)

Abstract

The utility model discloses a kind of highway engineering drawing out soil equipment, including the drilling rod as three, the top of drilling rod is provided with annular hand grip, three drilling rods are arranged in a linear on same connecting plate, the inside of connecting plate is provided with inner chamber, drilling rod includes the first drilling rod and the second drilling rod, and the groove that fetches earth is fixedly mounted in the bottom of the second drilling rod;The bottom of first drilling rod is provided with two groups of first radially installed holes for being used to install the second drilling rod, the top of second drilling rod is provided with the second radially installed hole for being used for coordinating with any one group of the first radially installed hole, first radially installed hole is connected with the second radially installed hole by latch, three first drilling rods are mounted on gear in the part of inner chamber, per be in engagement between two neighboring gear, thickness of the difference in height between two group of first radially installed hole more than gear.The utility model can either meet the needs of multiple regions while soil sampling, also disclosure satisfy that the demand of the soil sampling in single region, improve operating efficiency.

Description

A kind of highway engineering drawing out soil equipment
Technical field
Highway sampling technique is the utility model is related to, more particularly to a kind of highway engineering drawing out soil equipment.
Background technology
The highway engineering road of the prior art sampling device that fetches earth, the general highway engineering road sampling device that fetches earth Only include a drill bit and a sampling core pipe.In order to increase soil sample analysis accuracy and in order to analyze close position soil sample Uniformity, it is sometimes necessary at least two soil samples are taken in close position, using highway engineering road of the prior art with taking Soil sample device needs more sub-samplings, wastes time and energy, influences operating efficiency.
Utility model content
Technical problem to be solved in the utility model is to provide a kind of highway engineering drawing out soil equipment, and the drawing out soil equipment was both The demand of multiple regions while soil sampling is disclosure satisfy that, the demand of the soil sampling in single region is also disclosure satisfy that, improves work Efficiency.
To achieve the above object, the utility model provides following technical scheme:A kind of highway engineering drawing out soil equipment, bag The drilling rod as three is included, the end of the drilling rod is provided with the groove that fetches earth, and the top of drilling rod is provided with annular hand grip, three brills Bar is arranged in a linear on same connecting plate, and the inside of connecting plate is provided with inner chamber, the drilling rod include the first drilling rod with And second drilling rod, the diameter of first drilling rod are more than the diameter of the second drilling rod, and the bottom of the first drilling rod is provided with and accommodates the The groove that fetches earth is fixedly mounted in the cavity of two drilling rods, the bottom of second drilling rod;The bottom of first drilling rod is used for provided with two groups First radially installed hole of the second drilling rod is installed, the top of the second drilling rod, which is provided with, to be used to match somebody with somebody with any one group of the first radially installed hole The the second radially installed hole closed, the first radially installed hole are connected with the second radially installed hole by latch, and three described first are bored Bar is mounted on gear in the part of inner chamber, per being in engagement between two neighboring gear, two group of first radially installed hole it Between difference in height be more than gear thickness.
Preferably, spring is cased with the second drilling rod, one end of the spring is fixed on the top for the groove that fetches earth, and the other end is fixed In the bottom of the first drilling rod.
Preferably, the spring is in compressive state.
Using above-mentioned technical proposal, during soil sampling, when three the first drilling rods and the link position of the second drilling rod When identical, then the gear on three the first drilling rods is meshed, and when operating any one annular hand grip, three drilling rods carry out soil The collection of sample;When needing the soil sample of two adjacent areas of collection, then the first brill of the drilling rod of soil sample can will need not be gathered The link position of bar and the second drilling rod is different from the first drilling rod of two other adjacent drill pipes and the link position of the second drilling rod, makes The gear for the drilling rod that need not be gathered exposes, so as to not produce engagement;When needing to gather single region, by positioned at the brill of centre First drilling rod of bar and the link position of the second drilling rod are different from two other drilling rod, each drilling rod is individually gathered.This reality With new the needs of can either meeting multiple regions while soil sampling, the demand of the soil sampling in single region is also disclosure satisfy that, is carried High operating efficiency.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the schematic diagram in succession of the drilling rod of the utility model first and the second drilling rod.
Embodiment
Below in conjunction with the accompanying drawings, by the description to embodiment, the utility model is described further:
As shown in Figure 1, 2, a kind of highway engineering drawing out soil equipment of the utility model, including the drilling rod 1 as three, drilling rod 1 includes the first drilling rod 11 and the second drilling rod 12, and the diameter of the first drilling rod 11 is more than the diameter of the second drilling rod 12, and first bores The bottom of bar 11 is provided with the cavity for accommodating the second drilling rod 12, and the bottom of the second drilling rod 12 is welded and fixed the groove 2 that fetches earth, three brills Bar 1 is arranged in a linear on same connecting plate 4, and the top of drilling rod 1 passes through connecting plate 4, and the top of drilling rod 1 is provided with Annular hand grip 3, the inside of connecting plate 4 are provided with inner chamber 41.
The bottom of first drilling rod 11 is provided with two groups of first radially installed holes 111 for being used to install the second drilling rod 12, and second bores The top of bar 12 is provided with the second radially installed hole 121 for being used for coordinating with any one group of the first radially installed hole 111, and first radially Mounting hole 111 is connected with the second radially installed hole 121 by latch, and three the first drilling rods 11 are mounted in the part of inner chamber 41 Gear 5, per being in engagement between two neighboring gear 5, the difference in height between two group of first radially installed hole 111 is more than gear 5 thickness.
, can be in the second drilling rod for the ease of the reset of drilling rod 1 after the soil sample of the single region of collection or two adjacent areas Spring 6 is cased with 12, one end of spring 6 is fixed on the top for the groove 2 that fetches earth, and the other end is fixed on the bottom of the first drilling rod 11, and And spring 6 is set to be in compressive state.
The utility model is during soil sampling, when three the first drilling rods 11 are identical with the link position of the second drilling rod 12 When, then the gear 5 on three the first drilling rods 11 is meshed, and when operating any one annular hand grip 3, three drilling rods 1 are carried out The collection of soil sample;When needing the soil sample of two adjacent areas of collection, then the brill of soil sample can will need not be gathered on side The first drilling rod 11 and the second drilling rod 12 of first drilling rod 11 of bar 1 and the link position of the second drilling rod 12 and two other drilling rod 1 Link position it is different, the gear 5 for the drilling rod 1 for making to gather exposes, so as to not produce engagement;When needing to gather single area , will be different from two other drilling rod 1 positioned at the first drilling rod 11 of the drilling rod 1 of centre and the link position of the second drilling rod 12 during domain, Each drilling rod 1 is set individually to gather.
The utility model can either meet the needs of multiple regions while soil sampling, also disclosure satisfy that fetching earth for single region The demand of sample, improves operating efficiency.
Above-described is only preferred embodiment of the present utility model, it is noted that for the ordinary skill of this area For personnel, on the premise of not departing from the utility model and creating design, various modifications and improvements can be made, these all belong to In the scope of protection of the utility model.

Claims (3)

1. a kind of highway engineering drawing out soil equipment, including the drilling rod as three(1), the drilling rod(1)End be provided with and take Soil box(2), drilling rod(1)Top be provided with annular hand grip(3), it is characterised in that:Three drilling rods(1)Be arranged in a linear installation In same connecting plate(4)On, connecting plate(4)Inside be provided with inner chamber(41), the drilling rod(1)Including the first drilling rod(11)With And second drilling rod(12), first drilling rod(11)Diameter be more than the second drilling rod(12)Diameter, and the first drilling rod(11) Bottom be provided with accommodate the second drilling rod(12)Cavity, second drilling rod(12)Bottom be fixedly mounted and fetch earth groove(2);It is described First drilling rod(11)Bottom be provided with two groups be used for install the second drilling rod(12)The first radially installed hole(111), the second drilling rod (12)Top be provided be used for and any one group of the first radially installed hole(111)The the second radially installed hole coordinated(121), first Radially installed hole(111)With the second radially installed hole(121)Connected by latch, three first drilling rods(11)In inner chamber (41)Part be mounted on gear(5), per two neighboring gear(5)Between be in engagement, described two group first is radially pacified Fill hole(111)Between difference in height be more than gear(5)Thickness.
2. highway engineering drawing out soil equipment according to claim 1, it is characterised in that:Second drilling rod(12)On be cased with Spring(6), the spring(6)One end be fixed on the groove that fetches earth(2)Top, the other end is fixed on the first drilling rod(11)Bottom Portion.
3. highway engineering drawing out soil equipment according to claim 2, it is characterised in that:The spring(6)In compressive state.
CN201720257328.0U 2017-03-16 2017-03-16 A kind of highway engineering drawing out soil equipment Expired - Fee Related CN206693198U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720257328.0U CN206693198U (en) 2017-03-16 2017-03-16 A kind of highway engineering drawing out soil equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720257328.0U CN206693198U (en) 2017-03-16 2017-03-16 A kind of highway engineering drawing out soil equipment

Publications (1)

Publication Number Publication Date
CN206693198U true CN206693198U (en) 2017-12-01

Family

ID=60442526

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720257328.0U Expired - Fee Related CN206693198U (en) 2017-03-16 2017-03-16 A kind of highway engineering drawing out soil equipment

Country Status (1)

Country Link
CN (1) CN206693198U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677910A (en) * 2018-06-14 2018-10-19 王文爱 A kind of project supervision Subgrade Compaction detection drawing out soil equipment
CN109098222A (en) * 2018-07-05 2018-12-28 山西省交通科学研究院 A kind of sand replacement method auxiliary is dug a hole device and method of digging a hole

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677910A (en) * 2018-06-14 2018-10-19 王文爱 A kind of project supervision Subgrade Compaction detection drawing out soil equipment
CN108677910B (en) * 2018-06-14 2020-02-18 王文爱 Engineering is supervised and is detected native device with road bed compactness
CN109098222A (en) * 2018-07-05 2018-12-28 山西省交通科学研究院 A kind of sand replacement method auxiliary is dug a hole device and method of digging a hole

Similar Documents

Publication Publication Date Title
CN103267654B (en) Soft cloth subsealing type shallow water undisturbed surface sediment sampler
CN105178951B (en) Single-hole multi-layer underground water monitoring system and method
CN206693198U (en) A kind of highway engineering drawing out soil equipment
CN102022112A (en) Intelligent oil well simulation experiment system and working method
CN205135583U (en) Monitoring system of each interval water injection state of multilayer section water injection well
CN108442884B (en) Geological reamer
CN204457708U (en) Pitching choosing note process pipe string
CN107132071A (en) A kind of ring type water inlet thin-wall sampler and its application method
CN204960866U (en) Multi -functional well head sealing device
CN206756535U (en) Gas sampler is used in a kind of coal bed gas probing
CN204903520U (en) Groundwater multilayer position monitoring pipe
CN203441447U (en) Visual horizontal well gravel filling simulation test device
CN111964953A (en) Sampling analysis and storage equipment for deep-field mineral resource exploration and exploitation
CN109322621B (en) Broken layer pipe fixing and grouting method
CN209324257U (en) A kind of drilling project drilling equipment
CN218479812U (en) Variable layering underground water monitoring well
CN114809965B (en) Method for drilling 275 mm-level large-diameter undisturbed sample from 120m ultra-deep coating
CN207062924U (en) A kind of highway engineering road sampling device that fetches earth
CN207600779U (en) A kind of environmental pollution improvement soil sample harvester
CN212321182U (en) Sand river bed sediment pore water collection system
CN208396660U (en) A kind of Multifunctional drill
CN104505772A (en) Split conductor clamping device and method using split conductor clamping device to replace spacers
CN205025350U (en) Arrange material controlled trepan
CN206053836U (en) A kind of oil exploitation drilling equipment
CN206409228U (en) A kind of portable probing is fetched earth instrument

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171201

Termination date: 20190316