CN206685977U - A kind of intelligent power controller for electricity substation monitoring device - Google Patents
A kind of intelligent power controller for electricity substation monitoring device Download PDFInfo
- Publication number
- CN206685977U CN206685977U CN201720524198.2U CN201720524198U CN206685977U CN 206685977 U CN206685977 U CN 206685977U CN 201720524198 U CN201720524198 U CN 201720524198U CN 206685977 U CN206685977 U CN 206685977U
- Authority
- CN
- China
- Prior art keywords
- module
- modules
- arm
- channel
- chip computer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000005611 electricity Effects 0.000 title claims abstract description 25
- 238000012806 monitoring device Methods 0.000 title claims abstract description 12
- 238000004891 communication Methods 0.000 claims abstract description 30
- 238000001514 detection method Methods 0.000 claims abstract description 15
- 238000006243 chemical reaction Methods 0.000 claims abstract description 10
- 238000012544 monitoring process Methods 0.000 abstract description 8
- 238000013500 data storage Methods 0.000 abstract description 4
- 230000006855 networking Effects 0.000 abstract description 2
- 230000006870 function Effects 0.000 description 7
- 238000011084 recovery Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000007726 management method Methods 0.000 description 3
- 238000000034 method Methods 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000008569 process Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B90/00—Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
- Y02B90/20—Smart grids as enabling technology in buildings sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/12—Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S40/00—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them
- Y04S40/12—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment
- Y04S40/124—Systems for electrical power generation, transmission, distribution or end-user application management characterised by the use of communication or information technologies, or communication or information technology specific aspects supporting them characterised by data transport means between the monitoring, controlling or managing units and monitored, controlled or operated electrical equipment using wired telecommunication networks or data transmission busses
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The utility model discloses a kind of intelligent power controller for electricity substation monitoring device; including housing, the inside of the housing is provided with ARM one-chip computer modules, AD conversion module, civil power state acquisition module, UPS state acquisition modules, temperature collect module, voltage x current acquisition module, channel current detection module, channel overload protection module and power switching modules;The front side of the housing is provided with front panel, and front panel is provided with multiple locking air switches and status indicator lamp;The rear side of the housing is provided with rear board, and rear board is provided with multiple modular jacks, through terminal, ethernet communication module, RS485 communication modules and extension output interface, the ARM one-chip computer modules and communicated by ethernet communication module with host computer.The utility model realizes city's electricity condition, UPS states, the data monitoring such as passage normal condition, channel failure state, temperature, voltage, electric current and storage, and in the case of networking, data storage is uploaded into host computer.
Description
Technical field
The utility model belongs to the technical field of power supply smart control, and in particular to one kind is used for electricity substation monitoring and set
Standby intelligent power controller.
Background technology
In electricity substation, know that the condition information of civil power (AC220V) dead electricity is extremely important in time, this can be problem
Processing processing is raced against time, and can avoid the generation of accident.Electricity substation is currently to patrol to find this by live operator on duty
Class problem, such as operator on duty not at the scene, it may appear that pinpoint the problems not in time, the situation of process problem not in time;Further, power transformation
The equipment such as communication apparatus, digital hard disc video recorder, semaphore inside standing need continuous work phenomenon, it sometimes appear that data are blocked up
Phenomena such as plug, communication apparatus communication block, communication is slow, semaphore " reactionless ", the operation to transformer station cause it is very big not
Just, and then it have impact on enterprise's public credibility.Attendant to scene after after inspection, often carry out device powers down can solution
Problem;In addition, company manager is in order to preferably manage each terminal device, it is necessary to know terminal device voltage x current and exist offline
Wire state, and opening and closing control can be carried out to terminal device.In order to solve the above problems, devise one kind and be used for electric power
The intelligent power controller of supervisory control of substation equipment.
Utility model content
In order to solve civil power dead electricity can not and alarm, the communication apparatus communication as caused by blocking data blocks, communication is slow,
The problems such as semaphore " reactionless " and company manager can not monitor to terminal unit remote, the utility model provides one kind and is used for
The intelligent power controller of electricity substation monitoring device.
Technical scheme is used by the utility model:
A kind of intelligent power controller for electricity substation monitoring device, including housing, the inside of the housing are set
There are ARM one-chip computer modules, AD conversion module, civil power state acquisition module, UPS state acquisition modules, temperature collect module, voltage
Current acquisition module, channel current detection module, channel overload protection module and power switching modules, the civil power state acquisition
Module, UPS state acquisition modules, temperature collect module and voltage x current acquisition module are mono- by AD conversion module and ARM respectively
Piece machine module is connected, and lightning-protection module, the power switch are connected between the voltage x current acquisition module and AD conversion module
Module is connected with channel overload protection module, and the channel overload protection module is connected with channel current detection module, described logical
Road current detection module is connected with ARM one-chip computer modules;The front side of the housing is provided with front panel, and the front panel is provided with more
Individual locking air switch, the top of the multiple locking air switch are provided with multiple status indicator lamps, each locking air
Switch and status indicator lamp are connected with ARM one-chip computer modules respectively;The rear side of the housing is provided with rear board, on the rear board
Provided with multiple modular jacks, branch is provided with through terminal on each modular jack;The through terminal connection load
Module, the power switching modules are connected with through terminal, and ethernet communication module, RS485 are additionally provided with the rear board
Communication module and extension output interface, the ARM one-chip computer modules are communicated by ethernet communication module with host computer, institute
State RS485 communication modules and extension output interface is connected with ARM one-chip computer modules respectively.
Further, it is additionally provided with power switch on the left of the front panel.
Further, the ARM one-chip computer modules are also associated with handover module and FLASH memory modules.
Further, the both sides of the front panel and rear board are respectively arranged with fixed mount.
Further, the RS485 communication modules and extension output interface are respectively 2.
Further, locking air switch, status indicator lamp and the modular jack are 16.
Compared with prior art, the beneficial effects of the utility model are:
The utility model is using ARM one-chip computer modules by high-precision AD modular converter by city's electricity condition, UPS states, logical
Road normal condition, channel failure state etc., which directly displays front-panel status indicator lamp and stored, arrives FLASH memory modules, will also
The data Cun Chudao FLASH memory modules such as collecting temperature, voltage, electric current;Channel current detection module will detect load blocks electricity
FLASH memory modules are arrived in flow data storage, and in the case of networking, data storage is uploaded to host computer by ARM one-chip computer modules,
If load blocks electric current exceedes passage institute energy load current, channel overload protection module will disconnect automatically, the shape on front panel
Passage indicator lamp corresponding to state indicator lamp becomes red and buzzer warning, host computer can be supplied to subscriber management function,
User can be disconnected the equipment of some non-working time by monitoring that channel current data control respective channel, can also be incited somebody to action
The communication apparatus and video equipment that data block are carried out restarting recovery, and the utility model is communicated suitable for electricity substation and set
The visual plants such as standby, digital hard disc video recorder, video camera adapter are powered off and restarted.
Brief description of the drawings
Fig. 1 is system functional block diagram of the present utility model;
Fig. 2 is front-panel structure schematic diagram of the present utility model;
Fig. 3 is rear panel structure schematic diagram of the present utility model;
Wherein, 1, ARM one-chip computer modules, 2, A/D module, 3, civil power state acquisition module, 4, UPS state acquisition modules, 5,
Temperature collect module, 6, ethernet communication module, 7, RS485 communication modules, 8, voltage x current acquisition module, 9, lightning-protection module,
10th, channel current detection module, 11, channel overload protection module, 12, power switching modules, 13, load blocks, 14, switching mould
Block, 15, host computer, 16, locking air switch, 17, status indicator lamp, 18, through terminal, 19, modular jack, 20, power supply
Switch, 21, extension output interface, 22, fixed mount, 23, FLASH memory modules.
Embodiment
The utility model is further illustrated below in conjunction with the accompanying drawings.
As shown in figure 1, a kind of intelligent power controller for electricity substation monitoring device, including housing, the shell
The inside of body is provided with ARM one-chip computer modules 1, AD conversion module 2, civil power state acquisition module 3, UPS state acquisition modules 4, temperature
Spend acquisition module 5, voltage x current acquisition module 8, channel current detection module 10, channel overload protection module 11, power switch
Module 12, handover module 14 and FLASH memory modules 23, the ARM one-chip computer modules 1 by civil power state acquisition module 3,
UPS state acquisition modules 4, temperature collect module 5, voltage x current acquisition module 8 and AD conversion module 2 gather city's electricity condition, UPS
The monitoring of the real time data such as state, temperature, voltage, electric current, channel current is handled, and is stored into FLASH memory modules 23, described
Lightning-protection module 9 is connected between voltage x current acquisition module 8 and AD conversion module;Civil power and UPS are completed by handover module 14
Rapid switching, when mains-supplied, channel power source output be mains-supplied;When civil power is lost, channel power source output is UPS
Power supply, when city power recovery, channel power source output is rapid to switch back into mains-supplied, does not influence power load modules during switching;Institute
State channel current detection module 10, the quantity of channel overload protection module 11 and power switching modules 12 and modular jack 19, pass through
The quantity of formula terminal 18 is identical, and also respectively 16, the power switching modules 12 are connected with channel overload protection module 11,
The channel overload protection module 11 is connected with channel current detection module 10, and the channel current detection module 10 and ARM are mono-
Piece machine module 1 is connected, and when loading through overcurrent more than the electric current that passage is allowed, channel overload protection module will be from dynamic circuit breaker
Open.
As shown in Fig. 2 the front side of the housing is provided with front panel, the both sides of the front panel are respectively arranged with fixation, 22,
The front panel is provided with 16 locking air switches 16, and the top of 16 locking air switches 16 refers to provided with 16 states
Show lamp 17, it is carefully and neatly done using modularized design, layout;The each locking air switch 16 and status indicator lamp 17 respectively with ARM
One-chip computer module 1 is connected, and the status indicator lamp 17 is provides civil power power down alarm lamp, when civil power power down is alarmed, state
Indicator lamp red light lights;Power switch 20 is additionally provided with the left of the front panel.
As shown in figure 3, the rear side of the housing is provided with rear board, the both sides of the rear board are provided with fixed mount 22, institute
State rear board and be provided with 16 modular jacks 19, branch is provided with through terminal 18, the power supply control on each modular jack
The output of device processed uses through terminal 18 and the flexible configuration of modular jack 19, meets the diversity of user;It is described through
Terminal 18 connects load blocks 13, and the power switching modules 12 are connected with through terminal 18, are connected to when there is load blocks 13
Through terminal 18, the modular jack 19 of rear board, channel current detection module 10 will detect the channel current immediately, if negative
Carry the electric current of module 13 and exceed passage institute energy load current, channel overload protection module will disconnect automatically, and front panel will be prompted to alarm;
Two ethernet communication modules 6, RS485 communication modules 7 and extension output interface 21 are additionally provided with the rear board, it is described
ARM one-chip computer modules 1 are communicated by ethernet communication module 6 with host computer 15, are in real time uploaded to data in time upper
On machine monitoring software, there is provided data monitoring function, management function, control function, after data upload, judge by administrative staff
Afterwards, remotely load blocks can be managed by host computer 15, load blocks is subjected to remote reboot or disconnection, when some
Inessential load (communication apparatus, monitoring adapter, video camera, DVR etc.) is connected to through terminal, Yong Huke on one's own time
To disconnect the passage by host computer, and then field apparatus is managed;The RS485 communication modules 7 and extension output connect
Mouth 21 is connected with ARM one-chip computer modules 1 respectively.
In use, gathered by ARM one-chip computer modules 1 by city's electricity condition, UPS states, passage normal condition, channel failure
The data such as state, temperature, voltage, electric current, and by these data Cun Chudao FLASH memory modules 23, ARM one-chip computer modules 1 can
Data storage is uploaded to by host computer 15 by ethernet communication module 6;The power-supply controller of electric is carried out fast by handover module 14
Speed switching, when mains-supplied, channel power source output is mains-supplied;When civil power is lost, channel power source output supplies for UPS
Electricity, when city power recovery, channel power source output switches back into mains-supplied rapidly, does not influence load blocks confession when switching using UPS
Electricity;When there is load blocks 13 to be connected to the through terminal 18 of rear board, modular jack 19, channel current detection module 10 will immediately
The channel current is detected, if load blocks electric current exceedes passage institute energy load current, channel overload protection module 11 will be automatic
Disconnect, front panel will be prompted to alarm;The power-supply controller of electric also provides Path remote control function, when some inessential loads are (logical
News equipment, monitoring adapter, video camera, DVR etc.) through terminal is docked with one's own time, user can be by upper
Machine 15 disconnects the passage, and then field apparatus is managed;In addition, host computer will also be supplied to subscriber management function, there is provided
Device channels are alarmed offline, the excessive alarm of electric current, and civil power, UPS loss alarm lamp functions, user is by monitoring channel current data
Control respective channel, remotely can disconnect the equipment of some non-working time, the communication apparatus that data can also be blocked and
Video equipment carries out restarting recovery, and the utility model is simple to operate, reduces the consumption of man power and material.
It is not new to this practicality although above-mentioned specific embodiment of the present utility model is described with reference to accompanying drawing
The limitation of type protection domain, one of ordinary skill in the art should be understood that on the basis of the technical solution of the utility model, ability
Field technique personnel need not pay the various modifications that creative work can make or deformation still in protection model of the present utility model
Within enclosing.
Claims (6)
1. a kind of intelligent power controller for electricity substation monitoring device, it is characterized in that, including housing;The housing
Inside is provided with ARM one-chip computer modules, AD conversion module, civil power state acquisition module, UPS state acquisition modules, temperature acquisition mould
Block, voltage x current acquisition module, channel current detection module, channel overload protection module and power switching modules, the civil power
State acquisition module, UPS state acquisition modules, temperature collect module and voltage x current acquisition module pass through AD conversion module respectively
It is connected with ARM one-chip computer modules, lightning-protection module, the work(is connected between the voltage x current acquisition module and AD conversion module
Rate switch module is connected with channel overload protection module, and the channel overload protection module is connected with channel current detection module,
The channel current detection module is connected with ARM one-chip computer modules;The front side of the housing is provided with front panel, on the front panel
Provided with multiple locking air switches, the top of the multiple locking air switch is provided with multiple status indicator lamps, each band
Lock air switch and status indicator lamp are connected with ARM one-chip computer modules respectively;The rear side of the housing is provided with rear board, after described
Panel is provided with multiple modular jacks, and branch is provided with through terminal on each modular jack;The through terminal connects
Connect load blocks, the power switching modules are connected with through terminal, be additionally provided with the rear board ethernet communication module,
RS485 communication modules and extension output interface, the ARM one-chip computer modules are led to by ethernet communication module with host computer
Letter, the RS485 communication modules and extension output interface are connected with ARM one-chip computer modules respectively.
2. a kind of intelligent power controller for electricity substation monitoring device according to claim 1, it is characterized in that,
Power switch is additionally provided with the left of the front panel.
3. a kind of intelligent power controller for electricity substation monitoring device according to claim 1, it is characterized in that,
The ARM one-chip computer modules are also associated with handover module and FLASH memory modules.
4. a kind of intelligent power controller for electricity substation monitoring device according to claim 1, it is characterized in that,
The both sides of the front panel and rear board are respectively arranged with fixed mount.
5. a kind of intelligent power controller for electricity substation monitoring device according to claim 1, it is characterized in that,
The RS485 communication modules and extension output interface are respectively 2.
6. a kind of intelligent power controller for electricity substation monitoring device according to claim 1, it is characterized in that,
Locking air switch, status indicator lamp and the modular jack are 16.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720524198.2U CN206685977U (en) | 2017-05-11 | 2017-05-11 | A kind of intelligent power controller for electricity substation monitoring device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720524198.2U CN206685977U (en) | 2017-05-11 | 2017-05-11 | A kind of intelligent power controller for electricity substation monitoring device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206685977U true CN206685977U (en) | 2017-11-28 |
Family
ID=60406544
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720524198.2U Expired - Fee Related CN206685977U (en) | 2017-05-11 | 2017-05-11 | A kind of intelligent power controller for electricity substation monitoring device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206685977U (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108896847A (en) * | 2018-06-21 | 2018-11-27 | 江苏中房电力安装工程有限公司 | A kind of integrated automation of transformation stations detection system |
CN109599949A (en) * | 2019-01-03 | 2019-04-09 | 安徽省禹坤自动化科技有限公司 | A kind of substation secondary device power control based on SDH |
CN109599950A (en) * | 2019-01-03 | 2019-04-09 | 安徽省禹坤自动化科技有限公司 | A kind of converting station electric power dispatch data net device power supply control based on SDH |
-
2017
- 2017-05-11 CN CN201720524198.2U patent/CN206685977U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108896847A (en) * | 2018-06-21 | 2018-11-27 | 江苏中房电力安装工程有限公司 | A kind of integrated automation of transformation stations detection system |
CN109599949A (en) * | 2019-01-03 | 2019-04-09 | 安徽省禹坤自动化科技有限公司 | A kind of substation secondary device power control based on SDH |
CN109599950A (en) * | 2019-01-03 | 2019-04-09 | 安徽省禹坤自动化科技有限公司 | A kind of converting station electric power dispatch data net device power supply control based on SDH |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206685977U (en) | A kind of intelligent power controller for electricity substation monitoring device | |
CN201276024Y (en) | Auxiliary control cell of power disperse type train set | |
CN202276284U (en) | Electric power-used AC/DC integrated power supply device | |
CN208272700U (en) | Electric power auxiliary power supply system | |
CN104333081A (en) | Online maintenance method of distributed power supply | |
CN206575379U (en) | Solar panel terminal box and solar power system | |
CN206712539U (en) | A kind of marine low-pressure continuous-current plant based on the autonomous management of multiple batteries | |
CN108736567A (en) | Power supply system for electric power monitoring | |
CN115514067B (en) | Energy storage battery pack management system device | |
CN214069555U (en) | Intelligent electricity utilization protection device with water immersion protection | |
CN214376742U (en) | Intelligent digital display high-voltage charge control controller | |
CN205123234U (en) | No external power supply type motor protector of intelligence | |
CN205176131U (en) | Processing display module at power consumption information collection system module terminal | |
CN210327131U (en) | Intelligent multi-path energy management controller | |
CN203840061U (en) | Air switch position acquisition device | |
CN210092957U (en) | Direct-current power supply device of transformer substation | |
CN207281556U (en) | The control system of intelligent case | |
CN105262052A (en) | Intelligent motor protector without external power source | |
CN206211553U (en) | A kind of Anti-reflux controller for photovoltaic generating system | |
CN206524680U (en) | Emergency power supply control system | |
CN206321698U (en) | A kind of power supply row cabinet of auto-alarming | |
CN208337222U (en) | Electricity storage preventing pond overdischarging protector | |
CN217469552U (en) | 10kV transmission line voltage monitoring and early warning system | |
CN204536436U (en) | A kind of transmission tower Forewarning Terminal | |
CN209001658U (en) | A kind of dustbin for micro-base station power supply |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||