CN206681165U - A kind of full bolt beam-column connection of assembled - Google Patents
A kind of full bolt beam-column connection of assembled Download PDFInfo
- Publication number
- CN206681165U CN206681165U CN201720434858.8U CN201720434858U CN206681165U CN 206681165 U CN206681165 U CN 206681165U CN 201720434858 U CN201720434858 U CN 201720434858U CN 206681165 U CN206681165 U CN 206681165U
- Authority
- CN
- China
- Prior art keywords
- steel
- clamping plate
- column
- connecting plate
- plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Joining Of Building Structures In Genera (AREA)
Abstract
The utility model discloses a kind of full bolt beam-column connection of assembled, including steel column, internal partition, steel I-beam, first clamping plate, second clamping plate and connecting plate;Steel column and steel I-beam are attached by connecting node of the present utility model using substantial amounts of bolt with connecting plate, this mode can greatly reduce the production difficulty of connecting node, steel column and steel I-beam, which can separate, to be transported, greatly reduce transport difficulty, the utility model greatly reduces difficulty of construction using site-assembled mode, connect reliably simultaneously, Path of Force Transfer is clear and definite.
Description
Technical field
The utility model belongs to building engineering field, more particularly to a kind of full bolt beam-column connection of assembled.
Background technology
With the economic sustained and rapid development in China, Development of China's Urbanization is constantly accelerated, to realize town and country construction sustainable development,
It is proposed transformation town and country construction pattern, promote construction industry transition and upgrade, strength promotes " building industrialization ", the important load of building industrialization
One of body is exactly that beam-column connection needs to assemble in advance, then transports to job site, transport difficulty is big, difficulty of construction is big, into
This height, it is again fragile in transportation, and connecting node is stress nucleus, extremely small damage may all cause entirely
The stability of framework reduces;The node assembled in advance simultaneously also increases production difficulty.
Utility model content
The purpose of this utility model is to provide a kind of assembled full bolt beam-column connection, existed with solving connecting node
The problem of in the presence of production, transport, construction.
To achieve the above object, the utility model adopts the following technical scheme that:
A kind of full bolt beam-column connection of assembled, including steel column, internal partition, steel I-beam, first clamping plate, the second folder
Plate and connecting plate;Steel column is rectangular-shape, and cross section is square;Two internal partitions weld for one week around steel column perpendicular to steel column
Connect;Between two internal partitions, first clamping plate is welded with along steel column y direction on any three surfaces of steel column, is being welded with
Some bolts hole are provided with internal partition on three sides of the steel column of first clamping plate, some spiral shells are also offered in first clamping plate
Keyhole;The through hole to match with the bolt hole in first clamping plate, the abdomen of steel I-beam are provided with the web of steel I-beam one end
Plate one side contacts with first clamping plate, and another side is provided with second clamping plate, is provided with second clamping plate and first clamping plate identical spiral shell
Keyhole;First clamping plate, steel I-beam and second clamping plate are bolted to connection;Connecting the upper of the steel I-beam of steel column one end
Some bolts hole are provided with lower flange, are provided with connecting plate and the bolt hole on the upper lower flange of internal partition and steel I-beam
The through hole to match;The upper lower flange of steel I-beam and the surface of internal partition are provided with connecting plate, the upper bottom wing of steel I-beam
Edge, connecting plate and internal partition are bolted to connection.
Further, I-steel depth of beam is identical with the distance between two internal partitions;Connecting plate includes the first connection
Plate and the second connecting plate;First connecting plate is arranged on the upper surface of steel I-beam top flange and the following table of steel I-beam lower flange
Face;Second connecting plate is arranged on the lower surface of steel I-beam top flange and the upper surface of steel I-beam lower flange.
Further, the bolt hole number on steel I-beam on lower flange is at least 4;On the internal partition of each side of steel column
Bolt hole number be at least 4;Bolt hole on clamping plate is arranged in two row, and the bolt hole number of each column is at least 5.
Compared with prior art, the utility model has following technique effect:
Steel column and steel I-beam are attached by connecting node of the present utility model using substantial amounts of bolt with connecting plate, this
Kind mode can greatly reduce the production difficulty of connecting node, and steel column and steel I-beam, which can separate, to be transported, and greatly reduces fortune
Defeated difficulty, the utility model greatly reduces difficulty of construction using site-assembled mode, while connects reliably, and Path of Force Transfer is bright
Really.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is the first explosive view of the present utility model;
Fig. 3 is the second explosive view of the present utility model;
Fig. 4 is steel column structure schematic diagram of the present utility model;
Wherein:1st, steel column;2nd, internal partition;3rd, first clamping plate;4th, steel I-beam;7th, the first connecting plate;8th, the second connecting plate;
9th, second clamping plate.
Embodiment
The utility model is further illustrated below in conjunction with accompanying drawing:
A kind of full bolt beam-column connection of assembled, including steel column 1, internal partition 2, steel I-beam 4, first clamping plate 3,
Second splint 9 and connecting plate;Steel column 1 is square steel tube;Two internal partitions 2 weld for 1 one weeks around steel column perpendicular to steel column 1;In two every
Between plate 2, first clamping plate 3 is welded with along the y direction of steel column 1 on any three surfaces of steel column 1, is being welded with the first folder
Some bolts hole are provided with internal partition 2 on three sides of the steel column 1 of plate 3, if also offering bolt stem in first clamping plate 3
Hole;The through hole to match with the bolt hole in first clamping plate 3, the abdomen of steel I-beam 4 are provided with the web of the one end of steel I-beam 4
Plate one side contacts with first clamping plate 3, and another side is provided with second clamping plate 9, is provided with second clamping plate 9 identical with first clamping plate 3
Bolt hole;First clamping plate 3, the web of steel I-beam 4 and second clamping plate 9 are bolted to connection;In connection steel column 1 one end
Steel I-beam 4 upper lower flange on be provided with some bolts hole, be provided with connecting plate and internal partition 2 and steel I-beam 4
The through hole that bolt hole on upper lower flange matches;The upper lower flange of steel I-beam 4 and the surface of internal partition 2 are provided with connection
Plate, upper lower flange, connecting plate and the internal partition 2 of steel I-beam 4 are bolted to connection.
The height of steel I-beam 4 is identical with the distance between two internal partitions 2;Connecting plate includes the first connecting plate 7 and the
Two connecting plates 8;First connecting plate 7 is arranged on the upper surface of the top flange of steel I-beam 4 and the lower surface of the lower flange of steel I-beam 4;
Second connecting plate 8 is arranged on the lower surface of the top flange of steel I-beam 4 and the upper surface of the lower flange of steel I-beam 4.
Bolt hole number on steel I-beam 4 on lower flange is at least 4;Bolt on the internal partition 2 of 1 each side of steel column
Hole number is at least 4;Bolt hole on clamping plate 3 is arranged in two row, and the bolt hole number of each column is at least 5.
Claims (3)
1. a kind of full bolt beam-column connection of assembled, it is characterised in that including steel column (1), internal partition (2), steel I-beam
(4), first clamping plate (3), second clamping plate (9) and connecting plate;Steel column (1) is rectangular-shape, and cross section is square;In two
Dividing plate (2) welds for (1) one week around steel column perpendicular to steel column (1);Between two internal partitions (2), any three surfaces of steel column (1)
On along steel column (1) y direction be welded with first clamping plate (3), in three sides of the steel column (1) for being welded with first clamping plate (3)
On internal partition (2) on be provided with some bolts hole, first clamping plate also offers some bolts hole on (3);Steel I-beam (4) one
It is provided with the web at end and the through hole that matches of bolt hole in first clamping plate (3), the web one side of steel I-beam (4) and the
One clamping plate (3) contacts, and another side is provided with second clamping plate (9), is provided with second clamping plate (9) and first clamping plate (3) identical
Bolt hole;First clamping plate (3), steel I-beam (4) and second clamping plate (9) are bolted to connection;In connection steel column (1) one end
Steel I-beam (4) upper lower flange on be provided with some bolts hole, be provided with connecting plate with internal partition (2) and steel I-beam
(4) through hole that the bolt hole on upper lower flange matches;The upper lower flange of steel I-beam (4) and the surface of internal partition (2) are equal
Connecting plate is provided with, upper lower flange, connecting plate and the internal partition (2) of steel I-beam (4) are bolted to connection.
A kind of 2. full bolt beam-column connection of assembled according to claim 1, it is characterised in that steel I-beam (4)
Height it is identical with the distance between two internal partitions (2);Connecting plate includes the first connecting plate (7) and the second connecting plate (8);The
One connecting plate (7) is arranged on the upper surface of steel I-beam (4) top flange and the lower surface of steel I-beam (4) lower flange;Second connects
Fishplate bar (8) is arranged on the lower surface of steel I-beam (4) top flange and the upper surface of steel I-beam (4) lower flange.
A kind of 3. full bolt beam-column connection of assembled according to claim 1, it is characterised in that steel I-beam (4)
Bolt hole number on upper lower flange is at least 4;Bolt hole number on the internal partition (2) of each side of steel column (1) is at least
4;Bolt hole on clamping plate (3) is arranged in two row, and the bolt hole number of each column is at least 5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720434858.8U CN206681165U (en) | 2017-04-24 | 2017-04-24 | A kind of full bolt beam-column connection of assembled |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720434858.8U CN206681165U (en) | 2017-04-24 | 2017-04-24 | A kind of full bolt beam-column connection of assembled |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206681165U true CN206681165U (en) | 2017-11-28 |
Family
ID=60400539
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720434858.8U Active CN206681165U (en) | 2017-04-24 | 2017-04-24 | A kind of full bolt beam-column connection of assembled |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206681165U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113969615A (en) * | 2021-10-20 | 2022-01-25 | 苏州德力智慧物流科技有限公司 | A stand, crossbeam connection structure for multilayer steel structure platform |
-
2017
- 2017-04-24 CN CN201720434858.8U patent/CN206681165U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113969615A (en) * | 2021-10-20 | 2022-01-25 | 苏州德力智慧物流科技有限公司 | A stand, crossbeam connection structure for multilayer steel structure platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10851537B2 (en) | Assemblable structural column joint connection using fiber-reinforced concrete filled round double steel tubes and mounting method thereof | |
CN103850392B (en) | Vertical floor concrete column with holes and the practice is established between outer square steel pipe inner circle steel pipe | |
CN106988433A (en) | A kind of modular containers build connecting node | |
CN104652610B (en) | Box-type module builds corner splicing node structure | |
CN106245762A (en) | A kind of assembled corrugated web bean column node attachment means recovering function | |
CN214738828U (en) | Steel construction assembled beam column connected node device | |
CN205711701U (en) | A kind of steel plate combination beam bridge pier consolidation structure | |
CN109629679A (en) | A kind of quadrate steel pipe column and H-type cut section bar assembling type node | |
CN105780989A (en) | Double beam floor structure | |
CN103174222A (en) | Steel casting modularization panel point for connection of steel pipe column and H-shaped beam | |
CN206681165U (en) | A kind of full bolt beam-column connection of assembled | |
CN105401960B (en) | A kind of mould bases and its construction method for the construction of railway tunnel inverted arch | |
CN102182276A (en) | Mega column in shape of double Chinese characters ya and manufacturing method thereof | |
CN206360399U (en) | The existing reinforced concrete coupling beam bracing means of one species " doubly-linked beam " | |
CN205063965U (en) | A die carrier for construction of railway tunnel inverted arch | |
CN216616288U (en) | Modular building node structure connected by cross-shaped steel plates | |
CN201432272Y (en) | Steel structure module platform for steel truss girder rod piece | |
CN207959499U (en) | A kind of steel construction | |
CN215802266U (en) | Direct-insertion type bolt-free connecting joint of closed cavity column and steel beam | |
CN204899028U (en) | Clod wash section bar for building multi -functional | |
CN214296124U (en) | Beam transporting vehicle body | |
CN206070560U (en) | Steel beam foundation of construction elevator | |
CN103835442A (en) | Anchor plate type beam steel bar connection structure | |
CN208056325U (en) | A kind of multi-cavity steel tube concrete coupled column assembled dual-sided board connecting node | |
CN203769196U (en) | Anchor plate type beam steel bar connecting structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |