CN206673450U - The general service kit in extra-high voltage strain insulator wire side end - Google Patents
The general service kit in extra-high voltage strain insulator wire side end Download PDFInfo
- Publication number
- CN206673450U CN206673450U CN201720218278.5U CN201720218278U CN206673450U CN 206673450 U CN206673450 U CN 206673450U CN 201720218278 U CN201720218278 U CN 201720218278U CN 206673450 U CN206673450 U CN 206673450U
- Authority
- CN
- China
- Prior art keywords
- clamping
- card
- insulator
- rod
- closed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Insulators (AREA)
Abstract
本实用新型提供一种特高压耐张绝缘子导线侧端部通用检修工具,它包括绝缘子闭式卡下卡、夹持杆和延长杆;夹持杆的一端和延长杆的一端分别与绝缘子闭式卡下卡的两端连接,使得夹持杆、绝缘子闭式卡下卡和延长杆构成门字形;夹持杆的另一端和延长杆的另一端均设有用于与液压丝杆紧线器连接的通孔;所述的夹持杆包括用于夹持端部挂线联板的上下两片夹持分杆,两片夹持分杆之间设有松紧调节机构。本实用新型能够适用于所有的端部挂线联板,实现通用的目的,同时节约成本。
The utility model provides a general overhaul tool for the side ends of UHV strain insulator wires, which comprises an insulator closed clamp, a clamp rod and an extension rod; The two ends of the lower card are connected so that the clamping rod, the insulator closed lower card and the extension rod form a door shape; the other end of the clamping rod and the other end of the extension rod are equipped with a hydraulic screw tensioner for connection The through hole; the clamping rod includes two upper and lower clamping sub-rods for clamping the end hanging wire connecting plate, and an elastic adjustment mechanism is arranged between the two clamping sub-rods. The utility model can be applied to all hanging wire connecting plates at the ends, realizes the general purpose and saves cost at the same time.
Description
技术领域technical field
本实用新型属于特高压输电线路检修领域,具体涉及一种特高压耐张绝缘子导线侧端部通用检修工具。The utility model belongs to the field of overhauling of extra-high voltage transmission lines, in particular to a universal overhauling tool for the side ends of conductors of extra-high voltage strain insulators.
背景技术Background technique
1000kV交流特高压试验示范输电线路南荆I线运行已超过8年,在运维工作中开展了多项检修工作。相较于500kV输电线路,特高压线路的设计及结构变化明显,元件显著增大、承力工器具的吨位很大,必须用新的思路对部分检修工艺及工器具重新进行研制,才能确保安全、高效地完成检修工作。The 1000kV AC UHV test demonstration transmission line Nanjing Line I has been in operation for more than 8 years, and a number of maintenance work has been carried out during the operation and maintenance work. Compared with the 500kV transmission line, the design and structure of the UHV line have changed significantly, the components have increased significantly, and the tonnage of the load-bearing tools is large. It is necessary to re-develop some maintenance processes and tools with new ideas to ensure safety. , Complete maintenance work efficiently.
比如耐张塔的水平绝缘子串的单片更换作业项目,有成熟的液压丝杆+钛合金闭式卡可以使用,但在更换导线侧端部绝缘子时,尚没有通用的端部工具。中国专利CN102545102A公开了一种1000kV耐张水平式绝缘子带电更换装置,提供的前部端卡采用钛合金上下板,在使用时上下板合并,利用端部挂线联板上的预留孔,通过螺栓连接紧固组合而成。然而因为该端部挂线联板在一条线路中有多种,其上的预留孔的大小、位置均不相同,需要配合制作不同的前部端卡,实现不了通用的目的。For example, there are mature hydraulic screw rods + titanium alloy closed clamps that can be used for the single-piece replacement of the horizontal insulator string of the strain tower, but there is no general-purpose end tool for replacing the end insulators on the wire side. Chinese patent CN102545102A discloses a 1000kV tension-resistant horizontal insulator live replacement device. The front end card provided uses titanium alloy upper and lower plates. Bolt connection fastened combination. However, because there are many kinds of the end hanging wire connecting plate in one line, the size and position of the reserved holes on it are all different, and different front end cards need to be made in cooperation, which cannot realize the general purpose.
实用新型内容Utility model content
本实用新型要解决的技术问题是:提供一种特高压耐张绝缘子导线侧端部通用检修工具,能够适用于所有的端部挂线联板,实现通用的目的,同时节约成本。The technical problem to be solved by the utility model is: to provide a general inspection tool for the side ends of UHV strain insulator wires, which can be applied to all end hanging wire connecting plates, so as to realize the general purpose and save costs at the same time.
本实用新型为解决上述技术问题所采取的技术方案为:一种特高压耐张绝缘子通用检修工具,其特征在于:它包括绝缘子闭式卡下卡、夹持杆和延长杆;夹持杆的一端和延长杆的一端分别与绝缘子闭式卡下卡的两端连接,使得夹持杆、绝缘子闭式卡下卡和延长杆构成门字形;夹持杆的另一端和延长杆的另一端均设有用于与液压丝杆紧线器连接的通孔;The technical scheme adopted by the utility model to solve the above technical problems is: a universal overhaul tool for UHV strain insulators, characterized in that it includes an insulator closed clamping card, a clamping rod and an extension rod; the clamping rod One end and one end of the extension rod are respectively connected with the two ends of the insulator closed card lower card, so that the clamping rod, the insulator closed card lower card and the extension rod form a door shape; the other end of the clamping rod and the other end of the extension rod are both There is a through hole for connecting with the hydraulic screw tensioner;
所述的夹持杆包括用于夹持端部挂线联板的上下两片夹持分杆,两片夹持分杆之间设有松紧调节机构。The clamping rod includes two upper and lower clamping sub-rods for clamping the end hanging wire connecting plate, and a tightness adjustment mechanism is arranged between the two clamping sub-rods.
按上述方案,绝缘子闭式卡下卡的内侧设有用于卡入与端部挂线联板连接的二联板的定位槽;绝缘子闭式卡下卡的内侧与延长杆和夹持杆位于同一侧。According to the above scheme, the inner side of the lower card of the insulator closed type card is provided with a positioning groove for snapping into the two connecting plates connected with the end hanging wire connecting plate; the inner side of the lower card of the insulator closed type card is located at the same side.
按上述方案,所述的松紧调节机构为调节螺母。According to the above solution, the tightness adjusting mechanism is an adjusting nut.
按上述方案,所述的夹持杆和延长杆的长度相等。According to the above scheme, the lengths of the clamping rod and the extension rod are equal.
所述的特高压耐张绝缘子通用检修工具的操作方法,其特征在于:它包括以下步骤:The operation method of the universal overhaul tool for UHV tension insulators is characterized in that it includes the following steps:
S1、准备:清理端部挂线联板和二联板;将所述的特高压耐张绝缘子通用检修工具起吊至合适位置;S1. Preparation: Clean up the connecting plate and the second connecting plate at the end; lift the general maintenance tool for the UHV tension insulator to a suitable position;
S2、安装:利用2片夹持分杆将端部挂线联板夹持住,且绝缘子闭式卡下卡与二联板相抵住,通过松紧调节机构夹紧使得夹持杆与端部挂线联板相对固定;夹持杆的另一端和延长杆的另一端分别连接液压丝杆紧线器。S2. Installation: use two clamping sub-rods to clamp the end hanging wire connecting plate, and the insulator closed card lower card is against the second connecting plate, and clamped by the elastic adjustment mechanism to make the clamping rod and the end hanging wire The connecting plate is relatively fixed; the other end of the clamping rod and the other end of the extension rod are respectively connected with a hydraulic screw tensioner.
按上述操作方法,所述的S1中,若二联板上有均压环安装杆,则将均压环安装杆拆掉。According to the above operation method, in the above S1, if there is a pressure equalizing ring installation rod on the second connecting plate, remove the pressure equalization ring installation rod.
按上述操作方法,绝缘子闭式卡下卡的内侧设有用于卡入与端部挂线联板连接的二联板的定位槽;According to the above operation method, the inner side of the lower card of the insulator closed card is provided with a positioning groove for snapping in the two connecting plates connected with the end hanging line connecting plates;
所述的S2中,二联板卡入所述的定位槽中。In the above S2, the two-piece board is snapped into the positioning groove.
本实用新型的有益效果为:The beneficial effects of the utility model are:
1、通过采用与现有的绝缘子闭式卡下卡相同的结构作为端部卡,并由夹持杆将端部挂线联板夹住固定,由于所有的端部挂线联板外形是相同的,因此本实用新型装置能够适用于所有的端部挂线联板,实现通用的目的;相较于现有的连接方式,其受力截面有所增大,提高了受力的效果;同时只需要另外配置一组夹持杆和延长杆即可,减少了检修班组工具配置的种类和数量,而绝缘子闭式卡下卡本身就能够作为普通的绝缘子闭式卡下卡使用,实现了一物两用的目的,节约成本。1. By adopting the same structure as the lower card of the existing insulator closed card as the end card, and clamping and fixing the end hanging wire connecting plate by the clamping rod, because all the end hanging wire connecting plates have the same shape Therefore, the device of the utility model can be applied to all end-hanging connecting plates to achieve a general purpose; compared with the existing connection method, its force-bearing section is increased, which improves the force-bearing effect; at the same time It only needs to configure another set of clamping rods and extension rods, which reduces the types and quantities of tools for the maintenance team, and the insulator closed clamp itself can be used as an ordinary insulator closed clamp, realizing a The purpose of dual-use, saving costs.
2、通过在绝缘子闭式卡下卡的内侧开设定位槽,能够在与二联板配合时更为牢固,起到防滑的作用。2. By setting up a positioning groove on the inner side of the lower card of the insulator closed card, it can be more firmly matched with the double plate and play an anti-skid role.
附图说明Description of drawings
图1为本实用新型一实施例的使用状态结构示意图。Fig. 1 is a schematic view of the structure of an embodiment of the utility model in use.
图2为图1的A向视图。Fig. 2 is a view along the direction A of Fig. 1 .
图3为图1的B向视图。Fig. 3 is a view taken along direction B of Fig. 1 .
图4为图1的C向视图。Fig. 4 is a view from the direction C of Fig. 1 .
图5为本实用新型一实施例的安装示意图。Fig. 5 is a schematic diagram of installation of an embodiment of the utility model.
图中:1-绝缘子闭式卡下卡,1-1-定位槽,2-夹持杆,2-1-通孔,2-2-夹持分杆,3-延长杆,3-1-通孔,4-端部挂线联板,5-二联板,6-绝缘子,7-导线,8-松紧调节机构,9-液压丝杆紧线器,10-绝缘子闭式卡上卡。In the figure: 1-Insulator closed card lower card, 1-1-Positioning slot, 2-Clamping rod, 2-1-Through hole, 2-2-Clamping sub-rod, 3-Extension rod, 3-1-Through Hole, 4-end hanging wire connecting plate, 5-two connecting plate, 6-insulator, 7-lead wire, 8-elasticity adjustment mechanism, 9-hydraulic screw rod tensioner, 10-insulator closed clamping card.
具体实施方式detailed description
下面结合具体实例和附图对本实用新型做进一步说明。Below in conjunction with specific example and accompanying drawing, the utility model is further described.
如图1至图5所示,在特高压耐张塔上,由绝缘子6构成的耐张塔水平绝缘子串通过端部挂线联板4和二联板5与导线7连接,每个绝缘子6都是需要承受一定的力的,想要更换其中的某一个绝缘子6,必须要其它的部件来代替待更换绝缘子去承受一定的力。本实用新型提供一种特高压耐张绝缘子通用检修工具,它包括绝缘子闭式卡下卡1、夹持杆2和延长杆3;夹持杆2的一端和延长杆3的一端分别与绝缘子闭式卡下卡1的两端连接,使得夹持杆2、绝缘子闭式卡下卡1和延长杆3构成门字形;夹持杆2的另一端和延长杆3的另一端均设有用于与液压丝杆紧线器9连接的通孔2-1和3-1;所述的夹持杆2包括用于夹持端部挂线联板4的上下两片夹持分杆2-2,两片夹持分杆2-2之间设有松紧调节机构8。As shown in Figures 1 to 5, on the UHV tension tower, the horizontal insulator string of the tension tower composed of insulators 6 is connected to the wire 7 through the end hanging wire connecting plate 4 and the double connecting plate 5, and each insulator 6 All need to withstand a certain force, and if you want to replace a certain insulator 6, you must replace the insulator to be replaced with other parts to bear a certain force. The utility model provides a general overhaul tool for UHV strain insulators, which includes an insulator closed clamping card 1, a clamping rod 2 and an extension rod 3; one end of the clamping rod 2 and one end of the extension rod 3 are respectively closed with the insulator. The two ends of the card lower card 1 are connected so that the clamping rod 2, the insulator closed card lower card 1 and the extension rod 3 form a door shape; the other end of the clamping rod 2 and the other end of the extension rod 3 are provided with The through holes 2-1 and 3-1 connected by the hydraulic screw tensioner 9; the clamping rod 2 includes two upper and lower clamping sub-rods 2-2 for clamping the end hanging wire connecting plate 4, two A tightness adjustment mechanism 8 is arranged between the sheet clamping sub-rods 2-2.
优选的,绝缘子闭式卡下卡1的内侧设有用于卡入与端部挂线联板4连接的二联板5的定位槽1-1;绝缘子闭式卡下卡1的内侧与延长杆3和夹持杆2位于同一侧。Preferably, the inner side of the insulator closed card lower card 1 is provided with a positioning groove 1-1 for snapping into the two connecting plates 5 connected to the end hanging line connecting plate 4; the inner side of the insulator closed card lower card 1 and the extension rod 3 and clamping rod 2 are located on the same side.
进一步优选的,所述的松紧调节机构8为调节螺母。Further preferably, the tightness adjusting mechanism 8 is an adjusting nut.
本实施例中,所述的夹持杆2和延长杆3的长度相等。In this embodiment, the lengths of the clamping rod 2 and the extension rod 3 are equal.
所述的特高压耐张绝缘子通用检修工具的操作方法,它包括以下步骤:The operation method of the general overhaul tool for UHV tensile insulators includes the following steps:
S1、准备:清理端部挂线联板4和二联板5;将所述的特高压耐张绝缘子通用检修工具起吊至合适位置;若二联板5上有均压环安装杆,则将均压环安装杆拆掉。S1. Preparation: Clean up the connecting plate 4 and the second connecting plate 5 at the end; lift the general maintenance tool for UHV tension insulators to a suitable position; Remove the pressure equalizing ring mounting rod.
S2、安装:利用2片夹持分杆2-2将端部挂线联板4夹持住,且绝缘子闭式卡下卡1与二联板5相抵住,通过松紧调节机构8夹紧使得夹持杆2与端部挂线联板4相对固定;夹持杆2的另一端和延长杆3的另一端分别连接液压丝杆紧线器9。S2. Installation: Use two clamping sub-rods 2-2 to clamp the end hanging line connecting plate 4, and the insulator closed card lower card 1 and the second connecting plate 5 are against each other, and the elastic adjustment mechanism 8 is clamped to make the clamping The holding rod 2 is relatively fixed with the end hanging wire connecting plate 4; the other end of the clamping rod 2 and the other end of the extension rod 3 are respectively connected with a hydraulic screw thread tensioner 9.
绝缘子闭式卡下卡1的内侧设有用于卡入与端部挂线联板4连接的二联板5的定位槽1-1;所述的S2中,二联板5卡入所述的定位槽1-1中,由于二联板5与绝缘子闭式卡下卡1为相互垂直的状态,增加定位槽1-1能够起到防滑的作用。The inner side of the insulator closed card lower card 1 is provided with a positioning groove 1-1 for snapping in the two-joint plate 5 connected to the end hanging line joint plate 4; In the positioning groove 1-1, since the two-joint plate 5 and the lower card 1 of the closed insulator are perpendicular to each other, adding the positioning groove 1-1 can play an anti-slip effect.
利用所述的特高压耐张绝缘子通用检修工具实现的绝缘子更换方法,它包括以下步骤:The insulator replacement method implemented by using the UHV tensile insulator universal maintenance tool includes the following steps:
S1、准备:清理端部挂线联板4和二联板5;将所述的特高压耐张绝缘子通用检修工具、液压丝杆紧线器和绝缘子闭式卡的上卡起吊至合适位置;若二联板5上有均压环安装杆,则将均压环安装杆拆掉。S1. Preparation: Clean up the end-hanging connecting plate 4 and the second connecting plate 5; lift the above-mentioned UHV tension insulator universal maintenance tool, hydraulic screw tensioner and the upper clamp of the insulator closed clamp to a suitable position; If there is a pressure equalizing ring installation rod on the second connecting plate 5, then the pressure equalization ring installation rod is dismantled.
S2、安装:如图5所示,S2, installation: as shown in Figure 5,
导线侧:利用2片夹持分杆2-2将端部挂线联板4夹持住,且绝缘子闭式卡下卡1与二联板5相抵住,通过松紧调节机构8夹紧使得夹持杆2与端部挂线联板4相对固定;夹持杆2的另一端和延长杆3的另一端分别连接液压丝杆紧线器9;Conductor side: Use two clamping sub-rods 2-2 to clamp the end hanging wire connecting plate 4, and the closed clamping card 1 of the insulator is against the second connecting plate 5, and is clamped by the elastic adjustment mechanism 8 so that the clamping The rod 2 is relatively fixed to the end hooking plate 4; the other end of the clamping rod 2 and the other end of the extension rod 3 are respectively connected to the hydraulic screw tensioner 9;
绝缘子侧:将绝缘子闭式卡上卡10卡住待更换绝缘子导线侧方向相邻的绝缘子,绝缘子闭式卡上卡10的两端分别连接液压丝杆紧线器9;On the insulator side: clamp the insulator closed card upper card 10 to the insulator adjacent to the wire side of the insulator to be replaced, and connect the two ends of the insulator closed card upper card 10 to the hydraulic screw tensioner 9 respectively;
绝缘子闭式卡下卡1的内侧设有用于卡入与端部挂线联板4连接的二联板5的定位槽1-1;所述的S2中,二联板5卡入所述的定位槽1-1中。The inner side of the insulator closed card lower card 1 is provided with a positioning groove 1-1 for snapping in the two-joint plate 5 connected to the end hanging line joint plate 4; In the positioning slot 1-1.
S3、更换绝缘子:绝缘子闭式卡上卡10、液压丝杆紧线器9和特高压耐张绝缘子通用检修工具构成一个框形,将液压丝杆紧线器9收紧,则能够分担待更换绝缘子的力,直到待更换绝缘子松落能够取下时,停止紧线,取下待更换绝缘子,换上新的绝缘子;S3. Replacement of insulators: the insulator closed clamping card 10, the hydraulic screw tensioner 9 and the UHV tension insulator general maintenance tool form a frame shape, and the hydraulic screw tensioner 9 can be tightened, and the replacement can be shared The force of the insulator, until the insulator to be replaced is loose and can be removed, stop tightening the wire, remove the insulator to be replaced, and replace it with a new insulator;
S4、拆卸:松开液压丝杆紧线器9,恢复导线正常受力,拆除液压丝杆紧线器9、绝缘子闭式卡上卡10和特高压耐张绝缘子通用检修工具并放落至地面。S4. Disassembly: Loosen the hydraulic screw tensioner 9, restore the normal force on the wire, remove the hydraulic screw tensioner 9, the insulator closed card upper card 10 and the general maintenance tool for UHV tension insulators and drop them to the ground .
以1000kV交流特高压试验示范输电线路南荆I线为例,采用水平双串绝缘子的受力结构,导线侧使用梯形的端部挂线联板连接4块三角形的各挂2根导线,形成8分裂导线的耐张挂线。塔身侧采用U型螺栓+调整版+调节板+牵引板与绝缘子串相连接。南荆I线交流特高压输电线路使用8x500分裂导线结构,耐张塔挂线张力,在对应平均运行应力时为22T,考虑一定的余度系数,按照24吨进行归约及相关力学计算是合理的,可以接受的。两串耐张绝缘子平均受力按12T考虑制作相应的承力转移工器具,本实用新型是完全适用的。Taking Nanjing Line I of the 1000kV AC UHV test demonstration transmission line as an example, the stress structure of horizontal double-string insulators is adopted, and the trapezoidal end hanging connection plate is used on the conductor side to connect 4 triangles with 2 conductors each, forming 8 Tension wire for splitting conductors. The side of the tower is connected with insulator strings by U-shaped bolts + adjustment plate + adjustment plate + traction plate. The AC UHV transmission line of Nanjing Line I uses 8x500 split conductor structure, and the tension of the tension tower hanging wire is 22T when corresponding to the average operating stress. Considering a certain margin coefficient, it is reasonable to carry out reduction and related mechanical calculations based on 24 tons Yes, acceptable. The average stress of two strings of tension insulators is considered to be 12T to make corresponding load-bearing transfer tools, and the utility model is fully applicable.
耐张塔水平串绝缘子为55T玻璃绝缘子,型号为 U550B/240T,伞裙直径为375mm,两串绝缘子间距600mm,因此两串间空间为225mm,这个空间可供安装液压丝杆紧线器。利用绝缘子闭式卡下卡1作为端部卡,这样在强度能保证的前提下,该端部卡同时可以作为普通的绝缘子闭式卡下卡1使用,实现了一物两用的目的,减少工具种类。简单地说,就是在绝缘子闭式卡下卡1的顶面相应位置开设定位防滑槽,作为端部卡使用。通过机械力学计算,由于开槽位置不是对称的,且开槽后降低了端部卡的强度,因此必须进行相应加强。方法是在绝缘子闭式卡下卡1结构高度不变的前提下,增大定位槽1-1的横截面,提高其抗弯强度。另外,夹持杆2采用了双面包夹二联板5的方式,能够确保绝缘子闭式卡下卡1与绝缘子闭式卡上卡10在同一平面受力。The horizontal series insulators of the strain tower are 55T glass insulators, the model is U550B/240T, the diameter of the shed is 375mm, and the distance between the two series of insulators is 600mm, so the space between the two series is 225mm, which can be used to install the hydraulic screw tensioner. Using the insulator closed card lower card 1 as the end card, so that under the premise that the strength can be guaranteed, the end card can be used as an ordinary insulator closed card lower card 1 at the same time, realizing the purpose of one thing with two purposes, reducing Kind of tool. Simply put, it is to open a positioning anti-skid groove at the corresponding position on the top surface of the lower card 1 of the insulator closed card, and use it as an end card. According to the calculation of mechanical mechanics, because the slotting position is not symmetrical, and the strength of the end card is reduced after slotting, it must be strengthened accordingly. The method is to increase the cross-section of the positioning groove 1-1 under the premise that the structural height of the lower card 1 of the insulator closed card remains unchanged, and improve its bending strength. In addition, the clamping rod 2 adopts the method of clamping the two connecting plates 5 with double sides, which can ensure that the lower card 1 of the insulator closed card and the upper card 10 of the insulator closed card are stressed on the same plane.
由以上说明可以看出,该端部卡借用了普通绝缘子闭式卡下卡的基础结构形式,固定在挂接导线的2块二联板上,通过延长杆3与液压丝杆紧线器9及绝缘子闭式卡上卡10连接配套使用,进行端部绝缘子更换、检修。相较于普通绝缘子闭式卡下卡,其受力截面有所增大。在端部卡布置时,内外侧两串中的任一串,导线侧关节结构镜像对称,因此在另一侧使用时,仅需要将端部卡水平旋转180度布置即可。显然,该型端部卡因固定位置的原因,其在该线路全线是通用的,并且由于其基于普通绝缘子闭式卡下卡的结构,也能作为普通绝缘子闭式卡下卡使用,减少了检修班组工具配置的种类和数量,实现了一物两用的目的。It can be seen from the above description that the end card borrows the basic structure of the ordinary insulator closed card lower card, and is fixed on the two two-piece boards on which the wires are hooked. Through the extension rod 3 and the hydraulic screw tensioner 9 And insulator closed card upper card 10 connection supporting use, carry out end insulator replacement, maintenance. Compared with the ordinary insulator closed clamping clamp, its force cross section has been enlarged. When arranging the end cards, any one of the inner and outer strings, the joint structure of the wire side is mirror-symmetrical, so when using it on the other side, it is only necessary to horizontally rotate the end cards by 180 degrees to arrange them. Obviously, because of the fixed position of this type of end clamp, it is universal in the whole line of the line, and because it is based on the structure of the common insulator closed clamp, it can also be used as a common insulator closed clamp, reducing the The types and quantities of tools configured by the maintenance team realize the purpose of one thing with two uses.
以上实施例仅用于说明本实用新型的设计思想和特点,其目的在于使本领域内的技术人员能够了解本实用新型的内容并据以实施,本实用新型的保护范围不限于上述实施例。所以,凡依据本实用新型所揭示的原理、设计思路所作的等同变化或修饰,均在本实用新型的保护范围之内。The above embodiments are only used to illustrate the design concept and characteristics of the present utility model, and its purpose is to enable those skilled in the art to understand the content of the present utility model and implement it accordingly. The protection scope of the present utility model is not limited to the above-mentioned embodiments. Therefore, all equivalent changes or modifications based on the principles and design ideas disclosed in the present utility model are within the protection scope of the present utility model.
Claims (4)
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720218278.5U CN206673450U (en) | 2017-03-07 | 2017-03-07 | The general service kit in extra-high voltage strain insulator wire side end |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| CN201720218278.5U CN206673450U (en) | 2017-03-07 | 2017-03-07 | The general service kit in extra-high voltage strain insulator wire side end |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| CN206673450U true CN206673450U (en) | 2017-11-24 |
Family
ID=60377151
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| CN201720218278.5U Active CN206673450U (en) | 2017-03-07 | 2017-03-07 | The general service kit in extra-high voltage strain insulator wire side end |
Country Status (1)
| Country | Link |
|---|---|
| CN (1) | CN206673450U (en) |
Cited By (1)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106877235A (en) * | 2017-03-07 | 2017-06-20 | 国家电网公司 | The extra-high voltage general service kit of strain insulator wire side end and operating method |
-
2017
- 2017-03-07 CN CN201720218278.5U patent/CN206673450U/en active Active
Cited By (2)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| CN106877235A (en) * | 2017-03-07 | 2017-06-20 | 国家电网公司 | The extra-high voltage general service kit of strain insulator wire side end and operating method |
| CN106877235B (en) * | 2017-03-07 | 2018-06-22 | 国家电网公司 | The general service kit in extra-high voltage strain insulator conducting wire side end and operating method |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| CN202651692U (en) | Large-knife clamp tool for changing double-strain string insulator | |
| CN202059096U (en) | Tool component capable of replacing insulator string electrically | |
| CN105914646B (en) | Working method for replacing 35kV tension insulator strings with power on | |
| CN106451214B (en) | A kind of combination tool of charged for replacement extra-high voltage same tower double circuit strain insulator | |
| CN104752996B (en) | Method for live replacement of tension duplex whole-string insulators of 330kV power transmission line | |
| CN206673450U (en) | The general service kit in extra-high voltage strain insulator wire side end | |
| CN106877235B (en) | The general service kit in extra-high voltage strain insulator conducting wire side end and operating method | |
| CN204424804U (en) | Equipotential changes the instrument of the two soft bus strain insulator of simply connected | |
| CN105790158B (en) | Special tools for live replacement of 35kV tension insulator strings | |
| CN209277668U (en) | A kind of reinforced electric wire cross-arm | |
| CN104253394B (en) | A kind of replacing instrument of strain insulator string | |
| CN206099164U (en) | Change combination tool of extra -high voltage with two dead end insulator of returning of tower with electricity | |
| CN201910594U (en) | Special clamping apparatus of quadruple board at guide line end | |
| CN204858403U (en) | Change V -arrangement insulator hangs some fixing device to transmission line temporarily with electricity | |
| CN204144800U (en) | The special cross-arm card of a kind of ZML type tower | |
| CN204127079U (en) | A kind of connecting plate with Novel threaded cover | |
| CN205724648U (en) | A kind of charged for replacement 35kV strain insulator string specific purpose tool | |
| CN203839881U (en) | Strain clamp structure specially used for 110KV transmission line | |
| CN203747295U (en) | Special tool used for changing tension insulator of a 10kV power supply circuit in live-line state | |
| CN209088488U (en) | A kind of strain clamp | |
| CN207977667U (en) | A kind of more changing device twisting formula overhanging golden tool for transmission line of electricity aerial condutor | |
| CN207490436U (en) | The double models for hanging V-type composite insulator string replacing options of ± 500kV DC power transmission lines duplex | |
| CN207542669U (en) | It replaces tangent tower list and hangs the multipurpose instrument (tool) that the twin insulator period of the day from 11 p.m. to 1 a.m fixes three yoke plates | |
| CN206432624U (en) | Transmission line tangent tower first insulator changes instrument | |
| CN205429654U (en) | Wedge type aluminum alloy high -voltage cable strain insulator tension disk |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| GR01 | Patent grant | ||
| GR01 | Patent grant |