CN206670492U - A kind of positioner for determining flow of cement mortar - Google Patents

A kind of positioner for determining flow of cement mortar Download PDF

Info

Publication number
CN206670492U
CN206670492U CN201720263427.XU CN201720263427U CN206670492U CN 206670492 U CN206670492 U CN 206670492U CN 201720263427 U CN201720263427 U CN 201720263427U CN 206670492 U CN206670492 U CN 206670492U
Authority
CN
China
Prior art keywords
tamper
locating rod
locating
bolt
cement mortar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720263427.XU
Other languages
Chinese (zh)
Inventor
毛海勇
黄昱霖
魏明宇
徐创霞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Institute of Building Research
Original Assignee
Sichuan Institute of Building Research
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Institute of Building Research filed Critical Sichuan Institute of Building Research
Priority to CN201720263427.XU priority Critical patent/CN206670492U/en
Application granted granted Critical
Publication of CN206670492U publication Critical patent/CN206670492U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

The utility model discloses a kind of positioner for determining flow of cement mortar, it includes tamper(1), locating rod(2), locating ring(3)And bolt(4), locating rod(2)It is horizontally disposed, locating rod(2)Length be more than die sleeve(6)Large end face external diameter, locating rod(2)On be provided with locating ring(3), locating ring(3)On be provided with bolt hole(5), bolt hole(5)Internal thread is connected with bolt(4), tamper(1)Diameter is less than locating ring(3)Internal diameter, tamper(1)It is vertical to run through locating ring(3)Set, tamper(1)Bottom be provided with scale.The beneficial effects of the utility model are:It is simple in construction, quickly can accurately determine to smash pressure position and glue sand filler position, be simple to operate.

Description

A kind of positioner for determining flow of cement mortar
Technical field
The technical field of flow of cement mortar is the utility model is related to, particularly a kind of measure flow of cement mortar Positioner.
Background technology
At present, according to GB/T2419-2005《Test method for fluidity of cement mortar》Determine wanting for flow of cement mortar Ask:First layer glue sand is filled at truncated cone circle mould height about 2/3rds;Second layer glue sand, which is filled to, is higher by truncated cone circle mould about 20mm positions Put;First layer smashes pressure depth to the half of glue sand height;The second layer, which is smash pressure depth and is no more than, has smash pressure depth surface.
Existing Test method for fluidity of cement mortar, comprises the following steps:Step 1:Jumping table first carries out empty before the test Turn, to examine each position whether normal.Step 2:Prepared by glue sand is carried out by the pertinent regulations of GB/T 17671.Preparing glue sand Meanwhile jumping table table top, die trial inwall, tamper and the apparatus contacted with glue sand are wiped with moist cotton, die trial is placed on jumping table Table top center is simultaneously covered with moist cotton.Step 3:The glue sand mixed is divided two layers and is quickly charged with flowing die trial, first layer is filled to At truncated cone circle mould height about 2/3rds, each stroke of both direction is being mutually perpendicular to 5 times with pocket knife, it is equal by edge to center with tamper It is even to smash pressure 15 times, second layer glue sand then is filled, is filled to and is higher by truncated cone circle mould about 20mm, 10 times are drawn again with tamper by edge with pocket knife Pressure is uniformly smash to center 10 times.Smashing amount of pressure should be enough to make glue sand just full of truncated cone circle mould.Pressure depth is smash, first layer is smash to glue The half of sand height, second layer tamping, which is no more than, has consolidated bottom surface.Dress glue sand and when smashing pressure, with hand steered steady die trial, It not move it.Step 4:Smash pressure to finish, remove die sleeve, truncated cone circle mould will be higher by twice from centre to edge with pocket knife Glue sand scrape off floating, wipe glue sand on the table.Truncated cone circle mould is gently lifted vertically upward.Jumping table is started at once, About each second once, completes 30 bounces in 30 ± 1s.Step 5:Bounce finishes, and is expanded with kind of calliper glue sand bottom surface is maximum Diameter and the diameter vertical with base are dissipated, calculates average value, round numbers, with being represented in units of mm.The as cement mortar of the water Fluidity.
It follows that this assay method can not accurately, quickly determine to smash pressure position, glue sand filling position above.
Utility model content
The shortcomings that the purpose of this utility model is to overcome prior art, there is provided it is a kind of it is simple in construction, can be quickly accurate It is determined that smash pressure position and glue sand filler position, the positioner of measure flow of cement mortar simple to operate.
The purpose of this utility model is achieved through the following technical solutions:A kind of positioning dress for determining flow of cement mortar Put, it includes tamper, locating rod, locating ring and bolt, and described locating rod is horizontally disposed with, and the length of locating rod is more than mould Large end face external diameter is covered, locating ring is provided with locating rod, bolt hole is provided with locating ring, bolt hole internal thread is connected with positioning Bolt, described tamper diameter are less than locating ring internal diameter, and tamper is vertical to be set through locating ring, and the bottom of tamper is provided with quarter Degree.
Described locating ring is set parallel to locating rod.
Described scale bottommost numerical value is 0, and scale top numerical value is 100mm, and scale division value is 1mm.
Described bolt hole and the opposed setting of locating rod.
The utility model has advantages below:The utility model kind is simple in construction, quickly can accurately determine to smash pressure position With glue sand filler position, simple to operate.
Brief description of the drawings
Fig. 1 is front view of the present utility model;
Fig. 2 is top view of the present utility model;
Fig. 3 is operating diagram of the present utility model;
In figure, 1- tampers, 2- locating rods, 3- locating rings, 4- bolts, 5- bolts hole, 6- die sleeves, 7- truncated cones circle mould.
Embodiment
The utility model is further described below in conjunction with the accompanying drawings, the scope of protection of the utility model be not limited to It is lower described:
As shown in Figure 1 and 2, a kind of positioner for determining flow of cement mortar, it includes tamper 1, locating rod 2, positioning Ring 3 and bolt 4, described locating rod 2 is horizontally disposed, and the length of locating rod 2 is more than the large end face external diameter of die sleeve 6, locating rod 2 On be provided with locating ring 3, the mode such as locating rod 2 and locating ring 3 are by welding, riveting, bolt connection is connected, described locating ring 3 are set parallel to locating rod 2, and bolt hole 5, bolt hole 5 and 2 opposed setting of locating rod, bolt hole 5 are provided with locating ring 3 Internal thread is connected with bolt 4, and the diameter of tamper 1 is less than the internal diameter of locating ring 3, and tamper 1 is vertical to be set through locating ring 3, tamper 1 Bottom be provided with scale, scale bottommost numerical value is 0, and scale top numerical value is 100mm, and scale division value is 1mm.When During screwed in place bolt 4, the head of bolt 4 is pressed on tamper 1 so that tamper 1 is lock onto in locating ring 3;It is fixed when unscrewing During the bolt 4 of position, the head of bolt 4 is separated with tamper 1 to realize that tamper 1 moves freely in locating ring 3.
As shown in figure 3, the localization method of the positioner of described measure flow of cement mortar, it is characterised in that:It Including following:
S1, first layer glue sand load the determination of position, and it is concretely comprised the following steps:First by locating rod 2 across frame on the top of die sleeve 6 Portion;The vertical insertion truncated cone in graduated one end on tamper 1 is justified into the bottom of mould 7 again, sight is concordant with the top surface of die sleeve 6 with from quarter The summation height of die sleeve 6 and truncated cone circle mould 7, summation height abbreviation combined altitudes are read on degree;Tamper 1 is moved then up, together When sight it is concordant with the top surface of die sleeve 6 to read scale numerical value, when scale numerical value=combined altitudes-(Die sleeve height+truncated cone justifies mould / 3rd height)When, stop mobile tamper 1 and screwed in place bolt 4 is so that bolt 4 locks tamper 1, most backward truncated cone Glue sand is loaded in circle mould 7, when glue sand is filled into 0 scale, that is, ensure that first layer glue sand is accurately loaded to truncated cone circle mould height At 2/3rds height;
S2, first layer glue sand smash the determination of pressure position, and it is concretely comprised the following steps:Unscrew bolt 4 and make tamper 1 to moving down It is dynamic, while sight is concordant with the top surface of die sleeve 6 to read scale numerical value, when scale numerical value=combined altitudes-(Die sleeve height+the first Layer glue sand half height)When, stop mobile tamper 1 and screwed in place bolt 4 is so that bolt 4 locks tamper 1, now 0 scale pointed location is that first layer glue sand smashes pressure position, and first layer glue sand is carried out smashing pressure using tamper 1, is smash after pressure terminates, First layer glue sand smashes the half that pressure height is just equal to first layer glue sand height;
S3, second layer glue sand load the determination of position, and it is concretely comprised the following steps:First unscrew bolt 4 and make tamper 1 upward Move on to outside truncated cone circle mould 7 and the assembly of die sleeve 6, move tamper 1 still further below, while sight is concordant with the top surface of die sleeve 6 with reading Take scale numerical value, when scale numerical value=combined altitudes-(Truncated cone circle mould height+20mm)When, stop mobile tamper 1 and screwed in place Bolt 4 is so that bolt 4 locks tamper 1, and most backward truncated cone circle mould 7 is interior to load glue sand, when glue sand is filled into 0 scale, i.e., It ensure that second layer glue sand accurately to truncated cone circle mould 20mm is higher by highly locate by filling;
S4, second layer glue sand smash the determination of pressure position, and it is concretely comprised the following steps:Unscrew bolt 4 and make tamper 1 to moving down It is dynamic, while sight is concordant with the top surface of die sleeve 6 to read scale numerical value, it is ensured that scale numerical value<(Combined altitudes-first layer glue sand Smash pressure height), then stop mobile tamper 1 and screwed in place bolt 4 be so that bolt 4 locks tamper 1, now 0 quarter Degree pointed location is that second layer glue sand smashes pressure position, finally second layer glue sand is carried out smashing pressure using tamper 1, smashes pressure and terminate Afterwards, it accurately ensure that the second layer is smash pressure depth and is no more than and smash pressure depth surface.
Therefore first layer glue sand can be loaded accurately and rapidly to truncated cone to justify mould height three points by the positioner Two opening positions;Second layer glue sand load to be higher by truncated cone circle mould 20mm opening positions;First layer smashes pressure depth to first layer glue sand The half of height;The second layer, which is smash pressure depth and is no more than, has smash pressure depth surface.

Claims (4)

  1. A kind of 1. positioner for determining flow of cement mortar, it is characterised in that:It includes tamper(1), locating rod(2), it is fixed Position ring(3)And bolt(4), described locating rod(2)It is horizontally disposed, locating rod(2)Length be more than die sleeve(6)Large end face External diameter, locating rod(2)On be provided with locating ring(3), locating ring(3)On be provided with bolt hole(5), bolt hole(5)Internal thread connects It is connected to bolt(4), described tamper(1)Diameter is less than locating ring(3)Internal diameter, tamper(1)It is vertical to run through locating ring(3)If Put, tamper(1)Bottom be provided with scale.
  2. A kind of 2. positioner for determining flow of cement mortar according to claim 1, it is characterised in that:Described determines Position ring(3)Parallel to locating rod(2)Set.
  3. A kind of 3. positioner for determining flow of cement mortar according to claim 1, it is characterised in that:Described quarter It is 0 to spend bottommost numerical value, and scale top numerical value is 100mm, and scale division value is 1mm.
  4. A kind of 4. positioner for determining flow of cement mortar according to claim 1, it is characterised in that:Described spiral shell Keyhole(5)With locating rod(2)Opposed setting.
CN201720263427.XU 2017-03-17 2017-03-17 A kind of positioner for determining flow of cement mortar Expired - Fee Related CN206670492U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720263427.XU CN206670492U (en) 2017-03-17 2017-03-17 A kind of positioner for determining flow of cement mortar

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720263427.XU CN206670492U (en) 2017-03-17 2017-03-17 A kind of positioner for determining flow of cement mortar

Publications (1)

Publication Number Publication Date
CN206670492U true CN206670492U (en) 2017-11-24

Family

ID=60377854

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720263427.XU Expired - Fee Related CN206670492U (en) 2017-03-17 2017-03-17 A kind of positioner for determining flow of cement mortar

Country Status (1)

Country Link
CN (1) CN206670492U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106767272A (en) * 2017-03-17 2017-05-31 四川省建筑科学研究院 A kind of positioner and localization method for determining flow of cement mortar

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106767272A (en) * 2017-03-17 2017-05-31 四川省建筑科学研究院 A kind of positioner and localization method for determining flow of cement mortar

Similar Documents

Publication Publication Date Title
CN104316380B (en) Sample preparation device for coarse-grained soil triaxial test and application method thereof
CN106767272A (en) A kind of positioner and localization method for determining flow of cement mortar
CN204007582U (en) A kind of concrete joint surface roughness measuring device
CN206670492U (en) A kind of positioner for determining flow of cement mortar
CN106908289B (en) A kind of prismatical joint rock mass preparation method of sample of cylinder stomata containing filling
CN105332511B (en) A kind of huge steel core concrete column filling core, which pours, smashes device and method
CN205665144U (en) Core test piece infiltration coefficient measurement appearance is got in drilling
CN204630896U (en) A kind of bituminous pavement infiltration coefficient determinator improving accuracy
CN202869937U (en) Permeation tester of permeable emulsified asphalt
CN109724860B (en) Mudstone core access device and access method thereof
CN105424485B (en) Concrete filled steel tube bow member perfusion pilot system and test method
CN105115857B (en) Flow of cement mortar test device
CN205691954U (en) A kind of hourglass being easy to accurate perception timing length
CN216516931U (en) Grout supplementing device for grouting sleeve
CN209280395U (en) A kind of underground project model test contains water-soluble chamber producing device
CN206733490U (en) EVA shoe pads mould
CN205426646U (en) Rapid saturation and drainage structure for cohesive granular soil large triaxial test
CN105867101A (en) Hourglass convenient in accurately controlling timing duration
CN114800795A (en) Vertical combined die for preparing triaxial compression test sample and using method
CN105136612B (en) Flow of cement mortar testing mould
CN209400302U (en) Mud stone core access device
CN208607107U (en) A kind of auxiliary device measuring mortar apparent density
CN208280139U (en) A kind of mould bag grouting pile molding machine
CN207964592U (en) Concrete re- vibrating contraction measuring device
CN208702135U (en) A kind of aluminum dipping form top plate of controllable concrete thickness

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171124

Termination date: 20180317

CF01 Termination of patent right due to non-payment of annual fee