CN206667264U - It is a kind of from draining string data enlarging anchor rod supporting construction - Google Patents

It is a kind of from draining string data enlarging anchor rod supporting construction Download PDF

Info

Publication number
CN206667264U
CN206667264U CN201720187418.7U CN201720187418U CN206667264U CN 206667264 U CN206667264 U CN 206667264U CN 201720187418 U CN201720187418 U CN 201720187418U CN 206667264 U CN206667264 U CN 206667264U
Authority
CN
China
Prior art keywords
draining
string data
anchor rod
steel pipe
data enlarging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720187418.7U
Other languages
Chinese (zh)
Inventor
袁方龙
董建华
朱耀庭
田伟
刘和文
李明英
郑爱荣
陈举
张嘉莹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd
Tianjin Harbor Engineering Quality Inspection Center Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, Tianjin Port Engineering Institute Ltd of CCCC Frst Harbor Engineering Co Ltd, Tianjin Harbor Engineering Quality Inspection Center Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN201720187418.7U priority Critical patent/CN206667264U/en
Application granted granted Critical
Publication of CN206667264U publication Critical patent/CN206667264U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses one kind from draining string data enlarging anchor rod supporting construction, including from draining string data enlarging anchor rod, it is made up of from draining string data enlarging anchor rod variable diameters drainage steel pipe, hollow steel tube, water swelling ring, spiral apex point and siphon pipe, it is spiral apex point from draining string data enlarging anchor rod front end, the spiral apex point, variable diameters drainage steel pipe and hollow steel tube are sequentially connected by screw thread, and water swelling ring set is on variable diameters drainage steel pipe;Crept into from draining string data enlarging anchor rod according to angle is drilled with soil mass of foundation pit, in domatic the setting lattice frame and breast boards of foundation ditch, and it will be fixed on from the tail end of draining string data enlarging anchor rod on lattice frame, treatment hole is provided with variable diameters drainage steel pipe, drainage channel is provided for foundation soil, water swelling ring water-swellable forms expanding reach and provides anchor force, and siphon pipe is inserted in hollow steel tube, apply initial siphon power to siphon pipe with suction pump, implement draining.

Description

It is a kind of from draining string data enlarging anchor rod supporting construction
Technical field
The utility model belongs to anchoring engineering technical field, and in particular to a kind of from draining string data enlarging anchor rod supporting knot Structure.
Background technology
With the fast development of China's economy, skyscraper and city underground engineering are on the increase, and are generated therefrom big Measure deep pit digging support engineering.With the increasing of foundation ditch scale and depth, engineering accident and construction difficult problem gradually increase, especially In China's Coastal Areas, soft soil layer is widely distributed, and soil moisture content is high, physico-mechanical properties is poor so that deep basal pit stability Contradiction between anchorage technology becomes very urgent and protruded.Grouted anchor bar is difficult to weak soil used by traditional anchorage technology The characteristics of side slope provides preferable anchoring effect, and enlarged footing anchor pole relies on itself high-bearing capacity is promoted in soft clay area should With.At present, it is high-pressure injection enlarging anchor rod using more enlarged footing anchor pole in Deep Foundation Pit Supporting Project, but in soft clay area In deep-foundation pit engineering, it is controllable difficult pore-forming, anchoring section injecting cement paste compression strength deficiency, construction quality to be present in high-pressure injection enlarging anchor rod A series of problems, such as property difference.However, the improvement for weak slope should not be limited to improve supporting construction bearing capacity, soil is improved The same significant of mechanics characteristic, Deep Foundation Pit Dewatering Design are one of key issues that emphasis considers before foundation pit construction, are to carry The effective measures of high soil body mechanical strength.Therefore, it will be enlarged by an anchorage technology to be combined with water discharge technology, be a kind of deep base of raising Cheat the more effective supporting measure of engineering stability.
Application No. 201420805558.2, entitled draining is compound to be disclosed from the patent for boring tire string data suspension roof support structure A kind of method for protecting support for being combined drainage measure with enlarged footing anchorage technology, it is characterized in that from tire string data anchor pole is bored by hollow The body of rod, carcass and drilling rod are formed by connecting, and by being inflated to from the carcass for boring tire string data anchor pole, make carcass expand to form expanding reach To provide compared with high-bearing capacity to be domatic, will be fixed on lattice beam, Special composition branch from tire string data anchor pole is bored by anchorage and billet Weak slope is anchored in the stable soil body by protection structure, by arranging drain bar domatic to reach the purpose of base pit dewatering, the party Method can effectively discharge domatic moisture, and have preferable anchoring effect from tire string data anchor pole is bored, still, comparatively from brill tire The manufacturing process of string data anchor pole is more complicated, and drain bar is larger to domatic disturbance during arranging, and easily causes domatic soil Body collapses, in addition, the draining provided in the supporting is new is separate with supporting measure, increases difficulty of construction and input.
Water swelling rubber technology is a kind of the new of hydrophilic radical or hydrophilic component to be introduced in the elastic matrix of rubber Type technology, upon contact with water, hydrone can enter in matrix, and extremely strong affinity is formed with the hydrophilic radical in rubber, And the hydroaropic substance in rubber is dissolved or is swelled, permeable pressure head is formed inside and outside rubber, this pressure difference promotes water to rubber Internal penetration.Hydroaropic substance constantly absorbs moisture, causes rubber to deform upon.Water swelling rubber meets water and is expandable to itself Quality or the several times of volume or even hundreds times, adapt to malformation, and produce the larger bulbs of pressure, are keeping the elasticity of matrix While with intensity, the also ability with water conservation sealing.Water swelling rubber technology is incorporated into enlarged footing anchor by the utility model Gu in technology, and combine drainage anchor rod technology and propose a kind of deep basal pit from draining string data enlarging anchor rod supporting construction and construction party Method.
Utility model content
The purpose of this utility model is overcome the deficiencies in the prior art, there is provided a kind of to have drain function and anchoring simultaneously The deep basal pit of effect is from draining string data enlarging anchor rod supporting construction and construction method.
The utility model is achieved through the following technical solutions:
One kind expands body from draining string data enlarging anchor rod supporting construction, including from draining string data enlarging anchor rod from draining string data Anchor pole is made up of variable diameters drainage steel pipe, hollow steel tube, water swelling ring, spiral apex point and siphon pipe, expands body from draining string data Anchor pole front end is spiral apex point, and the spiral apex point, variable diameters drainage steel pipe and hollow steel tube are sequentially connected by screw thread, is inhaled Water expansion loop is sleeved on variable diameters drainage steel pipe,
From draining string data enlarging anchor rod according to being drilled with angle drilling soil mass of foundation pit, in the domatic setting lattice frame of foundation ditch And breast boards, and will be fixed on from the tail end of draining string data enlarging anchor rod on lattice frame, it is provided with variable diameters drainage steel pipe Treatment hole, drainage channel is provided for foundation soil, water swelling ring water-swellable forms expanding reach and provides anchor force, siphon pipe insertion In hollow steel tube, apply initial siphon power to siphon pipe with suction pump, implement draining.
In the above-mentioned technical solutions, the variable diameters drainage steel pipe is by least one major diameter drainage steel pipe and at least one Minor diameter drainage steel pipe is connected through a screw thread composition, and water swelling ring set is located at the minor diameter drainage steel pipe of variable diameters drainage steel pipe On, major diameter drainage fastener for connection anchors into stop ladder of the side as water swelling ring minor diameter drainage steel pipe.
In the above-mentioned technical solutions, variable diameters drainage steel pipe includes two major diameter drainage steel pipes and two minor diameter drainages Steel pipe, during connection, the spiral apex point, a major diameter drainage steel pipe, a minor diameter drainage steel pipe, the filter of another major diameter Water steel pipe, another minor diameter drainage steel pipe, hollow steel tube are sequentially connected by screw thread.
In the above-mentioned technical solutions, the spiral apex point length is 0.4m~0.6m, and surface sets helical blade, helical-blade Piece maximum gauge is slightly larger than or the original outer diameter equal to water swelling ring.
In the above-mentioned technical solutions, the major diameter drainage steel tube surface uniformly opens up a diameter of 5~10mm for the treatment of hole;Soil Work filter cloth uses high strength synthetic fibre material;A diameter of 4~the 6mm for the treatment of hole that minor diameter drainage steel tube surface uniformly opens up.
In the above-mentioned technical solutions, the drilling end of hollow steel tube is threaded.
In the above-mentioned technical solutions, water swelling ring uses high intensity highly expanded rate water sucting rubber material, expansion rate 200 ~400%;Water swelling ring internal diameter is slightly larger than the external diameter of minor diameter drainage steel pipe.
In the above-mentioned technical solutions, the siphon pipe is sequentially connected by suction hose, union elbow and rubber tube and formed, diameter For 10~25mm, suction hose is inserted in hollow steel tube, water suction length of tube and hollow steel tube equal length;The design of union elbow Angle can be depending on the domatic design angle of foundation ditch.Further, the suction hose uses rigid polyvinyl chloride material.
It is as follows from the concrete construction method of draining string data enlarging anchor rod supporting construction:
1. arranging position and angle from draining string data enlarging anchor rod in the determination of foundation ditch free face with survey tool, generally will 10 °~15 ° are set to from the angle of arranging of draining string data enlarging anchor rod;
2. arrange from draining string data enlarging anchor rod:By design attitude and angle is arranged in foundation ditch free face, successively by spiral Apex point, a major diameter drainage steel pipe, a minor diameter drainage fastener for connection, by water swelling ring set in minor diameter drainage steel pipe Periphery, then the other end of minor diameter drainage steel pipe is connected with rig, starts rig, progressively filter spiral apex point, major diameter Water steel pipe, minor diameter drainage steel pipe pierce that foundation ditch is domatic, until stopping drilling when the end of minor diameter drainage steel pipe closes on domatic; It can continue to connect major diameter drainage steel pipe, minor diameter drainage steel according to design requirements such as deep pit monitor grade, anchorage depths afterwards Pipe, water swelling ring simultaneously are implemented to creep into, and are installed needed for the major diameter drainage steel pipe, minor diameter drainage steel pipe, water swelling ring Number depending on the design requirements such as deep pit monitor grade, anchorage depth;When single from needed for draining string data enlarging anchor rod At the end of last root minor diameter drainage steel pipe is crept into, by hollow steel tube with being connected through a screw thread in minor diameter drainage steel pipe, so After start rig, until complete an installation from draining string data enlarging anchor rod;
3. construct lattice frame and breast boards:Bar-mat reinforcement is laid on foundation ditch is domatic, and according to design requirement spray furnace To complete the construction of lattice frame and breast boards, lattice frame should will be passed through from draining string data enlarging anchor rod during spray furnace Frame, and will be fixed on anchorage from the tail end of draining string data enlarging anchor rod on lattice frame;
4. implement draining:The suction hose of siphon pipe is inserted into hollow steel tube, union elbow is connected with suction hose, and by rubber Sebific duct is connected to the other end of union elbow;Rubber tube is connected with suction pump, starts suction pump and applies initial rainbow to siphon pipe Suction, when there is water to flow to rubber tube, close suction pump and remove, domatic interior moisture is gradually discharged under siphonage;
5. by step 2.~order 4. in next work surface construction from draining string data enlarging anchor rod, lattice frame and gear Native plate, and slope drainage is carried out, until bottom of slope.
The advantages of the utility model and have the beneficial effect that:
The utility model is setting water swelling ring from draining string data enlarging anchor rod, after anchor pole pierces soft soil foundation, profit With soft soil foundation water content the characteristics of high in combination with the water absorption behavior of water swelling rubber, it is swollen that water swelling ring can meet water Bulging compresses compacted surrounding soil into expanding reach, and stable anchor force is provided for anchor pole.
Meanwhile the utility model will make hollow anchor bar from draining string data enlarging anchor rod, and filter is opened up on hollow anchor bar Water hole, drainage channel is provided for foundation soil, inserted in hollow anchor bar siphon pipe in hollow steel tube, applied with suction pump to siphon pipe Initial siphon power, implements draining.
Water swelling rubber technology is creatively incorporated into enlarged footing anchorage technology by the utility model, is solved soft In the deep-foundation pit engineering in soil area, there is difficult pore-forming, anchoring section injecting cement paste compression strength deficiency, construction in high-pressure injection enlarging anchor rod A series of problems, such as quality controllability difference;Meanwhile of the present utility model have from draining string data enlarging anchor rod from drain function, energy It is enough effectively to reduce water content of soil, improve the mechanical characteristic of weak soil;It is combined by enlarged footing anchorage technology with water discharge technology, energy Enough improve the stability of Deep Foundation Pit Supporting Project.
Compared with the patent of Application No. 201420805558.2, anchor pole of the present utility model has enlarged footing anchoring simultaneously With from drain function, its manufacturing process is simple, easily construction, and carries out draining without setting drain bar in addition, so as to avoid It is big to domatic disturbance during arranging, the problem of easily causing the domatic soil body to collapse.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model.
Fig. 2 is Fig. 1 A to sectional view.
Fig. 3 is the zoomed-in view from draining string data enlarging anchor rod shown in Fig. 2.
Wherein:1 is lattice frame, and 2 be breast boards, and 3 be from draining string data enlarging anchor rod, and 4 be variable diameters drainage steel pipe, 5 It is water swelling ring for hollow steel tube, 6,7 be spiral apex point, and 8 be siphon pipe, and 9 be major diameter drainage steel pipe, and 10 be that minor diameter is filtered Water steel pipe, 11 be treatment hole, and 12 be anchor ear, and 13 be filter cloth, and 14 be anchorage, and 15 be helical blade, and 16 be suction hose, and 17 be bend pipe Joint, 18 be rubber tube.
Embodiment
The technical solution of the utility model is further illustrated with reference to specific embodiment.
, will be from draining from draining string data enlarging anchor rod supporting construction, including from draining string data enlarging anchor rod 3 referring to accompanying drawing 1 String data enlarging anchor rod 3 is anchored into deep basal pit, and from the end of draining string data enlarging anchor rod 3 set lattice frame 1 and breast boards 2 with Form deep foundation pit supporting structure;
It is described to include variable diameters drainage steel pipe 4, hollow steel tube 5, water suction from draining string data enlarging anchor rod 3 referring to accompanying drawing 2-3 Expansion loop 6, spiral apex point 7 and siphon pipe 8,
It is spiral apex point 7 from the front end of draining string data enlarging anchor rod 3, the spiral apex point 7, the and of variable diameters drainage steel pipe 4 Hollow steel tube 5 is sequentially connected by screw thread, and siphon pipe 8 is inserted in hollow steel tube 5,
The variable diameters drainage steel pipe 4 is by least one major diameter drainage steel pipe 9 and at least one minor diameter drainage steel pipe 10 are connected through a screw thread composition (both ends of major diameter drainage steel pipe 9 and minor diameter drainage steel pipe 10 are provided with hickey), Water swelling ring 6 is set on the minor diameter drainage steel pipe 10 of variable diameters drainage steel pipe 4, and major diameter drainage steel pipe 9 is connected to small Diameter drainage steel pipe 10 anchors into side, i.e. spiral apex point 7, major diameter drainage steel pipe 9, minor diameter drainage steel pipe 10 passes sequentially through Threaded connection;After anchor pole anchors into soil mass of foundation pit, the water-swellable of water swelling ring 6 forms expanding reach and provides anchor force, variable diameters filter Stop ladder of the major diameter drainage steel pipe 9 of water steel pipe 4 as water swelling ring 6, prevents anchor pole slip, so as to realize whole anchor The fixation of bar;Major diameter drainage steel pipe 9, minor diameter drainage steel pipe 10 and the water swelling ring 6 of the variable diameters drainage steel pipe 4 Installation number depending on the design requirements such as deep pit monitor grade, anchorage depth, in the present embodiment, as shown in drawings, become Diameter drainage steel pipe 4 includes two major diameter drainage steel pipes 9 and two minor diameter drainage steel pipes 10, during connection, the auger Sharp 7, major diameter drainage steel pipes, 9, minor diameter drainage steel pipes 10, another major diameter drainage steel pipe, another is small straight Footpath drainage steel pipe, hollow steel tube 5 are sequentially connected by screw thread.Set on major diameter drainage steel pipe 9 and minor diameter drainage steel pipe 10 Treatment hole 11 is equipped with, and the colligation geotechnique filter cloth 13 of anchor ear 12 is used in the periphery of major diameter drainage steel pipe 9.
, will be from draining string data enlarging anchor rod 3 according to being drilled with angle drilling soil mass of foundation pit during construction, domatic in foundation ditch is set Lattice frame 1 and breast boards 2 are put, and lattice will be fixed on from the tail end of hollow steel tube 5 of draining string data enlarging anchor rod 3 with anchorage 14 On framework 1, variable diameters drainage steel pipe 4 provides drainage channel for foundation soil, and the water-swellable of water swelling ring 6 forms expanding reach and provided Anchor force, and compacted surrounding soil is compressed, siphon pipe 8 is inserted in hollow steel tube 5, applies initial rainbow to siphon pipe 8 with suction pump Suction, implement draining.
The length of spiral apex point 7 is 0.4m~0.6m in the present embodiment, and surface sets helical blade 15, helical blade 15 maximum gauges are slightly larger than or the original outer diameter equal to water swelling ring 6.The surface of major diameter drainage steel pipe 9 uniformly opens up filter 11 a diameter of 5~10mm of water hole;Geotechnological filter cloth 13 uses high strength synthetic fibre material;10 surfaces of minor diameter drainage steel pipe are uniform The 11 a diameter of 4~6mm for the treatment of hole opened up.The drilling end of hollow steel tube 5 is threaded.Water swelling ring 6 is high using high intensity Expansion rate water sucting rubber material, expansion rate are 200~400%;The internal diameter of water swelling ring 6 is slightly larger than minor diameter drainage steel pipe 10 External diameter (internal diameter of water swelling ring 6 is bigger 1-5mm than the external diameter of minor diameter drainage steel pipe 10).As shown in figure 3, the siphon pipe 8 by Suction hose 16, union elbow 17 and rubber tube 18 are sequentially connected composition;Suction hose 16 uses rigid polyvinyl chloride material, and a diameter of 10 ~25mm, suction hose 16 are inserted in hollow steel tube 5, water suction length of tube and the equal length of hollow steel tube 5;Union elbow 17 is set Counting angle can be depending on the domatic design angle of foundation ditch.
Concrete construction method of the present utility model from draining string data enlarging anchor rod supporting construction is as follows:
1. it is prefabricated from draining string data enlarging anchor rod each several part component, determined with survey tool in foundation ditch free face from draining string Formula enlarging anchor rod arranges position and angle, generally will be set to 10 °~15 ° from the angle of arranging of draining string data enlarging anchor rod.
2. arrange from draining string data enlarging anchor rod:By design attitude and angle is arranged in foundation ditch free face, successively by spiral The minor diameter drainage steel pipe 10 of major diameter drainage steel pipe 9, one of apex point 7, one is connected, and water swelling ring 6 is enclosed on into minor diameter filter The periphery of water steel pipe 10, then the other end of minor diameter drainage steel pipe 10 is connected with rig, rig is started, progressively by spiral apex point 7th, major diameter drainage steel pipe 9, minor diameter drainage steel pipe 10 pierce that foundation ditch is domatic, until the end of minor diameter drainage steel pipe 10 is closed on Stop drilling when domatic;It can continue to connect major diameter drainage steel according to design requirements such as deep pit monitor grade, anchorage depths afterwards Pipe 9, minor diameter drainage steel pipe 10, water swelling ring 6 simultaneously are implemented to creep into (the major diameter drainage steel pipe 9, minor diameter drainage steel pipe 10th, the number of installation needed for water swelling ring 6 is depending on the design requirements such as deep pit monitor grade, anchorage depth);When it is single from At the end of last root minor diameter drainage steel pipe 10 drilling needed for draining string data enlarging anchor rod, by hollow steel tube 5 and small straight Footpath drainage steel pipe 10 is connected through a screw thread, and then starts rig, is applied until completing an installation from draining string data enlarging anchor rod Work.
3. construct lattice frame 1 and breast boards 2:Bar-mat reinforcement is laid on foundation ditch is domatic, and sand is sprayed according to design requirement Starch to complete the construction of lattice frame 1 and breast boards 2, will should be passed through during spray furnace from draining string data enlarging anchor rod 3 Lattice frame 1, and will be fixed on anchorage 14 from the tail end of draining string data enlarging anchor rod 3 on lattice frame 1.
4. implement draining:The suction hose 16 of siphon pipe 8 is inserted into hollow steel tube 5, union elbow 17 and suction hose 16 are connected Connect, and rubber tube 18 is connected to the other end of union elbow 17;Rubber tube 18 is connected with suction pump, starts suction pump to rainbow Suction pipe 8 applies initial siphon power, when there is water to flow to rubber tube 18, closes suction pump and removes, domatic interior moisture is made in siphon With lower gradually discharge.
5. by step 2.~order 4. in next work surface construction from draining string data enlarging anchor rod 3, the and of lattice frame 1 Breast boards 2, and slope drainage is carried out, until bottom of slope.
It is described above simply use graphical interpretation the utility model, be not intended to by the utility model be limited in shown in it is described Structure and use range in, therefore every made within spirit of the present utility model and principle accordingly modification and equivalent Thing, belong to the apllied the scope of the claims of the utility model.

Claims (9)

  1. It is 1. a kind of from draining string data enlarging anchor rod supporting construction, it is characterised in that:Including from draining string data enlarging anchor rod, from draining String data enlarging anchor rod is made up of variable diameters drainage steel pipe, hollow steel tube, water swelling ring, spiral apex point and siphon pipe, from draining String data enlarging anchor rod front end is spiral apex point, the spiral apex point, variable diameters drainage steel pipe and hollow steel tube by screw thread according to Secondary connection, water swelling ring set are mounted on variable diameters drainage steel pipe,
    From draining string data enlarging anchor rod according to being drilled with angle drilling soil mass of foundation pit, in domatic the setting lattice frame and gear of foundation ditch Native plate, and will be fixed on from the tail end of draining string data enlarging anchor rod on lattice frame, it is provided with drainage on variable diameters drainage steel pipe Hole, drainage channel is provided for foundation soil, water swelling ring water-swellable forms expanding reach and provides anchor force, and siphon pipe insertion is hollow In steel pipe, apply initial siphon power to siphon pipe with suction pump, implement draining.
  2. It is 2. according to claim 1 from draining string data enlarging anchor rod supporting construction, it is characterised in that:The variable diameters drainage Steel pipe is connected through a screw thread and formed by least one major diameter drainage steel pipe and at least one minor diameter drainage steel pipe, water swelling Ring set is located on the minor diameter drainage steel pipe of variable diameters drainage steel pipe, and major diameter drainage fastener for connection is in minor diameter drainage steel pipe Anchor into stop ladder of the side as water swelling ring.
  3. It is 3. according to claim 2 from draining string data enlarging anchor rod supporting construction, it is characterised in that:Variable diameters drainage steel pipe Including two major diameter drainage steel pipes and two minor diameter drainage steel pipes, during connection, the spiral apex point, a major diameter drainage Steel pipe, a minor diameter drainage steel pipe, another major diameter drainage steel pipe, another minor diameter drainage steel pipe, hollow steel tube lead to Screw thread is crossed to be sequentially connected.
  4. It is 4. according to claim 2 from draining string data enlarging anchor rod supporting construction, it is characterised in that:In major diameter drainage steel Use anchor ear colligation geotechnique's filter cloth in pipe periphery.
  5. It is 5. according to claim 2 from draining string data enlarging anchor rod supporting construction, it is characterised in that:The major diameter drainage Steel tube surface uniformly opens up a diameter of 5~10mm for the treatment of hole;The treatment hole a diameter of 4 that minor diameter drainage steel tube surface uniformly opens up ~6mm.
  6. It is 6. according to claim 1 from draining string data enlarging anchor rod supporting construction, it is characterised in that:The spiral apex point length Spend for 0.4m~0.6m, surface sets helical blade, and helical blade maximum gauge is slightly larger than or initial equal to water swelling ring External diameter.
  7. It is 7. according to claim 1 from draining string data enlarging anchor rod supporting construction, it is characterised in that:The drilling of hollow steel tube End is threaded.
  8. It is 8. according to claim 1 from draining string data enlarging anchor rod supporting construction, it is characterised in that:Water swelling ring uses High intensity highly expanded rate water sucting rubber material, expansion rate are 200~400%.
  9. It is 9. according to claim 1 from draining string data enlarging anchor rod supporting construction, it is characterised in that:The siphon pipe is by inhaling Water pipe, union elbow and rubber tube are sequentially connected composition, a diameter of 10~25mm, and suction hose is inserted in hollow steel tube, water suction Length of tube and hollow steel tube equal length.
CN201720187418.7U 2017-02-28 2017-02-28 It is a kind of from draining string data enlarging anchor rod supporting construction Active CN206667264U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720187418.7U CN206667264U (en) 2017-02-28 2017-02-28 It is a kind of from draining string data enlarging anchor rod supporting construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720187418.7U CN206667264U (en) 2017-02-28 2017-02-28 It is a kind of from draining string data enlarging anchor rod supporting construction

Publications (1)

Publication Number Publication Date
CN206667264U true CN206667264U (en) 2017-11-24

Family

ID=60378491

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720187418.7U Active CN206667264U (en) 2017-02-28 2017-02-28 It is a kind of from draining string data enlarging anchor rod supporting construction

Country Status (1)

Country Link
CN (1) CN206667264U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755703A (en) * 2018-07-04 2018-11-06 中建七局第四建筑有限公司 The high Pulling-Resistant Anchor Rod supporting construction and its construction method of soft soil foundation pit
US20190153698A1 (en) * 2017-06-30 2019-05-23 Zhejiang University Self-starting negative pressure drainage system for draining groundwater in slope and construction method thereof
CN111042159A (en) * 2019-12-20 2020-04-21 江苏省东台中等专业学校 Mounting method of slope vegetation attachment device
CN113530587A (en) * 2021-06-30 2021-10-22 李爽 Mechanical linkage anti-pulling anchor rod
CN114232595A (en) * 2021-12-22 2022-03-25 浙江大学 PVD drainage system and method thereof

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20190153698A1 (en) * 2017-06-30 2019-05-23 Zhejiang University Self-starting negative pressure drainage system for draining groundwater in slope and construction method thereof
US10577770B2 (en) * 2017-06-30 2020-03-03 Zhejiang University Self-starting negative pressure drainage system for draining groundwater in slope and construction method thereof
CN108755703A (en) * 2018-07-04 2018-11-06 中建七局第四建筑有限公司 The high Pulling-Resistant Anchor Rod supporting construction and its construction method of soft soil foundation pit
CN108755703B (en) * 2018-07-04 2020-05-05 中建七局第四建筑有限公司 High-uplift anchor rod supporting structure of soft soil foundation pit and construction method thereof
CN111042159A (en) * 2019-12-20 2020-04-21 江苏省东台中等专业学校 Mounting method of slope vegetation attachment device
CN113530587A (en) * 2021-06-30 2021-10-22 李爽 Mechanical linkage anti-pulling anchor rod
CN114232595A (en) * 2021-12-22 2022-03-25 浙江大学 PVD drainage system and method thereof

Similar Documents

Publication Publication Date Title
CN206667264U (en) It is a kind of from draining string data enlarging anchor rod supporting construction
CN106894423A (en) From draining string data enlarging anchor rod supporting construction and construction method
CN107023005A (en) A kind of string data enlarging anchor rod and its construction method with water swelling ring
CN206844107U (en) A kind of string data enlarging anchor rod with water swelling ring
CN107642360A (en) Tunneling boring front pre-grouting construction method
CN108166513B (en) Hole forming process for dual-purpose hole of anchor hole and drain hole in muck slope
CN106917627B (en) The advanced support method of pilot tunnel under a kind of water rich strata boring construction
CN107747312A (en) A kind of method of sand and gravel stratum well cementing construction
CN207878460U (en) A kind of high-pressure rotary-spray reamed end anchor pole
CN108951648A (en) Open trench tunnel layer of sand Sand foundation ditch strengthening method
CN208136918U (en) A kind of tubular type Soil-Nailing Wall Structure
CN208534448U (en) A kind of mash gas pumping drilling hole sealing device
CN108612101A (en) Echelon grouting under pressure anchor pole and its construction method with water swelling block
CN108756804A (en) Mash gas pumping drilling hole sealing device
CN202644538U (en) A grouting device used for a water-rich quicksand stratum
CN105731978A (en) Grouting slurry for reinforcing tunnel face of jacking culvert of fine-sand layer and grouting method
CN104499491B (en) Draining is compound from boring tire string data suspension roof support structure and construction method
CN2742121Y (en) Quick expansion water blocking seal device
CN204343307U (en) Draining compound is from boring tire string data bolt support structure
CN109441486A (en) The grouting method reinforced for tunnel grouting
CN110778332B (en) Reducing self-adaptive expansion grouting device for cracked and damaged part of secondary lining of tunnel and reinforcing method
CN215804475U (en) Sleeve valve pipe slip casting component and be used for hole sealing subassembly of rich water karst
CN106939619A (en) A kind of anti-vibration for underground engineering disturbs the leak stopping reinforcement means of voids and pits
CN110295945A (en) Tunnel weak surrounding rock excavates emergency repair air bag and its application method
CN201953367U (en) Underground drilling and pressurizing integrated staged fracturing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant