CN206666973U - A kind of asphalt concrete pavement Transverse notch structure for road surface drainage - Google Patents

A kind of asphalt concrete pavement Transverse notch structure for road surface drainage Download PDF

Info

Publication number
CN206666973U
CN206666973U CN201720062827.4U CN201720062827U CN206666973U CN 206666973 U CN206666973 U CN 206666973U CN 201720062827 U CN201720062827 U CN 201720062827U CN 206666973 U CN206666973 U CN 206666973U
Authority
CN
China
Prior art keywords
road surface
asphalt concrete
concrete pavement
track
transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720062827.4U
Other languages
Chinese (zh)
Inventor
陈有养
田永志
陈才楠
张金礼
王新元
管伟民
欧阳水根
林来荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xiamen Hecheng Water Transportation Engineering Consulting Co.,Ltd.
Original Assignee
Fuzhou Hecheng Engineering Consulting Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fuzhou Hecheng Engineering Consulting Management Co Ltd filed Critical Fuzhou Hecheng Engineering Consulting Management Co Ltd
Priority to CN201720062827.4U priority Critical patent/CN206666973U/en
Application granted granted Critical
Publication of CN206666973U publication Critical patent/CN206666973U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of asphalt concrete pavement Transverse notch structure for road surface drainage, including roadbed body, road surface body is fixedly connected with the top of roadbed body, the side of road surface bodies top is provided with median strip, the top of the road surface body and side of centrally located dividing strip is provided with track, side of the track away from median strip is provided with curb, groove structure face is provided with the track and close to the side of median strip, the utility model is related to road engineering technical field.This is used for the asphalt concrete pavement Transverse notch structure of road surface drainage, using bituminous concrete Transverse notch structure, reduces the noise that vehicle travels on traditional groove structure, increases road surface drainage ability;To reduce damage effect of the heavy-duty vehicle to cutting asphalt concrete pavement, this technology only carries out Transverse notch to leftmost side runway, both solves the problems, such as surface gathered water, and and can is reduced because of the destroying infection of cutting road pavement.

Description

A kind of asphalt concrete pavement Transverse notch structure for road surface drainage
Technical field
It the utility model is related to road engineering technical field, specially a kind of asphalt concrete pavement for road surface drainage Transverse notch structure.
Background technology
In the prior art, typically start with for China's Water Drainage of Expressway in terms of three:Roadbed transverse drainage, side slope row Water, road surface drainage;Although drainage measure is more, but the problem of road surface drainage is not smooth occurs.For multilane at a high speed Highway, particularly superelevation relax the ponding problem of changeover portion, are started with from subgrade and pavement drainage ditch mostly, spend big, effect Difference;It is mostly that cement concrete pavement is set to increase road surface frictional resistance with more road surface groove structure now, not The problem of considering road surface drainage.
With the fast development of economic construction of China, traffic volume of highway increases sharply, and incident is high-frequency friendship The generation of interpreter's event.According to statistics, the traffic accident for having nearly a quarter is and the correlative study as caused by the factors such as misty rain wind and snow Show, the degree of association of traffic accident and rain is bigger compared to other weather conditions degrees of association.Under rainstorm weather, rainfall is significantly Beyond Pavement surface drainage ability, cause seeping phenomenon occur, reduce the frictional resistance of wheel and road, driving vehicle may be made Water floats, and causes to lose control of one's vehicle, causes traffic accident, and consequence caused by the generation of such accident is mostly extremely serious.Especially exist Autoroute superelevation runoff, road table resultant gradient is small, or even has at zero gradient, and draining runoff length is big, road table product Water can not drain rapidly, and there is bend in the section in addition, if this section Vehicle Speed is fast, easily break away, and traffic thing occurs Therefore.
Processing to easy ponding section, improved on original road mostly, such as change the profile of road gradient, road camber Horizontal slope improves subgrade and pavement pumping equipment, and these measures can also improve road surface drainage performance to a certain extent, but during construction The existing Coherent traffic noise time is grown, has a strong impact on traffic, and engineering cost is high.Road milling and grovving machine tool function admirable at present, road Face cutting technology comparative maturity, to increase Anti-Sliding Performance of Cement Concrete Pavement, on newly-built cement concrete pavement Through commonly used cutting technology, road surface cutting technology is applied on asphalt concrete pavement, can effectively improve superelevation mitigation Road section surface ponding problem.
Utility model content
(1) technical problem solved
In view of the shortcomings of the prior art, it is horizontal to provide a kind of asphalt concrete pavement for road surface drainage for the utility model To groove structure, the existing Coherent traffic noise time is grown when solving construction, has a strong impact on traffic, and the high problem of engineering cost.
(2) technical scheme
To realize object above, the utility model is achieved by the following technical programs:It is a kind of for road surface drainage Asphalt concrete pavement Transverse notch structure, including roadbed body, road surface body is fixedly connected with the top of the roadbed body, And the side of road surface bodies top is provided with median strip, the top of the road surface body and the one of centrally located dividing strip Side is provided with track, and side of the track away from median strip is provided with curb, on the track and close to central strip The side of band is provided with groove structure face, transverse groove is offered on the groove structure face, and set between two transverse grooves There is road surface block, the top of the transverse groove cross section is provided with chamfering with the junction of road surface block.
Preferably, the transverse groove is in arranged in parallel, and transverse groove is arranged in a manner of equidistant.
Preferably, the bottom of the transverse groove inwall is inclined to set, and transverse groove is close to the side of median strip Less than side of the transverse groove away from median strip.
Preferably, the track is unidirectional three lanes.
(3) beneficial effect
The utility model provides a kind of asphalt concrete pavement Transverse notch structure for road surface drainage.Possess following Beneficial effect:This is used for the asphalt concrete pavement Transverse notch structure of road surface drainage, has simple structure, spy easy for construction Point, using bituminous concrete Transverse notch structure, the noise that vehicle travels on traditional groove structure is reduced, increases road surface drainage Ability;In autoroute, leftmost side runway is mainly that car is run at high speed track, load truck and other relatively low Speed vehicle mainly travels on middle lane and rightmost side track;It is small that predominantly running at high speed for maximum is influenceed by surface gathered water Automobile, to reduce damage effect of the heavy-duty vehicle to cutting asphalt concrete pavement, this technology is only carried out to leftmost side runway Transverse notch, both solves the problems, such as surface gathered water, and and can is reduced because of the destroying infection of cutting road pavement.
Brief description of the drawings
Fig. 1 is the diagrammatic cross-section of the utility model side;
Fig. 2 is the top view of the utility model structure;
Fig. 3 is the local dimensional structure diagram of the utility model;
Fig. 4 is the local sectional view of the utility model.
In figure:1 roadbed body, 2 road surface bodies, 3 median strips, 4 tracks, 5 curbs, 6 groove structure faces, 7 transverse grooves, 8 road surface blocks, 9 chamferings.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-4 are referred to, the utility model provides a kind of technical scheme:A kind of asphaltic concrete road for road surface drainage Face Transverse notch structure, including roadbed body 1, the top of roadbed body 1 are fixedly connected with road surface body 2, and road surface body 2 The side at top is provided with median strip 3, and the side of the top of road surface body 2 and centrally located dividing strip 3 is provided with track 4, track 4 is unidirectional three lanes, and side of the track 4 away from median strip 3 is provided with curb 5, on track 4 and close to center point The side of band 3 is provided with groove structure face 6, transverse groove 7 is offered on groove structure face 6, transverse groove 7 is set in being parallel to each other Put, and transverse groove 7 is arranged in a manner of equidistant, and the bottom of the inwall of transverse groove 7 is inclined to set, and transverse groove 7 is in The side of central median 3 is less than side of the transverse groove 7 away from median strip 8, and is provided with road surface between two transverse grooves 7 Block 8, the top of the cross section of transverse groove 7 are provided with chamfering 9 with the junction of road surface block 8.
This structure is engraved on the surface of autoroute superelevation runoff leftmost side track 4, perpendicular to direction of traffic;Laterally The cross section of groove 7 is that the shape of chamfering 9 that top is provided with is rectangular, and the radius of chamfering 9 is two millimeters, and the width of transverse groove 7 is four For millimeter to eight millimeters, the spacing of transverse groove 7 is 16 millimeters to 28 millimeters;Along cross-section towards the direction of median strip 3, from most Left-hand lane 4 and the separator bar of middle lane 4, which rise, starts cutting, and the initial depth of transverse groove 7 is three millimeters to four millimeters, along cross section Gradually deepen to the direction of median strip 3, form certain bottom land gradient of transverse groove 7;It is horizontal if the gradient in groove structure face 6 is i0 It is i1 to the bottom land gradient of groove 7, the bottom land gradient of transverse groove 7 is relative to 0. 5 the percent of the gradient of groove structure face 6.
It should be noted that herein, such as first and second or the like relational terms are used merely to a reality Body or operation make a distinction with another entity or operation, and not necessarily require or imply and deposited between these entities or operation In any this actual relation or order.Moreover, term " comprising ", "comprising" or its any other variant are intended to Nonexcludability includes, so that process, method, article or equipment including a series of elements not only will including those Element, but also the other element including being not expressly set out, or it is this process, method, article or equipment also to include Intrinsic key element.In the absence of more restrictions.By sentence " including one ... the key element limited, it is not excluded that Other identical element in the process including the key element, method, article or equipment also be present ".
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (4)

1. a kind of asphalt concrete pavement Transverse notch structure for road surface drainage, including roadbed body (1), its feature exist In:Road surface body (2) is fixedly connected with the top of the roadbed body (1), and the side at the top of road surface body (2) is provided with Median strip (3), the top of the road surface body (2) and the side of centrally located dividing strip (3) are provided with track (4), institute State side of the track (4) away from median strip (3) and be provided with curb (5), on the track (4) and close to median strip (3) side is provided with groove structure face (6), and transverse groove (7), and two transverse directions are offered on the groove structure face (6) Road surface block (8) is provided between groove (7), the top of transverse groove (7) cross section is provided with down with the junction of road surface block (8) Angle (9).
2. a kind of asphalt concrete pavement Transverse notch structure for road surface drainage according to claim 1, its feature It is:The transverse groove (7) is in arranged in parallel, and transverse groove (7) is arranged in a manner of equidistant.
3. a kind of asphalt concrete pavement Transverse notch structure for road surface drainage according to claim 1, its feature It is:The bottom of transverse groove (7) inwall is inclined to set, and transverse groove (7) is low close to the side of median strip (3) In side of the transverse groove (7) away from median strip (3).
4. a kind of asphalt concrete pavement Transverse notch structure for road surface drainage according to claim 1, its feature It is:The track (4) is unidirectional three lanes.
CN201720062827.4U 2017-01-19 2017-01-19 A kind of asphalt concrete pavement Transverse notch structure for road surface drainage Active CN206666973U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720062827.4U CN206666973U (en) 2017-01-19 2017-01-19 A kind of asphalt concrete pavement Transverse notch structure for road surface drainage

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720062827.4U CN206666973U (en) 2017-01-19 2017-01-19 A kind of asphalt concrete pavement Transverse notch structure for road surface drainage

Publications (1)

Publication Number Publication Date
CN206666973U true CN206666973U (en) 2017-11-24

Family

ID=60378835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720062827.4U Active CN206666973U (en) 2017-01-19 2017-01-19 A kind of asphalt concrete pavement Transverse notch structure for road surface drainage

Country Status (1)

Country Link
CN (1) CN206666973U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703946A (en) * 2022-05-05 2022-07-05 肖旭阳 Highway surface accumulated water treatment structure and treatment method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114703946A (en) * 2022-05-05 2022-07-05 肖旭阳 Highway surface accumulated water treatment structure and treatment method thereof

Similar Documents

Publication Publication Date Title
CN202898938U (en) Seepage and drainage combined pavement structure for urban road and landscape road
CN102076508A (en) Pneumatic tire
CN207659814U (en) A kind of highway pavement anti-skid structure
CN206666973U (en) A kind of asphalt concrete pavement Transverse notch structure for road surface drainage
CN203821274U (en) Base assembly for protective fence on side of highway
CN206495135U (en) A kind of road and bridge stretches denoising device
CN202826991U (en) Stone gripping prevention tire
CN206049256U (en) Weatherable tyre tread pattern structure
KR102179221B1 (en) Construction method of driveway boundary structure and driveway boundary structure
CN202055136U (en) Permeable road kerb applied in asphalt pavement
Burlacu et al. Preventing aquaplaning phenomenon through technical solutions
CN112878136B (en) Intersection rubber asphalt anti-rutting road surface detection and design method based on ground penetrating radar
CN205603995U (en) Drainage bituminous pavement structure that reformed transform on old way
US5415493A (en) Snow plow compatible speed bumps
CN114592400A (en) Structure for enhancing road surface drainage capacity by using movable ridge on zero-slope road section and implementation method
CN211498338U (en) Cement asphalt concrete pavement structure
CN208949668U (en) A kind of environmentally-friendly asphalt road surface
CN204039867U (en) L-type collection drainage type road kerb and comprise the road of this road kerb
CN209162531U (en) A kind of Ballast track high-speed railway anti-freeze expansion road structure
CN204125811U (en) A kind of cement concrete pavement longitudinal groove structure
CN202744918U (en) Road kerb
CN203514148U (en) Road surface edgestone capable of improving road surface drainage speed
CN207699975U (en) A kind of drainage type curb
CN104213489A (en) Cement concrete pavement longitudinal groove carving structure
CN218561992U (en) Use bituminous pavement of road surface sculpture drainage

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 "change of name, title or address"

Address after: Unit 1003, 2368 Fangzhong Road, Huli District, Xiamen City, Fujian Province 361000

Patentee after: Xiamen Hecheng Water Transportation Engineering Consulting Co.,Ltd.

Address before: Room 2301, 23 / F, Rongcheng business center, 129 Wuyi North Road, Gulou District, Fuzhou City, Fujian Province 350000

Patentee before: FUZHOU HOLSIN ENGINEERING CONSULTING & MANAGEMENT Co.,Ltd.

CP03 "change of name, title or address"