CN206666568U - Handle the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere - Google Patents

Handle the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere Download PDF

Info

Publication number
CN206666568U
CN206666568U CN201720318139.XU CN201720318139U CN206666568U CN 206666568 U CN206666568 U CN 206666568U CN 201720318139 U CN201720318139 U CN 201720318139U CN 206666568 U CN206666568 U CN 206666568U
Authority
CN
China
Prior art keywords
tuyere
sleeve
big
blast
furnace
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720318139.XU
Other languages
Chinese (zh)
Inventor
阿吾肯·白居马
安志庆
张文庆
任贵河
李刚义
舒艺
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xinjiang Bayi Iron and Steel Co Ltd
Original Assignee
Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd filed Critical Baosteel Group Xinjiang Bayi Iron and Steel Co Ltd
Priority to CN201720318139.XU priority Critical patent/CN206666568U/en
Application granted granted Critical
Publication of CN206666568U publication Critical patent/CN206666568U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Manufacture Of Iron (AREA)

Abstract

The utility model discloses one kind processing blast-furnace tuyere is big, the plugging device of middle set faying face gas leak, tuyere medium sleeve big end end face bottom at tuyere medium sleeve and tuyere big sleeve cooperation coordinate be installed be fixed together by first, the baffle plate that second curved plate is formed, wherein set in the second curved plate lower end in the space of 45 ° of chamferings and ceramic asbestos packing and refractory seals glue is set, on last furnace shell inwall by the bearing of setting it is affixed tuyere small sleeve pin-lift arrangement, affixed the push rod stretched into tuyere big sleeve on tuyere small sleeve pin-lift arrangement, the other end of push rod is fixed on the first curved plate.The utility model is rational in infrastructure, blast furnace gas leakage can effectively be blocked, substantially reduce blast fumance scene gas concentration, lift employee and enterprise safety operation, it can avoid because changing tuyere medium sleeve, producing cost is directly reduced, blast-furnace man can be reduced and change tuyere medium sleeve labor intensity, improve worker's operating efficiency.

Description

Handle the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere
Technical field
The utility model belongs to the plugging device of the big or middle set faying face gas leak of processing blast-furnace tuyere, particularly one kind Handle the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere.
Background technology
There is tuyere medium sleeve nose in large blast furnace at present, faying face leakage gas between tuyere big sleeve and tuyere medium sleeve, sternly Ghost image rings employee and enterprise safety operation.The measure uniquely taken is exactly to change tuyere medium sleeve.Blast furnace long period periodical repair, disposably 20 tuyere medium sleeves are changed, directly increase about 460,000 yuan of producing cost.And indivedual tuyere medium sleeve usage times can be again less than 1 year It is secondary nose, leakage gas occur.Frequently change, increase pig iron cost, increase blast-furnace man's labor intensity.
Utility model content
The purpose of this utility model is in a kind of closure dress for handling the big or middle set faying face gas leak of blast-furnace tuyere of offer Put, its is rational in infrastructure, can effectively block blast furnace gas leakage, substantially reduce blast fumance scene gas concentration, lift employee And enterprise safety operation, it can avoid, because changing tuyere medium sleeve, directly reducing producing cost, blast-furnace man's more air change outlet being reduced Middle set labor intensity, improve worker's operating efficiency.
What the purpose of this utility model was realized in:A kind of big or middle set faying face gas leak of processing blast-furnace tuyere The tuyere big sleeve and tuyere medium sleeve of mutual cooperation are installed on plugging device, including blast-furnace tuyere, it is big with air port in tuyere medium sleeve Tuyere medium sleeve big end end face bottom at set cooperation, which coordinates, is installed with being made up of first, second curved plate of being fixed together Baffle plate, ceramic asbestos packing and refractory seals are set wherein being set in the second curved plate lower end in the space of 45 ° of chamferings Glue, on last furnace shell inwall by the bearing of setting it is affixed tuyere small sleeve pin-lift arrangement, on tuyere small sleeve pin-lift arrangement Affixed the push rod stretched into tuyere big sleeve, the other end of push rod are fixed on the first curved plate.
Principle of the present utility model is by using blast furnace periodical repair chance, implements to block using home-made contrivance:Utilize resistance to height Warm sealant sealing, then blocked with ceramic asbestos packing, then fixed with self-control camber steel ring by welding, fastening bolt Etc. a series of fixed camber steel ring methods of sealings, effectively block the big-and-middle set faying face gas leak in air port.
Main improvement content is as follows:
1)It is standby that corresponding curved plate is made with initial reference to circular arc width outside tuyere medium sleeve and radian.Steel plate thickness is about 20mm, first piece of curved plate outer arc edge cut groove at 45 ° using oxyacetylene metal-cutting, are easy to compress ceramic asbestos packing.
2)The uniform Φ 16mm ceramics asbestos packings for smearing refractory seals glue are tightly attached to the tuyere medium sleeve of nose again Outer lower edge.
3)The curved plate for cutting groove at 45 ° by first piece tightly pushes down ceramic asbestos packing, by second piece of curved plate Push down first piece of curved plate, it is ensured that sealing effectiveness.
4)Tuyere medium sleeve curved plate and tuyere small sleeve top are fixed on using two ∮ 32mm of suitable dimension steel pipe bifurcated Between lever apparatus.
5)Above-mentioned two pieces of curved plate segmented weldings are fixed as one, one end of fixed steel pipe are welded on, by second Block curved plate, the other end are welded on tuyere small sleeve pin-lift arrangement.
6)Refractory seals glue is uniformly smeared into machined surface outside tuyere small sleeve again, tuyere small sleeve is installed in place.
7)Refractory seals glue is finally uniformly smeared to the head arc machined surface of air-supply blowpipe, blowpipe is installed in place.
Main improvement effect:
1)Blast furnace gas leakage can be effectively blocked, blast fumance scene gas concentration is substantially reduced, utilizes employee and enterprise Safety in production.
2)It can avoid, because changing tuyere medium sleeve, directly reducing producing cost.
3)Reduce blast-furnace man and change tuyere medium sleeve labor intensity.
The utility model is rational in infrastructure, realizes effectively closure blast furnace gas leakage, greatly reduces blast fumance scene Gas concentration, employee and enterprise safety operation are improved, avoid because changing tuyere medium sleeve, directly reduce producing cost, reduce Blast-furnace man changes tuyere medium sleeve labor intensity, improves worker's operating efficiency.
Brief description of the drawings
The utility model is further described below in conjunction with accompanying drawing, Fig. 1 illustrates for the utility model front view structure Big structure schematic diagram is sent out in figure, the A portions that Fig. 2 is Fig. 1.
Embodiment
A kind of plugging device for handling the big or middle set faying face gas leak of blast-furnace tuyere, as shown in Figure 1 and Figure 2, including height The tuyere big sleeve 2 and tuyere medium sleeve 3 of mutual cooperation are installed, the wind at tuyere medium sleeve 3 and the cooperation of tuyere big sleeve 2 on stove air port The end end face bottom greatly of set 3 coordinates the baffle plate being made up of first, second curved plate 6,7 for being installed with and being fixed together in mouthful, its In the lower end of the second curved plate 7 set 45 ° of chamferings space in ceramic asbestos packing 8 and refractory seals glue 9 are set, On the inwall of last furnace shell 1 by the bearing of setting it is affixed tuyere small sleeve pin-lift arrangement 4, it is solid on tuyere small sleeve pin-lift arrangement 4 Then the push rod 5 stretched into tuyere big sleeve 2, the other end of push rod 5 are fixed on the first curved plate 6.In tuyere small sleeve push rod Affixed two push rods 5 arranged side by side are in angle bifurcated on device 4, and its end is respectively and fixedly connected on the first curved plate 6.Firstth, The shape of second curved plate 6,7 holds greatly the circular shape of end face bottom corresponding with tuyere medium sleeve 3.First, second arc-shaped steel The thickness of plate 6,7 is 20mm.

Claims (4)

1. the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere is handled a kind of, including phase is installed on blast-furnace tuyere The tuyere big sleeve (2) and tuyere medium sleeve (3) mutually coordinated, it is characterized in that:At tuyere medium sleeve (3) and tuyere big sleeve (2) cooperation Tuyere medium sleeve (3) end end face bottom greatly coordinates the gear being made up of first, second curved plate (6,7) for being installed with and being fixed together Plate, ceramic asbestos packing (8) and high temperature resistant are set wherein being set in the second curved plate (7) lower end in the space of 45 ° of chamferings Fluid sealant (9), on last furnace shell (1) inwall by the bearing of setting it is affixed tuyere small sleeve pin-lift arrangement (4), it is small in air port Affixed the push rod (5) stretched into tuyere big sleeve (2), the other end of push rod (5) are fixed in the first arc on set pin-lift arrangement (4) On steel plate (6).
2. the plugging device of the big or middle set faying face gas leak of processing blast-furnace tuyere according to claim 1, its feature It is:Affixed two push rods (5) arranged side by side are in angle bifurcated on tuyere small sleeve pin-lift arrangement (4), and its end is respectively and fixedly connected to On first curved plate (6).
3. the plugging device of the big or middle set faying face gas leak of processing blast-furnace tuyere according to claim 1, its feature It is:The shape of first, second curved plate (6,7) is corresponding with the circular shape of tuyere medium sleeve (3) end end face bottom greatly.
4. the plugging device of the big or middle set faying face gas leak of processing blast-furnace tuyere according to claim 1, its feature It is:The thickness of first, second curved plate (6,7) is 20mm.
CN201720318139.XU 2017-03-29 2017-03-29 Handle the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere Expired - Fee Related CN206666568U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720318139.XU CN206666568U (en) 2017-03-29 2017-03-29 Handle the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720318139.XU CN206666568U (en) 2017-03-29 2017-03-29 Handle the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere

Publications (1)

Publication Number Publication Date
CN206666568U true CN206666568U (en) 2017-11-24

Family

ID=60373636

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720318139.XU Expired - Fee Related CN206666568U (en) 2017-03-29 2017-03-29 Handle the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere

Country Status (1)

Country Link
CN (1) CN206666568U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109136437A (en) * 2018-11-14 2019-01-04 马鞍山钢铁股份有限公司 It is a kind of with compressing and the blast-furnace tuyere device of sealing function and preparation method thereof
CN115404293A (en) * 2022-08-29 2022-11-29 首钢股份公司迁安钢铁公司 Blast furnace tuyere sleeve sealing structure and application method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109136437A (en) * 2018-11-14 2019-01-04 马鞍山钢铁股份有限公司 It is a kind of with compressing and the blast-furnace tuyere device of sealing function and preparation method thereof
CN115404293A (en) * 2022-08-29 2022-11-29 首钢股份公司迁安钢铁公司 Blast furnace tuyere sleeve sealing structure and application method thereof
CN115404293B (en) * 2022-08-29 2024-04-26 首钢股份公司迁安钢铁公司 Blast furnace tuyere sleeve sealing structure and application method thereof

Similar Documents

Publication Publication Date Title
CN206666568U (en) Handle the plugging device of the big or middle set faying face gas leak of blast-furnace tuyere
CN209278709U (en) More sealing rotary compensators
CN207018689U (en) A kind of jet chimney sealing device
CN203594805U (en) Flap valve for high-temperature particle materials
CN204387395U (en) New coal powder distributing valve
CN201671722U (en) Seal spacer for engine exhaust pipe
CN206817029U (en) A kind of flanging type is tightly connected metal compensator
CN204401026U (en) A kind of hot air furnace hot air pipe flange structure
CN201809367U (en) Water-cooled belly pipe
CN203960245U (en) Blast furnace staying air port sealing equipment
CN201462896U (en) Seal device for heat exchange tube of horizontal air preheating device of boiler
CN104060012A (en) Device and method for sealing blast-furnace damping-down tuyere
CN204268870U (en) Rotary kiln air cooling equipment
CN216347875U (en) Energy-saving brick kiln waste heat recovery system
CN207688629U (en) Removable rotary kiln non-contact sealing arrangement
CN203972845U (en) A kind of clean-burning hot-metal bottle roaster of blast furnace gas that contributes to
CN215261123U (en) Kiln tail sealing device
CN204594304U (en) Air preheater bypass flap seal structure
CN203034038U (en) Air supply pipe for blast furnace
CN104455544A (en) Pulverized coal distributing valve
CN211344215U (en) Detachable boiler valve heat preservation device
CN203440422U (en) Strengthening I type radiant tube outer tube
CN203718105U (en) Air cylinder support structure of three-way drain valve
CN203635790U (en) Pneumatic pipe sealer
CN209294439U (en) A kind of tertiary air valve sealing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180720

Address after: 830022 No. 1 Bayi Road, Toutun River District, Urumqi, the Xinjiang Uygur Autonomous Region

Patentee after: Xinjiang Bayi Iron & Steel Co., Ltd.

Address before: 830022 No. 1 Xingang Road, Toutun River District, Urumqi, the Xinjiang Uygur Autonomous Region.

Patentee before: Baosteel Group Xinjiang Bayi Iron & Steel Co., Ltd.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171124

Termination date: 20190329