CN206665605U - Watch and clock movement installing component conveyer - Google Patents
Watch and clock movement installing component conveyer Download PDFInfo
- Publication number
- CN206665605U CN206665605U CN201720428778.1U CN201720428778U CN206665605U CN 206665605 U CN206665605 U CN 206665605U CN 201720428778 U CN201720428778 U CN 201720428778U CN 206665605 U CN206665605 U CN 206665605U
- Authority
- CN
- China
- Prior art keywords
- guide pad
- output end
- loading plate
- bearing groove
- transition gear
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Specific Conveyance Elements (AREA)
Abstract
The utility model discloses watch and clock movement installing component conveyer, it is used to transmit time-division transition gear, and described device includes vibrating disk, has spiral feeding track in vibrating disk, the output end of spiral feeding track has bearing groove, and the width of bearing groove is gradually reduced along time-division transition gear direction of transfer;The output end side of the bearing groove, which is also sequentially provided with, promotees to fall portion and export orientation rail, the portion that promotees includes arc loading plate, upper guide pad and lower guide pad, arc loading plate is fixedly connected on the output end of bearing groove, the upper guide pad is fixed on the inner side above arc loading plate output end, lower guide pad is fixed on the outside of arc loading plate output end loading end, and upper guide pad and lower guide pad are in the shape that intersects along time-division transition gear direction of transfer.Said structure, without manual operation, full-automation is fully achieved, not only reliable operation but also transmission efficiency height.
Description
Technical field
It the utility model is related to clock and watch assembling field, more particularly to watch and clock movement installing component conveyer.
Background technology
The assembling of existing watch and clock movement gear is had been manually done by manpower, and the drain pan of movement is transmitted by streamline, is reached
Pedal control streamline is slammed during personnel's station by people to stop, personnel's crawl dissipates the time-division transition gear piled up on station, passes through
Eyes judge position of mounting hole, and then gear is put into mounting hole by both hands, realize installation, then unclamp pedal again by movement
Drain pan stream give next station personnel.
Wherein, time-division transition gear is a duplicate gear, and during installation, the little gear of duplicate gear will be towards installed in machine
On the drain pan of core, therefore time-division transition gear is installed with realizing mechanical automation, must just design for when automatically delivering
The equipment of point transition gear, and the time-division transition gear sent out will be in and keep flat and the state of little gear direction.
The content of the invention
In order to solve deficiency of the prior art, the purpose of this utility model be to provide a kind of transmission efficiently, work can
The watch and clock movement installing component conveyer leaned on.
To achieve the above object, the utility model uses following technical scheme:
Watch and clock movement installing component conveyer, it is used to transmit time-division transition gear, and described device includes vibrating disk, shaken
There is spiral feeding track, the output end of spiral feeding track has a bearing groove, and the width of bearing groove is along time-division transition in Moving plate
Gear direction of transfer is gradually reduced;The output end side of the bearing groove, which is also sequentially provided with, promotees to fall portion and export orientation rail, described
Promoting portion includes arc loading plate, upper guide pad and lower guide pad, and arc loading plate is fixedly connected on the output end of bearing groove, institute
The inner side that guide pad is fixed on above arc loading plate output end is stated, lower guide pad is fixed on the carrying of arc loading plate output end
The outside in face, and upper guide pad and lower guide pad are in the shape that intersects along time-division transition gear direction of transfer.
The output end of the export orientation rail is provided with Height Adjustable blow tank.
The export orientation rail input correspondingly descends the position of guide pad to be provided with the those widened sections extended laterally.
The utility model uses above structure, has the advantages that:The utility model being capable of automatic screening time-division mistake
The direction of gear is crossed, and promotes time-division transition gear to drop to the ground, is finally sent out with the state kept flat.Said structure, without artificial
Operation, fully achieves full-automation, not only reliable operation but also transmission efficiency height.
Brief description of the drawings
The utility model is described in further details below in conjunction with the drawings and specific embodiments;
Fig. 1 is stereogram of the present utility model;
Fig. 2 is enlarged diagram at the A in Fig. 1;
Fig. 3 is top view of the present utility model.
Embodiment
As shown in one of Fig. 1-3, the utility model watch and clock movement installing component conveyer, it is used to transmit time-division transition
Gear, device include vibrating disk 1, have spiral feeding track 2 in vibrating disk 1, and the output end of spiral feeding track 2 has carrying
Groove 21, the width of bearing groove 21 are gradually reduced along time-division transition gear direction of transfer;The output end side of bearing groove 21 is also sequentially
Provided with portion 3 and export orientation rail 4 is promoted, the portion 3 that promotees includes arc loading plate 31, upper guide pad 32 and lower guide pad 33, arc
Loading plate 31 is fixedly connected on the output end of bearing groove 21, and upper guide pad 32 is fixed on interior above the output end of arc loading plate 31
Side, lower guide pad 33 are fixed on the outside of the output end loading end of arc loading plate 31, and upper guide pad 32 and the lower edge of guide pad 33
Time-division transition gear direction of transfer is in the shape that intersects.
The output end of export orientation rail 4 is provided with Height Adjustable blow tank 41.By adjust to suitable height so that
Obtaining front and rear time-division transition gear has the superposition of part, and so design can improve the smoothness of time-division transition gear transmission, no
Clamping stagnation can be caused.
The input of export orientation rail 4 correspondingly descends the position of guide pad 33 to be provided with the those widened sections 42 extended laterally, so sets
The purpose of meter is to prevent that time-division transition gear backlash of droping to the ground is excessive and drop.
Operation principle of the present utility model:When time-division transition gear is sent to the output end of spiral feeding track 2, due to holding
The width for carrying groove 21 is gradually reduced, and is promoted time-division transition gear upright and is passed forward against the inner side of spiral feeding track 2
Send, while the time-division transition gear of little gear inwardly can drop automatically thereon, so as to complete the screening of time-division transition gear direction;
Then, time-division transition gear is sent to rush portion 3, in the presence of upper guide pad 32 and lower guide pad 33(Similar above push is stumbled
Principle), time-division transition gear droped to the ground, and the time-division transition gear of flat condition is finally sent out by export orientation rail 4(Wherein, it is defeated
Go out the loading end of guided way 4 width should be greater than time-division transition gear gear wheel diameter).Said structure, without manual operation,
Full-automation is fully achieved, not only reliable operation but also transmission efficiency height.
Claims (3)
1. watch and clock movement installing component conveyer, it is used to transmit time-division transition gear, and described device includes vibrating disk, vibration
There is spiral feeding track, the output end of spiral feeding track has a bearing groove, and the width of bearing groove is along time-division transition tooth in disk
Wheel direction of transfer is gradually reduced;It is characterized in that:The output end side of the bearing groove is also sequentially provided with rush, and portion and output are led
To rail, the portion that promotees is fixedly connected on bearing groove including arc loading plate, upper guide pad and lower guide pad, arc loading plate
Output end, the upper guide pad are fixed on the inner side above arc loading plate output end, and lower guide pad is fixed on arc loading plate
The outside of output end loading end, and upper guide pad and lower guide pad are in the shape that intersects along time-division transition gear direction of transfer.
2. watch and clock movement installing component conveyer according to claim 1, it is characterised in that:The export orientation rail
Output end is provided with Height Adjustable blow tank.
3. watch and clock movement installing component conveyer according to claim 1, it is characterised in that:The export orientation rail is defeated
The position for entering the corresponding lower guide pad in end is provided with the those widened sections extended laterally.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720428778.1U CN206665605U (en) | 2017-04-21 | 2017-04-21 | Watch and clock movement installing component conveyer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720428778.1U CN206665605U (en) | 2017-04-21 | 2017-04-21 | Watch and clock movement installing component conveyer |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206665605U true CN206665605U (en) | 2017-11-24 |
Family
ID=60375661
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720428778.1U Active CN206665605U (en) | 2017-04-21 | 2017-04-21 | Watch and clock movement installing component conveyer |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206665605U (en) |
-
2017
- 2017-04-21 CN CN201720428778.1U patent/CN206665605U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206318370U (en) | A kind of vibrating disk automatic feed mechanism for the automatic check machine of hub internal bore | |
CN206665605U (en) | Watch and clock movement installing component conveyer | |
CN205916630U (en) | Equipment material track | |
CN109093223A (en) | A kind of brazing solder automatic assembling machine | |
CN202863445U (en) | Water receiving device for conveniently receiving hot water on train | |
CN207691313U (en) | Electric line double insulator string work mobile platform | |
CN205436254U (en) | Simple and easy adjustable vibrator of amplitude | |
CN203079219U (en) | Triangular spring vibrating disc of automatic triangular spring assembly machine | |
CN205837801U (en) | A kind of feed mechanism of single-beam crane road wheel processing unit (plant) | |
CN207712845U (en) | A kind of sliding rail conveying device | |
CN205346223U (en) | Plastic container's bottled putting of reason | |
CN207329846U (en) | A kind of semi-automatic biplate orders machine automatic paper feeder | |
CN207090453U (en) | A kind of feeding device | |
CN205442215U (en) | Cable conductor sheath equipment is with conduction mechanism | |
CN205161436U (en) | Portable milk collector | |
CN204415654U (en) | Double-person pedal is adopted to drive the tandem bicycle of a chain | |
CN204689342U (en) | Escalator armrest drive mechanism | |
CN202828888U (en) | Chain type conveyor belt turning automatic reversal cup device | |
CN203283834U (en) | Automatic feeding shaking platform | |
CN209067694U (en) | Shift fork clutch | |
CN207135900U (en) | A kind of pulling-back type is easy to the Pet training apparatus picked up | |
CN210259967U (en) | Intelligent adjustable steel belt transmission tensioning mechanism | |
CN205589990U (en) | Mechanism of work piece direction can change | |
CN219619556U (en) | Online sub-packaging straw device of radix codonopsis pilosulae oral liquid automatic packaging line | |
CN207871422U (en) | 180 ° of rotating devices of racket production line |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CB03 | Change of inventor or designer information |
Inventor after: Lin Yajiang Inventor after: Su Yaqiong Inventor before: Lin Yajiang Inventor before: Li Chunmu |
|
CB03 | Change of inventor or designer information |