CN206664895U - A kind of fore construction platform device - Google Patents
A kind of fore construction platform device Download PDFInfo
- Publication number
- CN206664895U CN206664895U CN201720375077.6U CN201720375077U CN206664895U CN 206664895 U CN206664895 U CN 206664895U CN 201720375077 U CN201720375077 U CN 201720375077U CN 206664895 U CN206664895 U CN 206664895U
- Authority
- CN
- China
- Prior art keywords
- mounting
- fore
- platform
- construction platform
- support bar
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Foundations (AREA)
Abstract
The utility model discloses a kind of fore construction platform device, is related to fore constructing device technical field.Fore construction platform device includes symmetrical platform structure, the platform structure includes the multilayer arc platform from bottom to top connected by connector, the platform structure is hinged with ground or supporting structure, rotatable platform structure, the arc platform is closer or far from the outside plate of the fore of corresponding height, in addition to moveable first mounting, and support bar is connected with the platform structure, first mounting is moved to below the support bar, for supporting the support bar.Fore construction platform device disclosed in the utility model, platform structure is set to rotate to suitable position by hanging apparatus, so that the outside plate of arc platform and the fore of corresponding height is close, then support bar is propped up by the first mounting, so as to be played a supporting role to platform structure, assembling is rapid, will not.
Description
Technical field
It the utility model is related to fore constructing device technical field, more particularly to a kind of fore construction platform device.
Background technology
In shipbuilding sectional construction, it is essential work to set up landing stage of scaffold construction.Big when closing up lifting, building berth or
It is required to set up platform in dock building course.
The way that tradition sets up platform has:One kind is to use standard staging, during setting up worker's built, seesaw compared with
, easily there is accident in seesaw transmittance process in weight, and this method input is artificial more, and the duration is longer, built workload compared with
Delay project process greatly, less efficient, collapse accident often has generation;Another kind is tight using lock connection using long steel pipe
Gu being then covered with away web plate, during built, because steel pipe is heavier, it is prone to accidents in transmittance process, it is directly outer in paint
Plate welding hook is reinforced, and pollutes environment, and this method also easily causes collapse accident.
There is the problem of workload is big in the above-mentioned method for setting up platform, easily cause claim for eot, while be also easy to send out
Raw collapse accident, threatens the personal safety of worker.
In view of the above-mentioned problems, the application propose it is a kind of for fore construction when construction platform device, can fast construction,
The time is saved, Environmental Safety is efficiently constructed, and avoids collapse accident.
Utility model content
The purpose of this utility model is to propose a kind of fore construction platform device, can realize fast construction, accelerate work
Phase, and collapse accident is avoided safely.
To use following technical scheme up to this purpose, the utility model:
A kind of fore construction platform device, including symmetrical platform structure, the platform structure include passing through connection
The multilayer arc platform from bottom to top of part connection, the platform structure are hinged with ground or supporting structure, rotate the platform
Structure, the arc platform closer or far from the fore of corresponding height outside plate,
Also include moveable first mounting, be connected with support bar on the platform structure, first mounting is moved to
Below the support bar, for supporting the support bar.
As a kind of preferred scheme of above-mentioned fore construction platform device, from bottom to top it is fixed with the platform structure more
Individual electric permanent magnet fixing device, the electric permanent magnet fixing device include sucker and control box, and the control box is electrically connected with the sucker
Connect, for controlling the outside plate connection of sucker and fore and separating.
As a kind of preferred scheme of above-mentioned fore construction platform device, the electric permanent magnet fixing device is connected with movable joint spiral shell
Bolt, the eyelet bolt is combined with two nuts, so that the eyelet bolt is fixed on the platform structure.
As a kind of preferred scheme of above-mentioned fore construction platform device, the platform structure is cut with scissors with the supporting structure
Connecing, the supporting structure is the second mounting fixed on the ground, and top and the platform structure of second mounting are hinged,
Locking device is additionally provided with second mounting, the locking device connects with platform structure locking.
As a kind of preferred scheme of above-mentioned fore construction platform device, universal wheel is provided with first mounting, institute
State universal wheel connection Collapsible structure, during Collapsible structure elongation, the universal wheel supports first mounting, it is described can
When stretching structure shortens, the universal wheel leaves ground.
As a kind of preferred scheme of above-mentioned fore construction platform device, first mounting is located at the second mounting away from institute
The side of fore is stated, is connected between first mounting and the second mounting by telescopic attachment structure.
As a kind of preferred scheme of above-mentioned fore construction platform device, second mounting is correspondingly arranged at least
Two first mountings, first mounting arrange along the direction of the outside plate of second mounting away from the fore successively,
The attachment structure is connected between the first adjacent mounting.
As a kind of preferred scheme of above-mentioned fore construction platform device, the attachment structure include with the first mounting or with
The be hinged connecting rod of second mounting, the connecting rod between adjacent the first mounting or the first mounting and the second mounting are mutually cut with scissors
Connect.
As a kind of preferred scheme of above-mentioned fore construction platform device, outside plate of the platform structure away from the fore
Side set safety net.
As a kind of preferred scheme of above-mentioned fore construction platform device, support cylinder is installed on first mounting,
The support bar is connected with the piston rod of the support cylinder, and the piston rod, which rises, holds out against the support bar.
The beneficial effects of the utility model:
The utility model proposes fore construction platform device, platform structure is rotated to suitable position by hanging apparatus
Put so that arc platform is closer or far from the outside plate of the fore of corresponding height, and the first mounting is for supporting support bar, platform structure
During installation and removal, by the change of First rack position and the mobile lifting of hanging apparatus control platform structure, so as to real
Existing assembly or disassembly is efficiently constructed, and platform structure is that an entirety collapse accident will not occur in build process, will not be in ship
The outer plate weld hook strengthening construction platform of head, but also safety not only environmentally friendly using magnetic system, realizes quick erection construction platform dress
Put.
Brief description of the drawings
Fig. 1 is the structural representation for the fore construction platform device that the utility model embodiment provides;
Fig. 2 is the schematic cross-section in A-A faces in Fig. 1;
Fig. 3 is the structural representation for the second mounting that the utility model embodiment provides;
Fig. 4 is the attachment structure schematic diagram of the first mounting that the utility model embodiment provides and the second mounting;
Fig. 5 is the structural representation for the electric permanent magnet fixing device that the utility model embodiment provides.
Wherein, 1, platform structure;2nd, connector;3rd, arc platform;4th, the first mounting;5th, support bar;6th, electric permanent magnetism is fixed
Device;7th, sucker;8th, eyelet bolt;9th, nut;10th, the second mounting;11st, locking device;12nd, universal wheel;13rd, scalable knot
Structure;14th, connecting rod;15th, safety net;16th, support cylinder.
Embodiment
Further illustrate the technical solution of the utility model below in conjunction with the accompanying drawings and by embodiment.
As Figure 1-5, present embodiment proposes a kind of fore construction platform device, including symmetrical platform structure
1, platform structure 1 includes the multilayer arc platform 3 from bottom to top connected by connector 2, platform structure 1 and ground or support
Structure is hinged, rotatable platform structure 1, arc platform 3 closer or far from the fore of corresponding height outside plate,
Also include moveable first mounting 4, be connected with support bar 5 on platform structure 1, the first mounting 4 is moved to support
The lower section of bar 5, for supporting support bar 5.
During using the fore construction platform device, platform structure 1 is set to rotate to suitable position by hanging apparatus so that
Arc platform 3 is closer or far from the outside plate of the fore of corresponding height, and the first mounting for supporting support bar 5, install by platform structure 1
During with dismounting, by the change of the position of the first mounting 4 and the rotation of hanging apparatus control platform structure 1, so as to realize assembling
Rapid with dismounting, the time is short, uses manpower and material resources sparingly, and platform structure 1 is that an entirety will not fall in build process
Collapse accident.
In addition, the fore construction platform device repeatedly uses as overall can realize, construction cost can be saved,
Repairing mill, repairing paint etc. save the material of construction platform device consumption, energy-conserving and environment-protective.
Multiple electric permanent magnet fixing devices 6 are from bottom to top fixed with the platform structure 1, electric permanent magnet fixing device 6 includes inhaling
Disk 7 and control box, control box electrically connect with sucker 7, for controlling the outside plate connection of sucker 7 and fore and separating, sucker 7 and ship
The connection of the outside plate of head, can realize and platform structure 1 is preferably positioned.The control of control box can by be remotely controlled realize, and
Ensure that sucker 7 can be realized within 2-3s time with the outside plate of fore quickly to separate and adsorb so that fore construction is flat
The installation and removal of table apparatus are quicker.
As shown in figure 5, electric permanent magnet fixing device 6 is connected with eyelet bolt 8, eyelet bolt 8 is combined with two nuts 9, with
Make eyelet bolt 8 being fixed on platform structure 1, by adjusting the position of the opposed platforms structure 1 of eyelet bolt 8, ensure electricity forever
The sucker 7 of magnetically fixed device 6 is adsorbed on outside plate on the bow, realizes the fixation to platform structure 1.
As shown in figure 4, the embodiment medium-height trestle structure is the second mounting 10 fixed on the ground, the second mounting 10 with
Platform structure 1 is be hinged, and locking device 11 is additionally provided with the second mounting 10, and locking device 11 connects with the locking of platform structure 1, can
Prevent occurring the phenomenon of hinged place rotation during the fore construction platform device use, prevent the appearance of platform structure 1 from loosening,
The problems such as rocking.Wherein, the second mounting 10 is stair-stepping structure, and one layer of arc platform 3 is supported by every layer of ladder.
As shown in figure 3, being provided with universal wheel 12 on the first mounting 4, universal wheel 12 connects Collapsible structure 13, scalable knot
When structure 13 extends, universal wheel 12 supports the first mounting 4, and when Collapsible structure 13 shortens, universal wheel 12 leaves ground, therefore, when
When needing mobile first mounting 4, Collapsible structure 13 extends, and universal wheel 12 is landed and is supported to the first mounting 4, by universal
The movement of the first mounting 4 is realized in the rotation of wheel 12, and when the first mounting 4 is without movement, Collapsible structure 13 shortens, universal wheel 12
Ground is left, the bottom of the first mounting 4, which directly lands, avoids the occurrence of movement, and the first mounting 4 of the structure both can guarantee that flexibility,
And can realizes stability.Collapsible structure 13 in present embodiment is the structure such as oil cylinder, the selection cylinder for the property of may also adapt to.
As shown in figure 4, the first mounting 4 is located at the side of the second outside plate of the mounting 10 away from fore, the first mounting 4 and second
Connected between mounting 10 by telescopic attachment structure.One the second mounting 10 is correspondingly arranged on two the first mountings 4, and
Arranged successively along the direction of the second outside plate of the mounting 10 away from fore, attachment structure is connected between the first adjacent mounting 4.The
The number of one mounting 4 can be configured as the case may be.
Be provided with the fore construction platform device it is multigroup corresponding to the first mounting 4 and the second mounting 10, can realize pair
The stable support of platform structure 1.
Above-mentioned telescopic attachment structure includes the connecting rod 14 being hinged with the first mounting 4 or with the second mounting 10, phase
Connecting rod 14 between adjacent the first mounting 4 and the first mounting 4 and the second mounting 10 is hinged.When the construction platform device
When not in use, the first mounting 4 does not have to support support bar 5, the first adjacent mounting 4 and the first mounting 4 and the second mounting 10 it
Between connecting rod 14 rotate after fold up, the first mounting 4 is moved adjacent to the position of the second mounting 10, is easy to stack, subtracts
Few space-consuming.
The side of outside plate of the platform structure 1 away from fore sets safety net 15, specially nylon safety net 15, prevents work
Personnel the accident such as fall and occurred, and can preferably protect the personal safety of staff.
Support cylinder 16 is installed, support bar 5 is connected with the piston rod of support cylinder 16, on piston rod on first mounting 4
Rise and hold out against support bar 5, realize and the stable of platform structure 1 is supported.
Hanging apparatus makes platform structure 1 rotate to suitable position so that arc platform 3 is outer with the fore of corresponding height
Plate is close, the universal wheel 12 on the first mounting 4 is landed and pulls the first mounting 4 so that the first mounting 4 and the second mounting
Connecting rod 14 between 10 and adjacent first mounting 4 stretches, universal when the first mounting 4 reaches corresponding 5 position of support bar
Take turns 12 liftoff, the bottom of the first mounting 4 is stable to land, and props up support bar 5 by the first mounting 4, finally fixes electric permanent magnetism
Device 6 is adsorbed on outside plate on the bow, and locking device 11 connects the second mounting 10 and platform structure 1, realizes fore construction platform
The fast and safely assembling of device;, can also between the first mounting 4 and the second mounting 10 when without using the fore construction platform device
Enough it is closing the distance, occupies little space.
Pay attention to, above are only preferred embodiment of the present utility model.It will be appreciated by those skilled in the art that the utility model is not
It is limited to specific embodiment described here, can carries out various significantly changing, readjusting for a person skilled in the art
With replacement without departing from the scope of protection of the utility model.Therefore, although being carried out by above example to the utility model
It is described in further detail, but the utility model is not limited only to above example, is not departing from the utility model design
In the case of, other more equivalent embodiments can also be included, and the scope of the utility model is determined by scope of the appended claims
It is fixed.
Claims (10)
1. a kind of fore construction platform device, it is characterised in that including symmetrical platform structure (1), the platform structure
(1) the multilayer arc platform (3) from bottom to top connected by connector (2), the platform structure (1) and ground or branch are included
Frame structure is hinged, and rotates the platform structure (1), the arc platform (3) closer or far from the fore of corresponding height outside plate,
Also include moveable first mounting (4), support bar (5), first mounting are connected with the platform structure (1)
(4) it is moved to below the support bar (5), for supporting the support bar (5).
2. fore construction platform device according to claim 1, it is characterised in that on the platform structure (1) by lower and
On be fixed with multiple electric permanent magnet fixing devices (6), the electric permanent magnet fixing device (6) includes sucker (7) and control box, the control
Box processed electrically connects with the sucker (7), for controlling the outside plate connection of sucker (7) and fore and separating.
3. fore construction platform device according to claim 2, it is characterised in that the electric permanent magnet fixing device (6) is even
Eyelet bolt (8) is connected to, the eyelet bolt (8) is combined with two nuts (9), so that the eyelet bolt (8) is fixed on institute
State on platform structure (1).
4. fore construction platform device according to claim 1, it is characterised in that the platform structure (1) and the branch
Frame structure is hinged, and the supporting structure is the second mounting (10) fixed on the ground, the top of second mounting (10) with
The platform structure (1) is be hinged, and locking device (11), the locking device (11) and institute are additionally provided with second mounting (10)
State platform structure (1) locking connection.
5. fore construction platform device according to claim 4, it is characterised in that be provided with first mounting (4)
Universal wheel (12), universal wheel (12) the connection Collapsible structure (13) are described universal when the Collapsible structure (13) extends
Take turns (12) and support first mounting (4), when the Collapsible structure (13) is shortened, the universal wheel (12) leaves ground.
6. fore construction platform device according to claim 5, it is characterised in that first mounting (4) is located at second
Side of the mounting (10) away from the fore, passes through telescopic connection between first mounting (4) and the second mounting (10)
Structure connects.
7. fore construction platform device according to claim 6, it is characterised in that second mounting (10) is corresponding
At least two first mountings (4) are provided with, first mounting (4) is successively along second mounting (10) away from the ship
The direction of the outside plate of head is arranged, and the attachment structure is connected between adjacent first mounting (4).
8. fore construction platform device according to claim 7, it is characterised in that the attachment structure includes and First
Frame (4) or the connecting rod (14) being hinged with the second mounting (10), adjacent the first mounting (4) or the first mounting (4) and second
The connecting rod (14) between frame (10) is hinged.
9. fore construction platform device according to claim 1, it is characterised in that the platform structure (1) is away from described
The side of the outside plate of fore sets safety net (15).
10. fore construction platform device according to claim 1, it is characterised in that be provided with first mounting (4)
Support cylinder (16), the support bar (5) are connected with the piston rod of the support cylinder (16), and the piston rod, which rises, holds out against institute
State support bar (5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720375077.6U CN206664895U (en) | 2017-04-11 | 2017-04-11 | A kind of fore construction platform device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720375077.6U CN206664895U (en) | 2017-04-11 | 2017-04-11 | A kind of fore construction platform device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206664895U true CN206664895U (en) | 2017-11-24 |
Family
ID=60381067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720375077.6U Active CN206664895U (en) | 2017-04-11 | 2017-04-11 | A kind of fore construction platform device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206664895U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107054582A (en) * | 2017-04-11 | 2017-08-18 | 广船国际有限公司 | A kind of fore construction platform device |
CN108423617A (en) * | 2018-05-21 | 2018-08-21 | 灌云强微服饰有限公司 | Mobile easily safety hanging cradle |
-
2017
- 2017-04-11 CN CN201720375077.6U patent/CN206664895U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107054582A (en) * | 2017-04-11 | 2017-08-18 | 广船国际有限公司 | A kind of fore construction platform device |
CN108423617A (en) * | 2018-05-21 | 2018-08-21 | 灌云强微服饰有限公司 | Mobile easily safety hanging cradle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107054582A (en) | A kind of fore construction platform device | |
CN106368122B (en) | A kind of self-propelled twin beams bridge maintenance platform | |
CN101439757B (en) | Large-sized aerial work platform for shipbuilding | |
CN105604185B (en) | A kind of earthquake-resistant structure support connection structure and attaching method thereof | |
CN206664895U (en) | A kind of fore construction platform device | |
CN106892067B (en) | A kind of stage apparatus | |
CN104234200B (en) | A kind of suspen-shell structure rope leverage is by ring lifting installation method | |
CN105298139A (en) | Modular mounting method of large space division cooling box steel structure | |
CN205952298U (en) | Marine unmanned aerial vehicle device that takes off and land | |
CN208857700U (en) | A kind of Bridge Erector full telescopic outrigger of four cylinder types | |
CN102041815A (en) | Tower crane | |
CN109879179A (en) | A kind of assembling type steel structure tower crane platform | |
CN102361252B (en) | Folding rotary insulating platform | |
CN204225457U (en) | High-altitude operation frame | |
CN106627613B (en) | A kind of unmanned inspection car of electric railway | |
CN209721418U (en) | A kind of assembling type steel structure tower crane platform | |
CN206679224U (en) | A kind of stage apparatus | |
CN203846750U (en) | Buoyancy lift and turnover type external scaffolding tooling device special for installation of gas holder | |
CN202152260U (en) | Engineering plant and propeller strut structure thereof | |
CN207512744U (en) | For the turnable bottom die platform device of underwater concreting construction | |
CN202000268U (en) | Foldable front outrigger for bridge girder erection machine | |
CN205400216U (en) | Steel construction silo flip -chip construction auxiliary device | |
CN208135770U (en) | A kind of offshore platform crane A cabinet frame attaching/detaching apparatus | |
CN208637927U (en) | A kind of transmission and distribution line pipeline quick-speed first-aid repair device | |
CN203948008U (en) | Power system Rapid Combination ascending tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |