CN206660881U - A kind of furane resins production exhaust treatment system - Google Patents
A kind of furane resins production exhaust treatment system Download PDFInfo
- Publication number
- CN206660881U CN206660881U CN201720221469.7U CN201720221469U CN206660881U CN 206660881 U CN206660881 U CN 206660881U CN 201720221469 U CN201720221469 U CN 201720221469U CN 206660881 U CN206660881 U CN 206660881U
- Authority
- CN
- China
- Prior art keywords
- adsorption box
- water tank
- treatment system
- exhaust treatment
- adsorption
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Treating Waste Gases (AREA)
- Water Treatment By Sorption (AREA)
Abstract
The utility model belongs to exhaust gas processing device technical field, a kind of furane resins production exhaust treatment system proposed, including the reactor being sequentially connected, water tank and adsorption box, water tank is all connected with feed pipe and drainpipe, and horizontal baffle is provided with water tank, water tank is connected with adsorption box by anemostat, gas outlet is provided with the top of adsorption box, and three adsorption boxes set gradually up and down are provided with adsorption box, adsorption box positioned at centre is with rotating axis connection, and it is provided with connecting plate between the adsorption box and absorption chamber interior wall positioned at upper and lower ends, two neighboring adsorption box is connected by cylinder, and it is additionally provided with Foldable-type baffle between two neighboring adsorption box, Foldable-type baffle, connecting plate, adsorption box side wall and absorption chamber interior wall surround insulation blocking chamber, cylinder is arranged on insulation blocking intracavitary.The utility model is skillfully constructed, easy to operate, and solving exhaust treatment system in the prior art includes that number of devices is more, and activated carbon changes frequently technical problem.
Description
Technical field
The utility model belongs to exhaust gas processing device technical field, is related to a kind of furane resins production vent gas treatment system
System.
Background technology
Furane resins refer to the general name for making the resinae of raw material production with the furfuryl alcohol with furan nucleus and furfural, have and protrude
Corrosion resistance, heat resistance and its raw material sources extensively, simple production process the advantages that, cause the attention of people.It is wide at present
It is general to be applied to metallurgical casting industry, in moulding, such as the production of many auto parts machineries, water heating bathroom, tire-mold.Furans
Waste gas is often produced during production of resins, and current exhaust treatment system uses condenser and dust treatment plant to tail gas more
Carry out cooling and dust removes, required number of devices is more, and floor space is big, and acquisition cost is high.Institute in exhaust treatment system simultaneously
Charcoal absorption box structure is simple, and activated carbon utilization rate is low in superposed adsorption box, the adsorption box activated carbon of bottom
The high easily failure of utilization rate, need to frequently be changed, labor intensity is big, and influences manufacturing schedule.
Utility model content
The utility model proposes a kind of furane resins production exhaust treatment system, solves vent gas treatment in the prior art
System is more including number of devices, and activated carbon changes frequently technical problem.
What the technical solution of the utility model was realized in:
A kind of furane resins production exhaust treatment system, including reactor, water tank and the adsorption box being sequentially connected,
The water tank is all connected with feed pipe and drainpipe, and is provided with horizontal baffle in the water tank,
The water tank is connected with the adsorption box by anemostat,
Gas outlet is provided with the top of the adsorption box, and three absorption set gradually up and down are provided with the adsorption box
Box,
Positioned at centre adsorption box with rotate axis connection, and positioned at upper and lower ends adsorption box with it is described absorption chamber interior wall it
Between be provided with connecting plate,
Some through holes are provided with the adsorption box, activated carbon, and the via top and bottom are provided with the through hole
Portion is provided with NACF filter screen,
The two neighboring adsorption box is connected by cylinder, and is additionally provided between the two neighboring adsorption box collapsible
Baffle plate,
The Foldable-type baffle, the connecting plate, the adsorption box side wall and the absorption chamber interior wall surround insulation blocking
Chamber, the cylinder are arranged on the insulation blocking intracavitary.
As further technical scheme, the anemostat includes Y-piece, and the Y-piece passes through several vertical tubes and institute
State adsorption box connection.
As further technical scheme, the horizontal baffle includes the first level dividing plate being staggered and the second level
Dividing plate, the passage between the first level dividing plate and second horizontal baffle and the tank inner wall are separately positioned on described
Water tank both sides.
As further technical scheme, projection, the raised interior setting are provided with the top and bottom of the adsorption box
There is the activated carbon, the gas outlet is located at the raised surface.
As further technical scheme, described raised raised for circular platform type, the gas outlet is arranged on the adsorption box
Center, the raised top surface area is 1.2~2 times of cross-sectional area of the gas outlet.
As further technical scheme, the through hole is polygonal through hole.
The utility model use principle and have the beneficial effect that:
1st, the adsorption box that the utility model is changed in furane resins vent gas treatment charcoal absorption case is relative with casing
The changeless natural mode in position, there is provided the adjustable adsorption box in adsorption box position, effectively increase different zones in casing
The utilization rate of activated carbon, reduces the frequency of the replacing activated carbon of adsorption box, and then reduces exhaust treatment system maintenance shut-downs
Frequency, reduce the labor intensity of operating personnel, improve operating efficiency, it is ensured that manufacturing schedule is smoothed out.Meanwhile
The exhaust treatment system that the utility model is proposed changes the natural mode that condenser cools to tail gas, and it is complete to employ water tank
Into tail gas cooling and preliminary absorption, this setting effectively reduces the equipment needed for furane resins production exhaust treatment system
Number, reduces it and is taken up space, and reduces production, the purchase cost of equipment, sets scientific and reasonable.In addition, Foldable-type baffle, company
Fishplate bar, adsorption box side wall and absorption chamber interior wall surround insulation blocking chamber so that cylinder does not contact with tail gas, and then avoids gas
Cylinder reduces the probability and maintenance cost of device fails by the possibility of tail gas pollution, sets scientific and reasonable.
2nd, the setting of the utility model anemostat causes the gas that is tentatively filtered through water tank, can even into adsorption box,
And then increase effective contact area of gas and activated carbon.The supervisor of anemostat is set to Y-piece, is more beneficial for the expansion of gas
Dissipate, enter adsorption box by different vertical tubes, ensure that dispersiveness and uniformity that gas enters after adsorption box.
Due to being flowed out after vent gas treatment eventually through gas outlet, gas is easily sent to the movement of gas outlet direction certainly in adsorption box,
Therefore the tail gas that the adsorption box region closest with gas outlet contacts is more, and raised setting ensure that tail gas concentrated area
Filter effect, while avoid waste of each region uniform thickness setting of adsorption box to raw material.
Gas outlet is arranged on to the center of adsorption box, projection use truncated conical shape, the overall structure of adsorption box is more uniform,
It is stable, while the distribution of gas is symmetrical set in adsorption box, is easy to user to change the subregion of activated carbon in adsorption box.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Fig. 1 is the utility model structure diagram;
Fig. 2 is the structural representation of through hole in the utility model;
In figure:1- reactors, 2- water tanks, 3- adsorption boxes, 4- feed pipes, 5- drainpipes, 6- horizontal baffles, the water of 61- first
Flat partition board, the horizontal baffles of 62- second, 7- anemostats, 71-Y type pipes, 72- vertical tubes, 8- adsorption boxes, 9- through holes, 10- activated carbons,
11- is raised, 12- cylinders, 13- rotary shafts, 14- Foldable-type baffles, 15- gas outlets, 16- connecting plates, 17- insulation blocking chambers.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
As shown in Fig. 1~2, the utility model proposes a kind of furane resins production exhaust treatment system, including successively
Reactor 1, water tank 2 and the adsorption box 3 of connection,
Water tank 2 is all connected with feed pipe 4 and drainpipe 5, and horizontal baffle 6 is provided with water tank 2,
Water tank 2 is connected with adsorption box 3 by anemostat 7,
The top of adsorption box 3 is provided with gas outlet 15, and three adsorption boxes 8 set gradually up and down are provided with adsorption box 3,
Adsorption box 8 positioned at centre is connected with rotary shaft 13, and the adsorption box 8 positioned at upper and lower ends and the inwall of adsorption box 3
Between be provided with connecting plate 16,
Some through holes 9 are provided with adsorption box 8, activated carbon 10 are provided with through hole 9, and the top and bottom of through hole 9 are all provided with
NACF filter screen is equipped with,
Two neighboring adsorption box 8 is connected by cylinder 12, and is additionally provided with Foldable-type baffle between two neighboring adsorption box 8
14,
Foldable-type baffle 14, connecting plate 16, the side wall of adsorption box 8 and the inwall of adsorption box 3 surround insulation blocking chamber 17, cylinder 12
It is arranged in insulation blocking chamber 17.
In use, the tail gas that reactor 1 is discharged enters water tank 2 through blast pipe, cooled by water tank 2, adsorb water-soluble gas
After body and solid dust, then by the feeding adsorption box 3 of anemostat 7, discharged after the absorption of activated carbon 10 by gas outlet 15.Its
In, water tank 2 is provided with horizontal baffle 6 so that tail gas enters carries out broken line motion under the guiding of horizontal baffle 6 after water tank 2, increase
Added residence time of the gas in water tank 2 and flowing range, at the same the water in water tank 2 and water circulation system (by feed pipe 4,
Drainpipe 5, water system, Waste Water Treatment composition) connection so that the temperature of water and dustiness remain in water tank 2
In rational scope, the absorption of dust and soluble gas has been effectively ensured it, and tail gas cooling process is smoothed out.
In addition, after using a period of time, user can be according to the working condition of adsorption box 3 to the position of adsorption box 8 in casing
It is adjusted, cylinder 12 is first passed through during adjustment three adsorption boxes 8 are contracted in the middle part of casing, then in (the motor control of rotary shaft 13
System) drive under these three adsorption boxes 8 are subjected to 180 ° of rotations, then by cylinder 12 adsorption box 8 of upper and lower ends is pushed to
Relevant position, realize the exchange of the position of casing upper and lower part adsorption box 8.
The utility model changes the adsorption box position relative with casing in furane resins vent gas treatment charcoal absorption case
Changeless natural mode is put, there is provided the adjustable adsorption box in adsorption box position, effectively increases different zones in casing and lives
Property charcoal utilization rate, reduce the frequency of the replacing activated carbon of adsorption box, and then reduce exhaust treatment system maintenance shut-downs
Frequency, the labor intensity of operating personnel is reduced, improves operating efficiency, it is ensured that manufacturing schedule is smoothed out.Meanwhile this
The exhaust treatment system that utility model is proposed changes the natural mode that condenser cools to tail gas, employs water tank to complete
Tail gas cools and preliminary absorption, this setting effectively reduce the equipment needed for furane resins production exhaust treatment system
Number, reduces it and is taken up space, and reduces production, the purchase cost of equipment, sets scientific and reasonable.In addition, Foldable-type baffle 14,
Connecting plate 16, the side wall of adsorption box 8 and the inwall of adsorption box 3 surround insulation blocking chamber 17 so that and cylinder 12 does not contact with tail gas, and then
Cylinder 12 is avoided by the possibility of tail gas pollution, reduces the probability and maintenance cost of device fails, sets science to close
Reason.
Further, anemostat 7 includes Y-piece 71, and Y-piece 71 is connected by several vertical tubes 72 with adsorption box 3.
The setting of anemostat 7 causes the gas that is tentatively filtered through water tank 2, can be even into adsorption box 3, and then increases
Effective contact area of gas and activated carbon 10.
The supervisor of anemostat 7 is set to Y-piece, is more beneficial for the diffusion of gas, enters adsorption box by different vertical tubes 72
3, it ensure that dispersiveness and uniformity that gas enters after adsorption box 3.
Further, horizontal baffle 6 includes the horizontal baffle 62 of first level dividing plate 61 and second being staggered, first level
Passage between the horizontal baffle 62 of dividing plate 61 and second and the inwall of water tank 2 is separately positioned on the both sides of water tank 2.
Passage between the horizontal baffle 62 of first level dividing plate 61 and second and the inwall of water tank 2 is separately positioned on 2 liang of water tank
Side, run time of the gas in water tank 2 is effectively ensured, further ensure that tail gas cools and that tentatively filters smoothly enters
OK, set scientific and reasonable.
Further, the top and bottom of adsorption box 8 are provided with projection 11, and activated carbon 10, gas outlet are provided with projection 11
15 positioned at the surface of projection 11.
Due to being flowed out after vent gas treatment eventually through gas outlet 15, gas is easily sent to the direction of gas outlet 15 certainly in adsorption box 3
It is mobile, therefore the tail gas that the region closest with gas outlet 15 of adsorption box 8 contacts is more, raised 11 setting ensure that tail gas
The filter effect of concentrated area, while avoid waste of each region uniform thickness setting of adsorption box 8 to raw material.
Further, projection 11 is that circular platform type is raised, and gas outlet 15 is arranged on the center of adsorption box 3, the top surface face of projection 11
Product is 1.2~2 times of the cross-sectional area of gas outlet 15.
Gas outlet 15 is arranged on to the center of adsorption box 3, projection 11 uses truncated conical shape, and the overall structure of adsorption box 8 is more
Add uniform, stably, while the distribution of gas is symmetrical set in adsorption box 3, is easy to point of the user to activated carbon 10 in adsorption box 8
Change in region.
Raised 11 top surface areas are arranged to 1.2~2 times of the cross-sectional area of gas outlet 15, both ensure that the filtering of tail gas
Effect, waste of raw materials is turn avoid, set scientific and reasonable.
Further, through hole 9 is polygonal through hole.
Through hole 9 is set using polygon-prism, effectively increases the proportion of 8 inner via hole of unit area adsorption box 9, is increased
The loading of activated carbon 10, and then ensure that the adsorption effect of tail gas.
Preferred embodiment of the present utility model is the foregoing is only, it is all at this not to limit the utility model
Within the spirit and principle of utility model, any modification, equivalent substitution and improvements made etc., the utility model should be included in
Protection domain within.
Claims (6)
1. a kind of furane resins production exhaust treatment system, it is characterised in that including reactor (1), the water tank being sequentially connected
(2) and adsorption box (3),
The water tank (2) is all connected with feed pipe (4) and drainpipe (5), and is provided with horizontal baffle (6) in the water tank (2),
The water tank (2) is connected with the adsorption box (3) by anemostat (7),
Gas outlet (15) is provided with the top of the adsorption box (3), and three set gradually up and down are provided with the adsorption box (3)
Individual adsorption box (8),
Adsorption box (8) positioned at centre is connected with rotary shaft (13), and the adsorption box (8) positioned at upper and lower ends and the adsorption box
(3) connecting plate (16) is provided between inwall,
Some through holes (9) are provided with the adsorption box (8), activated carbon (10), and the through hole are provided with the through hole (9)
(9) top and bottom are provided with NACF filter screen,
The two neighboring adsorption box (8) is connected by cylinder (12), and is additionally provided between the two neighboring adsorption box (8)
Foldable-type baffle (14),
The Foldable-type baffle (14), the connecting plate (16), the adsorption box (8) side wall and the adsorption box (3) inwall enclose
Into insulation blocking chamber (17), the cylinder (12) is arranged in the insulation blocking chamber (17).
A kind of 2. furane resins production exhaust treatment system according to claim 1, it is characterised in that the anemostat
(7) Y-piece (71) is included, the Y-piece (71) is connected by several vertical tubes (72) with the adsorption box (3).
A kind of 3. furane resins production exhaust treatment system according to claim 1, it is characterised in that it is described it is horizontal every
Plate (6) includes the first level dividing plate (61) and the second horizontal baffle (62) that are staggered, the first level dividing plate (61) and
Passage between second horizontal baffle (62) and the water tank (2) inwall is separately positioned on the water tank (2) both sides.
A kind of 4. furane resins production exhaust treatment system according to claim 1, it is characterised in that the adsorption box
(8) top and bottom are provided with raised (11), and the activated carbon (10), the gas outlet are provided with the projection (11)
(15) positioned at the surface of raised (11).
A kind of 5. furane resins production exhaust treatment system according to claim 4, it is characterised in that the projection
(11) raised for circular platform type, the gas outlet (15) is arranged on the center of the adsorption box (3), the top surface face of the projection (11)
Product is 1.2~2 times of the cross-sectional area of the gas outlet (15).
A kind of 6. furane resins production exhaust treatment system according to any one of Claims 1 to 5, it is characterised in that
The through hole (9) is polygonal through hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720221469.7U CN206660881U (en) | 2017-03-08 | 2017-03-08 | A kind of furane resins production exhaust treatment system |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720221469.7U CN206660881U (en) | 2017-03-08 | 2017-03-08 | A kind of furane resins production exhaust treatment system |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206660881U true CN206660881U (en) | 2017-11-24 |
Family
ID=60376957
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720221469.7U Expired - Fee Related CN206660881U (en) | 2017-03-08 | 2017-03-08 | A kind of furane resins production exhaust treatment system |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206660881U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111068581A (en) * | 2018-10-18 | 2020-04-28 | 苏州能讯高能半导体有限公司 | Pollutant isolating device and vacuum degree monitoring equipment |
-
2017
- 2017-03-08 CN CN201720221469.7U patent/CN206660881U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111068581A (en) * | 2018-10-18 | 2020-04-28 | 苏州能讯高能半导体有限公司 | Pollutant isolating device and vacuum degree monitoring equipment |
CN111068581B (en) * | 2018-10-18 | 2022-02-01 | 苏州能讯高能半导体有限公司 | Pollutant isolating device and vacuum degree monitoring equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204187760U (en) | Cylindrical shape list blower fan standpipe indirect evaporating-cooling handpiece Water Chilling Units | |
CN206660881U (en) | A kind of furane resins production exhaust treatment system | |
CN204022465U (en) | A kind of portable hydrogen-hydrogen-feeding system | |
CN203678132U (en) | Oil online purifying machine | |
CN209791163U (en) | High-temperature waste gas purification device with waste heat recovery function | |
CN212619659U (en) | Compound fertilizer cooling device | |
CN110642321A (en) | Supergravity-enhanced dry-method denitration ammonia production device | |
CN109289435A (en) | A kind of organic exhaust gas vertical active carbon adsorption tower | |
CN206064093U (en) | A kind of organic exhaust gas separation absorbing tower | |
CN204582964U (en) | A kind of cleaning equipment for waste organic gas | |
CN210522112U (en) | Compressed air deep oil removing and purifying equipment | |
CN210993715U (en) | Organic waste gas treatment system | |
CN210728706U (en) | Distillation device for producing and purifying ultra-pure nitric acid | |
CN209519558U (en) | A kind of taste removal equipment of cooler fan outlet | |
CN203139650U (en) | Cylinder-type rotary evaporator | |
CN208917032U (en) | Microorganism sewage purifying equipment | |
CN207493455U (en) | A kind of vehicular glycol dehydration device and absorption system | |
CN208213190U (en) | A kind of tower chlorination reaction device and vent gas treatment | |
CN107875789B (en) | Efficient dehydration device for natural gas | |
CN212609926U (en) | Environment-friendly energy-saving water treatment equipment | |
CN205676488U (en) | A kind of dry processing device of blast furnace cinder | |
CN104501629B (en) | A kind of removal of impurities heat exchanger | |
CN219897625U (en) | Hydrogen chloride-containing high-temperature waste gas treatment system | |
CN218901273U (en) | High-efficient processing apparatus of garbage incinerator tail gas thermal cycle | |
CN204830832U (en) | Cooler |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171124 Termination date: 20200308 |