A kind of new city plans direction board Download PDFInfo
- Publication number
- CN206657579U CN206657579U CN201720361294.XU CN201720361294U CN206657579U CN 206657579 U CN206657579 U CN 206657579U CN 201720361294 U CN201720361294 U CN 201720361294U CN 206657579 U CN206657579 U CN 206657579U
- Authority
- CN
- China
- Prior art keywords
- magnet
- bearing rod
- iron plate
- junction
- offers
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model discloses a kind of new city to plan direction board, including bottom bar, the inside of the bottom bar offers cavity, support column is fixedly installed in the middle part of the cavity, top is fixedly installed at the top of support column, the inside of the top is fixedly installed the first magnet, and the bottom of the first magnet is bonded with the first iron plate, and the top movable of the bottom bar is provided with bearing rod.The utility model is by setting the first fixing groove, the first magnet, the second fixing groove and the first iron plate in support bar top top, accept the second magnet and the second iron plate in the 3rd fixing groove at the top of sleeve, and second magnet be fixedly connected at the top of bearing rod, the projection of bearing rod top end surface, reach convenience undertaking sleeve automatically to fall, and then the operation conveniently changed to board body, avoid using extraneous instrument or the troublesome operation directly extracted out, the advantages of reducing replacement operation step and replacing construction.
Description
Technical field
Urban planning equipment technology field is the utility model is related to, specially a kind of new city planning direction board.
Background technology
Urban planning direction board at this stage change very inconvenience, it is necessary to be climbed by extraneous instrument to board body
Crawl into row replacing or directly all extract direction board from ground out and changed, which not only adds the work of staff
Amount, operating efficiency, and fixed welding between board body and the body of rod are also reduced, just needs to carry out when changing single board body
Sealing-off is welding new board body, and which not only adds workload, also add replacement cost.
Utility model content
The purpose of this utility model is to provide a kind of new city planning direction board, possesses and conveniently board body is carried out more
Change, and reduce replacement operation step and replacing construction, so as to reduce workload and improve operating efficiency, meanwhile, avoid
The advantages of replacement cost increase, solve urban planning direction board at this stage and to board body change very not side
Just changed, it is necessary to climb to be changed or directly all extract straight direction board from ground out by extraneous instrument, so not
The workload of staff is increase only, operating efficiency, and fixed welding between board body and the body of rod are also reduced, to single board
Progress sealing-off is just needed to weld new board body when body is changed, which not only adds workload, also add replacement cost
The problem of.
To achieve the above object, the utility model provides following technical scheme:A kind of new city plans direction board, including
Bottom bar, the inside of the bottom bar offer cavity, and support column is fixedly installed in the middle part of the cavity, and the top of support column, which is fixed, to be set
Top is equipped with, the inside of the top is fixedly installed the first magnet, and the bottom of the first magnet is bonded with the first iron plate, the bottom bar
Top movable be provided with bearing rod, the inside of the bearing rod offers cavity, is opened up in the middle part of cavity the week side of boss bearing rod outer wall
There is annular groove, annular groove is internally provided with spring, the second magnet, the second magnetic are fixedly installed on the outside of the bearing rod top
The second iron plate is bonded with the top of iron, the outer wall on bearing rod top is movably set with undertaking sleeve, and the both ends of the undertaking sleeve lead to
Cross bearing plate to be flexibly connected with installation deckle board, the inside for installing deckle board is flexibly connected by mounting seat with board plate.
Preferably, the cavity of bearing rod is run through in one end of the support column, and is fixedly connected with top, the annular of bearing rod
Groove is adapted with the bottom bar outer wall size of cavity the week side of boss, and bottom bar is located at the inside of annular groove, and the both ends at the top of bottom bar are fixed
Confinement block is provided with, bearing rod offers the shifting chute being adapted with the junction of confinement block.
Preferably, the top offers the first fixing groove for being adapted with the junction of the first magnet, and comes directly towards and the
The junction of one iron plate, which offers, is adapted the second fixing groove, and the area of the first magnet is more than the area of the first iron plate, the top
The fixing hole being adapted is offered with the junction of bearing rod, and the inside of the first magnet and the first iron plate offers and bearing rod
The consistent through hole of diameter.
Preferably, the undertaking sleeve is fixedly connected with the second magnet, and the junction for accepting sleeve and the second magnet opens up
There is the 3rd fixing groove, the 3rd fixing groove is adapted with the size of the second magnet, and the size phase of the second magnet and the second iron plate
The junction of adaptation, bearing rod and the second iron plate is fixedly installed projection, and the junction of the projection and the second iron plate offers phase
It is adapted to groove.
Preferably, the undertaking sleeve offers the standing groove being adapted with the junction of bearing plate, the bearing plate both sides
Inserted link is fixedly installed, inserted link offers the slot being adapted with accepting the junction of sleeve, and the installation deckle board is away from undertaking
One end of sleeve offers gateway.
Compared with prior art, the beneficial effects of the utility model are as follows:
The utility model is by setting cavity and support bar inside bottom bar, the annular groove and spring of bearing rod bottom, bottom
Bar and the confinement block and shifting chute of bearing rod junction, have reached and have facilitated bearing rod to be moved down, meanwhile, facilitate bearing rod certainly
Dynamic the advantages of rising, by setting the first fixing groove, the first magnet, the second fixing groove and the first iron in support bar top top
Piece, the second magnet and the second iron plate in the 3rd fixing groove at the top of sleeve are accepted, and the top of the second magnet and bearing rod is fixed
Connection, the projection of bearing rod top end surface, is used in conjunction with each other, and has reached the first magnet and the second iron when facilitating the bearing rod to move down
Piece separates with the second magnet and the second iron plate, so as to which convenient sleeve of accepting automatically is fallen, and then the behaviour conveniently changed to board body
Make, avoid using extraneous instrument or the troublesome operation directly extracted out, the advantages of reducing replacement operation step and replacing construction,
By setting the bearing plate and inserted link of the installation deckle board side containing board body, installing frame intralamellar part is connected by mounting seat and board body
Connect, accept standing groove and slot in sleeve, be used in conjunction with each other, reached convenience will install deckle board or board body carry out dismounting and
Installation, and then facilitate board body to be changed, further reduce the working time and improve operating efficiency, meanwhile, avoid more
The advantages of changing this increase into.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is structure enlargement diagram at the utility model Fig. 1 A;
Fig. 3 is structure enlargement diagram at the utility model Fig. 1 B.
In figure:1 bottom bar, 2 cavitys, 3 support columns, 4 bearing rods, 5 annular grooves, 6 springs, 7 confinement blocks, 8 shifting chutes, 9 top,
10 accept sleeve, 11 bearing plates, 12 installation deckle boards, 13 board plates, 14 mounting seats, 15 inserted links, 16 slots, 17 standing grooves, 18 first
Fixing groove, 19 first magnet, 20 second fixing grooves, 21 first iron plates, 22 the 3rd fixing grooves, 23 second magnet, 24 second iron plates,
25 projections.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out
Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole
Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made
The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, a kind of new city plans that direction board, including bottom bar 1, the inside of bottom bar 1 offer cavity 2,
The middle part of the cavity 2 is fixedly installed support column 3, and the top of support column 3 is fixedly installed top 9, and one end of support column 3 is run through
The cavity of bearing rod 4, and be fixedly connected with top 9, the annular groove 5 of bearing rod 4 and the outer wall size phase of bottom bar 1 of the week side of boss of cavity 2
Adaptation, and bottom bar 1 is located at the inside of annular groove 5, the both ends at the top of bottom bar 1 are fixedly installed confinement block 7, bearing rod 4 and limit
The junction of clamp dog 7 offers the shifting chute 8 being adapted, and the inside of the top 9 is fixedly installed the first magnet 19, the first magnet
19 bottom is bonded with the first iron plate 21, and top 9 offers the first fixing groove 18 being adapted with the junction of the first magnet 19,
And top 9 offers with the junction of the first iron plate 21 and is adapted the second fixing groove 20, the area of the first magnet 19 is more than first
The area of iron plate 21, the top 9 offer the fixing hole being adapted, the first magnet 19 and the first iron with the junction of bearing rod 4
The inside of piece 21 offers the through hole consistent with the diameter of bearing rod 4, and the top movable of bottom bar 1 is provided with bearing rod 4, and this holds
The inside of extension bar 4 offers cavity, offers annular groove 5 in the middle part of the outer wall of cavity the week side of boss bearing rod 4, the inside of annular groove 5 is set
Spring 6 is equipped with, the second magnet 23 is fixedly installed on the outside of the top of bearing rod 4, the top of the second magnet 23 is bonded with the second iron
Piece 24, the outer wall on the top of bearing rod 4, which is movably set with, accepts sleeve 10, accepts sleeve 10 and is fixedly connected with the second magnet 23, is held
The junction of the magnet 23 of female connector cylinder 10 and second offers the 3rd fixing groove 22, and the 3rd fixing groove 22 is big with the second magnet 23
It is small to be adapted, and the second magnet 23 is adapted with the size of the second iron plate 24, the junction of bearing rod 4 and the second iron plate 24 is fixed
Projection 25 is provided with, the projection 25 offers with the junction of the second iron plate 24 and is adapted groove, the both ends of the undertaking sleeve 10
It is flexibly connected by bearing plate 11 with installation deckle board 12, the inside for installing deckle board 12 is connected by mounting seat 14 and the activity of board plate 13
Connect, accept sleeve 10 and the standing groove 17 being adapted is offered with the junction of bearing plate 11, the both sides of bearing plate 11 fixation is set
Inserted link 15 is equipped with, inserted link 15 offers the slot 16 being adapted with accepting the junction of sleeve 10, and the installation deckle board 12 is remote to be held
One end of female connector cylinder 10 offers gateway, by setting cavity 2 and support column 3 inside bottom bar 1, the ring of the bottom of bearing rod 4
Shape groove 5 and spring 6, bottom bar 1 and the confinement block 7 and shifting chute 8 of the junction of bearing rod 4, have reached and have facilitated bearing rod 4 to carry out down
Move, meanwhile, the advantages of bearing rod 4 rises automatically is facilitated, by setting the first fixing groove 18 in the top of support column 3 top 9, the
One magnet 19, the second fixing groove 20 and the first iron plate 21, accept the He of the second magnet 23 in the 3rd fixing groove 22 at the top of sleeve 10
Second iron plate 24, and the second magnet 23 is fixedly connected with the top of bearing rod 4, the projection 25 of the top end surface of bearing rod 4, phase interworking
Close and use, reached the first magnet 19 and the second iron plate 21 and the second magnet 23 and the second iron plate 24 when facilitating the bearing rod 4 to move down
Separation, so as to which convenient sleeve 10 of accepting automatically is fallen, and then the operation conveniently changed to board plate 13, avoid and use extraneous work
Tool or the troublesome operation directly extracted out, the advantages of reducing replacement operation step and replacing construction, contain board plate 13 by setting
Installation deckle board 12 side bearing plate 11 and inserted link 15, install and be connected inside deckle board 12 by mounting seat 14 with board plate 13, held
Standing groove 17 and slot 16 in female connector cylinder 10, are used in conjunction with each other, and have reached convenience and will install deckle board 12 or board plate 13 and carry out
Disassembly and installation, and then facilitate board plate 13 to be changed, further reduce the working time and improve operating efficiency, meanwhile,
The advantages of avoiding replacement cost increase.
In use, bearing rod 4 is pulled down, so as to which bearing rod 4 enters in cavity 2, bottom bar 1 enters in annular groove 5, spring 6
Being extruded, confinement block 7 moves in shifting chute 8, because support column 3 is located in cavity 2, and it is fixed, so as to the first magnetic
Under the iron plate 21 of iron 19 and first separates with the second magnet 23 and the second iron plate 24, and then undertaking sleeve 10 is automatic on bearing rod 4
Move, unclamp bearing rod 4, bearing rod 4 is moved up automatically, then the mounting seat 14 for being provided with board plate 13 is removed, so as to enter to board plate 13
Row is changed, and after replacing, will be accepted sleeve 10 and is moved up, the second magnet 23 and the second iron plate 24 and the first magnet 19 and the first iron
The phase of piece 24 is adsorbed, and then fixed.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art,
It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied
Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.
Claims (5)
1. a kind of new city plans direction board, including bottom bar (1), it is characterised in that:The inside of the bottom bar (1) opens up free
Chamber (2), support column (3) is fixedly installed in the middle part of the cavity (2), top (9) is fixedly installed at the top of support column (3), should
The inside of top (9) is fixedly installed the first magnet (19), and the bottom of the first magnet (19) is bonded with the first iron plate (21), described
The top movable of bottom bar (1) is provided with bearing rod (4), and the inside of the bearing rod (4) offers cavity, cavity the week side of boss bearing rod
(4) annular groove (5) is offered in the middle part of outer wall, annular groove (5) is internally provided with spring (6), bearing rod (4) top
Outside is provided with the second magnet (23), is bonded with the second iron plate (24) at the top of the second magnet (23), bearing rod (4) top it is outer
Wall, which is movably set with, accepts sleeve (10), and the both ends of the undertaking sleeve (10) pass through bearing plate (11) and installation deckle board (12) activity
Connection, the inside of installation deckle board (12) are flexibly connected by mounting seat (14) with board plate (13).
A kind of 2. new city planning direction board according to claim 1, it is characterised in that:The one of the support column (3)
The cavity of bearing rod (4) is run through at end, and is fixedly connected with top (9), annular groove (5) and cavity (2) the week side of boss of bearing rod (4)
Bottom bar (1) outer wall size is adapted, and bottom bar (1) is located at the inside of annular groove (5), and the fixation of the both ends at the top of bottom bar (1) is set
Confinement block (7) is equipped with, bearing rod (4) offers the shifting chute being adapted (8) with the junction of confinement block (7).
A kind of 3. new city planning direction board according to claim 1, it is characterised in that:The top (9) and first
The junction of magnet (19) offers the first fixing groove (18) being adapted, and comes directly towards (9) and the junction of the first iron plate (21)
Offer and be adapted the second fixing groove (20), the area of the first magnet (19) is more than the area of the first iron plate (21), the top (9)
The fixing hole being adapted is offered with the junction of bearing rod (4), and the inside of the first magnet (19) and the first iron plate (21) is opened
Provided with the through hole consistent with bearing rod (4) diameter.
A kind of 4. new city planning direction board according to claim 1, it is characterised in that:It is described undertaking sleeve (10) with
Second magnet (23) is fixedly connected, and the junction for accepting sleeve (10) and the second magnet (23) offers the 3rd fixing groove (22),
3rd fixing groove (22) is adapted with the size of the second magnet (23), and the size of the second magnet (23) and the second iron plate (24)
It is adapted, the junction of bearing rod (4) and the second iron plate (24) is fixedly installed projection (25), the projection (25) and the second iron plate
(24) junction, which offers, is adapted groove.
A kind of 5. new city planning direction board according to claim 1, it is characterised in that:It is described undertaking sleeve (10) with
The junction of bearing plate (11) offers the standing groove (17) being adapted, and bearing plate (11) both sides are fixedly installed inserted link
(15), inserted link (15) offers the slot being adapted (16) with accepting the junction of sleeve (10), and the installation deckle board (12) is remote
The one end for accepting sleeve (10) offers gateway.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720361294.XU CN206657579U (en) | 2017-04-08 | 2017-04-08 | A kind of new city plans direction board |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720361294.XU CN206657579U (en) | 2017-04-08 | 2017-04-08 | A kind of new city plans direction board |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206657579U true CN206657579U (en) | 2017-11-21 |
Family
ID=60317258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720361294.XU Expired - Fee Related CN206657579U (en) | 2017-04-08 | 2017-04-08 | A kind of new city plans direction board |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206657579U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056573A (en) * | 2018-08-02 | 2018-12-21 | 芜湖市朗道企业形象设计有限公司 | It is a kind of just to pacify the traffic sign device connect |
CN114005384A (en) * | 2020-07-28 | 2022-02-01 | 合肥天工标识标牌有限公司 | Sign with adjustable |
-
2017
- 2017-04-08 CN CN201720361294.XU patent/CN206657579U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109056573A (en) * | 2018-08-02 | 2018-12-21 | 芜湖市朗道企业形象设计有限公司 | It is a kind of just to pacify the traffic sign device connect |
CN114005384A (en) * | 2020-07-28 | 2022-02-01 | 合肥天工标识标牌有限公司 | Sign with adjustable |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206657579U (en) | A kind of new city plans direction board | |
CN206819743U (en) | Hard-disk fixer of computer | |
CN104249910A (en) | Lifting bracket of belt conveyor | |
CN209723560U (en) | A kind of construction girder construction | |
CN206707763U (en) | A kind of pre-buried channel flow component for subway tunnel | |
CN206736951U (en) | A kind of integrally foot bolt and framework shearing-resistant member positioning disk | |
CN209626772U (en) | Expander of mutual inductor branch stake tool | |
CN201511187U (en) | Improved gear workpiece fixing device | |
CN209888858U (en) | Railway signal lamp replacing structure | |
CN109747031B (en) | Tool type stair mold | |
CN209433595U (en) | A kind of liftable real training station | |
CN207425540U (en) | It is a kind of that stable transformer is installed | |
CN206065746U (en) | Adjustable type group welding of storage battery frock | |
CN204530792U (en) | A kind of antiseismic structure foundation structure | |
CN211572014U (en) | Steel structure beam column node | |
CN204866995U (en) | Stamping device is used in electric motor rotor installation that utilizes slide to adjust | |
CN204904965U (en) | Distribution transformer's installing support based on rapid disassembly structure | |
CN210255296U (en) | Cushion block for machining | |
CN207526518U (en) | For the adjacent frame hydraulic pipeline connecting device of hydraulic support | |
CN205050696U (en) | To piece ware | |
CN218176878U (en) | Building construction rail fixing device | |
CN218109707U (en) | Floating busbar welding position device | |
CN214835070U (en) | Hydraulic pressure that self-adaptation bracing was transferred and is hung down adjusts pole | |
CN210067123U (en) | Building wall with can dismantle window that wafts | |
CN217061717U (en) | Oil-immersed power transformer iron core |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20171121 Termination date: 20200408 |