CN206644122U - A kind of double work group steel wire rack - Google Patents

A kind of double work group steel wire rack Download PDF

Info

Publication number
CN206644122U
CN206644122U CN201720374389.5U CN201720374389U CN206644122U CN 206644122 U CN206644122 U CN 206644122U CN 201720374389 U CN201720374389 U CN 201720374389U CN 206644122 U CN206644122 U CN 206644122U
Authority
CN
China
Prior art keywords
steel wire
cylinder
frame
working group
wire rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720374389.5U
Other languages
Chinese (zh)
Inventor
李根富
胡琼娟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jinhua Huayi New Building Materials Co Ltd
Original Assignee
Jinhua Huayi New Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jinhua Huayi New Building Materials Co Ltd filed Critical Jinhua Huayi New Building Materials Co Ltd
Priority to CN201720374389.5U priority Critical patent/CN206644122U/en
Application granted granted Critical
Publication of CN206644122U publication Critical patent/CN206644122U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Wire Processing (AREA)

Abstract

It the utility model is related to a kind of double work group steel wire rack, it is fixedly mounted on including the first working group, the second working group, frame, transmission mechanism, first straight line guide rail, the first sliding block, slide unit, positioning buffer gear and clamp system, the first working group and the second working group in frame.When the steel wire of the first working group is broken, the second working group is moved to operating position.When second working group is in running order, worker at leisure can replace the steel wire being broken in the first working group, until having steel wire fracture in the second working group, repeat said process, first working group is moved to operating position and replaces the steel wire being broken in the second working group, so as to efficiently realize continuous production.

Description

A kind of double work group steel wire rack
Technical field
A kind of brickmaking steel wire rack is the utility model is related to, especially a kind of double work group steel wire rack.
Background technology
Fragment of brick is the main material and base unit for building various buildings.It is continuous with production technology with advances in technology Improve, the automaticity more and more higher of brickmaking production equipment.In brickmaking production equipment, the main steel equipped with more steel wires Required standard fragment of brick is cut into building block or mud bar by guide frame.
Steel wire its failure mode when cutting mud bar is predominantly broken, in actual production, due in building block and mud bar Complicated component, the fracture of steel wire are very frequent.On the one hand, because steel wire is for a long time with building block or mud bar friction, steel wire is caused to grind Damage attenuates, final fracture;On the other hand, steel wire is encountered hard little particle in cutting process and is broken suddenly.Traditional brick Block cutting equipment, need to stop the operation of whole brick making system in steel wire fracture, then worker is rapidly the cutting of steel of fracture Silk replaces, and could continue to put into production.Brickmaking efficiency is so not only greatly reduced, wastes the electricity of motor idle running consumption again Can, while the labor intensity of worker is also very high.
Utility model content
The technical problems to be solved in the utility model is to provide a kind of double work group steel wire rack, when steel wire is broken, Brick making system need not be stopped and wait worker to replace the cutting steel wire of fracture could continue to put into production, and can be efficiently Realize continuous production.
In order to solve the above-mentioned technical problem, the technical scheme that the utility model is provided is as follows:
A kind of double work group steel wire rack, including the first working group, the second working group, frame, transmission mechanism, first straight line lead Rail, the first sliding block, slide unit, positioning buffer gear and clamp system.First straight line guide rail is fixedly mounted on slide unit, and first slides Block is sleeved on first straight line guide rail and can slidably, and frame is fixedly mounted on the first sliding block, and transmission mechanism drives frame Slided along first straight line guide rail.The both ends that buffer gear is arranged on slide unit are positioned, frame slides into two along first straight line guide rail Contacted respectively with positioning buffer gear during end.Clamp system is fixedly mounted on slide unit and plays clamping action, the first work to frame Work group and the second working group are fixedly mounted in frame successively along housing slide direction.Using such structure, when the first work The steel wire of group is broken, and worker observes that the extension spring of taut wire is withdrawn, and manipulating clamping device unclamps it and start driving Device.Drive device drives transmission mechanism, and frame is slided along first straight line guide rail, and the second working group is moved to operating position, fixed Bit buffering mechanism plays buffer deceleration effect, and ensures the positioning precision of working group.After the completion of positioning, clamping device presss from both sides frame Tightly.Now the second working group is in running order, and worker at leisure can replace the steel wire being broken in the first working group, wait until When having steel wire fracture in the second working group, said process is repeated, the first working group is moved to operating position and second works The steel wire being broken in group replaces, so as to efficiently realize continuous production.
Further, transmission mechanism includes rack, and rack is arranged on frame ground Middle face.Using the excellent of rack pinion Point is compact-sized, effectively reduces physical dimension.
Further, positioning buffer gear includes second straight line guide rail and the second sliding block, and the second slide block set is mounted in second And can be slidably on line slideway.Line slideway and sliding block combination belong to standard component, can directly purchase, effectively reduce manufacture Cost and maintenance cost, sliding effect are good.
Further, positioning buffer gear also includes the first cylinder and buffer stopper, and the first cylinder is consolidated by air cylinder support On slide unit, axis and the second straight line guide rail parallel of the first cylinder, the piston rod of buffer stopper and the first cylinder are fixed for Dingan County Connection, buffer stopper are arranged on the second sliding block.In the course of work, the piston rod of the first cylinder is in stretching state, the first cylinder Air pressure be adjusted to proper states.After frame strikes buffer stopper, buffer stopper moves backward, forces piston rod to bounce back, due to pressure The effect of contracting air, during retraction by energy expenditure totally, frame stop motion.Then, piston rod is in compressed air Stretched out again under effect, drive buffer stopper to promote machine frame movement, until piston rod is fully extended, frame then moves to design position Put.This can just be such that frame is buffered when moving and stopping, and protect transmission mechanism, while also ensure that the accurate fixed of frame Position.
Further, buffer stopper is provided with magnet.After frame strikes buffer stopper, the magnet on buffer stopper adsorbs frame Firmly.When the setting of magnet can prevent that piston rod from stretching out drive buffer stopper promotion machine frame movement, frame departs from buffer stopper, and it is fixed to cause Position error.
Further, positioning buffer gear also includes sensor, and sensor is arranged on slide unit by sensor stand.Machine Frame motion in place when, sensor sends signal, drive device is stopped in time, prevents human users from causing to set not in time Standby corrupted.
Further, clamp system includes at least one set of mounting seat and the second cylinder, mounting seat are fixedly mounted on slide unit, Second cylinder is arranged in mounting seat.When first working group or the second working group are moved to operating position, control magnetic valve makes the The piston rod of two cylinders stretches out, and clamps frame, prevents machine frame movement in the course of work.
Further, the second cylinder can be double-rod cylinder.Double-rod cylinder is cheap, can reduce manufacturing cost.
Further, the second cylinder can also be band guide rod cylinder.Band guide rod cylinder stability is good, usage time length.
Further, the piston rod front end of the second cylinder is provided with brake pad., can be with provided with brake pad under same air pressure Effective increasing friction force, improve the clamping effect to frame.
In a word, after using such structure, when steel wire is broken, it is not necessary to stop brick making system and wait worker's handle The cutting steel wire of fracture, which replaces, could continue to put into production, and can efficiently realize continuous production.
Brief description of the drawings
The utility model is described in further detail with reference to the accompanying drawings and detailed description:
Fig. 1 is front view of the present embodiment the first working group of double work group steel wire rack in operating position;
Fig. 2 is top view of the present embodiment the first working group of double work group steel wire rack in operating position;
Fig. 3 is front view of the present embodiment the second working group of double work group steel wire rack in operating position;
Wherein, the 1, first working group, the 2, second working group, 3, frame, 4, first straight line guide rail, the 5, first sliding block, 6, sliding Platform, 7, steel wire, 8, rack, 9, gear, 10, second straight line guide rail, the 11, second sliding block, the 12, first cylinder, 13, buffer stopper, 14, Air cylinder support, 15, magnet, 16, sensor, 17, sensor stand, 18, mounting seat, the 19, second cylinder, 20, brake pad.
Embodiment
In order that the purpose of this utility model, technical scheme and advantage are more clearly understood, below in conjunction with accompanying drawing and implementation Example, the utility model is further elaborated.It should be appreciated that specific embodiment described herein is only explaining The utility model, it is not used to limit the utility model.
A kind of double work group steel wire rack as depicted in figs. 1 and 2, including the first working group 1, the second working group 2, frame 3rd, transmission mechanism, first straight line guide rail 4, the first sliding block 5, slide unit 6, positioning buffer gear and clamp system.First straight line is led Rail 4 is fixedly mounted on slide unit 6, and the first sliding block 5 is sleeved on first straight line guide rail 4 and can slidably, and frame 3 is fixedly mounted On the first sliding block 5, transmission mechanism drives frame 3 to be slided along first straight line guide rail 4.Position buffer gear and be arranged on slide unit Both ends, frame 3 are contacted with positioning buffer gear respectively when sliding into both ends along first straight line guide rail 4, and clamp system, which is arranged on, to be slided On platform 6, the first working group 1 and the second working group 2 are fixedly mounted in frame 3.
Transmission mechanism includes rack 8, and rack 8 is arranged in the middle part of the bottom surface of frame 3.The advantages of being driven using the rack 8 of gear 9 is existed In compact-sized, physical dimension is effectively reduced.
Positioning buffer gear includes the sliding block 11 of second straight line guide rail 10 and second, and the second sliding block 11 is sleeved on second straight line And can be slidably on guide rail 10.Line slideway and sliding block combination belong to standard component, can directly purchase, and effectively reduce being manufactured into This and maintenance cost, sliding effect are good.
Positioning buffer gear also includes the first cylinder 12 and buffer stopper 13, and the first cylinder 12 is fixed by air cylinder support 14 On slide unit 6, the axis of the first cylinder 12 is parallel with second straight line guide rail 10, the piston of the cylinder 12 of buffer stopper 13 and first Bar is fixedly connected, and buffer stopper 13 is arranged on the second sliding block 11.
Magnet 15 is additionally provided with buffer stopper.After frame 3 strikes buffer stopper 13, magnet 15 on buffer stopper 13 is by frame 3 Adsorb.When the setting of magnet 15 can prevent that piston rod from stretching out the drive promotion movement of frame 3 of buffer stopper 13, frame 3 departs from slow Block 13 is rushed, causes position error.
Positioning buffer gear also includes sensor 16, and sensor 16 is arranged on slide unit 6 by sensor stand 17.Machine When frame 3 is moved in place, sensor 16 sends signal, drive device is stopped in time, prevents leading not in time for human users Cause equipment corrupted.
Clamp system includes at least one set of cylinder 19 of mounting seat 18 and second, and mounting seat 18 is fixedly mounted on slide unit 6, the Two cylinders 19 are arranged in mounting seat 18.When first working group 1 or the second working group 2 are moved to operating position, magnetic valve is controlled The piston rod of the second cylinder 19 is stretched out, frame 3 is clamped, prevents that frame 3 moves in the course of work.
Second cylinder 19 can be double-rod cylinder.Double-rod cylinder is cheap, can reduce manufacturing cost.
Second cylinder 19 can also be band guide rod cylinder.Band guide rod cylinder stability is good, usage time length.
The piston rod front end of second cylinder 19 is provided with brake pad 20.Under same air pressure, can have provided with brake pad 20 Increasing friction force is imitated, improves the clamping effect to frame 3.
When the first working group is in running order, when the steel wire 7 of the first working group 1 is broken, worker observes drawing The extension spring of tight steel wire is withdrawn, and control magnetic valve makes the piston rod of the second cylinder 19 of holding frame 3 retract, and starts drive device. Drive device band carry-over bar 8 is moved, and frame 3 is slided along first straight line guide rail 4, while frame 3 strikes buffer stopper 13 Sensor 16 is blocked, sensor 16 sends signal, drive device is stopped in time, as shown in Figure 3.First cylinder 12 Piston rod is in stretching state originally, and the air pressure of the first cylinder 12 is adjusted in proper states.After being hit by frame, buffer stopper 13 to After move, force piston rod to bounce back, due to the effect of compressed air, frame 3 is stopped during retraction by energy expenditure totally Only move.Then, piston rod stretches out again in the presence of compressed air, drives buffer stopper 13 to promote frame 3 to move, until work Stopper rod is fully extended, and frame 3 then moves to design attitude.During pushing back, after striking buffer stopper 13 due to frame 3, delay The magnet 15 rushed on block 13 adsorbs frame 3.The setting of magnet 15 can prevent piston rod from stretching out to drive buffer stopper 13 to promote When frame 3 moves, frame 3 departs from buffer stopper 13, causes position error.This can just enable frame 3 delay when moving and stopping Punching, protects transmission mechanism, while also ensure that being accurately positioned for frame 3.After the completion of positioning, control magnetic valve makes the second cylinder 19 piston rod is stretched out, and frame 3 is clamped.Now the second working group 2 is in running order, and worker can be at leisure by the first work Organize the steel wire 7 being broken to replace, until there is the fracture of steel wire 7 in the second working group 2, repeat said process, by the first work Group 1 is moved to operating position and replaces the steel wire 7 being broken in the second working group 2, so as to efficiently realize continuous production.
In a word, preferred embodiment of the present utility model is the foregoing is only, it is all not to limit the utility model Made within spirit of the present utility model and principle all any modification, equivalent and improvement etc., should be included in this practicality Within new protection domain.

Claims (10)

  1. A kind of 1. double work group steel wire rack, it is characterised in that:Including the first working group, the second working group, frame, transmission mechanism, First straight line guide rail, the first sliding block, slide unit, positioning buffer gear and clamp system;The first straight line guide rail is fixedly mounted On slide unit, first slide block set is mounted on first straight line guide rail and can slidably, and the frame is fixedly mounted on first On sliding block, the transmission mechanism drives frame to be slided along first straight line guide rail;The positioning buffer gear is arranged on slide unit Both ends, frame contact with the positioning buffer gear respectively when sliding into both ends along first straight line guide rail;The clamp system is consolidated Clamping action is played on slide unit and to frame in Dingan County;First working group and the second working group along housing slide direction successively It is fixedly mounted in frame.
  2. 2. according to the double work group steel wire rack described in claim 1, it is characterised in that:The transmission mechanism includes rack, described Rack is arranged on frame ground Middle face.
  3. 3. according to the double work group steel wire rack described in claim 1, it is characterised in that:It is straight that the positioning buffer gear includes second Line guide rail and the second sliding block, second slide block set are mounted on second straight line guide rail and can be slidably.
  4. 4. according to the double work group steel wire rack described in claim 3, it is characterised in that:The positioning buffer gear also includes first Cylinder and buffer stopper, first cylinder are fixedly mounted on slide unit by air cylinder support, the axis of the first cylinder and second Line slideway is parallel, and the buffer stopper is fixedly connected with the piston rod of the first cylinder, and the buffer stopper is arranged on the second sliding block.
  5. 5. according to the double work group steel wire rack described in claim 4, it is characterised in that:The buffer stopper is provided with magnet.
  6. 6. according to the double work group steel wire rack described in claim 1, it is characterised in that:The positioning buffer gear also includes sensing Device, the sensor are arranged on slide unit by sensor stand.
  7. 7. according to the double work group steel wire rack described in claim 1, it is characterised in that:The clamp system includes at least one set of pacify Dress seat and the second cylinder, the mounting seat are fixedly mounted on slide unit, and second cylinder is arranged in mounting seat.
  8. 8. according to the double work group steel wire rack described in claim 7, it is characterised in that:Second cylinder is double-rod cylinder.
  9. 9. according to the double work group steel wire rack described in claim 7, it is characterised in that:Second cylinder is band guide rod cylinder.
  10. 10. double work group steel wire rack according to claim 8 or claim 9, it is characterised in that:Before the second described cylinder piston rod End is provided with brake pad.
CN201720374389.5U 2017-04-11 2017-04-11 A kind of double work group steel wire rack Expired - Fee Related CN206644122U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720374389.5U CN206644122U (en) 2017-04-11 2017-04-11 A kind of double work group steel wire rack

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720374389.5U CN206644122U (en) 2017-04-11 2017-04-11 A kind of double work group steel wire rack

Publications (1)

Publication Number Publication Date
CN206644122U true CN206644122U (en) 2017-11-17

Family

ID=60276018

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720374389.5U Expired - Fee Related CN206644122U (en) 2017-04-11 2017-04-11 A kind of double work group steel wire rack

Country Status (1)

Country Link
CN (1) CN206644122U (en)

Similar Documents

Publication Publication Date Title
CN201544294U (en) Sawed-off device of section bar extrusion machine
CN102700903B (en) Reciprocating type automatic feeding mechanism
CN208067069U (en) A kind of angle steel eyelet work device
CN106002404A (en) Clamping device for cube workpiece
CN105773719A (en) Novel woodworking saw cutting device
CN208645941U (en) A kind of taking mechanical hand for injection molding
CN206644122U (en) A kind of double work group steel wire rack
CN204194943U (en) Double-wall corrugated pipe slot-cutting machine
CN211178935U (en) Leaf spring test device
CN218926958U (en) Clamp convenient to operate
CN207841064U (en) A kind of sander convenient for fixed workpiece
CN202964817U (en) Material clamping mechanism for numerical control automatic double-end tenoning machine
CN107175535B (en) Tool changing protective door plane linkage mechanism
CN202090215U (en) Perforating device for automatic cutting bed
CN104275524A (en) Double-wall bellows slotting machine
CN105057742B (en) A kind of automatic drilling machine of the adjustable amount of feeding
CN211758617U (en) Drilling equipment is used in valve block processing
CN208277063U (en) Timber material cutting device
CN208945384U (en) A kind of laser engraving machine
CN206955213U (en) A kind of triangular glass automatic sheet-feeding mechanism
CN220787613U (en) Guiding shaft fixing mechanism of transverse cutting machine
CN207140209U (en) One kind feed positioner
CN206123789U (en) A get waste material mechanism for multi -functional automatic cutting machine
CN219234550U (en) Milling machine fixing clamp for metal product processing
CN210849355U (en) Pipe feeding device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171117

Termination date: 20210411