CN206637132U - The hot water pipe mouth of pipe positions construction tool - Google Patents

The hot water pipe mouth of pipe positions construction tool Download PDF

Info

Publication number
CN206637132U
CN206637132U CN201720435472.9U CN201720435472U CN206637132U CN 206637132 U CN206637132 U CN 206637132U CN 201720435472 U CN201720435472 U CN 201720435472U CN 206637132 U CN206637132 U CN 206637132U
Authority
CN
China
Prior art keywords
pipe
positioning pipe
sleeve
hot water
positioning
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720435472.9U
Other languages
Chinese (zh)
Inventor
丁光亮
董栋
宫珊娜
尹纪涛
张凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao No 1 Construction Group Co Ltd
Original Assignee
Qingdao No 1 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao No 1 Construction Group Co Ltd filed Critical Qingdao No 1 Construction Group Co Ltd
Priority to CN201720435472.9U priority Critical patent/CN206637132U/en
Application granted granted Critical
Publication of CN206637132U publication Critical patent/CN206637132U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of hot water pipe mouth of pipe to position construction tool, including positioning pipe I and positioning pipe II, the side of the positioning pipe I is provided with sleeve I, the side of the positioning pipe II is provided with sleeve II, the sleeve I is provided with several continuous spacing holes, the sleeve II is provided with fixing hole, and positioning pipe I and positioning pipe II are linked together by screwing in screw after being alignd by sleeve II insertion sleeves I and by the fixing hole with one of spacing hole;One end of the positioning pipe I and positioning pipe II are respectively connected with metal pipe collar, and the other end of the metal pipe collar is connected with outer silk loose joint, and the positioning pipe I and positioning pipe II hot water pipe mouths of pipe reserved respectively with wall are linked together by outer silk loose joint.The hot water pipe mouth of pipe of the present utility model positions construction tool, it is simple in construction, registration is convenient, after wall construction and inlay ceramic tile is carried out, reserved location will not be changed because of finishing by being able to ensure that the installation of cold-hot water mixing valve, therefore, be not in cold-hot water mixing valve can not install or because install not sternly caused by seepage the problem of.

Description

The hot water pipe mouth of pipe positions construction tool
Technical field
It the utility model is related to water power construction equipment technical field in building fitment process, and in particular to a kind of hot and cold water The pipe mouth of pipe positions construction tool.
Background technology
Finishing also known as decorate or decoration, refer to what is carried out in certain area and scope, including Hydroelectric Project Construction, wall, What plate, ceiling, landscape etc. were realized, a whole set of construction formed according to certain design concept and rule attractive in appearance and design side Case.The small direction put to furniture with door, the big customized treatment to room accessories and light fixture, all it is the embodiment fitted up.General dress Repair space and be divided into parlor finishing, dining room finishing, study finishing, bedroom finishing, passageway finishing, kitchen finishing, toilet decoration, sun Platform finishing, cloakroom finishing and Recreation area finishing etc..It is convenient for life later in kitchen and toilet decoration construction, often The use of access hot and cold water, especially toilet shower is needed, therefore, during Hydroelectric Project Construction, the peace of combination tap Dress is indispensable link.At present, need to install hot water pipe before combination tap is installed and carry out pipeline and reserve, Ran Houjin Row edge tiling, still, after the completion for the treatment of inlay ceramic tile, two water nozzles of cold-hot water mixing valve are not installed, or because of dimensional problem Imprecision is installed, causes to seep water.
Utility model content
In view of the shortcomings of the prior art, the utility model provides a kind of hot water pipe mouth of pipe positioning construction tool, solves Cold-hot water mixing valve can not installed or because dimensional problem installs imprecise technical problem after finishing.
The hot water pipe mouth of pipe positions construction tool, including positioning pipe I and positioning pipe II, the side of the positioning pipe I are provided with Sleeve I, the positioning pipe II side are provided with several continuous spacing holes, the sleeve provided with sleeve II, the sleeve I II is provided with fixing hole, by being screwed in after being alignd by sleeve II insertion sleeves I and by the fixing hole with one of spacing hole Screw links together positioning pipe I and positioning pipe II;One end of the positioning pipe I and positioning pipe II are respectively connected with metal Pipe collar, the other end of the metal pipe collar are connected with outer silk loose joint, by outer silk loose joint by positioning pipe I and positioning pipe II respectively with The reserved hot water pipe mouth of pipe of wall links together.
Preferably, the sleeve I and sleeve II are arranged on positioning pipe I and positioning pipe II by being welded and fixed respectively.
Compared with prior art, the beneficial effects of the utility model are:Hot water pipe mouth of pipe positioning of the present utility model is applied Work instrument, simple in construction, registration is convenient, after wall construction and inlay ceramic tile is carried out, it can be ensured that cold-hot water mixing valve Installation will not change reserved location because of finishing, therefore, be not in cold-hot water mixing valve can not install or because install not Tight the problem of causing seepage.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Reference:1st, positioning pipe I;2nd, positioning pipe II;3rd, sleeve I;4th, sleeve II;5th, spacing hole;6th, fixing hole;7th, it is golden Belong to pipe collar;8th, outer silk loose joint.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
Hot water pipe mouth of pipe positioning construction tool, including positioning pipe I 1 and positioning pipe II 2, the one of the positioning pipe I 1 Side is provided with sleeve I 3, and the side of the positioning pipe II 2 is provided with sleeve II 4, and the sleeve I 3 and sleeve II 4 pass through respectively It is welded and fixed on positioning pipe I 1 and positioning pipe II 2.The sleeve II 4 can be inserted into sleeve I 3, the sleeve I 3 Several continuous spacing holes 5 are provided with, the sleeve II 4 is provided with fixing hole 6, according to different model or different size Water mixing valve, determine the center spacing of cold water water pipe and hot water pipe, revolved after fixing hole 6 is alignd with one of spacing hole 5 Enter screw, positioning pipe I 1 and positioning pipe II 2 are linked together, to ensure both positioning pipe I 1 and positioning pipe II 2 Position do not shift.One end of the positioning pipe I 1 and positioning pipe II 2 are respectively connected with metal pipe collar 7, the metal tube The other end of hoop 7 is connected with outer silk loose joint 8, is reserved positioning pipe I 1 and positioning pipe II 2 with wall respectively by outer silk loose joint 8 The hot and cold water pipe mouth of pipe link together.Ensure that the spacing of the reserved hot and cold water pipe mouth of pipe does not change.Therefore, metope is treated After the completion of construction and inlay ceramic tile, it is ensured that installation cold-hot water mixing valve will not change reserved location because of finishing, therefore, will not Occur cold-hot water mixing valve can not install or because install not sternly caused by seepage the problem of.
Although above having made detailed description to the utility model with generality explanation and specific embodiment, On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art 's.Therefore, the these modifications or improvements on the basis of without departing from the utility model spirit, belonging to the utility model will Seek the scope of protection.

Claims (2)

1. the hot water pipe mouth of pipe positions construction tool, it is characterised in that:Including positioning pipe I and positioning pipe II, the positioning pipe I's Side of the side provided with sleeve I, the positioning pipe II is provided with several continuous spacing holes provided with sleeve II, the sleeve I, The sleeve II is provided with fixing hole, by by sleeve II insertion sleeves I and by the fixing hole and one of spacing hole pair Screw in screw after neat positioning pipe I and positioning pipe II link together;One end of the positioning pipe I and positioning pipe II connect Metal pipe collar is connected to, the other end of the metal pipe collar is connected with outer silk loose joint, by outer silk loose joint by positioning pipe I and positioning pipe The hot water pipe mouth of pipe that II reserves with wall respectively links together.
2. the hot water pipe mouth of pipe according to claim 1 positions construction tool, it is characterised in that:The sleeve I and sleeve II is arranged on positioning pipe I and positioning pipe II by being welded and fixed respectively.
CN201720435472.9U 2017-04-24 2017-04-24 The hot water pipe mouth of pipe positions construction tool Expired - Fee Related CN206637132U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720435472.9U CN206637132U (en) 2017-04-24 2017-04-24 The hot water pipe mouth of pipe positions construction tool

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720435472.9U CN206637132U (en) 2017-04-24 2017-04-24 The hot water pipe mouth of pipe positions construction tool

Publications (1)

Publication Number Publication Date
CN206637132U true CN206637132U (en) 2017-11-14

Family

ID=60246678

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720435472.9U Expired - Fee Related CN206637132U (en) 2017-04-24 2017-04-24 The hot water pipe mouth of pipe positions construction tool

Country Status (1)

Country Link
CN (1) CN206637132U (en)

Similar Documents

Publication Publication Date Title
CN206637132U (en) The hot water pipe mouth of pipe positions construction tool
CN202430780U (en) Improved assembly of indoor water drainage system
CN204627039U (en) A kind of integral vacuum toilet
CN203729420U (en) Concealed inductive urinal installing form board
CN203648743U (en) Novel shower device
CN205314185U (en) Double cannula formula toilet bowl drainage device
CN204852705U (en) Three -dimensional rotatory tap of multi -angle
CN205822671U (en) Toilet entirety chassis
CN203569641U (en) Portable cold and hot water pipe installation positioner
CN201284886Y (en) Pre-buried water pipe assembly
CN203213210U (en) Novel decorative water pipe
CN206706914U (en) Bright dress valve fixed seat
CN205999999U (en) A kind of environmental protection toilet
CN203475543U (en) Improved water slot water-draining structure and different-diameter tee joint piece thereof
CN2929412Y (en) Special clip for pipeline
CN207760945U (en) A kind of positioning device of hot water pipe
CN109268606A (en) A kind of interior water supply pipline system
CN203743497U (en) Hanging rod type shower faucet
CN204544521U (en) Can the showerhead of all-directional rotation
CN212294878U (en) Embedded shower gondola water faucet of wall body
CN205745461U (en) Multi-purposed faucet
CN207080474U (en) A kind of flexibility moved freely connects general-purpose system soon
CN216896160U (en) Silencing wall pipe for building water supply and drainage
CN203762970U (en) Combined shower faucet
CN201671205U (en) Movable kitchen pipeline wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171114

Termination date: 20190424