CN206637130U - Floor heating pipeline water knockout drum position pipeline positioner - Google Patents

Floor heating pipeline water knockout drum position pipeline positioner Download PDF

Info

Publication number
CN206637130U
CN206637130U CN201720435473.3U CN201720435473U CN206637130U CN 206637130 U CN206637130 U CN 206637130U CN 201720435473 U CN201720435473 U CN 201720435473U CN 206637130 U CN206637130 U CN 206637130U
Authority
CN
China
Prior art keywords
steel plate
floor heating
knockout drum
water knockout
harness cord
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720435473.3U
Other languages
Chinese (zh)
Inventor
方建文
史世鹏
张岳
刘志强
张帆渡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao No 1 Construction Group Co Ltd
Original Assignee
Qingdao No 1 Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao No 1 Construction Group Co Ltd filed Critical Qingdao No 1 Construction Group Co Ltd
Priority to CN201720435473.3U priority Critical patent/CN206637130U/en
Application granted granted Critical
Publication of CN206637130U publication Critical patent/CN206637130U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Floor Finish (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The utility model discloses floor heating pipeline water knockout drum position pipeline positioner, including steam heating pipe, water knockout drum, fixing steel plate and harness cord bar, one end of the water knockout drum is connected to the end of steam heating pipe, and the other end is connected with some floor heating standpipes;The fixing steel plate is spliced by steel plate I axisymmetricly and steel plate II, the steel plate I and a lateral edges of the steel plate II semicircular positioning hole that to be equipped with several apertures consistent, it is connected between steel plate I and steel plate II by fastening switch, the floor heating standpipe is located in positioning hole;The harness cord bar is two, and its end is vertically fixedly mounted on metope, and each parallel to ground, the left and right ends of the fixing steel plate are set up to be arranged in harness cord bar the harness cord bar.The utility model is simple in construction, easy for construction, it is ensured that floor heating standpipe spacing at water knockout drum is unified after ground construction, good appearance, avoid because the installation of floor heating standpipe is not neat and caused by water knockout drum ground cracking phenomenon.

Description

Floor heating pipeline water knockout drum position pipeline positioner
Technical field
It the utility model is related to construction engineering technical field, and in particular to a kind of floor heating pipeline water knockout drum position pipeline positioning Device.
Background technology
Floor heating is the abbreviation of floor panel heating, be using whole ground as radiator, by the heating agent in flooring radiation layer, Whole ground is uniformly heated, the rule radiated upwards using the accumulation of heat and heat on ground itself is conducted from the bottom to top, to reach To the purpose of heating.Common floor heating is mostly water floor heating, and hot water is flowed into by water knockout drum from floor heating pipe one end, after the heat that radiates
Flowed out and returned in water collector by the floor heating pipe other end, so as to form whole floor heating water circulation.Because it does not account for room The mode heat supply of room aboveground area and installation radiator more local than ground is more uniform, currently in family's residential housing, uses Floor panel heating it is more and more.
At present, in work progress, when steam heating pipe enters at the water knockout drum of resident family, floor heating standpipe need to be perpendicular to ground with dividing Hydrophone connects, still, floor heating standpipe at water knockout drum often occurs and wall spacing is inconsistent and floor heating standpipe between spacing It is inconsistent, after the completion of ground heating pipe laying finishes and bottom surface at water knockout drum pours, often there is the phenomenon of ground cracking, Influence ground perception even causes floor heating standpipe to rupture water outlet accidentally.
Utility model content
In view of the shortcomings of the prior art, the utility model is by providing a kind of floor heating pipeline water knockout drum position pipeline positioning dress Put, solve floor heating standpipe and wall spacing is inconsistent and floor heating standpipe between the inconsistent technical problem of spacing.
Floor heating pipeline water knockout drum position pipeline positioner, including steam heating pipe, water knockout drum, fixing steel plate and harness cord bar, institute The one end for stating water knockout drum is connected to the end of steam heating pipe, and the other end is connected with some floor heating standpipes;The fixing steel plate by Axisymmetric steel plate I and steel plate II are spliced, and it is consistent that the steel plate I with a lateral edges of steel plate II is equipped with several apertures Semicircular positioning hole, be connected between steel plate I and steel plate II by fastening switch, the floor heating standpipe is located at positioning hole In;The harness cord bar is two, and its end is vertically fixedly mounted on metope, and the harness cord bar is described each parallel to ground The left and right ends of fixing steel plate, which are set up, to be arranged in harness cord bar.
Preferably, the steel plate I is provided with bolt, and the steel plate II is provided with spacing hole, the fastening switch One end is actively socketed on bolt, and the other end inserts spacing hole by screw and is tightened, thus, by steel plate I and Steel plate II is fixed together.
Preferably, the end of the harness cord bar is mounted by means of bolts on metope.
Preferably, the bottom both sides of the steel plate I and steel plate II are welded with nut, set up fixing steel plate by nut In harness cord bar.
The utility model additionally provides the form of construction work of floor heating pipeline water knockout drum position pipeline positioner, specifically include with Lower step:
(1)Steel plate I is placed between floor heating standpipe and metope, two harness cord bars are each passed through steel plate I bottoms both sides Nut, the ending vertical of two harness cord bars is fixedly mounted on metope respectively with bolt, and ensure between two harness cord bars with And two parallel between harness cord bar and ground;
(2)The nut of steel plate II bottom is penetrated from the other end of harness cord bar, all floor heating standpipes are drained into respectively In steel plate I in corresponding semicircular positioning hole, moving steel plate II, make on the semicircular positioning hole and steel plate I in steel plate II Semicircular positioning hole splicing alignment, floor heating standpipe is folded in positioning hole;
(3)Rotary moveable is connected to the other end of the fastening switch on steel plate I, and steel plate is fixed on by switch is fastened with screw On II;
(4)Harness cord bar is rotated, distance of the fixing steel plate away from metope is adjusted, makes floor heating standpipe perpendicular to ground;
(5)The ground construction of floor heating pipeline is carried out, the positioner can be removed after the completion of ground construction.
Compared with prior art, the beneficial effects of the utility model are:The utility model is carried using what is detachably spliced The fixing steel plate of positioning hole carries out unified positioning to the floor heating standpipe at water knockout drum, ensures between floor heating standpipe and wall and floor heating Spacing between standpipe is consistent;Also, the spacing of fixing steel plate and metope is also adjusted by harness cord bar, it is ensured that whole floor heatings are stood Pipe is each perpendicular to ground after the completion of construction.The utility model is simple in construction, easy for construction, it is ensured that water knockout drum after ground construction The floor heating standpipe spacing at place is unified, good appearance, avoid because the installation of floor heating standpipe is not neat and caused by water knockout drum ground open The phenomenon split.
Brief description of the drawings
Fig. 1 is structural representation Fig. 1 of the present utility model;
Fig. 2 structural representation Fig. 2 of the present utility model;
Reference:1st, fixing steel plate;1-1, steel plate I;1-2, steel plate II;2nd, harness cord bar;3rd, floor heating standpipe;4th, position Hole;5th, fastening switch;6th, bolt;7th, spacing hole;8th, bolt;9th, nut;10th, screw.
Embodiment
The utility model is described in further detail with reference to the accompanying drawings and detailed description.
As shown in Figure 1-2, floor heating pipeline water knockout drum position pipeline positioner, including steam heating pipe, water knockout drum, fixing steel plate 1 and harness cord bar 2, one end of the water knockout drum be connected to the end of steam heating pipe, the other end is connected with some floor heating standpipes 3.Institute State fixing steel plate 1 to be spliced by steel plate I 1-1 axisymmetricly and steel plate II 1-2, the steel plate I 1-1 and steel plate II 1- 2 lateral edges are equipped with the consistent semicircular positioning hole 4 in several apertures, lead between steel plate I 1-1 and steel plate II 1-2 Cross fastening switch 5 to be connected, the steel plate I 1-1 are provided with bolt 6, and the steel plate II 1-2 is provided with spacing hole 7, institute The one end for stating fastening switch 5 is actively socketed on bolt 6, and the other end inserts spacing hole 7 by screw 10 and screw admittedly It is fixed, thus, steel plate I 1-1 and steel plate II 1-2 are fixed together.The floor heating standpipe 3 is located in positioning hole 4.It is described Harness cord bar 2 is two, and its end is vertically fixedly mounted on metope by bolt 8, the harness cord bar 2 each parallel to ground, The bottom both sides of the steel plate I 1-1 and steel plate II 1-2 are welded with nut 9, fixing steel plate 1 is set up installation by nut 9 In harness cord bar 2.
The utility model additionally provides the form of construction work of floor heating pipeline water knockout drum position pipeline positioner, specifically include with Lower step:
(1)Steel plate I 1-1 are placed between floor heating standpipe 3 and metope, two harness cord bars 2 are each passed through steel plate I 1-1 The nut 9 of bottom both sides, the ending vertical of two harness cord bars 2 is fixedly mounted on metope respectively with bolt 8, and ensures two It is parallel between harness cord bar 2 and between two harness cord bars 2 and ground;
(2)The nut 9 of steel plate II 1-2 bottoms is penetrated from the other end of harness cord bar 2, all floor heating standpipes 3 are distinguished It is drained into steel plate I 1-1 in corresponding semicircular positioning hole 4, moving steel plate II 1-2, makes the semicircle on steel plate II 1-2 The positioning hole 4 of shape is alignd with the splicing of semicircular positioning hole 4 on steel plate I 1-1, and floor heating standpipe 3 is folded in positioning hole 4;
(3)Rotary moveable is connected to the other end of the fastening switch 5 on steel plate I 1-1, is consolidated with screw 10 by switch 5 is fastened It is scheduled on steel plate II 1-2;
(4)Harness cord bar 2 is rotated, distance of the fixing steel plate 1 away from metope is adjusted, makes floor heating standpipe 3 perpendicular to ground;
(5)The ground construction of floor heating pipeline is carried out, the positioner can be removed after the completion of ground construction.
Although above having made detailed description to the utility model with generality explanation and specific embodiment, On the basis of the utility model, it can be made some modifications or improvements, this is apparent to those skilled in the art 's.Therefore, the these modifications or improvements on the basis of without departing from the utility model spirit, belonging to the utility model will Seek the scope of protection.

Claims (4)

1. floor heating pipeline water knockout drum position pipeline positioner, it is characterised in that:Including steam heating pipe, water knockout drum, fixing steel plate and Harness cord bar, one end of the water knockout drum are connected to the end of steam heating pipe, and the other end is connected with some floor heating standpipes;The positioning Steel plate is spliced by steel plate I axisymmetricly and steel plate II, and a lateral edges of the steel plate I and steel plate II are equipped with several The consistent semicircular positioning hole in aperture, is connected, the floor heating standpipe is located between steel plate I and steel plate II by fastening switch In positioning hole;The harness cord bar is two, and its end is vertically fixedly mounted on metope, and the harness cord bar is each parallel to ground Face, the left and right ends of the fixing steel plate, which are set up, to be arranged in harness cord bar.
2. floor heating pipeline water knockout drum position pipeline positioner according to claim 1, it is characterised in that:The steel plate I Bolt is provided with, the steel plate II is provided with spacing hole, and one end of the fastening switch is actively socketed on bolt, The other end inserts spacing hole by screw and is tightened, and thus, steel plate I and steel plate II are fixed together.
3. floor heating pipeline water knockout drum position pipeline positioner according to claim 2, it is characterised in that:The harness cord bar End be mounted by means of bolts on metope.
4. floor heating pipeline water knockout drum position pipeline positioner according to claim 3, it is characterised in that:The steel plate I Nut is welded with the bottom both sides of steel plate II, fixing steel plate is set up by nut and is arranged in harness cord bar.
CN201720435473.3U 2017-04-24 2017-04-24 Floor heating pipeline water knockout drum position pipeline positioner Expired - Fee Related CN206637130U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720435473.3U CN206637130U (en) 2017-04-24 2017-04-24 Floor heating pipeline water knockout drum position pipeline positioner

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720435473.3U CN206637130U (en) 2017-04-24 2017-04-24 Floor heating pipeline water knockout drum position pipeline positioner

Publications (1)

Publication Number Publication Date
CN206637130U true CN206637130U (en) 2017-11-14

Family

ID=60246817

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720435473.3U Expired - Fee Related CN206637130U (en) 2017-04-24 2017-04-24 Floor heating pipeline water knockout drum position pipeline positioner

Country Status (1)

Country Link
CN (1) CN206637130U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106907527A (en) * 2017-04-24 2017-06-30 青岛建集团有限公司 Floor heating pipeline water knockout drum position pipeline positioner and form of construction work

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106907527A (en) * 2017-04-24 2017-06-30 青岛建集团有限公司 Floor heating pipeline water knockout drum position pipeline positioner and form of construction work

Similar Documents

Publication Publication Date Title
CN103267315B (en) Recycled constant-temperature ceramic floor integrated system
CN112443877B (en) Floor heating heat dissipation structure capable of enhancing heat radiation and installation method thereof
JP6164461B2 (en) Geothermal utilization system
CN206637130U (en) Floor heating pipeline water knockout drum position pipeline positioner
KR20140037701A (en) Heat transfer panel for heating prefabricated
CN106907527A (en) Floor heating pipeline water knockout drum position pipeline positioner and form of construction work
CN107654042A (en) A kind of high integrated ground warm plate of heat transfer efficiency
CN107763372A (en) Heavy in section circular pipe insulation and the construction method of installation of outer casing
CN208519834U (en) A kind of Combined floor heating
CN204901944U (en) Timesharing subregion heating temperature controller system
CN206771482U (en) A kind of indoor ground-heating
CN203718883U (en) Indoor heating system
CN203383474U (en) Recyclable constant-temperature ceramic floor
CN207047293U (en) A kind of heating surface welds heat treatment fixture
CN205447960U (en) A independent heating structure and hot -water heating board for hot -water heating board
CN105781056B (en) Special-shaped metope moulding can adjust gusseted point hang device
CN209760681U (en) Integrated floor heating module
CN104633974B (en) Flat and inclined dual-purpose solar water heater
CN103703324B (en) Combined water heating radiator and lamellar body thereof
CN205897584U (en) Novel fall -in angie type solar energy is dull and stereotyped device
CN206328873U (en) A kind of modularization case room with Stilt layer
KR100649485B1 (en) A Korean floor heater panel for the dry heating that construction is convenient at the same time that a heat transmission improves
CN204225313U (en) A kind of lightgage steel joist balcony fence water flowing out structure for building
CN207846992U (en) A kind of bamboo flooring with floor heating pipeline
CN208168256U (en) A kind of compoiste wood floor

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171114

Termination date: 20190424