CN206635940U - A kind of grid structure - Google Patents

A kind of grid structure Download PDF

Info

Publication number
CN206635940U
CN206635940U CN201720163707.3U CN201720163707U CN206635940U CN 206635940 U CN206635940 U CN 206635940U CN 201720163707 U CN201720163707 U CN 201720163707U CN 206635940 U CN206635940 U CN 206635940U
Authority
CN
China
Prior art keywords
connecting rod
blind hole
sleeve pipe
grid structure
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720163707.3U
Other languages
Chinese (zh)
Inventor
李芳芳
张雷
李振强
高涛
欧阳洲
申付志
陆娴君
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Su Lan Construction Engineering Co Ltd
Original Assignee
Suzhou Su Lan Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Suzhou Su Lan Construction Engineering Co Ltd filed Critical Suzhou Su Lan Construction Engineering Co Ltd
Priority to CN201720163707.3U priority Critical patent/CN206635940U/en
Application granted granted Critical
Publication of CN206635940U publication Critical patent/CN206635940U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

It the utility model is related to a kind of grid structure, including connecting rod and bolt sphere, multiple first blind holes are provided with bolt sphere, screw thread is provided with first blind hole, connecting rod body and the sleeve pipe being set in connecting rod body are provided with connecting rod, the screw thread that can be engaged with the first blind hole internal thread is provided with sleeve pipe, bearing is provided between sleeve pipe and connecting rod body, first through hole is provided with sleeve pipe, connecting rod body opening position corresponding with first through hole is provided with the second blind hole, and screw thread is provided with the second blind hole;Builder can be combined into multiple small grid structures first with connector and bolt sphere on the ground;The small grid structure spliced then is transported to appointed place, sleeve pipe is extend into the first blind hole, and utilization is arranged on sleeve pipe and sleeve pipe and bolt sphere are tightly fastened by the first blind hole internal thread, after fixation, the screwed fixture in the surfaces such as bolt is tightened in the second blind hole through first through hole rear thread, sleeve pipe and connecting rod are tightly fastened.

Description

A kind of grid structure
Technical field
Engineering construction field is the utility model is related to, more particularly to a kind of rack framework.
Background technology
Rack is the space structure to be linked by plurality of rods part according to certain grid configuration by node.Form rack Elementary cell have pyrometric cone, triangular prism, square, butt quadrangular pyramid etc., be combined into flat shape by these elementary cells Triangle, quadrangle, hexagon, circular or other any bodies.With space-load, in light weight, rigidity is big, anti-seismic performance The advantages that good;It can be used as gymnasium, cinema, show room, Waiting Lounge, Stadium canopy, hangar, two-way large pillar net Roof system of the frame structure away from buildings such as workshops.
Such as a kind of grid structure disclosed in the Chinese patent that notification number is " CN202390927U ", it includes chord member and abdomen Bar, chord member include top boom and lower boom, are connected between upper and lower chord member by bolt sphere;Although this fixed form Simply and it is easy to construct, but due to being threaded connection between upper and lower chord member, is required for revolving chord member when often fixing a chord member Tighten in bolt sphere, be fixed so chord member can only be fixed in bolt sphere by operator successively in a certain order, no A part of grid structure assembled is fixed to another grid structure by the more people of energy simultaneously, is such as first spliced into multiple small nets Frame A, during multiple small rack A then are assembled into big rack B, because there is screw thread at chord member both ends, and screw thread can not be anti- Turn, so this assembling can not be carried out, cause to build less efficient.
Utility model content
The purpose of this utility model be to provide it is a kind of can the convenient and quick grid structure assembled.
Above-mentioned technical purpose of the present utility model technical scheme is that:A kind of grid structure, bag Connecting rod and bolt sphere are included, multiple first blind holes are provided with the bolt sphere, screw thread is provided with first blind hole, it is described Connecting rod body and the sleeve pipe being set in connecting rod body are provided with connecting rod, be provided with described sleeve pipe can with it is first blind The screw thread that hole internal thread is engaged, bearing is provided between described sleeve pipe and connecting rod body, first is provided with described sleeve pipe Through hole, connecting rod body opening position corresponding with first through hole are provided with the second blind hole, are provided with second blind hole Screw thread.
By using above-mentioned technical proposal, builder can be combined into multiple small nets first with connector and bolt sphere on the ground Frame structure;The small grid structure spliced then is transported to appointed place, sleeve pipe is extend into the first blind hole, and utilizes and sets Put and be tightly fastened sleeve pipe and bolt sphere in sleeve pipe and the first blind hole internal thread, after fixed, the surfaces such as bolt are carried into spiral shell The fixture of line is tightened in the second blind hole through first through hole rear thread, and sleeve pipe and connecting rod are tightly fastened.
Preferably, the connecting rod body inner hollow forms the first cavity.
By using above-mentioned technical proposal, connecting rod inner hollow, such setting can be built with the weight of connecting rod, mitigation The weight of thing is built, reduces materials, it is cost-effective, and convenience in transport.
Preferably, it is placed with ball in first cavity.
By using above-mentioned technical proposal, ball is placed in the first cavity, ball can roll in the first cavity, with this Check whether the rack for building shaping is horizontal;When ball all moves to certain inside the connecting rod lain across, it is known that rack is taken Build out-of-flatness;Magnetisable material, which be can also be used, to be slided in connecting rod, and the ball being placed in the first cavity is attracted into first At cavity center material, whether observation ball slides to connecting rod left and right ends.
Preferably, the connector to be spherical, is uniformly provided with multiple first blind holes on the connector, described the Screw thread is provided with one blind hole, the first blind hole that two of which is oppositely arranged is angularly disposed.
By using above-mentioned technical proposal, four the first blind holes are respectively arranged with spherical connector, two-by-two relatively; Connecting rod is threadedly attached in inside the first blind hole, one of which is oppositely arranged that oblique to extend into first blind in the first blind hole In hole, plug it is also angularly disposed into the connecting rod in the first blind hole, recycling be arranged on another group of the first blind hole on connector, Rack can be assembled into two layers up and down, such rack is more firm, firm.
Preferably, being coated with nanometer magnetofluid layer in first blind hole, nanometer magnetofluid is coated with described sleeve pipe Layer.
By using above-mentioned technical proposal, nanometer magnetofluid layer is coated with sleeve pipe and the first blind hole, makes sleeve pipe can To be preferably fixed in the first blind hole;Due to having the function that to attract each other between magnetic force, so it is blind to stretch into first in sleeve pipe The effect of pre-determined bit is had before hole.
Preferably, the connecting rod and bolt ball surface are coated with protective layer.
By using above-mentioned technical proposal, during by the rack that bolt sphere and connecting rod are formed by connecting on for building Wait, if when gymnasium, stadium, may because of weather reason washing away by wind and rain, in connecting rod and bolt sphere table Face is armor coated, and the moisture in connecting rod, bolt sphere and air, oxygen-barrier are avoided connecting rod, bolt sphere oxygen by protective layer Change corrosion, strengthen the durability of workpiece.
In summary, the utility model has the advantages that:Builder can be on the ground first with connector and spiral shell Bolt ball is combined into multiple small grid structures;The small grid structure spliced then is transported to appointed place, sleeve pipe is extend into In one blind hole, and utilization is arranged on sleeve pipe and sleeve pipe and bolt sphere are tightly fastened by the first blind hole internal thread, will after fixed The screwed fixture in the surfaces such as bolt is tightened in the second blind hole through first through hole rear thread, and sleeve pipe is tight with connecting rod Close fixation.
Brief description of the drawings
Fig. 1 is overall structure diagram in embodiment, for embodying the position relationship between connecting rod and bolt sphere;
Fig. 2 is bolt sphere overall structure diagram, for embodying the first blind hole being arranged in bolt sphere;
Fig. 3 is bolt sphere structure sectional view in embodiment, for embodying one group of first angularly disposed blind hole;
Fig. 4 is connecting rod structure sectional view in embodiment, for embodying connecting rod internal structure.
In figure, 1, connecting rod;2nd, bolt sphere;21st, the first blind hole;22nd, sleeve pipe;221st, first through hole;23rd, connecting rod sheet Body;231st, the second blind hole;232nd, the first cavity;233rd, ball;24th, bearing;3rd, nanometer magnetofluid layer;4th, protective layer.
Embodiment
The utility model is described in further detail below in conjunction with accompanying drawing.
This specific embodiment is only that it is not to limitation of the present utility model, ability to explanation of the present utility model Field technique personnel can make the modification of no creative contribution to the present embodiment as needed after this specification is read, but As long as all protected in right of the present utility model by Patent Law.
Embodiment:As shown in figure 1, a kind of grid structure, including connecting rod 1 and bolt sphere 2, bolt sphere 2 are spheroid, are such as schemed Shown in 2 and Fig. 3, six the first blind holes 21 are provided with bolt sphere 2, two-by-two relatively, and the first blind hole 21 and the line phase of the centre of sphere Mutually vertical, the first blind hole 21 that one of which is oppositely arranged is extended vertically into bolt sphere 2, and two group of first blind hole 21 is oblique in addition It extend into bolt sphere 2, screw thread is both provided with each first blind hole 21;Nanometer magnetic current is coated with the first blind hole 21 Body layer 3, refer to a kind of water-soluble ferroferric oxide nano magnetic disclosed in the Chinese patent that notification number is " CN103922422A " The preparation method of fluid;Layer protective layer 4 is coated with the surface of bolt sphere 2, protective layer 4 is formed by antirust paint coating, Refer to a kind of metal antirusting agent disclosed in the Chinese patent that notification number is " CN101298679A ".
As shown in figure 4, connecting rod 1 is the stock of cylinder, and the inner hollow of connecting rod 1 the first cavity 232 of formation, first Cavity 232 is arranged at the inner hub location of connecting rod 1, places a ball 233 in the first cavity 232, ball 233 can Rolled in the first cavity 232;Connecting rod 1 includes connecting rod body 23 and is set on two ends of connecting rod main body 23 Sleeve pipe 22, bearing 24 is provided between sleeve pipe 22 and connecting rod main body 23, sleeve pipe 22 can be extend into the first blind hole 21, in sleeve pipe Screw thread is provided with 22, fixes sleeve pipe 22 with bolt sphere using screw thread;Multiple second are uniformly provided with connecting rod 1 Blind hole 231,231 corresponding opening position of the second blind hole is provided with first through hole 221 on casing 22;It is coated with casing 22 Nanometer magnetofluid layer 3, refer to the oxidation three of one kind water solubility four disclosed in the Chinese patent that notification number is " CN103922422A " The preparation method of iron nanometer magnetofluid;Layer protective layer 4 is coated with connecting rod 1, protective layer 4 is formed by antirust paint coating , refer to a kind of metal antirusting agent disclosed in the Chinese patent that notification number is " CN101298679A ".
Application method:, will after can first connecting rod 1 be extend into the first blind hole 21 in bolt sphere 2 in building course Connecting rod 1 and bolt sphere 2, which are fixed, is spliced into an entirety;Then the entirety spliced is transported to behind suitable position and continues to spell It is connected into a complete rack;Sleeve pipe 22 is extended into the first blind hole 21, screw thread screws;Bolt is then worn into thick first through hole It is tightened on after 221 in second blind hole 221, sleeve pipe 22 is closely fixed in connecting rod body 23, it is complete so as to be spliced into one Whole rack;When building some heavy constructions again, rack is taken using angularly disposed the first blind hole 21 in bolt sphere 2 Build up two layers, it is more firm.

Claims (6)

1. a kind of grid structure, including connecting rod(1)And bolt sphere(2), it is characterised in that:The bolt sphere(2)Inside it is provided with Multiple first blind holes(21), first blind hole(21)Inside it is provided with screw thread, the connecting rod(2)On be provided with connecting rod body (23)Be set in connecting rod body(23)On sleeve pipe(22), described sleeve pipe(22)On be provided with can be with the first blind hole(21)It is interior The screw thread that screw thread is engaged, described sleeve pipe(22)And connecting rod body(23)Between be provided with bearing(24), described sleeve pipe(22) On be provided with first through hole(221), the connecting rod body(23)With first through hole(221)Corresponding opening position is provided with second Blind hole(231), second blind hole(231)Inside it is provided with screw thread.
A kind of 2. grid structure according to claim 1, it is characterised in that:The connecting rod body(23)Inner hollow shape Into the first cavity(232).
A kind of 3. grid structure according to claim 2, it is characterised in that:First cavity(232)Inside it is placed with circle Ball(233).
A kind of 4. grid structure according to claim 3, it is characterised in that:The connector(1)To be spherical, the connection Part(1)On be uniformly provided with multiple first blind holes(11), first blind hole(11)Screw thread is inside provided with, two of which is relative The first blind hole set(11)It is angularly disposed.
A kind of 5. grid structure according to claim 4, it is characterised in that:First blind hole(21)It is interior to be coated with nanometer Magnetic fluid layer(3), described sleeve pipe(22)It is upper to be coated with nanometer magnetofluid layer(3).
A kind of 6. grid structure according to claim 5, it is characterised in that:The connecting rod(1)And bolt sphere(2)Surface Coat matcoveredn(4).
CN201720163707.3U 2017-02-23 2017-02-23 A kind of grid structure Expired - Fee Related CN206635940U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720163707.3U CN206635940U (en) 2017-02-23 2017-02-23 A kind of grid structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720163707.3U CN206635940U (en) 2017-02-23 2017-02-23 A kind of grid structure

Publications (1)

Publication Number Publication Date
CN206635940U true CN206635940U (en) 2017-11-14

Family

ID=60252568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720163707.3U Expired - Fee Related CN206635940U (en) 2017-02-23 2017-02-23 A kind of grid structure

Country Status (1)

Country Link
CN (1) CN206635940U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972731A (en) * 2019-03-08 2019-07-05 福建鑫晟钢业有限公司 A kind of high intensity spatial steel structure node and its installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109972731A (en) * 2019-03-08 2019-07-05 福建鑫晟钢业有限公司 A kind of high intensity spatial steel structure node and its installation method
CN109972731B (en) * 2019-03-08 2020-11-10 福建鑫晟钢业有限公司 High-strength space steel structure node and installation method thereof

Similar Documents

Publication Publication Date Title
CN203891201U (en) Large-span steel structure two-stage shock mount
CN203891244U (en) Spherical damping support suitable for large-span steel structure
CN106193306B (en) A kind of long-span hangar fringe truss prestressed structural systems and its construction method
Dong et al. Application and development of modern long-span space structures in China
CN103243806B (en) Grid structure based on spherical polyhedron
CN103938720A (en) Large-space metal spherical lattice shell structure used for device storage and transportation, and construction method
CN206635940U (en) A kind of grid structure
CN104638381A (en) Spatial five-equal partition reflecting face unit of FAST (five-hundred-meter aperture spherical radio telescope)
CN210684972U (en) Prestressed steel structure net rack
CN106894506B (en) Large-span breathable structure system
CN111894133A (en) Assembled steel bamboo wood individual layer spherical shell structure system
CN204139332U (en) For the X-type gusset plate of box-type section surface net shell
CN104131621A (en) X-shaped node plate for box-shaped cross section curve surface reticulated shell
CN112227805B (en) Smoke tower integrated structure system of diagonal cable net and construction method thereof
CN204551731U (en) A kind of full steel structure building
CN204983148U (en) Concatenation formula calotte room
CN207484826U (en) A kind of roofing Elements of Space Grid Truss
CN106639464A (en) Buckling induction support with ends provided with oblique spiral induction units
CN206655315U (en) A kind of large span can breathing structure system
Xu et al. Structural design of irregular curved lattice shells in China
Göppert et al. A spoked wheel structure for the world’s largest convertible roof–the new commerzbank arena in Frankfurt, Germany
Klasz et al. A Cloud for Fresh Snow-Research Lab–a hybrid solution of minimal surface prestressed by bending active boundary conditions forming a spherical tetrahedron
CN211774525U (en) Grid structure connecting piece
CN112227804B (en) Integrally-tensioned smoke tower integrated structure system and construction method thereof
CN212561904U (en) Assembled steel bamboo wood individual layer spherical shell structure system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171114

Termination date: 20210223