CN206632992U - A kind of preliminary chalker of construction - Google Patents

A kind of preliminary chalker of construction Download PDF

Info

Publication number
CN206632992U
CN206632992U CN201720383136.4U CN201720383136U CN206632992U CN 206632992 U CN206632992 U CN 206632992U CN 201720383136 U CN201720383136 U CN 201720383136U CN 206632992 U CN206632992 U CN 206632992U
Authority
CN
China
Prior art keywords
graphite
chalker
base
pole
preliminary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720383136.4U
Other languages
Chinese (zh)
Inventor
马延君
刘利涛
李建军
郭怀吉
吉涌
李尚鸿
孙辽
李德强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720383136.4U priority Critical patent/CN206632992U/en
Application granted granted Critical
Publication of CN206632992U publication Critical patent/CN206632992U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction with preliminary chalker, including graphite boxes, pole and base, graphite case lid is provided with above the graphite boxes, the graphite boxes, which cover, is connected with pole, and canopy is fixed with the top of pole, graphite boxes are installed on the inside of the pole, and the bottom of graphite boxes is provided with graphite outlet, the positioned beneath of the graphite outlet has valve, the outer wall of the pole is connected with pull bar, and switch is installed on pull bar, the afterbody of the pull bar is fixed with handle, graphite boxes are mounted with above the base, and universal wheel is provided with below base, the inside of the base is provided with spring, and pipeline is fixed with the inside of spring.The construction is provided with canopy with preliminary chalker, rain cover can be carried out when rainy day can also carry out sunshade when sun in summer is excessive, the more preferable service life that ensure that chalker, spring can enter row buffering when chalker is being rule on the ground for injustice of jolting.

Description

A kind of preliminary chalker of construction
Technical field
Architectural furniture technical field is the utility model is related to, the preliminary chalker of specially a kind of construction.
Background technology
Chalker, it is a kind of be widely used in road, Gao Zheng highways, parking lot, square and runway on smooth ground On mark different constraints, guide and the road surface construction machinery of the regular restriction sign such as warning, chalker with it is quick, efficiently, The advantages that accurate, has played great function in terms of urban planning and highway construction, farthest saves the work of pavement construction Phase and economic input, place each to building site is first had to before the construction in construction site and is tentatively rule, this when builds Build construction just play the role of with preliminary chalker it is very big.But the construction used on the market with preliminary chalker all There is some defects, for example the use of chalker is influenced whether when being rule on rainy day, in sun in summer mistake Big also to make chalker lifetime, the spacing of line is unadjustable when line, it is impossible to meet to use, design not science, Manually take chalker that line can be caused not to be very straight, influenceing to construct, it is attractive in appearance also to influence, and often there are many dusts on ground, rules When often can't see the line drawn because dust is excessive, the appearance of a street in building site, which is easily jolted, has influence on the use of chalker The problems such as life-span, therefore, a kind of it is proposed that preliminary chalker of more efficient construction of ruling.
Utility model content
The purpose of this utility model is to provide a kind of construction preliminary chalker, to solve above-mentioned background technology The use that chalker is influenced whether when being rule on rainy day of middle proposition, it can also make line sun in summer is excessive The problems such as device lifetime shortens, and the spacing of line is unadjustable when line.
To achieve the above object, the utility model provides following technical scheme:A kind of preliminary chalker of construction, Including graphite boxes, pole and base, graphite case lid is provided with above the graphite boxes, the graphite boxes, which cover, is connected with branch Bar, and canopy is fixed with the top of pole, graphite boxes are installed, and the bottom of graphite boxes is provided with graphite on the inside of the pole Outlet, the positioned beneath of the graphite outlet have valve, and the outer wall of the pole is connected with pull bar, and is provided with out on pull bar Close, the afterbody of the pull bar is fixed with handle, graphite boxes is mounted with above the base, and be provided with below base universal Wheel, the inside of the base is provided with spring, and pipeline is fixed with the inside of spring, and motor is mounted with the base, described The right-hand member of motor is provided with battery, and charge port is provided with below battery, and the bottom of the base is inlaid with air blower.
Preferably, the canopy is shaped as umbellate form, and the width of canopy is more than the width of base.
Preferably, graphite speed governing valve is provided with the pipeline.
Preferably, it is electric connection between the switch and motor.
Preferably, the air blower is provided with two, and symmetrical on the axis of base.
Compared with prior art, the beneficial effects of the utility model are:The construction is provided with preliminary chalker Canopy, you can it can also carry out sunshade when sun in summer is excessive to carry out rain cover the rainy day when, it is more preferable to protect The service life of chalker is demonstrate,proved, spring can enter row buffering when chalker is being rule on the ground for injustice of jolting, protect The stationarity of whole device is demonstrate,proved, the speed that graphite speed governing valve can release to graphite is adjusted, can thus controlled The line of different spacing is drawn, practicality is more increased, and air blower can be cleared up the ash on ground, ensure that scribe area does not have There is dust, the line that draws can be made more obvious, it is ensured that the accuracy of line, chalker can be driven by motor It is mobile, do not move manually, so accomplished it is both time saving and energy saving in turn ensure that the line better appearance drawn is accurate, substantially increase The efficiency of line.
Brief description of the drawings
Fig. 1 is the utility model structure diagram;
Fig. 2 is the utility model understructure schematic top plan view;
Fig. 3 is the utility model base end face structural representation.
In figure:1st, graphite boxes, 2, graphite case lid, 3, pole, 4, canopy, 5, pole, 6, graphite outlet, 7, valve, 8, draw Bar, 9, switch, 10, handle, 11, graphite speed governing valve, 12, base, 13, universal wheel, 14, spring, 15, pipeline, 16, motor, 17th, battery, 18, charge port, 19, air blower.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the embodiment of the utility model is carried out Clearly and completely describing, it is clear that described embodiment is only the utility model part of the embodiment, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belong to the scope of the utility model protection.
Fig. 1-3 are referred to, the utility model provides a kind of technical scheme:A kind of preliminary chalker of construction, bag Include graphite boxes 1, graphite case lid 2, pole 3, canopy 4, pole 5, graphite outlet 6, valve 7, pull bar 8, switch 9, handle 10, graphite Speed governing valve 11, base 12, universal wheel 13, spring 14, pipeline 15, motor 16, battery 17, charge port 18 and air blower 19, The top of graphite boxes 1 is provided with graphite case lid 2, and pole 3 is connected with graphite case lid 2, and the top of pole 3 is fixed with canopy 4, Canopy 4 is shaped as umbellate form, and the width of canopy 4 is more than the width of base 12, you can to carry out rain cover the rainy day when It can also carry out sunshade when sun in summer is excessive, the more preferable service life that ensure that chalker, the inner side of pole 5 Graphite boxes 1 are installed, and the bottom of graphite boxes 1 is provided with graphite outlet 6, the positioned beneath of graphite outlet 6 has valve 7, pole 5 Outer wall be connected with pull bar 8, and switch 9 is installed on pull bar 8, the afterbody of pull bar 8 is fixed with handle 10, the top peace of base 12 Graphite boxes 1 are equipped with, and the lower section of base 12 is provided with universal wheel 13, the inside of base 12 is provided with spring 14, and spring is interior Side is fixed with pipeline 15, and graphite speed governing valve 11 is provided with pipeline 15, and the speed that can be released to graphite is adjusted, so Can, which controls, draws the lines of different spacing, and practicality is more increased, and is mounted with motor 16 in base 12, switch 9 and motor 16 it Between for be electrically connected with, by motor 16 chalker can be driven to move, do not moved manually, so accomplish both time saving provinces Power in turn ensure that the line better appearance drawn is accurate, and the right-hand member of motor 16 is provided with battery 17, and the lower section of battery 17 is set Charge port 18 is equipped with, the bottom of base 12 is inlaid with air blower 19, and air blower 19 is provided with two, and on the axis of base 12 Line is symmetrical, the ash on ground can be cleared up, ensure that scribe area does not have dust, and the line that draws can be made more aobvious Eye, it is ensured that the accuracy of line.
Operation principle:Before using construction with preliminary chalker, it is necessary first to which the structure of whole device is entered Row is simple to be understood, and battery 17 is filled by charge port 18 first with preliminary chalker for this kind of construction Electricity, the switch 9 on pull bar 8 is opened after charging complete, motor 16 starts to rotate, and drives universal wheel 13 to rotate, so whole dress Can is put to automatically move, open the graphite of valve 7 just released from graphite boxes 1, graphite speed governing valve 11 can by rotate come The speed that graphite is released is adjusted, air blower 19 can be cleared up the ash on ground, ensure that scribe area does not have dust, stone Ink is released from pipeline 15, starts to rule, canopy 4 can carry out rain cover when rainy day can also be excessive in sun in summer When carry out sunshade, user can control the direction of chalker by hand steered pull bar 8, complete like this whole The use process of the preliminary chalker of construction.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out with a variety of changes in the case where not departing from principle of the present utility model and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of preliminary chalker of construction, including graphite boxes (1), pole (5) and base (12), it is characterised in that: Graphite case lid (2) is provided with above the graphite boxes (1), pole (3), and pole (3) are connected with the graphite case lid (2) Top be fixed with canopy (4), graphite boxes (1) are installed, and the bottom of graphite boxes (1) is provided with the inside of the pole (5) Graphite exports (6), and the positioned beneath of the graphite outlet (6) has valve (7), and the outer wall of the pole (5) is connected with pull bar (8) switch (9), and on pull bar (8) is installed, the afterbody of the pull bar (8) is fixed with handle (10), the base (12) it is upper Side is mounted with graphite boxes (1), and universal wheel (13) is provided with below base (12), and the inside of the base (12) is provided with bullet Spring (14), and pipeline (15) is fixed with the inside of spring, motor (16) is mounted with the base (12), the motor (16) Right-hand member is provided with battery (17), and charge port (18) is provided with below battery (17), the bottom edge of the base (12) Embedded with air blower (19).
A kind of 2. preliminary chalker of construction according to claim 1, it is characterised in that:The canopy (4) Umbellate form is shaped as, and the width of canopy (4) is more than the width of base (12).
A kind of 3. preliminary chalker of construction according to claim 1, it is characterised in that:On the pipeline (15) It is provided with graphite speed governing valve (11).
A kind of 4. preliminary chalker of construction according to claim 1, it is characterised in that:It is described switch (9) with It is electric connection between motor (16).
A kind of 5. preliminary chalker of construction according to claim 1, it is characterised in that:The air blower (19) Two are provided with, and it is symmetrical on the axis of base (12).
CN201720383136.4U 2017-04-13 2017-04-13 A kind of preliminary chalker of construction Expired - Fee Related CN206632992U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720383136.4U CN206632992U (en) 2017-04-13 2017-04-13 A kind of preliminary chalker of construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720383136.4U CN206632992U (en) 2017-04-13 2017-04-13 A kind of preliminary chalker of construction

Publications (1)

Publication Number Publication Date
CN206632992U true CN206632992U (en) 2017-11-14

Family

ID=60247875

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720383136.4U Expired - Fee Related CN206632992U (en) 2017-04-13 2017-04-13 A kind of preliminary chalker of construction

Country Status (1)

Country Link
CN (1) CN206632992U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107974915A (en) * 2017-12-08 2018-05-01 黄邓花 A kind of efficiently beautiful housing construction isolation alert device
CN108360357A (en) * 2018-01-22 2018-08-03 张红艳 A kind of garden layout lime device for dotting
CN108994808A (en) * 2018-09-18 2018-12-14 李友新 A kind of lineation device for building
CN109468936A (en) * 2019-01-08 2019-03-15 德州职业技术学院(德州市技师学院) A kind of building construction line-marking vehicle

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107974915A (en) * 2017-12-08 2018-05-01 黄邓花 A kind of efficiently beautiful housing construction isolation alert device
CN108360357A (en) * 2018-01-22 2018-08-03 张红艳 A kind of garden layout lime device for dotting
CN108994808A (en) * 2018-09-18 2018-12-14 李友新 A kind of lineation device for building
CN109468936A (en) * 2019-01-08 2019-03-15 德州职业技术学院(德州市技师学院) A kind of building construction line-marking vehicle

Similar Documents

Publication Publication Date Title
CN206632992U (en) A kind of preliminary chalker of construction
CN103205948A (en) Three-wheeled road sweeper
CN209759990U (en) Old concrete road surface breaker of adjustable
CN205931072U (en) Electric tricycle with scalable deep bead
CN208149366U (en) Multifunctional assisting device is used in a kind of construction of Expressway Road
CN206843930U (en) It is a kind of can voluntarily dedusting road line marker
CN204000721U (en) A kind of cleaning car
CN210288219U (en) Highway construction is with be convenient for remove and fixed isolated column
CN208021254U (en) A kind of new-energy automobile charging pile with rainproof function
CN208472533U (en) Crushing plant is used in a kind of renovation of municipal administration road surface
CN206571111U (en) One kind finishing uses ground trimming device
CN205604050U (en) Municipal administration special road patching device
CN203188239U (en) Inspection well lid convenient to open
CN205531677U (en) Building site encloses automatic corral equipment that keeps off
CN204139082U (en) A kind of portable road cone
CN202730698U (en) Dust-absorption-type small garbage sweeper
CN210975682U (en) Road surface cleaning device is used in municipal administration road bridge construction
CN205711684U (en) A kind of highway broken road surface quick crashing device
CN208486159U (en) One kind being based on 3D printing technique road holes maintenance device
CN208792131U (en) A kind of special intelligent scribing line of highway communication scribing line is mechanical
CN206941360U (en) A kind of novel road pen machine
CN203346746U (en) Automatic road
CN202610743U (en) Environmental pollution cleaning vehicle
CN215758470U (en) Deceleration strip marking laying device for road construction
CN206843913U (en) A kind of cement concrete pavement trowelling machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171114

CF01 Termination of patent right due to non-payment of annual fee