CN206628710U - Low-temperature measurement acquisition control cabinet - Google Patents
Low-temperature measurement acquisition control cabinet Download PDFInfo
- Publication number
- CN206628710U CN206628710U CN201720368531.5U CN201720368531U CN206628710U CN 206628710 U CN206628710 U CN 206628710U CN 201720368531 U CN201720368531 U CN 201720368531U CN 206628710 U CN206628710 U CN 206628710U
- Authority
- CN
- China
- Prior art keywords
- room
- electric energy
- terminal block
- remote control
- connecting terminal
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Selective Calling Equipment (AREA)
Abstract
Low-temperature measurement acquisition control cabinet, including profile are in the cabinet of rectangular parallelepiped structure, and the first half of cabinet is spaced apart up and down to be spaced apart provided with terminal installation room and electric energy installation room, the lower half of cabinet or so and be provided with remote control switch room and pressure change chamber;Terminal installation is provided with terminal control table and the first connecting terminal block in room, and the first connecting terminal block is located on the left of terminal control table, and electric energy installation is provided with electric energy meter and the second connecting terminal block in room, and the second connecting terminal block is located on the left of electric energy meter;The first mounting bracket, remote control switch and the 3rd connecting terminal block are provided with remote control switch room.The purpose of this utility model is that acquisition control cabinet is installed separately with transformer, electric component in acquisition control cabinet is arranged apart, when running into different failures, the staff that difference according to failure distributes different departments is handled, master control room is acquired and stored to the data of electric energy meter by terminal control table, and remote control switch is sent and instructed.
Description
Technical field
The utility model belongs to field of electrical equipment, and in particular to a kind of low-temperature measurement acquisition control cabinet.
Background technology
Currently, the height that power supply department generally uses typically all is mounted directly on the transformer for low-pressure metering box, use
It is the layout of transformation, metering and collection expense control one, this design method make it that metering box house arrangement of parts is intensive,
It is complicated, waste time and energy during installation and do not say, need the department that coordinates more when staff safeguards, process is cumbersome, potential safety hazard
Greatly.When transformer breaks down, it is necessary to which individual department, which shows up, takes each part apart processing maintenance, when electric device for picking breaks down
When, be equally also required to all departments show up by each part take apart processing maintenance, waste time and energy, have a strong impact on operating efficiency.
Utility model content
The defects of existing for prior art, the purpose of this utility model are separately to pacify acquisition control cabinet with transformer
Fill, the electric component in acquisition control cabinet is arranged apart, and when running into different failures, different departments are distributed according to the difference of failure
Staff processing.Master control room is acquired and stored to the data of electric energy meter by terminal control table, to remote control
Switch sends instruction.
In order to solve the above technical problems, technical scheme is as follows used by the utility model:
Low-temperature measurement acquisition control cabinet, including profile are in the cabinet of rectangular parallelepiped structure, and the first half of cabinet is spaced apart up and down
Room is installed provided with terminal and electric energy installation room, the lower half of cabinet or so is spaced apart and is provided with remote control switch room and pressure change chamber;
Terminal control table and the first connecting terminal block are installed, the first connecting terminal block is located at a terminal control table left side in terminal installation room
Side, electric energy installation are provided with electric energy meter and the second connecting terminal block in room, and the second connecting terminal block is located on the left of electric energy meter;Remotely
The first mounting bracket, remote control switch and the 3rd connecting terminal block are provided with controlling switch room, remote control switch and the 3rd connects
Line terminals row is fixedly mounted on the first mounting bracket, and the 3rd connecting terminal block is located on the right side of remote control switch;In pressure change chamber
Provided with the second mounting bracket, current transformer, metal connection plate, cable and plant-grid connection port, current transformer and metal connection
Plate is installed on the second mounting bracket, and metal connection plate is located at the top of current transformer, and it is mutual that plant-grid connection port is located at electric current
The lower section of sensor;
One end connection plant-grid connection port of cable, the other end of cable connect through current transformer and metal connection plate
Connect, metal connection plate connects the incoming end of remote control switch by wire, and the end that picks out of remote control switch is connected by wire
The 3rd connecting terminal block is connect, the 3rd connecting terminal block connects electric energy meter by wire, passed through between electric energy meter and terminal control table
Wire connects, and is connected between terminal control table and remote control switch by wire, and terminal control table connects first by wire
Connecting terminal block, electric energy meter connect the second connecting terminal block by wire.
Current transformer, metal connection plate, cable and plant-grid connection port are at least provided with three.
Terminal installation room, electric energy installation room, remote control switch room and the pressure change chamber of switch board are equipped with single switch
, it is equipped with observation window on each switch gate.
Using above-mentioned technical proposal, the utility model has the advantages that:
Switch board is installed separately with transformer, when transformer breaks down, it is only necessary to is responsible for the work of transformer fault
Personnel, which show up, to be repaired or maintains.Switch board is arranged in switchgear house, and terminal installation room and electric energy installation are respectively equipped with switch board
Room, work are independent of each other, when the indoor terminal control table of terminal installation breaks down or needs to safeguard, it is only necessary to be responsible for terminal
Staff, which shows up, to be repaired or maintains, when the indoor electric energy meter of electric energy installation breaks down or needs to safeguard, it is only necessary to be responsible for whole
The staff at end, which shows up, to be repaired or maintains.Compared with the installation and maintenance maintenance flow of existing equipment, it is no longer necessary to people from all departments
Member all shows up, it is not required that all takes each part apart processing when safeguarding or maintaining.When running into different failures, according to failure
Difference distribute different types of staff processing, it is convenient, fast, greatly improve operating efficiency.Terminal control table is also
Remotely it is connected with master control room, master control room sends instruction by remote terminal control table to electric energy meter and remote control switch,
Meter reading instruction is sent to electric energy meter and shows ammeter parameter of electric energy meter etc., trip command and tripping operation are sent to remote control switch
Instruction releases.Master control room can also be acquired and stored to the data of electric energy meter by terminal control table.
Brief description of the drawings
Fig. 1 is the structural representation when switch gate of the utility model switch board is fully open.
Cabinet 1, terminal installation room 2, electric energy installation room 3, remote control switch room 4, pressure change chamber 5, terminal control table 6, the
One connecting terminal block 7, electric energy meter 8, the second connecting terminal block 9, the first mounting bracket 10, remote control switch 11, the 3rd terminals
Son row 12, the second mounting bracket 13, current transformer 14, metal connection plate 15, cable 16, plant-grid connection port 17.
Embodiment
Specific embodiment of the present utility model is described in further detail below in conjunction with the accompanying drawings:
As shown in figure 1, low-temperature measurement acquisition control cabinet, including profile is in the cabinet 1 of rectangular parallelepiped structure, the upper half of cabinet 1
Portion is spaced apart up and down to be spaced apart provided with terminal installation room 2 and electric energy installation room 3, the lower half of cabinet 1 or so and is provided with remote control
Switch gear room 4 and pressure change chamber 5;Terminal installation is provided with the connecting terminal block 7 of terminal control table 6 and first, the first binding post in room 2
Row 7 is provided with the connecting terminal block 9 of electric energy meter 8 and second, the second terminals positioned at the left side of terminal control table 6, electric energy installation in room 3
Son row 9 is positioned at the left side of electric energy meter 8;The first mounting bracket 10 is provided with remote control switch room 4, remote control switch 11 and the 3rd connects
Line terminals row 12, the connecting terminal block 12 of remote control switch 11 and the 3rd is fixedly mounted on the first mounting bracket 10, and the 3rd connects
Line terminals row 12 is positioned at the right side of remote control switch 11;The second mounting bracket 13, current transformer 14, metal are provided with pressure change chamber 5
Terminal plate 15, cable 16 and plant-grid connection port 17, current transformer 14 and metal connection plate 15 are installed in the second mounting bracket
On 13, metal connection plate 15 is located at the top of current transformer 14, and plant-grid connection port 17 is located at the lower section of current transformer 14.
One end connection plant-grid connection port 17 of cable 16, the other end of cable 16 connects through current transformer 14 with metal
Line plate 15 connects, and metal connection plate 15 connects the incoming end of remote control switch 11 by wire, and remote control switch 11 connects
Go out end and the 3rd connecting terminal block 12 is connected by wire, the 3rd connecting terminal block 12 connects electric energy meter 8, electric energy meter 8 by wire
Connected between terminal control table 6 by wire, terminal control table 6 connects the first connecting terminal block 7, electric energy meter 8 by wire
Second connecting terminal block 9 is connected by wire, terminal control table 6 is connected by wireless network with master control room.
Current transformer 14, metal connection plate 15, cable 16 and plant-grid connection port 17 are at least provided with three.Present
With electric line largely be all three-phase circuit.
Terminal installation room 2, electric energy installation room 3, remote control switch room 4 and the pressure change chamber 5 of switch board are equipped with individually
Switch gate, observation window is equipped with each switch gate.Single part, which needs repairing, opens the switch gate of single installation room when maintaining
, it is not necessary to it is fully open, it is time saving and energy saving, it is safe and efficient.Observation window facilitates staff to observe internal operation state at any time.
The course of work of the present utility model is as follows:
Plant-grid connection port 17 in switch board pressure change chamber 5 is connected by wire with transformer, the high voltage power supply of access
By being converted to low-tension supply after current transformer 14, controlling switch is opened, is switched on power, electric energy meter 8 and terminal control table 6
Be powered, electric energy meter 8 be used to measuring power consumption number, the second connecting terminal block 9 is used as electricity consumption output end and extraneous electrical equipment
Connection, terminal control table 6 is connected with electric energy meter 8, and terminal control table 6 is connected with remote control switch 11, terminal control table 6 also with
Master control room is remotely connected, and master control room is sent by remote terminal control table 6 to electric energy meter 8 and remote control switch 11 to be referred to
Order, sends meter reading instruction to electric energy meter 8 and shows ammeter parameter of electric energy meter 8 etc., and sending tripping operation to remote control switch 11 refers to
Order and trip command release.Master control room can also be acquired and stored to the data of electric energy meter 8 by terminal control table 6.
Terminal control table 6 is connected i.e. wireless long-distance meter-reading technology with supervisory control desk, belongs to prior art, wireless long-distance meter-reading
Refer to that carrying out technology with power system with present mobile communication technology is combined, be changed into traditional manual metering mode and pass through
Wireless network directly transmits electricity consumption data.And one of Internet of Things, wireless city and typical case of smart city.Radio meter register
Service is by recording the wireless module loaded in the instrument of the government utility data such as water meter, ammeter, wireless module installation in fact
Have a wireless network card, wireless module and intelligent management platform by network connection, intelligent management platform it is long-range realize to water, electricity,
The accurately and timely collection and processing of the government utility data such as coal.These public sectors periodically use radio communication again by special equipment
The data of collection are sent to intelligent management and put down by module, and wireless communication module is the terminal control table 6 in the present embodiment, intelligence
Management platform is the supervisory control desk in the present embodiment, so as to realize the function of remote meter reading and control.
The present embodiment not makees any formal limitation, every foundation to shape of the present utility model, material, structure etc.
Any simple modification, equivalent change and modification that the technical essence of the utility model is made to above example, belongs to this reality
With the protection domain of new technique scheme.
Claims (3)
1. low-temperature measurement acquisition control cabinet, it is characterised in that:It is in the cabinet of rectangular parallelepiped structure including profile, on the first half of cabinet
It is lower be spaced apart be provided with terminal installation room and electric energy installation room, the lower half of cabinet or so be spaced apart be provided with remote control switch room and
Pressure change chamber;Terminal installation is provided with terminal control table and the first connecting terminal block in room, and the first connecting terminal block is located at terminal control
Tabulation left side, electric energy installation are provided with electric energy meter and the second connecting terminal block in room, and it is left that the second connecting terminal block is located at electric energy meter
Side;Be provided with the first mounting bracket, remote control switch and the 3rd connecting terminal block in remote control switch room, remote control switch and
3rd connecting terminal block is fixedly mounted on the first mounting bracket, and the 3rd connecting terminal block is located on the right side of remote control switch;Become
The second mounting bracket, current transformer, metal connection plate, cable and plant-grid connection port, current transformer and gold are provided with pressure chamber
Category terminal plate is installed on the second mounting bracket, and metal connection plate is located at the top of current transformer, and plant-grid connection port is located at
The lower section of current transformer;
One end connection plant-grid connection port of cable, the other end of cable are connected through current transformer with metal connection plate, gold
Belong to the incoming end that terminal plate connects remote control switch by wire, the end that picks out of remote control switch connects the 3rd by wire
Connecting terminal block, the 3rd connecting terminal block connect electric energy meter by wire, connected between electric energy meter and terminal control table by wire
Connect, connected between terminal control table and remote control switch by wire, terminal control table connects the first terminals by wire
Son row, electric energy meter connect the second connecting terminal block by wire.
2. low-temperature measurement acquisition control cabinet according to claim 1, it is characterised in that:Current transformer, metal connection plate,
Cable and plant-grid connection port are at least provided with three.
3. low-temperature measurement acquisition control cabinet according to claim 1, it is characterised in that:The terminal installation room of switch board, electricity
Room, remote control switch room and pressure change chamber can be installed and are equipped with single switch gate, observation window is equipped with each switch gate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720368531.5U CN206628710U (en) | 2017-04-10 | 2017-04-10 | Low-temperature measurement acquisition control cabinet |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720368531.5U CN206628710U (en) | 2017-04-10 | 2017-04-10 | Low-temperature measurement acquisition control cabinet |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206628710U true CN206628710U (en) | 2017-11-10 |
Family
ID=60206658
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720368531.5U Expired - Fee Related CN206628710U (en) | 2017-04-10 | 2017-04-10 | Low-temperature measurement acquisition control cabinet |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206628710U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106816812A (en) * | 2017-04-10 | 2017-06-09 | 国网河南省电力公司安阳供电公司 | Low-temperature measurement acquisition control cabinet |
-
2017
- 2017-04-10 CN CN201720368531.5U patent/CN206628710U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106816812A (en) * | 2017-04-10 | 2017-06-09 | 国网河南省电力公司安阳供电公司 | Low-temperature measurement acquisition control cabinet |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN101409008B (en) | Integrated system for monitor, management and remotely meter-reading of power distribution network | |
CN205901146U (en) | Horizontal integration power distribution station | |
CN103414114A (en) | Drawer-type intelligent comprehensive low-voltage distribution JP cabinet | |
CN106505733A (en) | Power distribution automation monitoring platform | |
CN206628710U (en) | Low-temperature measurement acquisition control cabinet | |
CN202423887U (en) | Distributor box for construction site | |
CN204089727U (en) | High aititude photovoltaic plant electric network fault simulated testing system mobile detection apparatus | |
CN207037006U (en) | A kind of 10kV distribution line failures addressing system | |
CN203481922U (en) | Distribution automation remote measuring and control device for distribution monitoring | |
CN202454902U (en) | Remote meter-reading control cabinet for transformer | |
CN105929212B (en) | Anti- four line money drawing plat electricity box of arrearage low voltage three-phase | |
CN202094698U (en) | Intelligent transformer monitoring equipment | |
CN203301016U (en) | Outdoor box type substation | |
CN106816812A (en) | Low-temperature measurement acquisition control cabinet | |
CN210484017U (en) | Intelligent power air supply system of tunnel frequency conversion air compressor unit | |
CN102331559B (en) | In-situ test system for electric motors | |
CN100508313C (en) | Surface protection type integrated transformer substation | |
CN205092446U (en) | Rural power grids intelligent power distribution cabinet | |
CN201674135U (en) | High pressure transformer | |
CN204244172U (en) | For the interchange header box of photovoltaic plant | |
CN211579698U (en) | Oil well information monitoring system | |
CN209674218U (en) | A kind of electric power apparatus monitoring device | |
CN214153538U (en) | Load switch cabinet | |
CN215870484U (en) | Indoor intelligent integrated transformer substation and park intelligent energy management system formed by same | |
CN207835062U (en) | A kind of electricity getting device of high voltage iron tower auxiliary equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |