CN206618377U - Lift monitoring and protecting device - Google Patents

Lift monitoring and protecting device Download PDF

Info

Publication number
CN206618377U
CN206618377U CN201720366523.7U CN201720366523U CN206618377U CN 206618377 U CN206618377 U CN 206618377U CN 201720366523 U CN201720366523 U CN 201720366523U CN 206618377 U CN206618377 U CN 206618377U
Authority
CN
China
Prior art keywords
monitoring
frame base
monitoring device
basement rock
protective cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720366523.7U
Other languages
Chinese (zh)
Inventor
杨宗哲
刘俊国
吴涛
滕鸿煜
罗增录
郭长安
史亚军
周建龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Engineering Bureau 4 Co Ltd
Original Assignee
Sinohydro Engineering Bureau 4 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Engineering Bureau 4 Co Ltd filed Critical Sinohydro Engineering Bureau 4 Co Ltd
Priority to CN201720366523.7U priority Critical patent/CN206618377U/en
Application granted granted Critical
Publication of CN206618377U publication Critical patent/CN206618377U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The utility model discloses lifting monitoring and protecting device, including the monitoring device of deformation values is lifted for monitoring basement rock, monitoring device is provided with amesdial and measurement bar;Being provided with above basement rock is used to be fixed on the frame base above basement rock; supporting leg fixed in insertion basement rock is arranged below in frame base; the protective cover for being used for covering monitoring device is provided with above frame base; protective cover, which is provided with, is used to check the observation for the lifting deformation values door shown in monitoring device; relative both sides are equipped with the otic placode outwards paid below protective cover, and otic placode is connected by fixation kit with frame base.The cement grout and rock dust and rainy and strong wind weather sprayed in consolidation grouting engineering the drilling operation; it is difficult to produce influence to the monitoring device being placed in protective cover; the monitoring sensitivity of monitoring device and the normal reading of amesdial are not interfered with; the accuracy for lifting deformation monitoring result is ensure that, is conducive to avoiding lifting the problem of deforming havoc rock integrality.

Description

Lift monitoring and protecting device
Technical field
The utility model is specifically related to lift monitoring and protecting device.
Background technology
During grouting construction, rock should be set to lift deformation observing device around grout hole, rock lifts change Shape value cannot be greater than setting, to prevent from lifting the integrality for deforming havoc rock.Deformation observation is lifted in grouting works In it is most important, it is key point in grouting works to lift during the protection work and monitoring use of deformation observing device.
Constructed more than consolidation grouting engineering the drilling operation using pneumatic type down-the-hole drill, the depositing dust that adds water is taken in operation process Measure;The cement grout in grout hole just terminated in work progress is blown out with drilling rock dust to be sprayed in the scope of operation. The cement grout and rock dust sprayed can all have shadow to the normal reading for lifting deformation monitoring device monitoring sensitivity and amesdial Ring;Rained during open work surface construction and strong wind weather equally also normally be able to can all have an impact to the normal reading of amesdial.
Utility model content
The purpose of this utility model is the shortcoming for overcoming prior art there is provided monitoring and protecting device is lifted, to solve spray The cement grout and rock dust that spill and the problem of influenceing monitoring result accuracy with strong wind weather of raining.
To achieve the above object, technical solution adopted in the utility model is:Offer lifts monitoring and protecting device, including The monitoring device of deformation values is lifted for monitoring basement rock, monitoring device is provided with amesdial and measurement bar;Set above the basement rock There is the frame base for being fixed on above basement rock, supporting leg fixed in insertion basement rock, framework bottom is arranged below in frame base Seat is provided with the protective cover for being used for covering monitoring device above, and protective cover, which is provided with, to be used to check that what is shown in monitoring device lifts Relative both sides are equipped with the otic placode outwards paid below the observation door of deformation values, protective cover, and otic placode passes through fixation kit and frame Frame base is connected.
Preferably, the fixation kit includes bolt, nut and two pieces of anchor plates, two pieces of anchor plates are located at otic placode respectively Above with below frame base, bolt is connected through otic placode, frame base and two pieces of anchor plates and with nut.
Preferably, being provided with lamina of septum pellucidum in the observation door.
Preferably, the buttress immediately below measurement bar is placed above in the basement rock, set between buttress and measurement bar There is polylith to adjust backing plate.
Preferably, the buttress is made of concrete.
Preferably, the regulation backing plate is made of steel plate.
The beneficial effects of the utility model are:
1st, the cement grout and rock dust that are sprayed in the operation of the utility model consolidation grouting engineering the drilling and rain and big Wind weather, is difficult to produce influence to the monitoring device being placed in protective cover, does not interfere with the monitoring sensitivity of monitoring device With the normal reading of amesdial, it is ensured that lift the accuracy of deformation monitoring result, be conducive to avoiding lifting deforming havoc The problem of rock integrality, so as to ensure the smooth implementation of grouting works.
2nd, lamina of septum pellucidum is provided with observation door of the present utility model, the water of outside can be prevented when reading and lifting deformation values Slurry liquid, rock dust and rainwater enter in protective cover.
3rd, the buttress immediately below measurement bar is placed above in basement rock of the present utility model, is set between buttress and measurement bar There is polylith to adjust backing plate, measurement bar is that can reach monitoring and lift deformation values to obtain purpose with regulation pad contact, is made in monitoring device Amesdial without getting too close to surface of bedrock.
Brief description of the drawings
Fig. 1 is the example structure schematic diagram for lifting monitoring and protecting device;
Fig. 2 is the connecting-piece structure schematic diagram for lifting monitoring and protecting device;
Fig. 3 is the frame base structural representation for lifting monitoring and protecting device.
Wherein:1st, supporting leg;2nd, frame base;3rd, monitoring device;4th, protective cover;5th, amesdial;6th, measurement bar;7th, adjust Backing plate;8th, buttress;9th, fixation kit;10th, basement rock;11st, nut;12nd, bolt;13rd, anchor plate.
Embodiment
It is specific below in conjunction with the utility model to make the purpose of this utility model, technical scheme and advantage clearer Technical solutions of the utility model are clearly and completely described for embodiment and corresponding accompanying drawing.
With reference to Fig. 1,2 and 3, the present embodiment provides and lifts monitoring and protecting device, including lifts deformation for monitoring basement rock 10 The monitoring device 3 of value, monitoring device 3 is provided with amesdial 5 and measurement bar 6.The basement rock 10 is provided with above to be used to be fixed on base Frame base 2 above rock 10, frame base 2 is arranged below above supporting leg 1 fixed in insertion basement rock 10, frame base 2 Provided with the protective cover 4 for monitoring device 3 to be covered, protective cover 4, which is provided with, to be used to check that what is shown in monitoring device 3 lifts change Relative both sides are equipped with the otic placode outwards paid below the observation door of shape value, protective cover 4, and otic placode passes through fixation kit 9 and frame Frame base 2 is connected.
The fixation kit 9 includes bolt 12, nut 11 and two pieces of anchor plates 13, and two pieces of anchor plates 13 are located at otic placode respectively Above with below frame base 2, bolt 12 is connected through otic placode, frame base 2 and two pieces of anchor plates 13 and with nut 11.
Lamina of septum pellucidum is provided with the observation door.
The buttress 8 immediately below measurement bar 6 is placed above in the basement rock 10, provided with many between buttress 8 and measurement bar 6 Block adjusts backing plate 7.
The buttress 8 is made of concrete.
The regulation backing plate 7 is made of steel plate.
In implementation process, the monitoring device 3 that deformation values are lifted for monitoring basement rock 10 is installed by regulation first;So The supporting leg 1 of frame base 2 is inserted afterwards and is fixed in basement rock 10, monitoring device 3 is located in frame base 2;Finally will Protective cover 4 is placed on frame base 2 and above covers monitoring device 3, and the otic placode of protective cover 4 passes through fixation kit 9 and framework bottom Seat 2 is connected;Need to open observation door when needing reading to lift deformation values, lifting after deformation values reading is finished needs to close Close observation door.
The cement grout and rock dust and rainy and strong wind weather sprayed in consolidation grouting engineering the drilling operation, is difficult to Influence is produced on the monitoring device 3 that is placed in protective cover 4, the monitoring sensitivity and amesdial 5 of monitoring device 3 is not interfered with Normal reading, it is ensured that lift the accuracy of deformation monitoring result, be conducive to avoiding lifting deforming havoc rock integrality The problem of, so as to ensure the smooth implementation of grouting works.
Above-mentioned embodiment is used for illustrating the utility model, rather than the utility model is limited, in this reality With in new spirit and scope of the claims, any modifications and changes made to the utility model both fall within this The protection domain of utility model.

Claims (6)

1. lifting monitoring and protecting device, including the monitoring device of deformation values is lifted for monitoring basement rock, monitoring device is provided with thousand Divide table and measurement bar, it is characterised in that:Being provided with above the basement rock is used to be fixed on the frame base above basement rock, frame base It is arranged below above supporting leg fixed in insertion basement rock, frame base and is provided with the protective cover for being used for covering monitoring device, protects Shield, which is provided with, is used to check that both sides relative below the observation for the lifting deformation values door shown in monitoring device, protective cover to be all provided with There is the otic placode outwards paid, otic placode is connected by fixation kit with frame base.
2. according to claim 1 lift monitoring and protecting device, it is characterised in that:The fixation kit includes bolt, spiral shell Cap and two pieces of anchor plates, two pieces of anchor plates are located above otic placode and below frame base respectively, and bolt passes through otic placode, frame base With two pieces of anchor plates and be connected with nut.
3. according to claim 1 lift monitoring and protecting device, it is characterised in that:Septum pellucidum is provided with the observation door Plate.
4. according to claim 1 lift monitoring and protecting device, it is characterised in that:The basement rock has been placed above positioned at survey Buttress immediately below gauge rod, backing plate is adjusted between buttress and measurement bar provided with polylith.
5. according to claim 4 lift monitoring and protecting device, it is characterised in that:The buttress is made of concrete.
6. according to claim 4 lift monitoring and protecting device, it is characterised in that:The regulation backing plate uses steel plate system Into.
CN201720366523.7U 2017-04-10 2017-04-10 Lift monitoring and protecting device Active CN206618377U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720366523.7U CN206618377U (en) 2017-04-10 2017-04-10 Lift monitoring and protecting device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720366523.7U CN206618377U (en) 2017-04-10 2017-04-10 Lift monitoring and protecting device

Publications (1)

Publication Number Publication Date
CN206618377U true CN206618377U (en) 2017-11-07

Family

ID=60235863

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720366523.7U Active CN206618377U (en) 2017-04-10 2017-04-10 Lift monitoring and protecting device

Country Status (1)

Country Link
CN (1) CN206618377U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108072363A (en) * 2017-12-29 2018-05-25 山东大学 A kind of Tunnel Engineering monitoring measurement measuring point protection device and installation method
CN112161649A (en) * 2020-08-24 2021-01-01 南京信息职业技术学院 Agricultural thing networking environment monitoring device

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108072363A (en) * 2017-12-29 2018-05-25 山东大学 A kind of Tunnel Engineering monitoring measurement measuring point protection device and installation method
CN108072363B (en) * 2017-12-29 2024-03-15 山东大学 Tunnel engineering monitoring measurement point protection device and installation method
CN112161649A (en) * 2020-08-24 2021-01-01 南京信息职业技术学院 Agricultural thing networking environment monitoring device

Similar Documents

Publication Publication Date Title
CN104316380B (en) Sample preparation device for coarse-grained soil triaxial test and application method thereof
CN104568706A (en) Fluid-solid coupled similar simulation experimental platform
CN206618377U (en) Lift monitoring and protecting device
CN204359659U (en) A kind of fluid structurecoupling similarity simulation experiment platform
CN206540552U (en) A kind of concealed observation pier
CN203007974U (en) Tower crane foundation structure
CN205089345U (en) Anchor rope is put by pressure equipment
CN105821887A (en) Installing method for stand column pile constructed in pebble bed
CN206887980U (en) A kind of integrated bracket basis of antifreeze pile
CN103743584B (en) Wire netting Mechanics Performance Testing device
CN206945310U (en) A kind of workings subject to dy namic pressure stability three-dimensional analog simulation device
CN209460039U (en) A kind of prestressing force clamping plate
CN104847343B (en) Shaft wall stability is moved analogue means and the method that change is influenceed by water-bearing layer
CN209841650U (en) Pipe jacking of pipe jacking experimental box
CN210597410U (en) Foundation detection equipment
CN112730055A (en) Testing device and method for simulating drawing of deep soil layer constant-resistance soil anchor
CN108375504B (en) Anchorage type reaction frame test device suitable for underground space structure
CN203034470U (en) Caisson device applied to water foundation pit
CN207280782U (en) A kind of ultra-deep pile driving construction rock stratum extraction instrument of electronics intelligence control
CN205955248U (en) Construction weather enclosure in open cut foundation ditch
CN204728301U (en) A kind of size automatic firmness-impacting apparatus
CN208088268U (en) A kind of pore pressure gauge perforation device
CN205975709U (en) Mountain region photovoltaic power plant rock anchor basis resistance to plucking test system
CN214741205U (en) Casing bottom plugging device
CN211499865U (en) Brick pad protective equipment for building construction

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant