CN206616462U - A kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit - Google Patents

A kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit Download PDF

Info

Publication number
CN206616462U
CN206616462U CN201720230063.5U CN201720230063U CN206616462U CN 206616462 U CN206616462 U CN 206616462U CN 201720230063 U CN201720230063 U CN 201720230063U CN 206616462 U CN206616462 U CN 206616462U
Authority
CN
China
Prior art keywords
bridge deck
steel
steel bridge
fragment orbit
bridge
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201720230063.5U
Other languages
Chinese (zh)
Inventor
岳迎九
杨少军
乔雷涛
方桂芬
康炜
吴文华
文强
张蕾
周友权
冯亚成
房帅平
张鹏
张鹏举
卢皓
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Survey and Design Institute Group Ltd
Original Assignee
China Railway First Survey and Design Institute Group Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Survey and Design Institute Group Ltd filed Critical China Railway First Survey and Design Institute Group Ltd
Priority to CN201720230063.5U priority Critical patent/CN206616462U/en
Application granted granted Critical
Publication of CN206616462U publication Critical patent/CN206616462U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model is related to the bridge deck structure system that a kind of high-speed railway steel bridge upper berth sets non-fragment orbit.Non-fragment orbit is laid on existing Steel Bridge Deck, concrete bed is connected by WELDING STUDS with Steel Bridge Deck, steel bridge deck is also easy to produce fatigue crack, fatigue problem is serious, and peg bias is larger, the increase of weld seam moment of flexure finally causes the fatigue rupture of peg.The utility model in laid on crossbeam welded on steel bridge deck, steel bridge deck along bridge to PBL keys, pour on steel bridge deck and non-fragment orbit built-in fitting be installed on steel fiber reinforced concrete formation steel fiber reinforced concrete slabses, steel fiber reinforced concrete slabses, finally lay non-fragment orbit.The utility model can realize that non-fragment orbit is effectively connected with concrete bed and steel bridge deck, PBL shear connectors can save the welding sequence of peg, it is welded to by the continuous fillet weld of Size of welds very little on steel bridge deck, it is more reliable than peg local welding, than peg anti-fatigue performance more preferably, it is higher than peg bearing capacity.

Description

A kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit
Technical field
The utility model belongs to bridge structure technical field of buildings, and in particular to a kind of high-speed railway steel bridge upper berth sets no tiny fragments of stone, coal, etc. The bridge deck structure system of track.
Background technology
Because non-fragment orbit has high stability, reliability, durability, the features such as maintenance workload is small, no tiny fragments of stone, coal, etc. rail Road turns into the preferred track structure form of Develop High-Speed Railway in world wide.Both at home and abroad for laying nothing on concrete bridge This technology of tiny fragments of stone, coal, etc. track is highly developed, but the application example that non-fragment orbit is laid in LARGE SPAN STEEL BRIDGE is seldom.
The railway steel bridge that China builds early stage, using open bridge floors structure type.Repaiied in recent years in PDL Construction The a collection of LARGE SPAN STEEL BRIDGE built, it is most of to use Ballast track structure.The Long Span Railway Steel Bridge built up of foreign countries also big portion Divide and use open bridge floors and Ballast track, only have a small amount of application example on the steel truss bridge of medium and small span.
The mode that non-fragment orbit is laid on traditional Steel Bridge Deck is that non-fragment orbit is laid on concrete bed, concrete Base is connected by WELDING STUDS with Steel Bridge Deck.At home and abroad in Practical Project, fatigue crack occurs for Orthotropic Steel Bridge Deck Situation is than more serious, because WELDING STUDS is more in the solder joint of floorings, and the fatigue problem that can aggravate Steel Bridge Deck is produced.Concrete slab Shearing circulation between girder steel can also make the concrete damage of peg root, and cause peg bias increase, and then it is curved to increase weld seam Square, finally causes the fatigue rupture of peg.
The content of the invention
The purpose of this utility model is to provide the bridge deck structure system that a kind of high-speed railway steel bridge upper berth sets non-fragment orbit, adopts The mode of peg is replaced to realize that non-fragment orbit is effectively connected with concrete bed and steel bridge deck with PBL shear connectors.
The technical scheme that the utility model is used for:
A kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit, it is characterised in that:
In laid on crossbeam welded on steel bridge deck, steel bridge deck along bridge to PBL keys, pour steel fibre on steel bridge deck Non-fragment orbit built-in fitting is installed on concrete formation steel fiber reinforced concrete slabses, steel fiber reinforced concrete slabses, non-fragment orbit is finally laid.
PBL keys be along bridge to multiple tracks elongate steel plate, offer on per pass steel plate along bridge to rows of multiple PBL keys Direction across bridge is provided with hole, PBL keyholes hole runs through reinforcing bar.
Steel bridge deck bottom surface is provided with U-shaped ribbed stiffener.
Stringer is provided between the U-shaped ribbed stiffener of steel bridge deck bottom surface.
The utility model has advantages below:
Compared to the mode that non-fragment orbit is laid on traditional Steel Bridge Deck, the utility model is based on that PBL keys bearing capacity is big, ductility The good, advantage with good anti-fatigue performance, can be achieved non-fragment orbit and is effectively connected with concrete bed and steel bridge deck, PBL shear connectors can save the welding sequence of peg, be welded to by the continuous fillet weld of Size of welds very little on steel bridge deck, It is more reliable than peg local welding, it is, higher than peg bearing capacity than peg anti-fatigue performance more preferably, there is the larger market competitiveness, Economy is more superior.
Brief description of the drawings
Fig. 1 bridge deck structure system direction across bridge sectional drawings.
Fig. 2 bridge deck structures system is along bridge to sectional drawing.
Fig. 3 bridge deck structure system plans.
In figure, 1, non-fragment orbit, 2, ballastless track bed reinforcing bar, 3, ballastless track bed be connected steel with concrete bed Muscle, 4, PBL keys, 5, through reinforcing bar, 6, steel fiber reinforced concrete slabses, 7, steel bridge deck, 8, U-shaped ribbed stiffener, 9, stringer, 10, horizontal Beam, 11, PBL keyholes hole.
Embodiment
The utility model is described in detail with reference to embodiment.
The high-speed railway steel bridge upper berth that the utility model is related to sets the bridge deck structure system of non-fragment orbit, in the upper berth of crossbeam 10 If steel bridge deck 7, steel bridge deck 7 is orthotropic plate, on steel bridge deck 7 welding along bridge to PBL keys 4, PBL keys 4 are along bridge To multiple tracks elongate steel plate, offer on per pass steel plate along bridge to rows of multiple PBL keyholes holes 11, PBL keyholes hole 11 In be provided with direction across bridge run through reinforcing bar 5.20 ~ 50cm steel fiber reinforced concretes formation steel fiber reinforced concrete is poured on steel bridge deck 7 Non-fragment orbit built-in fitting is installed on plate 6, steel fiber reinforced concrete slabses 6, non-fragment orbit is finally laid.
The bottom surface of steel bridge deck 7 is provided with U-shaped ribbed stiffener 8.It is provided between the U-shaped ribbed stiffener 8 of the bottom surface of steel bridge deck 7 small vertical Beam 9.
Structure of the present utility model realizes the technical scheme that high-speed railway girder steel upper berth sets non-fragment orbit, improves no tiny fragments of stone, coal, etc. The reliability that track plates are connected with girder steel, when high-speed railway Steel Bridge Deck upper berth sets non-fragment orbit, is laid on mixed using non-fragment orbit On solidifying soil base, concrete bed is connected to form new bridge deck structure system by PBL shear connectors and Steel Bridge Deck.
Content of the present utility model is not limited to cited by embodiment, and those of ordinary skill in the art are new by reading this practicality Type specification and any equivalent conversion taken technical solutions of the utility model, are claim institute of the present utility model Cover.

Claims (4)

1. a kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit, it is characterised in that:
In crossbeam(10)Upper laying steel bridge deck(7), steel bridge deck(7)It is upper welding along bridge to PBL keys(4), steel bridge deck(7) On pour steel fiber reinforced concrete formation steel fiber reinforced concrete slabses(6), steel fiber reinforced concrete slabses(6)Upper installation non-fragment orbit is pre-buried Part, finally lays non-fragment orbit.
2. a kind of high-speed railway steel bridge upper berth according to claim 1 sets the bridge deck structure system of non-fragment orbit, its feature It is:
PBL keys(4)For along bridge to multiple tracks elongate steel plate, offer on per pass steel plate along bridge to rows of multiple PBL keys Hole(11), PBL keyholes hole(11)In be provided with direction across bridge run through reinforcing bar(5).
3. a kind of high-speed railway steel bridge upper berth according to claim 1 sets the bridge deck structure system of non-fragment orbit, its feature It is:
Steel bridge deck(7)Bottom surface is provided with U-shaped ribbed stiffener(8).
4. a kind of high-speed railway steel bridge upper berth according to claim 3 sets the bridge deck structure system of non-fragment orbit, its feature It is:
Steel bridge deck(7)The U-shaped ribbed stiffener of bottom surface(8)Between be provided with stringer(9).
CN201720230063.5U 2017-03-10 2017-03-10 A kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit Active CN206616462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720230063.5U CN206616462U (en) 2017-03-10 2017-03-10 A kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720230063.5U CN206616462U (en) 2017-03-10 2017-03-10 A kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit

Publications (1)

Publication Number Publication Date
CN206616462U true CN206616462U (en) 2017-11-07

Family

ID=60232130

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720230063.5U Active CN206616462U (en) 2017-03-10 2017-03-10 A kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit

Country Status (1)

Country Link
CN (1) CN206616462U (en)

Similar Documents

Publication Publication Date Title
CN102535355B (en) Method for reinforcing bridge structure separated steel-concrete combined truss
CN207891661U (en) A kind of medium-and low-speed maglev traffic track beam and rail system
CN204530418U (en) A kind of steel plate combination beam bridge
CN201843076U (en) Groove-shaped steel bridge deck structure of high-speed railway steel tied arched bridge
CN105839510A (en) Steel-ultra-high-performance concrete combined continuous beam bridge structure and construction method thereof
CN202416148U (en) Bridge structure of pre-stressed concrete hollow slabs
CN108824162A (en) A kind of steel_concrete composite beam and its construction method using plain plate and corrugated sheet steel mixing web
CN109958049A (en) A kind of modularization steel-is mixed to combine small box girder freely-supported continuous bridge and its construction method
CN204919302U (en) Few main girder structure of wave form steel web
CN201635007U (en) Continuous reinforcement bar connection deck structure for integrated seamless bridge
CN205443907U (en) Double track railway box web letter branching groove ellbeam
CN108532810A (en) A kind of recycled concrete superposed composite floor of steel plate-
CN205822006U (en) Steel and ultra-high performance concrete compoboard jointing
CN207597254U (en) A kind of bridge deck pavement structure of reinforcing
CN202081383U (en) Temporary support used in construction striding over existing line bridge
CN208933808U (en) Using the steel_concrete composite beam of plain plate and corrugated sheet steel mixing web
CN206616462U (en) A kind of high-speed railway steel bridge upper berth sets the bridge deck structure system of non-fragment orbit
CN208009170U (en) Plate-type ballastless track on a kind of steel truss girder bridge
CN108342980B (en) Railway suspension bridge upper bearing type steel truss bridge deck structure
CN104099859B (en) Highway and railway clad steel-mixed bondbeam
CN208668245U (en) A kind of steel-UHPC combination beam construction for cable-stayed bridge
CN105696455A (en) Box type web simply supported U-shaped girder of double-track railway
CN104032862B (en) Assembled girder steel seam line L shape mixing coupled wall and construction method thereof
CN111733697A (en) Prefabricated assembled composite slab structure